Digital Railway
Programme
Phil Bennett
Commercial Director Digital Railway
10th November 2016
Produced in partnership with…
The digital railway brings together systems, technology and business
change in an integrated way
It will focus on areas that offer best value for money, balancing benefits with affordability.
European Train Control System (ETCS)
allows trains to run closer together and to travel at
their best speeds whilst maintaining safe braking
distances.
Traffic Management (TM)
maximises performance as trains flow across the
network, maximising the throughput that existing
track can support and adapting in real-time as
network conditions change to aid rapid recovery.
Connected Driver Advisory Systems
(CDAS) + Automatic Train
Operation (ATO)
provides decision support to drivers in the cab so that
they have the information they need at the right time
to boost performance and safety.
Telecoms + Data
through FTN and GSM-R, will underpin and connect
all these systems.
Industry Readiness
builds capacity and capability and develops expertise. Enables the workforce and industry to adopt new technologies and
ways of working, build digital capabilities and maximise the benefits of the overall systems.
2
The digital railway enables us to manage and operate the railway in a
very different way
Manage and control trains better We can safely and cost effectively cater for increasing demand for rail
travel and freight paths, automating control of trains to smooth the flow and
improve performance.
Manage our physical infrastructure better The system provides data that can be used to operate and maintain these
assets in a predict and prevent way, aligning with the future operating
model for how the industry will work together to maintain and operate the
railway.
Provide better information The open data generated by a digital railway will allow other parties to
provide better, more targeted information about delays. It will provide
greater level of real-time detail about the locations of trains between stations.
3
It also enables the industry to…
The digital railway programme will…
Key Digital Railway Technologies
Connected Driver Advisory
System (C-DAS)
In-cab digital decision
support tools give drivers
the information they need
at the right time.
Traffic Management (TM):
TM maximises network
performance by managing
the movement of trains
more effectively.
1
European Train Control System (ETCS): Scalable digital signalling which is easier than conventional signalling to deploy and which enables more trains to run safely
on the track.
2 3
Readiness
Outcome
Could be delivered today For future development and integration
ETCS L2 TM C-DAS ETCS L3 COMPASS ATO
1. Improved safety
2. Improved capacity
3. Better customer information
4. Better connectivity
5. Better business information
6. Improved performance
7. Increased network availability
8. Reduced journey time
9. Better environmental sustainability
10. Lower whole industry / whole life
costs
11. Increased global leadership and
skills
Technology readiness level 7 7 5-7 3 3 3
Key: Limited relevance Medium relevance High relevance Technology readiness level: Estimate of technology
maturity from a low score of 1 (basic principles observed and
reported) to a high score of 9 (active technology proven
through successful use in an operational environment)
Why is Digital Railway Required?
Britain’s railways are in high demand
0
200
400
600
800
1000
1200
1400
1600
1800
1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015
Total passenger journeys (Millions per annum)
7
Passenger numbers have doubled since
1996 and are set to double again over the
next 25 years.
We are running more trains and adding
more carriages, but with these changes
alone we cannot meet projected
demand
800
850
900
950
1,000
1,050
1,100
500,000
550,000
600,000
650,000
700,000
750,000
800,000
2011 2012 2013 2014 2015
Nu
mb
er
of
train
s
Seats
an
d s
tan
din
g c
ap
acit
y
Trains, seats and capacity on journeys from all major cities into London in the 3 hour morning peak
Seats Capacity # Trains
And the DfT’s Rail Freight Study also
shows the growing demand for rail
freight services in recent years.
The railway is full, which affects performance
This gradual decline in train performance
is likely to continue as the railways get
busier and busier, unless we find a way to
run more trains and improve how we
manage our existing network.
* The public performance measure (PPM) shows the percentage of trains
which arrive at their terminating station on time. It combines figures for
punctuality and reliability into a single performance measure. It is the
industry standard measurement of performance.
More passengers standing in the
vestibule and getting on and off
means the train takes longer to
stop, set down, pick up and depart
at platforms.
350,000
400,000
450,000
500,000
550,000
600,000
650,000
50%
60%
70%
80%
90%
100%20
03/0
4…
20
04/0
5…
20
05/0
6…
20
06/0
7…
20
07/0
8…
20
08/0
9…
20
09/1
0…
20
10/1
1…
20
11/1
2…
20
12/1
3…
20
13/1
4…
20
14/1
5…
20
15/1
6…
Tim
eta
ble
d t
rain
s p
er
peri
od
% P
PM
Su
ccess
National PPM* vs. Train Count
PPM
Train Count
13 per. Mov. Avg. (PPM)
13 per. Mov. Avg. (Train Count)
Data Source:
BOPSS PPM
20
25
30
35
40
45
15,000
17,000
19,000
21,000
23,000
25,000
27,000
29,000
06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16
Dela
y p
er
incid
en
t
No
of
incid
en
ts
No. of incidents - 13 periodaverage
Delay per incident - 13 periodaverage
No of incidents vs Delay per incident
Meanwhile, the practical reality for drivers involves driving on yellows/double yellows, and the adoption of defensive
driving techniques that (rightly) prioritise safety over shorter headways.
When the system is above capacity, if a
train misses its allocated time at several
stations on the route, passengers are
significantly late getting to their
destination and the delay ripples to
other parts of the network throughout the
day. As passenger numbers grow, overall train punctuality will decline.
