DIRECTORATE GENERAL NEW RENEWABLE ENERGY AND ENERGY CONSERVATION
MINISTRY OF ENERGY AND MINERAL RESOURCESREPUBLIC OF INDONESIA
New Energy and Renewable Energy
(Law No. 30/2007 of Energi)
Source of New Energy:
Nuclear, hydrogen, coal bed methane, liquefied coal, and gasified coal
Source of Renewable Energy:
Geothermal, bioenergy, wind, solar, hydropower, and oceanic power.
National Energy Policy of Indonesia
Presidential Regulation No. 5/2006 on National Energy Policy
The role of each type of energy to the national energy consumption in 2025:
New + Renewable Energy 17%
bio-fuels > 5%geothermal energy > 5% new energy and other renewable energy > 5%liquefied coal > 2%
oil < 20%natural gas > 30%coal > 33% Fossil Energy 83%
NRE,4.79%
Coal26.38%
Oil46.93% Gas
21.90%
National Energy Mix 2011
(current condition)
Gas30 %
Oil20%
NRE,17%
Coal33%
National Energy Mix 2025
(Presidential Reg. 5/2006)
Oil30%
Coal22%
Gas23%
NRE25%
National Energy Mix 2025
Vision 25/25
MAIN POLICY
1. Energy Conservation: to improve efficiency in energy utilization from up-
stream up to down-stream (Demand Side) i.e. industrial, transportation,
household and commercial sector
2. Energy Diversification: to increase new renewable energy share in
national energy mix (Supply Side). i.e.
New Energya. Liquefied Coal,b. Coal Bed Methane,c. Gasified Coal,d. Nuclear,e. Hydrogen.
Renewable Energya. Geothermal,b. Bioenergy,c. Hydro,d. Solar,e. Wind,f. Ocean.
ENERGY RESERVES AND PRODUCTION
NO NON FOSSIL ENERGYRESOURCES
(SD)
INSTALLED CAPACITY
(KT)
RATIO KT/SD(%)
1 2 3 4 5 = 4/3
1 Hydro 75.670 MW 6.654,29 MW 8,8%
2 Geothermal 29.038 MW 1.226 MW 4,2%
3 Mini/Micro Hydro 769,69 MW 228,983 MW 29,75%
4 Biomass 49.810 MW 1.618,40 MW 3,25 %
5 Solar Energy 4,80 kWh/m2/day 22,45 MW -
6 Wind Energy 3 – 6 m/s 1,87 MW -
7 Uranium 3.000 MW *) 30 MW **) 1.00
*) only in Kalan – West Kalimantan
**) non energy, only for research
NO FOSSIL ENERGY RESERVES PRODUCTION
PER YEAR
RESERVE TO PRODUCTION
RATIO
1 2 3 4 5 = 4/3
1 Oil 4.0 billion barel 347 million barel 11 years
2 Gas 104.71 TSCF 3212 BSCF 32 years
3 Coal 28 billion ton 329 million ton 85 years
7
Year
1980 1985 1990 1995 2000 2005 2006 2007 2008 2009 2010 2011
Electrification
Ratio8% 16% 28% 43% 53% 62% 63% 64.34% 65.10% 65.79% 67.15% 72.95%
NAD87,72%
Sumut83,98%
Sumbar77,72%
Riau 78.17%
Sumsel72,71%
Bengkulu71,15%
Babel82,26%
Lampung70,40%
Jakarta99,99%
Banten68,18%
Jabar70,72%
Jateng77,31%
Jambi76,54%
DIY75,19% Jatim
72,05%
Bali69,77%
NTB52,88%
NTT39,92%
Kalbar65,37%
Kalteng67,28%
Kalsel75,65%
Kaltim63,44%
Sulut73,21%Gorontalo
54,69%
Sulteng64,84%
Sultra54,46%
Sulsel74,18%
Malut70,34%
Maluku70,80%
Papua29,25%
Category :
> 60 %
41 - 60 %
20 - 40 %
Sulbar64,12%
Kepri91,52%
Papua Barat58,24%
ELECTRIFICATION RATIO
HYDRO POWER PLANT DEVELOPMENT VS
NATIONAL ENERGY POLICY PLAN 2010-2015
No Development 2010 2011 2012 2013 2014 2015
I Plan based on NEP:
- Installed Capacity(MW) 5.891 6.071 6.251 6.551 6.901
II Development
1. Added Capacity (MW) 204 -- -- 213 1.300
2. Installed Capacity (MW) 5.711 5.915 5.915 5.915 6.128 8.688
III Development/NEP Plan (%) 100,4 97 95 94 125
Note: - CF Hydro Power Plant = 40%
No Development 2010 2011 2012 2013 2014 2015
I Plan based on NEP:
- Installed Capacity(MW)20
30 190 2.005 5.185
II Development
1. Added Capacity (MW) -- 10 60 115 530
2. Installed Capacity (MW) 20 20 30 90 205 735
III Development/NEP Plan (%) 100 100 47 10 14
SOLAR POWER PLANT DEVELOPMENT VS
NATIONAL ENERGY POLICY PLAN 2010 – 2015
Note: - CF Solar Power Plant = 40%
No Geothermal Development 2010 2011 2012 2013 2014 2015
I Plan based on NEP:
- Installed Capacity(MW) 7 22 90 258 691
II Development
1. Added Capacity (MW) 1 15 68 218 433
2. Installed Capacity (MW) 2 3 18 86 304 737
III Development/NEP Plan (%) 43 82 96 117 106
DEVELOPMENT OF WIND ENERGY AND OTHER
RENEWABLE ENERGY 2010 – 2015
Note: - CF Wind Power Plant = 40%
PROGRAM OF SOLAR ENERGY, WIND AND
OCEAN ENERGY
1. Rural Electricity: increasing rural community
accessibility to electricity; targeting electricity demand
in remote area
2. Urban Electricity: targeting middle and high class
household, real estate, office and commercial
buildings, hotel and resort, industry and others
3. Electricity for Frontier Island: targeting community in
the island located along the country border line
GOVERNMENT POLICIES ON OTHER NEW AND
RENEWABLE ENERGY
1. Ministry of Finance Regulation No. 21/PMK.011/2010
Concerning on Tax and Custom Facilities for
Renewable Energy Utilization;
2. Ministry of Finance Regulation Number
130/PMK.011/2011 Concerning on Provision of
Exemption Facilities or Reduction of Income Tax.
3. Ministry of Energy and Mineral Resources Regulation
Number 04 Year 2012 Electricity Power Purchased
Price from Renewable Generations (small and medium
scale) and Excess Power
Go Green Indonesia !green energy, future energy
Jalan Jenderal Gatot Subroto, Kav. 49 Jakarta 12950; Telp: 021-52904235; 5250575; Faks: 021-25529106; 25529212
Email: [email protected] ; [email protected]
MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA
DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY, AND ENERGY CONSERVATION
Thank You
www.ebtke.esdm.go.id