Digital Railway – Joint Development Group Engineering Rules Gap Analysis and Impact Assessment Report
Prepared By: Keith Attwood, Professional Head of Signalling, Alsto
Prepared By:
Jon Hayes, Principal Consultant, Systra
Date:03/09/2018 Prepared By:
Prepared By:
Prepared By:
Prepared By:
Unrestricted
Engineering Rules
Gap Analysis and Impact
Assessment Report
Unrestricted 2
Document Control Electronic file reference: 147883-NWR-REP-CPO-000001
Disclaimer
Group Digital Railway has used its best endeavours to ensure that the content, layout and text of this document are accurate, complete and suitable for its stated purpose. It makes no warranties, expressed or implied, that compliance with the contents of this document will be sufficient to ensure safe systems of work or operation. Group Digital Railway will not be liable to pay compensation in respect of the content or subsequent use of this document for any purpose other than its stated purpose or for any purpose other than that for which it was prepared, except where it can be shown to have acted in bad faith or there has been wilful default. © Copyright 2017 Group Digital Railway. This document is the property of Group Digital Railway. It shall not be reproduced in whole or in part, nor disclosed to a third party, without the written permission of Group Digital Railway. Document owner: Joint Development Group (JDG) – [email protected] Distributed to: Public Issue/Version: 1.0 Feedback to be provided to: Christos Panou [email protected] and Joint
Development Group (JDG) - [email protected]
Version Comments Updated By Reviewed By Date
0.7 Final Draft Submitted DT 05/09/2018
0.8 Reviewed and updated by Network
Rail for issue. BY
CP 14/09/2018
0.9 Appendices added to main body of
report for issue. CP
08/10/2018
1.0 Final Version for publication JDG Team AA 15/10/2018
Unrestricted 3
Contents
1 EXECUTIVE SUMMARY ........................................................................... 6
2 INTRODUCTION ....................................................................................... 7
2.1 JOINT DEVELOPMENT GROUP (JDG) ............................................................................ 7
2.2 PROJECT BACKGROUND ................................................................................................ 8
2.3 PROBLEM STATEMENT ................................................................................................... 8
2.4 SYSTEM UNDER CONSIDERATION ................................................................................. 9
2.5 PROCESS FOLLOWED ................................................................................................... 10
2.6 DELIVERY TEAM............................................................................................................. 12
2.7 OUTPUTS ........................................................................................................................ 13
3 GAP ANALYSIS OF STANDARDS LIBRARY ........................................ 15
3.1 OVERVIEW ...................................................................................................................... 15
3.2 STANDARDS REVIEWED ............................................................................................... 15
3.3 SUMMARY OF GAPS IDENTIFIED & THEIR IMPACT .................................................... 15
4 GAP ANALYSIS OF INDIVIDUAL STANDARDS .................................... 19
4.1 OVERVIEW ...................................................................................................................... 19
4.2 STANDARDS APPLICABLE TO DIGITAL RAILWAY TECHNOLOGIES ........................ 19
4.2.1 INDUSTRY STANDARDS IDENTIFIED AS APPLICABLE TO DIGITAL RAILWAY ... 19
4.2.2 NETWORK RAIL COMPANY STANDARDS IDENTIFIED AS APPLICABLE TO
DIGITAL RAILWAY .................................................................................................................. 21
4.3 SUMMARY OF GAPS / CONFLICTS IDENTIFIED .......................................................... 29
4.4 DETAILED ASSESSMENT OF GAPS / CONFLICTS AND THEIR IMPACTS ................. 31
5 LESSONS LEARNT FROM EXISTING DR PROJECTS ......................... 32
5.1 SYDNEY AUSTRALIA ..................................................................................................... 32
5.1.1 ISSUES ..................................................................................................................... 32
5.1.2 LESSON LEARNED .................................................................................................. 33
5.2 CAMBRIAN EARLY DEPLOYMENT SCHEME (EDS) ..................................................... 33
5.2.1 ISSUES ..................................................................................................................... 33
5.2.2 LESSON LEARNED .................................................................................................. 35
5.3 TASS ................................................................................................................................ 35
5.3.1 ISSUES ..................................................................................................................... 35
5.3.2 LESSON LEARNED .................................................................................................. 35
5.4 THAMESLINK .................................................................................................................. 36
Unrestricted 4
5.4.1 ISSUES ..................................................................................................................... 36
5.4.2 LESSON LEARNED .................................................................................................. 36
5.5 CROSSRAIL .................................................................................................................... 36
5.5.1 ISSUES ..................................................................................................................... 36
5.5.2 LESSON LEARNED .................................................................................................. 36
5.6 DOCUMENTATION FROM PREVIOUS PROJECTS ....................................................... 37
6 RECOMMENDATIONS ........................................................................... 39
6.1 GENERAL APPROACH ................................................................................................... 39
6.2 PROPOSED NEW STANDARDS AND GUIDANCE ........................................................ 40
6.2.1 HIGHEST PRIORITY ................................................................................................. 40
6.2.2 SECOND PRIORITY ................................................................................................. 43
6.2.3 THIRD PRIORITY ...................................................................................................... 45
6.2.4 FOURTH PRIORITY .................................................................................................. 46
6.2.5 FIFTH PRIORITY ...................................................................................................... 47
6.2.6 SIXTH PRIORITY ...................................................................................................... 48
6.2.7 LOWEST PRIORITY .................................................................................................. 48
6.3 GAPS / CONFLICTS IN EXISTING INDUSTRY STANDARDS AND THEIR IMPACTS ... 49
6.4 GAPS / CONFLICTS IN EXISTING NETWORK RAIL STANDARDS AND THEIR
IMPACTS .................................................................................................................................... 52
7 NEXT STEPS .......................................................................................... 61
7.1 INTRODUCTION .............................................................................................................. 61
7.2 DEDICATED PROJECT TEAM. ....................................................................................... 61
7.3 OUTPUT REVIEW ............................................................................................................ 61
7.4 DIGITAL STANDARDS SUITE ......................................................................................... 61
7.5 ROUGH ORDER OF MAGNITUDE ESTIMATES OF WORKLOAD ................................. 62
7.5.1 OVERVIEW ............................................................................................................... 62
7.5.2 DEVELOPMENT OF PROPOSED NEW STANDARDS ............................................. 62
7.5.3 UPDATE OF INDUSTRY STANDARDS .................................................................... 63
7.5.4 UPDATE OF NETWORK RAIL COMPANY STANDARDS ......................................... 63
APPENDIX A: ANALYSIS OF INDUSTRY STANDARDS & GUIDANCE ..... 64
APPENDIX B: ANALYSIS OF NETWORK RAIL COMPANY STANDARDS & GUIDANCE ................................................................................................... 64
APPENDIX C: EXCLUDED NETWORK RAIL COMPANY STANDARDS & GUIDANCE ................................................................................................... 64
APPENDIX D: GLOSSARY .......................................................................... 65
Unrestricted 5
APPENDIX E: REFERENCES ...................................................................... 68
Unrestricted 6
1 Executive Summary Deployment of Digital Railway (DR) technologies - European Train Control System (ETCS), Traffic
Management (TM) and Connected Driver Advisory System (CDAS) - on the GB rail network
requires modifications to existing industry and Network Rail company standards. Working within the
DR Interim Joint Delivery Group (IJDG), a team of subject matter experts from three different
suppliers and Network Rail reviewed the current standards library and identified the changes
needed to support DR roll out as well as how to implement those changes in a cost effective
manner.
The key recommendation from this work is that a suite of new DR standards should be developed to
complement, and where necessary take precedence over, existing standards. Analysis of the gaps
in the current library and lessons learnt from previous DR projects indicate that this is a more cost
effective approach to addressing gaps and conflicts in standards than attempting to update them on
an individual basis. The new standard suite should address the following areas (listed in order of
decreasing priority).
1. The processes by which DR systems are designed and installed.
2. Commissioning DR systems, management of DR geographic data and parameters.
3. How ETCS functionality is applied in GB and associated operational procedures managed.
4. Consistency of TM user requirements and interfaces.
5. Maintenance of DR technologies.
6. Requirements for supporting telecommunications systems.
7. User requirements for CDAS.
Unrestricted 7
2 Introduction
2.1 Joint Development Group (JDG) Building on the success of the previous Early Contractor Involvement (ECI) work streams, the Digital
Railway Programme (DRP) developed the concept of a Joint Development Group (JDG). The JDG
seeks to leverage the breadth and depth of technical competencies that exist in the supply chain to
inform a diverse industry opinion and respond to novel and ambiguous problem statements that
emerge within the DRP. The core concept behind the JDG is to bring together a community of
suppliers with a wide range of skills and capabilities, each able to be called upon / invited to support
the DRP’s development activities. This new way of working allows the DRP to utilise the diversity of
thinking from the supply chain on a variety of problem statements. For the remainder of CP5, the JDG
will be in its interim phase (IJDG) during which the concept and operating model will be validated prior
to a solution being locked in CP6.
A combination of ECI led to the JDG end to end process being developed. Figure 1 shows each step
with descriptions.
Figure 1: JDG commissioning process
Customer will approach JDG core management team with a problem statement. The JDG work with the customer to convert the problem statement into a capability request.
Instructions regarding the submission process will be included in the capability request email. Suppliers will be asked to populate a submission form
The core management team will issue the capability request, evaluation criteria, submission form and NR03 construction services agreement via email
All competing suppliers will be notified of the evaluation outcome and awarded suppliers will be issued an NR03 construction services agreement for execution. A kick off meeting is convened to capture deliverables and assign responsibilities.
JDG core management team use a simplified process whereby only submission forms are evaluated. There will be no interview component
Unrestricted 8
2.2 Project Background The DRP is developing a generic suite of ‘Customer Requirement Specifications (CRS)’ to provide a
baseline to ensure that the use of Digital Railway (DR) technologies on any individual deployment
project will integrate and be compatible across route boundaries. These DR systems will not exist in
isolation on the rail network and will need to interact with a variety of other systems, which may include
both existing systems and DR systems.
The Generic CRS are intended to promote the development of technically, operationally and
environmentally compatible solutions, which are safe and secure, and which could be deployed
across Great Britain’s rail network to maximise the benefits of adopting DR technologies. The Generic
CRS include functional and non-functional process requirements that will be utilised to form the project
specific requirements for a DR application including the applicable ‘Engineering Rules’.
Engineering Rules, in the context of the CRS, can be described as the relevant Network Rail
Company and Industry technical, process and engineering management standards, which are still
deemed applicable for the delivery of the following DR technologies:
• European Train Control System (ETCS) Level 2 – No Signals,
• Traffic Management (TM),
• Connected Driver Advisory System (CDAS).
2.3 Problem statement This report has been produced in response to the following problem statement that Network Rail set
the Interim Joint Development Group (IJDG).
‘Limited work has been undertaken by Network Rail to review, identify and adapt current
project delivery processes and Command Control and Signalling standards to suit ETCS, TM
and CDAS applications. Network Rail is keen to leverage the interim Joint Development
Group (IJDG) to enable clarity and definition of the applicable Engineering Rules to project
and programme teams across its business.
Whilst it is understood that certain commercial arrangements may have an impact on the
delivery of such DR schemes, for this exercise it will remain a generic activity. It is assumed
that schemes with a mixture of DR and conventional signalling technologies are excluded
from this exercise. However, it is noted that some findings for ETCS provision, as a result,
may be applicable.’