8
Long-term trends mean that this problem is most acute in some
of our major urban areas
Long term demographic trends like
population growth and urbanisation mean
more people travelling within and between major
cities and city regions. People in urban areas use
public transport to get to work…
… but major stations like Birmingham
New Street, Kings Cross, Leeds, Euston,
Manchester Piccadilly, Paddington,
London Victoria and London Bridge which
connect into and between our major
urban areas are already full at peak
times.
Better performance and additional
capacity will enable more people to travel more
reliably into and between cities.
Network congestion extends over a
widely defined catchment of the major
cities, especially in the morning and evening peak
periods.
Crowding heat map based on peak
passenger numbers and load factor 46
41
59
60
EdinburghGlasgow
Birmingham
ManchesterLeeds
Liverpool
Cardiff
Bristol
Sheffield
Nottingham
Leicester
Newcastle
Aberdeen
London
9
Options to improve capacity are increasingly limited
There are broadly four ways of improving capacity on the railway. But as the analysis below shows, two of the options are
no longer available where the problems are most significant. Our roads are very congested, and we have exhausted
options that lengthen trains and platforms where it is most needed. Building new tracks into our biggest, busiest cities
would be hugely expensive and disruptive (and in some places is simply not possible). We need to find a way to get more
performance out of our existing railway and manage our network more efficiently.
Cost of deliv
ering c
apacity
Conv.
Digital + Conv.
Do nothing to address capacity challenges: rely on other modes of transport
Less disruptive
conventional
enhancements,
marginal
incremental
capacity e.g.
lengthen trains
Highly disruptive
conventional
enhancements e.g.
build a new track
(offers a step
change in capacity
vs option 2)
We have four options…
• Do nothing to address capacity
challenges, rely on other modes of
transport e.g. road
• Less disruptive conventional
enhancements e.g. lengthen trains
• System upgrade: Digital
technologies and enabling
conventional e.g. grade separation
• Highly disruptive conventional
enhancements e.g. build a new
track
In the most congested areas major
roads are full and we have already done
what we can with conventional options
like lengthening trains.
In these areas we now face a choice:
Digital + Enabling Conventional
system upgrade
Major Conventional
1
2
3
4
System
upgrade:
Digital
technologies
and enabling
conventional
e.g. grade
separation,
station works,
junctions etc
3
4
1
2
3
4
10
In the most congested areas we have exhausted these options
Glasgow
Edinburgh
59
60
Derby
Crewe
Manchester
York
Leeds
Cambridge
41
ElyBirmingham
Norwich
Peterborough
46
Southampton
Brighton
Dover
LONDON Southend
CardiffReading
Our studies show digital railway interventions and enabling conventional
is the clear option to address the challenge on our network
Where capacity is needed and we have exhausted low disruption conventional enhancements, a
system upgrade of digital + enabling conventional works is the best option to address the
challenge. Our case studies show it will deliver capacity and performance improvements sooner
and at comparable or lower cost than conventional only works. It does this through unlocking the
maximum capacity potential through system upgrade.
Cost of deliv
ering c
apacity
1920 - 1995 1995 – 2015 Future
Conv.
Digital + Conv.
Conventional
only:
Lengthen
trains and
platforms,
infrastructure
interventions
Enabling
Conventional*:
e.g. Junctions,
grade separation
System
upgrade:
Digital: ETCS,
TM, C-DAS,
ATO
Major
conventional:
Major
infrastructure
programmes
and network
configuration
e.g. building
new viaducts
Digital + Conventional
Planned Digital +
Conventional
Planned infrastructure
programmes
We are here:
In most places
where capacity
is needed we
have already
done what we
can
Now we face a
choice:
System upgrade
(Digital + Enabling
Conventional) or
Major Conventional
*DR needs to be accompanied by other measures to generate the benefits that have been obtained in a metro context. For example
new and uniform train-fleets designed for shorter dwell times, junction improvements to reduce conflictions, station works etc. Digital
Railway will therefore need to work closely with industry partners to realise its benefits.
HS2
Crossrail 2
11
Do nothing to address capacity challenges: rely on other modes of transport
ECI Programme
Team members selected based on knowledge and experience and cross
industry teams formed to support seven work streams:
1. Traffic Management
2. Cost Reduction
3. ERTMS Specification Review
4. ERTMS Capacity Proof
5. ERTMS Ready Spec
6. Working together
7. Trans Pennine Upgrade
Each work stream has a team leader appointed from the supplier
nominations.
The work streams are tasked with completing their work between October
and December 2016.
Procurement Approach
Collaborative Strategy
14
Typical Packaging Strategy
15
Relationship Structure
16
Collaborative Relationship
Relationship Management
Plan
Client
Prog Mngt
System Integration
Business Change
GMS-R
FTNx
ETCS,
TM & C-DAS
Compass
Enablement
Civils
Level Crossings
Removals
Train Fitment
Freight Fitment
OTM Fitment
Data
Find Out More
Digital Railway website – www.digitalrailway.co.uk
Source of materials and background info on previous events
Notice of regular digital railway supplier events
Programme news stories
Industry groups & bodies
Rail Delivery Group
Rail Supply Group
Railway Industry Association
17