Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr...
-
Upload
melina-harrell -
Category
Documents
-
view
212 -
download
0
Transcript of Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr...
![Page 1: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/1.jpg)
DinagatElec. Coop
Loreto Municipality
8hrs410KW
16 hrs1050KW
A Case Study
NPC
440 kWDiesel Pwr Plant
1430KW DPP
North
South
![Page 2: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/2.jpg)
BARANGAY LEVEL HOUSEHOLD CONNECTIONSMunicipality No. of Brgys. Energized % Potential Actual Connections
%NORTH EDSLoreto 10 4 40 1395 406 29Tubajon 9 4 44 1078 213 20Sub-total 19 8 42 2473 619 25SOUTH EDSBasilisa 27 5 19 3743 314 8Cagdianao 14 4 29 2134 414 19Dinagat 12 8 67 1558 453 29Libjo 16 7 44 2575 345 13San Jose 12 11 92 5046 2051 41Sub-total 81 35 43 15056 3577 24TOTAL 100 43 43 17529 4196 24
![Page 3: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/3.jpg)
YEAR DEMAND (MWH) 1/ SUPPLY (MWH) 2/ SHORTAGE (MWH)1998 4,227 1,541 2,6861999 5,495 1,787 3,7082000 7,143 2,227 4,916
1/ source : National Electrification Administration reported by DIELCO 2/ Based on DIELCO's historical data
![Page 4: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/4.jpg)
LGU
Php
DinagatElec. Coop
350KWHydro
North Area
24hrs
440KW DPP
Project Objective
![Page 5: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/5.jpg)
DinagatElec. Coop
Loreto Municipality
8hrs
24 hrs
A Case Study
NPC
440 KW +
1430 KWDPP
350KW
LGU
![Page 6: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/6.jpg)
Brief Project Profile
Type: Mini HydroInstalled Capacity: 350KWProduction Cost: Php 2.47 / KWhAve. Annual Energy production 2716 MWHEconomic Life 35 yearsElectricity buyers Dinagat Electric Cooperative
Krominco Inc (mining company)
![Page 7: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/7.jpg)
DBP NRE Project (mini hydro) - A potential CDM Project
DBP LGU
Php
![Page 8: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/8.jpg)
Loan Term SheetAmount: 40,000,000.00 (Equity: 10% of Project Cost)
Tenor : 15 yrs Interest: AAA category (8%.- 8.5%) Quarterly Payments Principal: 3 yr. Grace Quarterly Payment Security: I.R.A.Assignment PPA Assignment Asset Insurance
Fund Source: DBP
![Page 9: Dinagat Elec. Coop Loreto Municipality 8hrs 410KW 16 hrs 1050KW A Case Study NPC 440 kW Diesel Pwr Plant 1430KW DPP North South.](https://reader036.fdocuments.in/reader036/viewer/2022083005/56649f1b5503460f94c31831/html5/thumbnails/9.jpg)
Major DBP Requirements in the Project
1. Reconnaissance Permit2. Feasibility Study2. E.C.C. or CNC / IPR / NWRB3. Financial and Economic Analysis4. Borrowers Financial Statements 5. Consultant’s Credentials6. Formal Letter of Proposal/ Application7. Appropriate DBP Forms