Unrestricted 9
2.4 System under consideration For the purposes of this study, the system under consideration is the ‘end state’ DR, i.e. a line
signalled with ETCS Level 2 where lineside signals are not provided and equipped with TM and
CDAS. Figure 2 illustrates the functional architecture of this system. For further details see Ref. 1.
Figure 2: High Level System Architecture
Unrestricted 10
2.5 Methodology Figure 3 illustrates the process followed in addressing this problem statement.
Figure 3: Process Followed
Network Rail
Company
Standards
Input
Standard
s
Update & Extension
of Preliminary
Assessment
Network Rail Preliminary
Assessment (02/10/2015)
Categorisation of
Standards &
Assignment to SMEs
Initial Filter of
Standards by SMEs
GAP Analysis of
Standards Library
Proposed new standards and
guidance
(Section 6.2)
Gaps in Standards Library &
their impacts
(Section 3)
SME Clause by
Clause Analysis of
Filtered Standards
Standards Relevant to DR
(Section 4.2)
Gaps / conflicts in specific
standards & their impacts
(Sections 4.3 & 4.4)
Railway Group
Standards &
Forms
Railway
Industry
Standards
Rule Book
Modules &
Forms
Industry Codes
of Practice Industry
Guidance
Notes
Industry Good
Practice
Guides
Rule Book
Manuals &
Handbooks
Industry Standards
Activity
Input provided to
delivery team.
Output
Key
Gaps / conflicts in existing
standards & their impacts (Sections 6.3 & 6.4)
This Report
Unrestricted 11
Railway industry (Ref. 2) and Network Rail company standards (Ref. 3) were taken as inputs along
with Network Rail’s preliminary assessment (Ref. 4) identifying standards impacted by ETCS. The
first task was to Update and Extend this earlier analysis as follows:
• independent ‘sense check’ of earlier analysis;
• update to reflect new standards / standards changes between 02/10/2015 (the date of the
preliminary analysis) and 26/06/2018 (the date of the current analysis);
• extension to identify standards potentially impacted by TM and CDAS as well as by ETCS.
This task was conducted at a high-level based on standards titles with the aim of removing
standards that are definitely not impacted by DR technologies (ETCS, TM, CDAS) rather than
definitively identify those that are.
Gap analysis of standards library: the list of standards applicable to DR was then reviewed to
identify gaps in the coverage of existing standards with respect to DR schemes. Gaps in similar
areas were grouped together to form proposed new standards.
Categorisation of standards and assignment to Subject Matter Experts (SMEs): in parallel, the
existing standards potentially impacted by DR were split into the following categories.
• Industry Standards
• Network Rail company standards in category 1: Scheme Development – Design
• Network Rail company Standards in category 2: Detailed Design
• Network Rail company Standards in category 3: Implementation / Construction / Testing
• Network Rail company Standards in category 4: Maintenance / Operations
• Network Rail company Standards incategory 5: Traffic Management
• Network Rail Company Standards in category 6: Telecoms
• Network Rail Company Standards in category 7: Other – processes, configuration
management, method of deployment, electromagnetic compatibility, etc.
• Network Rail Company Standards category in 8: Interfaces with conventional signalling
Industry standards and Network Rail company standards in categories 1 – 7 were each assigned to
an SME for the particular category.
Standards in category 8 were not assessed further as they are not impacted by the DR end state –
the system under consideration in this review. They are, however, likely to be impacted by practical
DR schemes through fringes with other signalling technologies and / or through overlay / underlay
solutions that use lineside signals alongside ETCS.
Initial filtering of standards by SMEs: each SME looked at the contents of each of their assigned
standards to assess whether it was relevant to each of the DR technologies and asses whether a
detailed gap / conflict analysis review was required.
SME clause by clause analysis of filtered standards: where a detailed gap / conflict analysis
review was required, the SME read the standard and provided a section by section / clause by
clause commentary on gaps with respect to DR technologies and the impact of those gaps.
Unrestricted 12
2.6 Delivery team
Name Organisation Role
Pareisse Wilson Arcadis Problem Statement Project Manager
Dan Holder Network Rail Problem Statement Owner
John Alexander Network Rail Principal Engineer
Christos Panou Network Rail Senior Project Engineer
Bernard Yeo Network Rail Project Engineer
Qiang Zhou Network Rail Project Engineer
Dominic Taylor SYSTRA SME + Report Author
Jon Hayes SYSTRA SME
Keith Attwood Alstom SME
Chris Pearson Alstom SME
Mark O’Neil Amey SME
Charlie White Amey SME
Unrestricted 13
2.7 Outputs In accordance with requirements initially placed on the IJDG, this report provides the following
outputs.
• Review all Command, Control and Signalling (CCS) company and industry standards
including their content and clauses.
Sections 3.2 lists the standards that were reviewed. Section 4.2 describes where a clause
by clause review was carried out on specific standards that were identified as relevant to DR
in the initial review.
• Undertake a GAP analysis / impact assessment of all current CCS company and industry
standards.
The outputs of gap analysis / impact assessment are summarised in Sections 3.3 (gaps in
standards library) and Section 4.3 (gaps in individual standards). Further details are
provided in Appendices A & B.
• Provide a definition of the standards applicability to DR schemes with respect to the DR
technologies described above.
Section 6.2 recommends proposed new standards applicable to the DR technologies
described whereas Section 4.2 lists the existing standards that are applicable.
• Identify conflicts and requirements for deviation.
Sections 6.3 and 6.4 identifies conflicts in standards applicable to DR technologies.
Creation of new DR stations is recommended as the most economic path for addressing
deviations.
• Review all process and engineering management standards currently undertaken in the
delivery and assurance of conventional CCS projects.
Process and engineering management standards were considered, along with CCS
standards, as described in Sections 3.2.
Unrestricted 14
In accordance with DR’s requirements for this GAP analysis / impact assessment report, the
following topics are addressed.
• Review of all current standards and classification as to whether the standards require
change or are not applicable in consideration of the delivery of the following DR
technologies:
o ETCS Level 2 – No Signals,
o TM (All types),
o CDAS.
See Sections 3 and 4.
• Lessons learnt from previous DR projects.
See Section 5.
• Set of recommendations such as new standards required.
See Section 6.
• Methodology for the change or amendments of current standards.
See Section 7.
• Worked example of how this change could occur.
See Appendices A & B.
• Next steps for DR and process.
See Section 7.
Unrestricted 15
3 Gap Analysis of Standards Library
3.1 Overview This section describes the gap analysis conducted on the existing Standard Library and output
‘Gaps in Standards Library and their impacts.’
3.2 Standards reviewed The following standards were reviewed.
• All Railway Group standards and Guidance Notes.
• All Rule Book Modules.
• All Railway Industry Standards and Industry Good Practice Guides.
• All Industry Codes of Practice.
• All Network Rail Company standards listed in the Network Rail preliminary assessment.
• All Network Rail Company standards published after 02/10/2015 (the date that the
preliminary assessment was carried out).
Note that the Network Rail preliminary assessment listed only ~10% of all Network Rail company
standards. The remainder had been identified as not-relevant to DR and have therefore not been
considered further. A full list of these excluded standards is provided in Appendix C.
3.3 Summary of gaps identified & their impact The delivery team identified the following areas where standardisation across the Great Britain (GB)
rail network would be beneficial, but is not addressed by existing standards. These areas are listed
in order of decreasing priority, as assessed by the delivery team. Some of these requirements may
need to be Notified National Technical Rules (NNTR) to avoid incompatibilities between trackside
and on-board ETCS equipment.
1) The processes by which DR systems are designed and installed
As novel, highly complex, software based systems, the processes needed to safely and
reliably designing and installing DR systems are markedly different from those used for
conventional signalling. Whereas the later are built on the cumulative experience of almost
200 years of railway operation, ETCS, TM and CDAS technologies are still relatively new
and embody significantly greater levels of functionality.
There is currently a gap in the standards library whereby processes for designing and
installing ETCS, TM and CDAS are not specified. This gap extends to the management of
Euroradio keys, ETCS identities, business change and operational procedures.
The impact of this gap is that projects must either apply existing processes or develop their
own processes. The former could introduce safety or reliability hazards where processes
designed for conventional signalling are inappropriately applied to DR schemes. The latter
would tend to introduce unnecessary cost and delay as process development work would be
duplicated between multiple projects.
Unrestricted 16
2) Commissioning DR systems, management of DR geographic data and parameters.
As well as needing different processes for design and installation, DR systems also require
different processes for commissioning into operational service. Furthermore, unlike
conventional signalling systems which need only limited geographical configuration data, DR
technologies require an accurate and up-to-date geographic representation of the railways
that they supervise. Generating and maintaining such geographic representations requires a
rigorous approach to specification, collation and management of geographic infrastructure
data. In addition to geographic data, DR technologies also entail many new identities and
parameters
There are currently gaps in the standards library whereby processes for commissioning
ETCS, TM and CDAS technologies are not specified and neither are robust processes for
managing the geographic data and parameters that they need.
The impact of the commissioning gap is similar to that of the design and installation gap:
projects either apply inappropriate existing processes or incur unnecessarily time and
expense developing their own. The initial impact of the data and parameters gap is
additional expense and delay due to DR projects being provided with inadequate or
unsuitable data for their needs. The long term impact is poor reliability and possible safety
hazards with significant remedial expense where data is not adequately maintained.
3) How ETCS functionality is applied in GB and associated operational procedures
managed.
A key strength of ETCS is its versatility in terms of the range of functions it supports and the
flexibility with which they can be implemented. However, without national standardisation on
how these functions are implemented, different ETCS projects could implement the same
function in very different ways or vary significantly in the functions that they use.
There is currently a gap in the standards library in terms of how and where different aspects
of ETCS functionality should be used.
The impact of this gap is potential inconsistencies in behaviour of different DR deployments
in different areas. Such inconsistencies are likely to cause operator confusion with
consequent safety and performance hazards.
4) Consistency of TM user requirements and interfaces.
Different TM technologies are provided by different suppliers, each with slightly different
functionality user interfaces and interfaces to other systems.
There are currently gaps in the standards library in terms of specifying standard TM user
requirements across Network Rail infrastructure and in terms of specifying standard
interfaces between different TMs and between TMs and other systems.
Unrestricted 17
The impact of these gaps are incompatibilities between different TMs and other systems and
inconsistencies in how suppliers’ TM products are tailored to the GB market. The former is
likely to incur unnecessary operator training expense and risk of error. The latter will tend to
result in additional project costs and delays associated with systems integration and the
possibility that some project interface requirements cannot be delivered.
5) Maintenance of DR technologies.
As highly complex, software based systems, the maintenance requirements for DR
technologies differ significantly from those for traditional electro-mechanical signalling
equipment. Management of hardware obsolescence, software updates and data are key as
are Information Technology (IT) skills to interrogate to the equipment.
There is currently a gap in the standards library in terms of how maintenance of DR
technologies should be planned and managed.
The impact of this gap is higher whole-life cycle costs as maintenance arrangements are
inadequately planned during deployment of DR technologies.
6) Requirements for supporting telecommunications systems.
ETCS Level 2 (as used by DR) requires a radio network to carry ETCS messages between
trackside and train-borne signalling equipment. Currently Global System for Mobile
Communications – Railways (GSM-R) radio networks are specified though other
technologies are likely to be required to address GSM-R obsolescence and capacity
limitations. As such, deployment of ETCS Level 2 places requirements on radio networks in
terms of communication channel availability, quality of service and technologies employed.
Similarly deployment of CDAS requires a (currently unspecified) radio bearer to convey its
message between trackside and train-borne equipment as does TM for communication with
handheld devices used by track workers. TM is also dependent on a supporting fixed
telecommunications network for which it has its own requirements in terms of connectivity,
bandwidth and quality of service.
Cyber security is a key consideration for all modern computer based signalling technologies,
including DR technologies, as they are potentially vulnerable to cyber attack.
There is currently a gap in the standards library in terms of how telecommunications
functional, performance and cyber security requirements for DR deployment projects should
be determined and specified.
The impact of this gap is the risk of signalling projects receiving inadequate
telecommunications networks for the technologies that they are deploying. This in turn could
lead to significant expense and delay to address the shortfall.
Unrestricted 18
7) User requirements for CDAS.
As with TM, different CDAS technologies are provided by different suppliers, each with
slightly different functionality.
There is currently a gap in the standards library in terms of specifying standard CDAS user
requirements across Network Rail infrastructure.
The impact of this gap is inconsistencies in the operational deployment of CDAS with
consequent risk of operator confusion and poor performance.
Unrestricted 19
4 Gap Analysis of Individual Standards
4.1 Overview This section describes the analysis of individual standards within the Standard Library, conducted in parallel with the gap analysis of the Standards
Library described in Section 3. The first step in analysing individual standards was to identify which are applicable to DR. This lead to the output,
contained in Section 4.2: ‘Standards Relevant to DR.’ The next step was to conduct a clause by clause analysis of each standard leading to the output
‘Gaps / conflicts in specific standards & their impacts:’ contained in Sections 4.3 and 4.4.
4.2 Standards applicable to Digital Railway technologies
4.2.1 Industry Standards Identified as Applicable to Digital Railway
Number Title Issue Compliance Date Standard Type
Applicability
ET
CS
TM
CD
AS
GMRT2466 Railway Wheelsets 4 03/03/2018 Railway Group Standard Y N N
GERT8270 Assessment of Route Compatibility of Vehicles and Infrastructure.
3 05/03/2016 Railway Group Standard Y N Y
GKRT0044 Permissive Working 3 07/03/2015 Railway Group Standard Y N N
GMRT2185 Train Safety Systems 2 02/02/2002 Railway Group Standard Y N N
Form RT3973-EXL Advice to Train Crews - Conveyance of Exceptional Loads 1 06/02/2010 Railway Group Standard Form Y N N
Form RT3973-CON Advice to Train Crews - Conveyance of Containers 1 06/02/2010 Railway Group Standard Form Y N N
Form RT3973-HAW Advice to Train Crew - Conveyance of Heavy Axle Weight 1 06/02/2010 Railway Group Standard Form Y N N
GMGN2571 Guidance on the Storage and Recommissioning of Traction and Rolling Stock
1 03/08/2002 Guidance Note Y N Y
GMGN2607 Guidance on the Braking Requirements for Hauling Unbraked Multiple Units in Freight Trains
1 04/09/2010 Guidance Note Y N N
GEGN8651 Guidance Note for Safe Integration of CCS Systems with Train Operations
1 03/03/2018 Guidance Note Y N Y
GEGN8540 Guidance on Low Adhesion between the Wheel and the Rail - Managing the Risk
2 05/09/2015 Guidance Note Y N Y
Unrestricted 20
Number Title Issue Compliance Date Standard Type
Applicability
ET
CS
TM
CD
AS
GEGN8578 Guidance on the Use of On-Train Satellite Positioning Technology Based Locator for Railway Applications
3 05/12/2015 Guidance Note Y N Y
GIGN7619 Guidance on the Safety in Railway Tunnels Technical Specification for Interoperability
1 07/12/2013 Guidance Note Y N N
GKGN0644 Guidance on Permissive Working 2 07/03/2015 Guidance Note Y N N
GKGN0802 Glossary of Signalling Terms 1 05/06/2004 Guidance Note Y Y Y
RIS-0703-CCS Signalling Layout and Signal Aspect Sequence Requirements 1.1 13/03/2018 Rail Industry Standard Y N N
RIS-0713-CCS Lineside Signalling Layout Driveability Assessment Requirements
1.1 13/03/2018 Rail Industry Standard Y N N
RIS-0758-CCS Lineside Signal Aspects and Indications 1.1 13/03/2018 Rail Industry Standard Y N N
RIS-2710-RST Magnetic Track Brakes 1 03/03/2018 Rail Industry Standard Y N N
RIS-0707-CCS Management of Safety Related Control, Command and Signalling System
1 03/09/2016 Rail Industry Standard Y N N
RIS-3703-TOM Passenger Train Dispatch and Platform Safety Measures 3 02/12/2017 Rail Industry Standard Y Y Y
RIS-8040-TOM Low Adhesion between the Wheel and the Rail - Managing the Risk
1 03/12/2016 Rail Industry Standard Y N Y
RIS-8048-CCS Positioning of Lineside Telephones 1 03/12/2016 Rail Industry Standard Y N N
RIS-8060-CCS Engineering Requirements for Dispatch of Trains from Platforms 1 02/09/2017 Rail Industry Standard Y Y Y
RIS-2273-RST Post Incident and Post Accident Testing of Rail Vehicles 2 02/12/2017 Rail Industry Standard Y N N
RIS-2766-RST Rail Industry Standard for Wheelsets 1 02/12/2017 Rail Industry Standard Y N N
RIS-3440-TOM Operation of Heritage Trains 2 02/12/2017 Rail Industry Standard Y N N
RIS-8270-RST Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
1 02/06/2018 Rail Industry Standard Y N Y
RIS-0386-CCS Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment
1 06/12/2014 Rail Industry Standard Y N N
RIS-3702-TOM Rail Industry Standard for Management of Route Knowledge for Drivers, Train Managers, Guards and Driver Managers
2 06/12/2014 Rail Industry Standard Y N N
Form RT3186 Release of signalling controls 12-13 07/12/2013 Rule Book Form Y N N
Unrestricted 21
4.2.2 Network Rail Company Standards Identified as Applicable to Digital Railway
SME Categories for Standards Review and tables
• SME category 1: Scheme Development – Design
• SME category 2: Detailed Design
• SME category 3: Implementation / Construction / Testing
• SME category 4: Maintenance / Operations
• SME category 5: Traffic Management
• SME category 6: Telecoms
• SME category 7: Other – processes, configuration management, method of deployment, electromagnetic compatibility, etc.
• SME category in 8: Interfaces with conventional signalling
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/GN/SIG/14202 Prevention and Mitigation of Overruns - Risk Assessment of Signals (Formerly RT/E/G/14202)
2 26/08/2008 1 Y Y N
NR/L2/INF/02018 Specification for the Management of Safety Related Infrastructure Record 6 05/03/2011 1 Y N N
NR/L2/SIG/10157 Signal sighting assessment process 3 03/04/2017 1 Y N N
NR/L2/SIG/11711 Digital Railway Reading Signalling 2 31/05/2018 1 Y Y Y
NR/L2/SIG/30009 Signalling Principles Handbook 13 02/06/2018 1 Y N N
NR/L2/SIG/30009/D120 'Signalling Principles Handbook - Identification of Primary and Slotted Signals 1 06/04/2008 1 Y N N
NR/L2/SIG/30009/D310 Control of Signals' 3 02/09/2017 1 Y N N
NR/L2/SIG/30009/D410 Signalling Principles Handbook - Provision of Trapping Protection (including catch points and derailers)
1 05/12/2009 1 Y N N
NR/L2/SIG/30009/E063 Signalling Principles Handbook -Approach Locking and Train Operated Route Release
1 02/06/2018 1 Y N N
Unrestricted 22
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/L2/SIG/30009/E120 Signalling Principles Handbook - Replacement Facilities 1 01/03/2009 1 Y N N
NR/L2/SIG/30009/E420 Overrun Detection and Management 2 06/06/2015 1 Y Y N
NR/L2/SIG/30009/E421 Application of Overrun Management 1 01/08/2018 1 Y N N
NR/L2/SIG/30009/E430 Signalling Principles Handbook - Provision of derailment detectors 1 06/04/2008 1 Y N N
NR/L2/SIG/30009/E440 Signalling Principles Handbook - Provision of overlaps for shunt routes' 1 01/03/2009 1 Y N N
NR/L2/SIG/30009/E450 Signalling Principles Handbook - Overlap Proving 1 05/03/2010 1 Y N N
NR/L2/SIG/30009/E610 Signalling Principles Handbook - Restoration of Trapping Protection 1 05/12/2009 1 Y N N
NR/L2/SIG/30009/E810 Reasonable Opportunity Assessment for Signalling Alterations 2 03/09/2016 1 Y N N
NR/L2/SIG/30009/GERT8071 Control Facilities for use during Lineside Signalling Failures 1 06/06/2015 1 Y N N
NR/L2/SIG/30009/GKRT0039 Semaphore And Mechanical Signalling 1 06/09/2014 1 Y N N
NR/L2/SIG/30009/GKRT0041 Track Circuit Block 1 06/09/2014 1 Y N N
NR/L2/SIG/30009/GKRT0060 Interlocking Principles 2 06/06/2015 1 Y N N
NR/L2/SIG/30009/GKRT0061 Shunters Release, Ground Frames, Switch Panels and Gate Boxes 1 06/09/2014 1 Y N N
NR/L2/SIG/30009/GKRT0064 Provision of Overlaps, Flank Protection and Trapping 2 06/06/2015 1 Y N N
NR/L2/SIG/30009/MANUAL 14 01/08/2018 1 Y N N
NR/L2/SIG/30009/Z110 Signalling Principles Handbook - Staff Protection Systems 1 05/12/2009 1 N Y N
NR/L2/SIG/30021 Alteration to Authorised Line Speeds 2 03/09/2011 1 Y Y Y
NR/L3/INF/02225 Records management 1 01/10/2009 1 Y Y Y
NR/PRC/MPI/ST0029 Signalling scheme plan number controls 2 01/04/2006 1 Y N N
NR/GN/SIG/00028 General Guidelines on Train Protection & the Provision of Signalling (formerly RT/E/G/00028)
1 06/12/2003 1 Y N N
NR/L2/SIG/14201 Prevention and Mitigation of Overruns - Risk Assessment of Signals 2 26/08/2008 1 Y N N
NR/GN/SIG/02022 Requirements for TASS Infrastructure System Description (formerly RT/E/C/02022)
2 03/12/2005 2 Y N N
NR/L2/ELP/27500 Production of Isolation Diagrams, Isolation Instructions, Comprehensive Track Diagrams and Operations Diagrams
2 03/03/2018 2 Y Y N
NR/L2/SIG/11201 Signalling Design Handbook 11 01/12/2018 2 Y N N
Unrestricted 23
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/L2/SIG/11201/Mod A1-2 Signalling Design – overview 1 01/12/2018 2 Y N Y
NR/L2/SIG/11201/Mod A2-4 Configuration control 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A2-7 Source records - As built Technical Review 1 01/12/2018 2 Y Y ?
NR/L2/SIG/11201/Mod A2-17 Risk Assessments & Safety System 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A2-24 Data Systems 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A3-3 Signalling Scheme Plans 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A3-5 Signal spacing Parameters 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A3-7 Signal Sighting 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A3-10 Signalling Scheme Plans Best Practice 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A4-2 Signalling plan & Signal box Notes 1 01/12/2018 2 Y Y Y
NR/L2/SIG/11201/Mod A4-3 Location area plan & Cable Route Plan 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A4-9 Electronic systems 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-1 Symbols for Plans and Sketches used in Signalling Application 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-3 Signalling Design Control Tables 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-3/App A Conventions, General Notes, Dollar Notes and Signaller Route Lists 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-3/App D Control Tables for Level Crossings 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-3/App E Control Tables for Train Warning and Protection Systems 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-3/App H SSI Control Tables 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-3/App K Signalling Control Tables - MCB-OD Level Crossings 1 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod A5-4 Definitions 1 01/12/2018 2 Y Y Y
NR/L2/SIG/11201/Mod A5-5 Signalling Control Centres 1 01/12/2018 2 Y Y N
NR/L2/SIG/11201/Mod B1 General Introduction 5 01/12/2018 2 Y Y Y
NR/L2/SIG/11201/Mod B5 Circuits - Electromagnetic Compatibility of Electronic Equipment 5 01/12/2018 2 Y Y Y
NR/L2/SIG/11201/Mod B6 Circuits - Insulation and Earthing for Occupational Safety 5 01/12/2018 2 Y Y Y
NR/L2/SIG/11201/Mod B7 Interlockings - General 7 01/12/2018 2 Y N N
NR/L2/SIG/11201/Mod B11 Interlockings - Electronic Interlocking Guidelines 5 02/06/2012 2 Y N N
Unrestricted 24
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/L2/SIG/11201/Mod B12 Transmission Systems - (Cable terminations & Cable routes) 5 02/06 2012 2 Y Y Y
NR/L2/SIG/11201/Mod B13 Points - General 5 02/06/2018 2 Y N N
NR/L2/SIG/11201/Mod B17 Signals - General 5 03/09/2011 2 Y N N
NR/L2/SIG/11201/Mod X02 Signalling Design: Module X02- Level Crossings: Common Design Requirements
2 01/12/2012 2 Y N N
NR/L2/SIG/11201/Mod X10 Signalling Design: Module X10 - Level Crossings: Automatic Half Barriers 1 03/09/2011 2 Y N N
NR/L2/SIG/11201/Mod X11 Signalling Design: Module X10 - Level Crossings: Automatic Half Barriers 1 01/12/2012 2 Y N N
NR/L2/SIG/11201/Mod X12 Signalling Design: Module X12 - Level Crossings: Automatic Open Crossing Locally Monitored
2 01/12/2012 2 Y N N
NR/L2/SIG/11201/Mod X20 Signalling Design: Module X20 - Level Crossings: Manned Gated Crossings 1 03/09/2011 2 Y N N
NR/L2/SIG/11201/Mod X21 Signalling Design: Module X21 - Level Crossings: Manually Controlled Barriers With Obstacle Detectors
3 01/12/2012 2 Y N N
NR/L2/SIG/11201/Mod X22 Signalling Design: Module X22 - Level Crossings: Manually Controlled Barriers 2 01/12/2012 2 Y N N
NR/L2/SIG/11201/Mod X24 Signalling Design: Module X24 - Level Crossings: On Call Barriers 2 01/12/2012 2 Y N N
NR/L2/SIG/11201/Mod X25 Signalling Design: Module X25 - Wicket Gate Magnetic Locks 1 03/09/2011 2 Y N N
NR/L2/SIG/11201/Mod X30 Signalling Design: Module X30 - Traincrew Operated Gates 1 03/09/2011 2 Y N N
NR/L2/SIG/11201/Mod X31 Signalling Design: Module X31 - Traincrew Operated Barriers 1 03/09/2011 2 Y N N
NR/L2/SIG/11201/Mod X39 System Application Specification for Overlay Miniature Stop Light Level Crossings 1 June, 2015 2 Y N N
NR/L2/SIG/11201/Mod X40 Signalling Design: Module X40 - Level Crossings: Miniature Stop Lights 2 01/12/2012 2 Y N N
NR/L2/SIG/30080 Axle Counter System - Operational and safety principles 1 05/09/2009 2 Y Y N
NR/L3/SIG/30082 Axle Counter System Handbook 2 04/12/2010 2 Y N N
NR/SP/SIG/02026 Provision and Management of TASS Infrastructure Data (formerly RT/E/S/02026) 1 04/06/2005 2 Y N N
NR/L2/INI/CP0075 Procedure for the Entry into Operational Service of Railway Infrastructure 1 March 2011 3 Y ? ?
NR/L3/INI/CP0044 Work Package Planning 4 June 2010 3 Y ? ?
NR/L3/INI/CP0077 Signalling Pre-Commissioning Verification Requirements 1 March 2011 3 Y ? ?
NR/L2/SIG/30014 Signalling Works Testing Handbook 13 March 2018 3 Y ? ?
NR/L2/SIG/30014/A… (multiple modules) Signalling works Testing 1 Sep 2011 3 Y ? ?
Unrestricted 25
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/L2/SIG/30014/B… (multiple modules) Signalling Works Testing Staff Competence Assessment 3 June 2012 3 Y ? ?
NR/L2/SIG/30014/C110 Testing Strategy 3 Y ? ?
NR/L2/SIG/30014/C120 Test Plan 3 Y ? ?
NR/L2/SIG/30014/C210 Acceptance of Testing Planning Documentation 2 June 2012 3 Y ? ?
NR/L2/SIG/30014/C310 Check Marking and Recording on Test Copies 3 Y ? ?
NR/L2/SIG/30014/C410 Error Reporting 3 June 2012 3 Y ? ?
NR/L2/SIG/30014/C510 Handover of Signalling Works Testing 1 June 2012 3 Y ? ?
NR/L2/SIG/30014/D… (multiple modules) Signalling Works Test Specifications and certificates 3 Y ? ?
NR/L2/SIG/30014/E110 Signalling Works Testing Glossary 2 June 2012 3 Y ? ?
NR/L2/SIG/30014/F… (multiple modules) Signalling Works Principles Testing 3 Y ? ?
NR/L2/SIG/30014/G… (multiple modules) Signalling Non-Conceptual Works and Emergency Testing 3 Y ? ?
NR/L3/SIG/11303 Signalling Installation (Formerly RT/E/S/11303) 7 3 Y ? ?
NR/L3/SIG/11303/1B05 Signalling Installation Safety: Introduction 2 Dec 2010 3 Y ? ?
NR/L3/SIG/11303/..D... (multiple modules) Electrical wiring - multiple section 3 Y ? ?
NR/L3/SIG/11303/..H... (multiple sections) Tools and Techniques - multiple sections 3 Y ? ?
NR/L3/SIG/11303/..M... (multiple sections) Labelling 3 Y ? ?
NR/L3/SIG/11303/1Q05 Fixings: Nuts, Bolts, Screws, Washers etc 2 3 Y ? ?
NR/L3/SIG/11303/1U10 Pre-commissioning work quality checks 2 Sep 2010 3 Y ? ?
NR/L3/SIG/11303/1X05 Good House Keeping Practice 2 3 Y ? ?
NR/L3/SIG/11303/1X10 Common Pitfalls 2 3 Y ? ?
NR/L3/SIG/11303/2… (multiple sections) Various equipment specifics 3 Y ? ?
NR/L3/SIG/11303/2Y05 TASS Balise 2 3 Y ? ?
NR/SP/SIG/02024 Requirements for TASS Infrastructure – Installation. Test and Maintenance (formerly RT/E/S/02024)
2 December 2005 3 Y ? ?
NR/L3/INF/AK0025
This standard is branded as "HISTORIC"
Asset Data Maintenance Reference Data Change 2 26/08/2008 4 Y Y Y
NR NR/L2/MTC/02020 Ellipse for Network Rail Work Management 7 26/08/2008 4 Y Y Y
Unrestricted 26
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/L2/MTC/088 Responsibility for Maintenance of Changes Assets 4 06/06/2009 4 Y Y Y
NR NR/L3/EBM/089 Asset Management Plan (aka NR/L3/MTC/089 1 06/06/2018 4 Y Y Y
NR/L2/MTC/PL0175 Infrastructure Maintenance Planning Handbook 6 02/02/2018 4 Y Y Y
NR/L2/SIG/10028 Supervisory Inspection of Signalling Assets 7 05/12/2015 4 Y Y Y
NR/L2/SIG/10047 Management Of Safety Related Reports For Signalling & Telecoms Failures 16 4 Y N N
NR/L3/SIG/10064 General Instructions to Staff Working on S&T Equipment (formerly NR/SP/SIG/10064)
6 31/05/2018 4 Y N N
NR/L2/SIG/11010 Management of Signalling and Communication Systems (Formerly RT/E/S/11010) 3 03/09/2011 4 Y Y Y
NR/L3/SIG/10046 SINCs (Signalling) for Network Rail Fault Management 1 05/03/2011 4 Y N N
NR NR/L3/SIG/10661 Signalling Maintenance Task Intervals 16 31/05/2018 4 Y Y Y
NR/L3/SIG/19810 Signal Engineering Involvement in Civil Engineering 2 26/08/2008 4 Y N N
NR/L2/SIG/20047 Management of Safety Related Reports for Signalling Failures Appendix 2 02/09/2018 4 Y N N
NR NR/L3/SIG/30011 Signalling Equipment Support Specification 1 01/06/2008 4 Y Y Y
NR/L3/SIG/MG0110 Imposition and Removal of Emergency and Temporary Speed Restrictions 3 02/06/2012 4 Y N N
NR NR/L3/SIG/SG0111 Design of Emergency and Temporary Speed Restrictions 3 03/09/2011 4 Y N N
NR NR/L3/SIG/SG0163 Management of Data from Logging Systems and Event Recorders 3 03/09/2011 4 Y N N
NR/SIG/10663 Signal Maintenance Specification (SMS) 8 31/05/2018 4 Y Y Y
NR/SIG/10665 Reliability Centred Maintenance of Signalling Equipment (ROSE) 15 31/05/2018 4 Y Y Y
NR/SIG/11231/Index Signalling Maintenance Testing Handbook (NR/SMTH) 11 03/03/2018 4 Y ? ?
NR/L2/RMVP/1332 Wheelset and Axle Bearing Manual 4 01/09/2017 4 Y N N
NR/L3/AIF/003 Asset data management for Ellipse and GEOGIS 1 14/12/2010 4 Y Y Y
NR/L2/CTM/011 Competence & Training In Track Engineering (NR/L2/CTM/011) 1 31/12/2006 4 Y N N
NR/L2/CTM/012 Competence and Training In Signal Engineering (formerly NR/SP/CTM/012) 3 02/06/2012 4 Y Y Y
NR/L1/OPS/010 Signals Passed at Danger and Signal Reversions 12 06/03/2010 4 Y N N
NR/L2/SIG/19807 Prioritisation Of Signal Engineering Equipment Defects (Formerly NR/SP/SIG/19807)
3 04/09/2010
4 Y N N
NR/SP/ERG/00005 Signalling Centre Desks 1 07/04/2007 5 N Y N
Unrestricted 27
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/SP/ERG/24017 Control room Design specification, process, guide 2 5 N Y N
NR/L3/SIG/10120 Automated Route Setting Specification 1 01/09/2008 5 N Y N
NR/SP/SIG/11130 Requirements for the provision of SPAD Alarms at Signalling Control Centres 2 5 N Y N
RT/E/P/10024 Signaller's Operating Guide for the use of the IECC Signalling Workstation 4 5 Y N N
RT/E/PS/00012 Specification for the preparation and Implementation of Train Describer System Parameter Tables
1 5 N Y N
RT/E/S/10041 Requirement Specification for an IECC System Monitor Terminal 1 5 N Y N
RT/E/S/10067 Requirement Specification for a VDU Based System (NR/SP/SIG/10067) 2 02/08/2003 5 N Y N
RT/E/S/17504 IECC Operating Specification for Signalling Control and Indications Purposes 3 06/12/2003 5 Y N N
NR/PS/SIG/00009 Message handling and data transmission reqs between processor based systems 2 5 N Y N
NR/L1/TEL/30029 Telecoms installation 4 06/03/2010 6 Y ? ?
NR/L1/TEL/30092 Telecoms testing and Commissioning 4 04/03/2017 6 Y ? ?
NR/L1/TEL/30093 Telecoms maintenance 3 06/03/2010 6 Y ? ?
NR/L1/TEL/30099 Telecoms asset management 4 06/03/2010 6 Y ? ?
NR/L2/CTM/013 Training and competence in telecom engineering 2 05/02/2011 6 Y ? ?
NR/L2/TEL/30066 Signalling and Telecommunications Telecoms Clearance for Fixed transmitters 7 06/03/2010 6 Y ? ?
NR/L3/TEL/30088 Specification for Mast Inspections and Maintenance of Antenna Systems and Feeders
4 04/03/2017 6 Y ? ?
NR/L2/TEL/30098 Testing & commissioning of telecoms equipment and systems 2 26/08/2008 6 Y ? ?
NR/L2/TEL/30124 Specification for the maintenance of GSM-R, Radio BTS, BSC, TCU, repeater and IVRS equipment
2 02/03/2013 6 Y ? ?
NR/L2/TEL/30127 GSM-R air interface functionality, availability management and compliance validation
4 02/09/2018 6 Y ? ?
NR/L2/TEL/30146 Product specification for UMTS, GSM and GSM-R modems 2 02/12/2010 6 Y ? ?
NR/L2/TEL/31001 Telecommunications maintenance testing & failure investigation 4 02/06/2018 6 Y ? ?
NR/L2/TEL/31002 Maintenance of telecom equipment 5 01/09/2018 6 Y ? ?
NR/L3/MTC/MG0021 Corrective maintenance (faulting) of operational telecom assets 2 26/08/2008 6 Y ? ?
NR/L3/TEL/0023 Management of SINCS Records for Telecoms Assets 3 06/03/2010 6 Y ? ?
Unrestricted 28
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/L3/TEL/0092 Disconnection and at risk processes for telecoms bearer circuits and systems including GSM-R equipment
5 02/09/2017 6 Y ? ?
NR/L3/TEL/31103 Energisation of Commercial and Operational Radio Antenna Systems 3 06/03/2010 6 Y ? ?
NR/L3/TEL/40047 Management of Safety Related Reports for Telecoms Failure Appendix 2 03/06/2017 6 Y ? ?
NR/PS/TEL/00025 Synchronous Digital Hierarchy Multiplexing Equipment 2 01/04/2006 6 Y ? ?
NR/SP/TEL/30024 Fault priority and response times for telecommunications equipment 4 03/03/2007 6 Y ? ?
NR/GN/SIG/11721 The Verification and Validation of Interlockings 2 June 2002 7 Y N N
NR/SP/ELP/27204 Specification for the screening of Signals 2 April 2006 7 Y N N
NR/L2/SIG/30035 Signalling Scheme Technical Approval Process 3 01/09/2012 7 Y Y Y
NR/L2/SIG/30003 Engineering Assurance Arrangements for Signalling Engineering Schemes and Services
1 03/09/2011 7 Y Y Y
NR/L2/RSE/30041 Electromagnetic compatibility (EMC) assurance process 2 01/09/2012 7 Y Y Y
NR/L1/RSE/30040 EMC Strategy for Network Rail 1 01/12/2008 7 Y Y Y
NR/L1/INF/002232 Information Security Policy 2 07/06/2016 7 Y N N
NR/L2/ERG/24020 Engineering Assurance Arrangements for Ergonomics within design and development projects
3 03/03/2012 7 Y N N
NR/L2/INF/02242 Information Security Manual 4 03/06/2017 7 Y N N
NR/L2/INF/02242/02 Information Security Manual Module 2 2 03/12/2016 7 Y Y Y
NR/L2/INF/02242/03 Information Security Manual Module 3 1 03/12/2016 7 Y Y Y
NR/L2/INF/02242/04 Information Security Manual Module 4 1 03/06/2017 7 Y Y Y
NR/L2/INF/02242/05 Information Security Manual Module 5 1 03/06/2017 7 Y Y Y
NR/L2/RSE/070 Engineering Verification 2 03/03/2012 7 Y Y Y
NR/L2/RSE/100 Network Rail Assurance Panel processes 4 03/03/2018 7 Y Y Y
NR/L2/RSE/100/01 Network Rail Assurance Panel 2 05/03/2016 7 Y Y Y
NR/L2/RSE/100/02 Application of the CSM for Risk Evaluation and Assessment. 3 05/03/2016 7 Y N N
NR/L2/RSE/100/03 The application of the interoperability regulations for infrastructure projects. 2 05/03/2016 7 Y N N
NR/L2/RSE/100/04 Introduction of new or modified vehicles 2 05/03/2016 7 Y N N
Unrestricted 29
Number Title Issue Compliance
Date SME
Category
Applicability
ET
CS
TM
CD
AS
NR/L2/RSE/100/05 Product Acceptance and change to Network Rail Operational Infrastructure 3 03/03/2018 7 Y N N
NR/L2/RSE/100/07 System Review Panels 2 05/03/2016 7 Y Y Y
Unrestricted 30
4.3 Summary of gaps / conflicts identified Gaps / conflicts in existing standards were identified in the following areas.
• Delivery processes: design and installation processes specified in standards are inappropriate for development and deployment of software based DR technologies. These gaps could be addressed by the proposed new first priority standards described Section 3.3.
• Commissioning processes and data management: commissioning processes specified in standards are inappropriate for DR technologies. Similarly, standards do not specify how geographic data maps or DR parameters should be managed. These gaps could be addressed by the proposed new second priority standards described Section 3.3.
• Application ETCS functionality: standards are written from the perspective of signalling by lineside signals. As such, there are gaps / conflicts in terms of defining how ETCS functionality is applied in GB, notably in the following areas.
o Terminology - standards use terms relevant to lineside signals (e.g. ‘signal,’ ‘aspect’) for requirements that could also apply to ETCS movement authorities (MAs) / signage.
o Route classes - no provision is made for ETCS classes of routes in addition to conventional classes of route nor how conventional routes would map to ETCS routes.
o Driveability - driveability requirements for ETCS schemes are undefined.
o Overrun risk - requirements for overrun risk assessment are from the perspective of trains passing signals at danger and do not consider risk of trains passing ETCS block markers in degraded mode operation.
o Approach locking - difference in how approach locking is implemented in ETCS schemes are not reflected in standards.
o Use of ETCS functionality as an alternative to conventional controls - standards do not allow for
▪ use of ETCS position reports to disengage route entrances; ▪ use of ETCS position reports to prove train at a stand for the purposes of
releasing overlap locking; ▪ use of ETCS position reports / movement authority requests to trigger level
crossing opening / closure; ▪ use of ETCS (Packet 88) level crossing protection functionality.
These gaps could be addressed by the proposed new third priority standards described Section 3.3.
• Control system: TM user requirements and interfaces not defined, neither are indications for ETCS schemes. These gaps could be addressed by the proposed new fourth priority standards described Section 3.3.
Unrestricted 31
• Maintenance: existing standards are focused on maintenance of legacy signalling assets. As such, they do not cover the needs of new DR technologies notably in the following areas.
o Obsolescence management.
o Reflecting infrastructure changes within geographic data maps.
o Replacement of DR equipment following maintenance activities.
o Update of ETCS on-board equipment following wheel re-profiling.
These gaps could be addressed by the proposed new fifth priority standards described Section 3.3.
• Telecommunications: existing telecommunications standards focus on legacy signalling equipment (telephones, voice radio networks, solid state interlocking and integrated electronic control centres communication links, etc.). As such they do not adequately cover the specific needs of new DR technologies. These gaps could be addressed by the proposed new sixth priority standards described Section 3.3.
• CDAS: CDAS requirements are not covered in existing standards. This gaps could be addressed by the proposed new seventh priority standards described Section 3.3.
Unrestricted 32
4.4 Detailed assessment of gaps / conflicts and their impacts Appendix A contains a clause by clause gap / conflict analysis for Industry standards.
Appendix B contains a clause by clause gap / conflict analysis for Network Rail company standards.
Unrestricted 33
5 Lessons learnt from existing DR projects The Engineering Rules delivery team contained a number of SMEs who had experience of ETCS
projects overseas and in the UK. The team agreed that the issues concerning standards and
engineering rules encountered on those projects would help inform the recommendations of the
group. The following projects were considered.
• Sydney Australia: this project is still in the implementation phase and involves the
application of an ETCS Level 1 hybrid solution to provide speed supervision only for the
Transport for New South Wales commuter network. Note: signal passed at danger (SPAD)
and overrun protection functionality being retained by the mechanical train stop system.
• Cambrian: The first UK ETCS Level 2 deployment in North Wales.
• Tilt Authorisation and Speed Supervision (TASS): the West Coast Main Line TASS
project.
• Thameslink: the recent ETCS Level 2 overlay on the Thameslink central corridor.
• Crossrail: the current Crossrail ETCS Level 2 overlay project between Paddington and
Heathrow.
• Modular Signalling: the project to develop and deploy new Modular Signalling technologies.
• London Underground Design Handbook: outcome of update to standards and guidance in
the late 1990s.
5.1 Sydney Australia
5.1.1 Issues
Signalling standards and engineering rules in the Sydney and New South Wales (NSW) region are
considerable and cover all areas of signalling. Transport for NSW (TfNSW) is responsible for all
transport in the state. Previously the NSW railway was run by a company called Railcorp, who was
also responsible for all railway standards. However, Railcorp was split in 2013, and Sydney Trains
now runs the local commuter services in the Sydney area. TfNSW has a department named Asset
Standards Authority (ASA) that is now responsible for all standards.
The signalling standards and engineering rules come under the following types:
• ASA Standards,
• Engineering Standards (existing Railcorp standards),
• Engineering Specifications,
• Engineering Guidelines,
• Engineering Procedures (specific processes),
• Engineering Manual (procedures and work instructions),
• Design Guidelines.
The new ETCS Level 1 system is spread across all the different standard types, in order to integrate
with the existing standards structure, as well as take account of the new ASA organisation. In
addition, there is also a number of project specific standards that have been produced by the project
team that cover the design and implementation rules for the project.
Unrestricted 34
Consequently, the same information is repeated in a number of documents, and it is difficult to find
the correct information required for each design task. The information also conflicts between
documents (such as balise identity numbers) and the project documents are updated frequently as
the project is rolled out and lessons are learned (such as control table layout changes). There is
also a guide written by the equipment supplier (who will undertake the data design) that does not
match the latest project updates.
5.1.2 Lesson Learned
The project team have tried to fit in with the existing standards structure, and also provide project
specific guidance information as well as guidance information from the equipment supplier. This has
lead to numerous documents that have exactly the same information and system description, but
due to updates there is inconsistencies between the documents. This set up also makes it difficult to
find the correct information for the different design documentation.
The lesson learned here is not to fit the new DR standards amongst the existing standards set up,
or with the existing standards organisations, but to have the standards under the control of the DRP
only. This will allow simpler management and quicker updates as lessons are learned during the roll
out.
5.2 Cambrian Early Deployment Scheme (EDS)
5.2.1 Issues Network Rail produced a number of Requirements Specifications for the Cambrian EDS project that
were subsequently reviewed by the supplier, Ansaldo. The resulting updates meant that the system
requirements were changed to meet the supplier’s solution.
Network Rail also intended to update the existing standards to cover the ETCS Level 2 system, but
this was never achieved due to lack of resources and timescales to undertake this considerable
task.
A lessons learned meeting was held after the Cambrian project was complete, but this only
focussed on the project lessons, not the operational and maintenance issues that have occurred
since commissioning. Significant post commissioning issues include the following.
• Driveability: the static speed profile in the dynamic loops at Welshpool was determined by
the maximum permissible speed permitted by track geometry. The result of this was a
cluttered Driver Machine Interface (DMI) display and drivers choosing to smooth the profile
by ignoring all of the peaks and driving at a constant speed. When the opportunity arose in
conjunction with other work the profile was altered to a single speed for almost the entire
length of both loops which in turn simplified the DMI display and matched the driver’s
technique.
In terminal station on the Cambrian the approach line speed is continued up to the buffer
stop, this area of rail is often subject to oil spills, rust and other contamination making it an
area of poor adhesion. Consideration could be given to setting the speed at a similar level
as company defensive driving policies require or configuring approaches as poor adhesion
areas to reduce the likelihood of a train sliding into the buffer stops.
Unrestricted 35
• Degraded mode operation: degraded mode speed indicators (DMSI) are provided to inform
the driver of the maximum speed a train may be driven in a degraded mode. The Rule Book
requires the speed of a train not to exceed 25 km/h over any points, switch diamonds or
swing nose crossings, at few locations the last DMSI the driver encountered displayed a
speed higher than 25 km/h. To provide consistent and unambiguous information to drivers
additional 25km/h DMSI were installed to cover all points.
At Welshpool when a train approached block marker 1051 it first passed a 40 km/h DMSI
which was of no relevance to the driver of a train operating in FS mode. If the same train
was then issued with a written order to proceed beyond 1051 there was nothing to remind
the driver that the 80 km/h ceiling speed no longer applied. As a consequence it was agreed
to relocate the DMSI at the marker. Where the degraded mode speed is lower than the
ceiling speed consideration should be given to placing a miniature reminder DMSI below the
block marker.
• Incident management: when investigating allegations against or failures of the system it
was known that details of events were recorded with a timestamp but such data was either
difficult to access or knowledge of how to locate it was lacking. Two specific changes were
made to assist the maintainer. The first was the creation of a window the content of
messages sent to the train, the most commonly used is the content of an MA. The other
was an interrogation facility to list errors reported by trains when reading balise telegrams.
This facility allows for faulty balise to be identified and replaced before a service affecting
failure results. Another advantage is that the majority do not need their telegrams to be read
when undertaking routine maintenance reducing the time on track for maintenance staff.
There is probably a need to train critical staff to a more advanced level than is traditionally
applied of how to access stored data that may only be required infrequently but could be
essential to restoring the system following an allegation.
• DMI: a number of problems were encountered where it became difficult for drivers to read
the DMI screen. This problem is associated with the Class 158 retrofitted cabs so could
affect other cabs where the DMI is fitted into a conventional drives desk.
1. The screen flickered repeatedly from day to night intensity as it responded to changes in
the light entering the cab which distracted the driver. This was rectified by the installation
of a DMI that ignored short duration changes to the light entering the cab so eliminated
the problem.
2. The ATW drivers uniform includes a white shirt. When sunlight entered the cab through
the windscreen it reflected off the shirt onto the DMI screen, this was eradicated by
changing the uniform shirt to dark blue.
3. The DMI was washed out when sunlight entered the cab through the side widow. To
prevent this the fixed pane of glass was covered with a dark filter. The opening section
of the window had a sliding louvered screen added to allow fresh air to enter the cab
when open and still block the sunlight.
• Discipline boundaries: on a number of occasions where signalling communications passed
over the Fixed Telecoms Network the time to repair equipment was extended. This occurred
because the onsite signalling technicians could not easily identify which side of the
Signalling / Telecommunications boundary the root cause of the fault was
Unrestricted 36
located. Assuming Network Rail (NR) is to continue using staff that are discipline specific, it
is suggested they specify test / monitoring equipment as part of the deployment to allow the
onsite technician to identify which side of the boundary a fault exists. This in turn will allow
for the correct teams to be mobilised and speed defect rectification.
• Competence: Signal Fault Investigation (SFI) Level 2 and 3 is an area where competence is
difficult to gain and maintain. Because ERTMS is a new system to most areas of the UK rail
network and not just a variation of the classic systems this makes gaining skills and
knowledge challenging for staff in senior positions. NR should consider as part of any
further deployment how to train these staff and maintain their knowledge of this critical role
which often requires out of office hours as an on call activity.
As part of any deployment it is recommended that training should not only cover any
employees specific role, but that it should be extended to include cross discipline and inter-
company awareness of the roles of others. The purpose of this proposal is to allow the
information contained in these communications to be clear and easily understood by the use
of common terms and phrases.
5.2.2 Lesson Learned The requirements specifications should not suit a supplier specific solution. The Engineering Rules
or deployment guidelines that provide information on how to meet the requirements need to be
referenced back to the DR Customer Requirements so that there is traceability.
Also, the attempt to have the standards updated did not work due to the number of stakeholders
involved and the subsequent timescales and resources required for the update process. Therefore a
separate set of DR standards/engineering rules are simpler to achieve.
The operational and maintenance issues that have occurred on the Cambrian post commissioning
need to be studied as a separate lessons learned activity and incorporated in any new DR
standards and engineering rules.
5.3 TASS
5.3.1 Issues
The TASS project used ETCS balises and ETCS equipment on board the Virgin Pendolino trains to
supervise the tilt authorisation functionality. Separate standards and guidelines were produced for
the TASS system and these contributed to the success of the initial TASS project. They have also
subsequently been applied across multiple projects post initial commisioning where the TASS
system has been affected.
5.3.2 Lesson Learned
System specific standards and guidelines produced by the project team simplified the
implementation of the project.
Unrestricted 37
5.4 Thameslink
5.4.1 Issues
The Thameslink project also produced their own specifcations and guidelines for the ETCS instead
of trying to produce Network Rail Company Standards. Key specifications included interlocking
principles, control table and scheme plan layouts; these could potentially be adapted for application
on other projects.
5.4.2 Lesson Learned
System specific specifications developed separately to current standards were successful in
achieving the project outcomes.
5.5 Crossrail
5.5.1 Issues The testing of the ETCS Level 2 system is not covered by existing testing standards, which are
based on individual component or sub-system level of a known conventional signalling system. A
system based process is required for the testing of a DR solution with a focus on generating
evidence to demonstrate that functional requirements are satisfied and interfaces to other system
elements are adequately proven.
The migration of signalling functionality to the train equipment creates new roles to ensure the
onboard system demonstrates compatibility and is integrated into the railway system. Configuration
control is essential in ensuring the operational system is proven and compatible. The train borne
testing roles are likely to be within the Railway Undertaking (RU) organisation as opposed to the
Infrastructure Managers (IM). The system integration must capture the entire system with a role
spanning across the RU and IM organisations.
There is also little or no guidance on how to protect the operational railway utilising DR technology
during the physical site preparatory works for introducing changes to the railway system. This is
specifically relevant to balises, which will be operational immediately they are laid down.
The process for authorising an interoperable railway into revenue service needs to comply with the
EU directive on interoperability (EU 2016/979). This process goes beyond traditional Network Rail
entry into service requirements with additional formalised activities for verification and validation and
safety authorisation. There is little or no guidance on how to alter an operational railway utilising DR
technology and subject to the interoperability regulations. The lack of guidance could result in
projects being unable to demonstrate compliance with the European Union (EU) directive on
interoperability, and this may lead to a breach of the legislation.
5.5.2 Lesson Learned
The DR engineering rules need to consider the whole installation, testing and entry into service of
the complete system as current standards are not adequate. This needs to include the integration of
the trackside and train borne ETCS systems, and the entry into service guidelines need to consider
the EU directive on interoperability (EU 2016/979).
Unrestricted 38
5.6 Modular Signalling
5.6.1 Issues
Though not an ETCS related project, Modular Signalling was faced with a similar issue regarding
standards changes and how to manage the updates. Modular Signalling decided it was best to have
a separate Modular Signalling Handbook that would be used by modular signalling projects, and
included both standards and guidance in the one handbook. This handbook was jointly produced by
suppliers of modular signalling equipment and Network Rail.
5.6.2 Lesson Learned
Providing a separate handbook for designated modular signalling projects avoided the need to
review and update many standards. All the required information for a modular project was contained
in one handbook, and this facilitated a simpler update when lessons were learned from the initial
deployment sites. A single handbook also helped the project implementation, as the necessary
information was in one set of documentation.
This way forward may be a model for the DR and avoids the need to update many existing
standards, and places all the DR information in one place.
5.7 London Underground Limited (LUL) Design Handbook
5.7.1 Issues
In the late 1990s LUL were updating their standards and guidance documentation. The approach
taken was to have requirements standards on specific safety related topics, such as interlocking
principles, control systems and depot operation. These requirements documents were backed up by
a Design Handbook that provided guidance on principles, process and application related to the
deliverables required on an LUL project. This included scheme plans, headway charts, wiring
diagrams, etc. An installation handbook and testing guidance documents were also issued.
5.7.2 Lesson Learned This format was well received by engineers as it explained the principles behind the design
application and the production process needed for each deliverable, with the information provided in
one place. The design principles explained related to the different applications on the different LUL
lines. The handbook was also a good introduction and training guide to LUL signalling, particularly
for those new to the underground.
A similar methodology may be suitable for DR, as DR technologies will be new in the UK and
unfamiliar to many engineers.
5.8 Documentation from Previous Projects The delivery team agreed that considerable documentation has already been produced for the
Cambrian EDS as well as the current Thameslink and Crossrail projects being undertaken by NR.
The DR project has also produced a number of reference design documents that contain significant
information on the proposed UK application of ETCS Level 2.
Unrestricted 39
The specifications and documentation already produced by these Network Rail projects should be
reviewed prior to any further Engineering Rules work to determine if sections can be reused or
altered to form the basis of the proposed Engineering Rules Deployment Guides.
Note: All Engineering Rules Deployment Guides must fit in with the DR requirements and
documentation hierarchy and be traced back to the DR Customer Requirements where applicable.
Unrestricted 40
6 Recommendations
6.1 General approach A new suite of DR standards should be created rather than attempting to accommodate DR
technologies through update of existing standards.
Rationale: gap analysis of the Standards Library has shown that the most significant gaps are in
areas that are outside the scope of existing standards, which would be best filled by new standards.
Furthermore, lessons learnt form earlier DR projects indicate that production of new standards for
new technologies is a much more efficient and reliable processes than attempting to adapt existing
standards. Gaps in individual standards could be addressed by these new standards. Conflicts
between existing standards and DR technologies could be managed by giving precedence to the
requirements of the new standards over existing standards for DR technologies.
Unrestricted 41
6.2 Proposed new standards and guidance The following new standards plus associated guidance notes should be produced to fill gaps where
the current standards library does not adequately support deployment of DR technologies.
Rationale: these new standards fill the gaps identified in Section 3.3. Their contents was developed
through brain-storming within the delivery team.
Guidance: note that much of the material for these standards can come from existing DR
workstreams, such as customer requirements specifications and the ETCS reference design.
6.2.1 Highest priority
Title ETCS design and installation
Type Network Rail company standard + guidance
Scope • Information to be contained in an ETCS application specification
(applicable sections of Reference Design, project specific functionality,
performance, etc.).
• Deliverables and approvals required at each pre-commissioning
Governance for Railway Investment Projects (GRIP) stage.
• Track to train compatibility checks when new trackside ETCS equipment is
installed or an ETCS fitted train operates over a new route.
• Adjacent system compatibility checks when new trackside ETCS equipment
is installed in an area adjacent to one that is already ETCS fitted.
• Depiction of design, including the role of scheme plans and the information
shown on them.
• Sighting of ETCS block markers.
• Overrun risk assessment of ETCS block markers in degraded mode
operation.
• Driveability assessment criteria.
• Eurobalise installation requirements to ensure that installed location is
accurately captured and within design tolerances, clear of big metal
masses, and that the eurobalise is correctly configured with the correct
telegram.
• Trackside labelling of eurobalises.
Unrestricted 42
• Requirements to minimise the risk posed to ETCS fitted trains by
eurobalises and RBCs installed prior to commissioning.
• Supplementary information / tools used in design sign-off, e.g. simulation.
• Systems Integration and role of the System Authority.
Title Euroradio key management
Type Network Rail company standard + guidance
Scope • Network Rail processes for delivering the requirements of RIS-0743-CCS
'ERTMS Key Management.'
Title ETCS national identities management
Type Network Rail company standard + guidance
Scope • Process for delivering the requirements of RIS-8072-CCS 'ERTMS National
Identities Management'.
Title TM & CDAS design and installation
Type Network Rail company standard + guidance
Scope • Information to be contained in a TM / CDAS application specification
(functionality, performance, etc.).
• Deliverables and approvals required at each pre-commissioning GRIP
stage.
• Track to train compatibility checks when new trackside CDAS equipment is
installed or a CDAS fitted train operates over a new route.
• Adjacent system compatibility checks when a new TM interfaces to a TM
for an adjacent area.
• Supplementary information / tools used in design sign-off, e.g. simulation.
• Systems Integration and role of System Authority.
Unrestricted 43
Title Business change for introducing Digital Railway technologies
Type Network Rail company standard for Network Rail business change +
Railway Industry Standard for railway undertaking business change +guidance.
Scope • Roles and responsibilities for ETCS, TM & CDAS
• Operator / maintainer training and competency management requirements.
• Briefing of operators and maintainers on changes to tasks carried out by
other staff whom they deal with.
• Strategies for ensuring competent staff are available when needed and
have opportunities to practice their competence (e.g. selective use of ETCS
overlay / underlay solutions).
• Metrication of asset information and processes.
• Train operating company engagement to develop technical file to enable
entry into service.
Title ETCS processes for signallers, drivers and technicians
Type Railway industry standard + guidance
Scope • Applying / revoking Temporary Speed Restrictions (TSRs).
• Applying / revoking areas of reduced adhesion.
• Authorising movements in degraded mode.
Note that existing DR project have already defined their own processes for
signallers, drivers and technicians, which are not necessarily consistent with one
another or the wider DR roll-out.
Unrestricted 44
6.2.2 Second priority
Title Commissioning Digital Railway projects
Type Network Rail company standard + guidance
Scope • Verification & validation evidence required, including integration testing as
well as use of off-site simulation environments and / or formal verification in
lieu of site based tests.
• Commissioning process.
• GRIP deliverables and approvals required for commissioning.
• Managing non-compliances to interoperability regulations.
• Records to be returned for an ETCS / TM / C-DAS project.
• Post commissioning support.
Title Digital Railway geographic data management
Type Network Rail standard, provisionally an extension to the NR/L2/ADG/… suite of
standards + guidance.
Scope Requirements on geographical data for ETCS, TMS & CDAS covering the
following:
• responsibilities for capturing, collating, storing and maintaining geographic
data;
• track centre line information to be recorded;
• physical assets to be recorded and required information for each;
• virtual assets (e.g. ETCS ends of authority) and required information for
each;
• type of coordinate system to be used for positional data;
• specification of positional accuracy;
• specification of positional tolerances within which equipment must be
installed and maintained to avoid updates to geographic data maps;
• identifying time period for which data is valid;
Unrestricted 45
• processes for ensuring data quality;
• processes for maintaining data to ensure it remains current.
Title Record of Digital Railway parameters
Type Living document / database
Scope • National value sets.
• Principles of deployed technologies that use Packet 44.
• Allocation of ETCS identities.
• Allocation of TM identities.
• Allocation of CDAS identities.
Unrestricted 46
6.2.3 Third priority
Title Application of ETCS functions on Network Rail infrastructure
Type Railway group / railway industry standard + guidance
Scope Standard to be based on the ETCS Reference Design (Ref. 5) and Customer
Requirements Specifications (Ref. 12 - 15) and cover the following areas.
• What Full Supervision (FS), On Sight (OS), Limited Supervision (LS), Staff
Responsible (SR) and Shunting (SH) mode imply about the state and
occupancy of the track ahead.
• Provision of ETCS block markers and other signage, correspondence with
ends of authority and controls of approach speed for degraded mode
operation.
• Max / min values of release speed and where they are used.
• Use of train categories for differential and axle load speed profiles.
• Use of text messages and consistency in their content between projects.
• Use of track condition packets.
• Use of route suitability data.
• Use of level crossing information.
• When and how movement authorities can be shortened.
• Station dispatch arrangements.
• Transitions in / out of ETCS Level 2.
• National values.
Unrestricted 47
6.2.4 Fourth priority
Title TM user requirements
Type Network Rail company standard + guidance
Scope Standard to be based on TM Customer Requirements Specification (Ref. 9 &
10) and cover the following areas.
• Functional split between TM and traditional signalling control system
products.
• TM roles and responsibilities.
• Requirements defining a standard 'look and feel' for TM products.
• Definition of timetable optimisation criteria.
• Specification of user-configurable elements of TM products.
• Support arrangements for non user-configurable elements.
• Operational procedures for use of TM.
• TM data logging requirements.
• Training and competency management.
• Approval and commissioning of a TM system.
Title LINX
Type Network Rail company standard + guidance
Scope Modular suite of standards specifying LINX interfaces, based on the LINX
Service Catalogue (Ref. 6) and DR Interface Requirements Specification (Ref.
11), and functionality for TM and other business systems.
Unrestricted 48
6.2.5 Fifth priority
Title Digital railway maintenance
Type Network Rail company standard + guidance
Scope ETCS Section
• Hand-over of ETCS projects to maintenance, including duration of post-
commissioning project support.
• ETCS Defect Reporting And Corrective Action System (DRACAS).
• Inspection and maintenance of eurobalises, including ensuring correct
location & configuration following removal / replacement.
• Long-term support arrangements with ETCS suppliers for hardware,
software and data updates.
• Management of safety-critical software bug fixes and updates.
• Obsolescence management.
• Monitoring infrastructure to ensure RBC geographic data maps remain
accurate and up to date.
• Managing updates to geographic data maps to reflect infrastructure
changes (e.g. changes to permissible speeds).
TM + CDAS Section
• Hand-over of TM / CDAS projects to maintenance, including duration of
post-commissioning project support.
• TM / CDAS DRACAS.
• Long-term support arrangements with TM / CDAS suppliers for hardware,
software and data updates.
• Obsolescence management.
• Monitoring infrastructure to ensure TM / CDAS geographic data maps
remain accurate and up to date.
• Managing updates to geographic data maps to reflect infrastructure
change.
Unrestricted 49
6.2.6 Sixth priority
Title Telecoms requirements for Digital Railway
Type Network Rail company standard + guidance
Scope • Requirements on radio coverage (channels, bandwidth, quality of service,
etc.) for ETCS (according to type of application) (based on Ref. 16).
• Interfacing an RBC to the GSM-R radio network (or its successor).
• Fixed telecommunication requirements for TM / CDAS deployments
(physical interfaces, bandwidth, protocols, latency, quality of service, etc.)
• Radio requirements for hand held terminal components of TM.
• Radio requirements for CDAS.
6.2.7 Lowest priority
Title CDAS user requirements
Type Railway industry standard + guidance
Scope Standard to be based on of the CDAS Customer Requirements Specifications
(Ref. 7 & 8) and cover the following areas.
• Operational procedures for use of CDAS.
• CDAS roles and responsibilities.
• Training and competency management.
• Approval and commissioning of CDAS.
• How and where to optimise of CDAS.
Unrestricted 50
6.3 Gaps / conflicts in existing industry standards and their impacts Gaps / conflicts were identified in the following industry standards and guidance. The relevant
RSSB standards review teams should be informed of these gaps / conflicts.
Rationale: as part of the natural industry standards review cycle, know issues with existing
standards should be addressed. However, as recommended above, the focus of DR standards
activity needs to be on the creation of new standards rather than update of existing standards.
1) Highest priority: processes by which DR technologies are deployed.
Number Title Issue Compliance Date
GEGN8651 Guidance Note for Safe Integration of CCS Systems with Train Operations
1 03/03/2018
RIS-0713-CCS Lineside Signalling Layout Driveability Assessment Requirements
1.1 13/03/2018
RIS-0737-CCS Rail Industry Standard for Signal Sighting Assessment Requirements
1 04/06/2016
RIS-8270-RST Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
1 02/06/2018
RIS-3702-TOM Rail Industry Standard for Management of Route Knowledge for Drivers, Train Managers, Guards and Driver Managers
2 06/12/2014
2) Second priority: management of geographic data and parameters for DR technologies
N/A
3) Third priority: how ETCS functionality is applied in GB and associated operational
procedures managed.
Number Title Issue Compliance Date
GMRT2185 Train Safety Systems 2 02/02/2002
Unrestricted 51
Number Title Issue Compliance Date
GMGN2607 Guidance on the Braking Requirements for Hauling Unbraked Multiple Units in Freight Trains
1 04/09/2010
GEGN8540 Guidance on Low Adhesion between the Wheel and the Rail - Managing the Risk
2 05/09/2015
GKGN0802 Glossary of Signalling Terms 1 05/06/2004
RIS-2710-RST Magnetic Track Brakes 1 03/03/2018
RIS-0036-CCS Transitions Between Signalling Systems
1 03/12/2016
RIS-0707-CCS Management of Safety Related Control, Command and Signalling System
1 03/09/2016
RIS-2273-RST Post Incident and Post Accident Testing of Rail Vehicles
2 02/12/2017
RIS-2766-RST Rail Industry Standard for Wheelsets
1 02/12/2017
Form RT3186 Release of signalling controls 12-13 07/12/2013
4) Fourth priority: consistency of TM user requirements and interfaces.
N/A
5) Fifth priority: maintenance of DR technologies.
Number Title Issue Compliance Date
GMGN2571 Guidance on the Storage and Recommissioning of Traction and Rolling Stock
1 03/08/2002
6) Sixth priority: requirements for supporting telecommunications systems.
Unrestricted 52
Number Title Issue Compliance Date
RIS-8048-CCS Positioning of Lineside Telephones
1 03/12/2016
7) Lowest priority: user requirements for CDAS.
N/A
See Appendix A for further details on the proposed updates.
Unrestricted 53
6.4 Gaps / conflicts in existing Network Rail standards and their impacts Gaps / conflicts were identified in the following Network Rail standards and guidance.
Consideration should be given to these gaps / conflicts if and when specific standards are being
updated however they should not be the trigger for updates.
Rationale: updating a Network Rail company standard entail significant effort in terms of stakeholder
consultation, re-formatting and Red, Amber Green (RAG) categorisation of requirements. This effort
is not to be justified given the large number of standards identified with gaps / conflicts, the minor
nature of those gaps / conflicts and the availability of a more economic approach to address them
through creation of new DR standards.
1) Highest priority: processes by which DR technologies are deployed.
Number Title Issue Compliance Date
NR/GN/SIG/14202 Prevention and Mitigation of Overruns - Risk Assessment of Signals (Formerly RT/E/G/14202)
2 26/08/2008
NR/L2/SIG/10157 Signal sighting assessment process
3 03/04/2017
NR/L2/SIG/30009/E810
Reasonable Opportunity Assessment for Signalling Alterations
2 03/09/2016
NR/L2/SIG/11201 Signalling Design Handbook 11 01/12/2018
NR/L2/SIG/11201/Mod A1-2 Signalling Design - overview 1 01/12/2018
NR/L2/SIG/11201/Mod A2-4 Configuration control 1 01/12/2018
NR/L2/SIG/11201/Mod A2-7 Source records - As built Technical Review
1 01/12/2018
NR/L2/SIG/11201/Mod A2-17 Risk Assessments & Safety System
1 01/12/2018
NR/L2/SIG/11201/Mod A3-3 Signalling Scheme Plans 1 01/12/2018
NR/L2/SIG/11201/Mod A3-6 Aspect Sequence Charts 1 01/12/2018
NR/L2/SIG/11201/Mod A3-7 Signal Sighting 1 01/12/2018
NR/L2/SIG/11201/Mod A3-10 Signalling Scheme Plans Best Practice
1 01/12/2018
NR/L2/SIG/11201/Mod A4-2 Signalling plan & Signal box Notes
1 01/12/2018
NR/L2/SIG/11201/Mod A4-3 Location area plan & Cable Route Plan
1 01/12/2018
Unrestricted 54
Number Title Issue Compliance Date
NR/L2/SIG/11201/Mod A5-1 Symbols for Plans and Sketches used in Signalling Application
1 01/12/2018
NR/L2/INI/CP0075
Procedure for the Entry into Operational Service of Railway Infrastructure
1 March 2011
NR/L3/INI/CP0044 Work Package Planning 4 June 2010
NR/L3/INI/CP0077 Signalling Pre-Commissioning Verification Requirements
1 March 2011
NR/L2/SIG/30014 Signalling Works Testing Handbook
13 March 2018
NR/L2/SIG/30014/A… (multiple modules)
Signalling works Testing 1 Sep 2011
NR/L2/SIG/30014/B… (multiple modules)
Signalling Works Testing Staff Competence Assessment
3 June 2012
NR/L2/SIG/30014/C110 Testing Strategy
NR/L2/SIG/30014/C120 Test Plan
NR/L2/SIG/30014/C210 Acceptance of Testing Planning Documentation
2 June 2012
NR/L2/SIG/30014/C310 Check Marking and Recording on Test Copies
NR/L2/SIG/30014/C410 Error Reporting 3 June 2012
NR/L2/SIG/30014/C510 Handover of Signalling Works Testing
1 June 2012
NR/L2/SIG/30014/D… (multiple modules)
Signalling Works Test Specifications and certificates
NR/L2/SIG/30014/E110 Signalling Works Testing Glossary
2 June 2012
NR/L2/SIG/30014/F… (multiple modules)
Signalling Works Principles Testing
NR/L2/SIG/30014/G… (multiple modules)
Signalling Non-Conceptual Works and Emergency Testing
NR/L3/SIG/11303 Signalling Installation (Formerly RT/E/S/11303)
7
NR/L3/SIG/11303/..D... (multiple modules)
Electrical wiring - multiple section
Unrestricted 55
Number Title Issue Compliance Date
NR/L3/SIG/11303/..H... (multiple sections)
Tools and Techniques - multiple sections
NR/L3/SIG/11303/..M... (multiple sections)
Labelling
NR/L3/SIG/11303/1Q05 Fixings: Nuts, Bolts, Screws, Washers etc
2
NR/L3/SIG/11303/1U10 Pre-commissioning work quality checks
2 Sep 2010
NR/L3/SIG/11303/1X10 Common Pitfalls 2
NR/L3/SIG/11303/2… (multiple sections)
Various equipment specifics
NR/L3/SIG/11303/2Y05 TASS Balise 2
NR/GN/SIG/11721 The Verification and Validation of Interlockings
2 June 2002
NR/L2/SIG/30035 Signalling Scheme Technical Approval Process
3 01/09/2012
2) Second priority: management of geographic data and parameters for DR technologies
Number Title Issue Compliance Date
NR/L2/INF/02018 Specification for the Management of Safety Related Infrastructure Record
6 05/03/2011
NR/L2/SIG/11201/Mod A2-24
Data Systems 1 01/12/2018
NR/SP/SIG/02026 Provision and Management of TASS Infrastructure Data (formerly RT/E/S/02026)
1 04/06/2005
Unrestricted 56
3) Third priority: how ETCS functionality is applied in GB and associated operational
procedures managed.
Number Title Issue Compliance Date
NR/L2/SIG/30009/D410
Signalling Principles Handbook - Provision of Trapping Protection (including catch points and derailers)
1 05/12/2009
NR/L2/SIG/30009/E063 Signalling Principles Handbook -Approach Locking and Train Operated Route Release
1 02/06/2018
NR/L2/SIG/30009/E120 Signalling Principles Handbook - Replacement Facilities
1 01/03/2009
NR/L2/SIG/30009/E420 Overrun Detection and Management
2 06/06/2015
NR/L2/SIG/30009/E421 Application of Overrun Management
1 01/08/2018
NR/L2/SIG/30009/E430 Signalling Principles Handbook - Provision of derailment detectors
1 06/04/2008
NR/L2/SIG/30009/E440 Signalling Principles Handbook - Provision of overlaps for shunt routes'
1 01/03/2009
NR/L2/SIG/30009/E450 Signalling Principles Handbook - Overlap Proving
1 05/03/2010
NR/L2/SIG/30009/GERT8071 Control Facilities for use during Lineside Signalling Failures
1 06/06/2015
NR/L2/SIG/30009/GKRT0060 Interlocking Principles 2 06/06/2015
NR/L2/SIG/30009/GKRT0061 Shunters Release, Ground Frames, Switch Panels and Gate Boxes
1 06/09/2014
NR/L2/SIG/30009/GKRT0064 Provision of Overlaps, Flank Protection and Trapping
2 06/06/2015
NR/GN/SIG/00028
General Guidelines on Train Protection & the Provision of Signalling (formerly RT/E/G/00028)
1 06/12/2003
Unrestricted 57
Number Title Issue Compliance Date
NR/L2/ELP/27500
Production of Isolation Diagrams, Isolation Instructions, Comprehensive Track Diagrams and Operations Diagrams
2 03/03/2018
NR/L2/SIG/11201/Mod A3-5 Signal spacing Parameters 1 01/12/2018
NR/L2/SIG/11201/Mod A4-9 Electronic systems 1 01/12/2018
NR/L2/SIG/11201/Mod A5-3 Signalling Design Control Tables 1 01/12/2018
NR/L2/SIG/11201/Mod A5-3/App A
Conventions, General Notes, Dollar Notes and Signaller Route Lists
1 01/12/2018
NR/L2/SIG/11201/Mod A5-3/App D
Control Tables for Level Crossings
1 01/12/2018
NR/L2/SIG/11201/Mod A5-3/App H
SSI Control Tables 1 01/12/2018
NR/L2/SIG/11201/Mod A5-3/App K
Signalling Control Tables - MCB-OD Level Crossings
1 01/12/2018
NR/L2/SIG/11201/Mod A5-5 Signalling Control Centres 1 01/12/2018
NR/L2/SIG/11201/Mod B1 General Introduction 5 01/12/2018
NR/L2/SIG/11201/Mod B7 Interlockings - General 7 01/12/2018
NR/L2/SIG/11201/Mod X02 Signalling Design: Module X02- Level Crossings: Common Design Requirements
2 01/12/2012
NR/L2/SIG/11201/Mod X10 Signalling Design: Module X10 - Level Crossings: Automatic Half Barriers
1 03/09/2011
NR/L2/SIG/11201/Mod X11 Signalling Design: Module X10 - Level Crossings: Automatic Half Barriers
1 01/12/2012
NR/L2/SIG/11201/Mod X12 Signalling Design: Module X12 - Level Crossings: Automatic Open Crossing Locally Monitored
2 01/12/2012
NR/L2/SIG/11201/Mod X21
Signalling Design: Module X21 - Level Crossings: Manually Controlled Barriers With Obstacle Detectors
3 01/12/2012
Unrestricted 58
Number Title Issue Compliance Date
NR/L2/SIG/11201/Mod X22 Signalling Design: Module X22 - Level Crossings: Manually Controlled Barriers
2 01/12/2012
NR/L2/SIG/11201/Mod X24 Signalling Design: Module X24 - Level Crossings: On Call Barriers
2 01/12/2012
NR/L2/SIG/11201/Mod X25 Signalling Design: Module X25 - Wicket Gate Magnetic Locks
1 03/09/2011
NR/L2/SIG/11201/Mod X30 Signalling Design: Module X30 - Traincrew Operated Gates
1 03/09/2011
NR/L2/SIG/11201/Mod X31 Signalling Design: Module X31 - Traincrew Operated Barriers
1 03/09/2011
NR/L2/SIG/11201/Mod X39 System Application Specification for Overlay Miniature Stop Light Level Crossings
1 June, 2015
NR/L2/SIG/11201/Mod X40 Signalling Design: Module X40 - Level Crossings: Miniature Stop Lights
2 01/12/2012
NR/L3/SIG/30082 Axle Counter System Handbook 2 04/12/2010
NR/L3/SIG/MG0110 Imposition and Removal of Emergency and Temporary Speed Restrictions
3 02/06/2012
NR NR/L3/SIG/SG0111 Design of Emergency and Temporary Speed Restrictions
3 03/09/2011
Unrestricted 59
4) Fourth priority: consistency of TM user requirements and interfaces.
Number Title Issue Compliance Date
NR/SP/ERG/00005 Signalling Centre Desks 1 07/04/2007
NR/L3/SIG/10120 Automated Route Setting Specification
1 01/09/2008
NR/SP/SIG/11130 Requirements for the provision of SPAD Alarms at Signalling Control Centres
2 -
RT/E/PS/00012
Specification for the preparation and Implementation of Train Describer System Parameter Tables
1 -
RT/E/S/10067 Requirement Specification for a VDU Based System (NR/SP/SIG/10067)
2 02/08/2003
NR/PS/SIG/00009 Message handling and data transmission reqs between processor based systems
2 -
Unrestricted 60
5) Fifth priority: maintenance of DR technologies.
Number Title Issue Compliance Date
NR/L2/SIG/10028 Supervisory Inspection of Signalling Assets
7 05/12/15
NR/L3/SIG/10064 General Instructions to Staff Working on S&T Equipment (formerly NR/SP/SIG/10064
6 31/05/18
NR/L2/SIG/11010 Management of Signalling and Communication Systems (Formerly RT/E/S/11010)
3 03/09/11
NR/L3/SIG/10046 SINCs (Signalling) for Network Rail Fault Management
1 05/03/11
NR/L3/SIG/19810 Signal Engineering Involvement in Civil Engineering
2 26/08/08
NR/L2/SIG/20047 Management of Safety Related Reports for Signalling Failures Appendix
2 02/09/18
NR/L2/CTM/011 'Competence & Training In Track Engineering (NR/L2/CTM/011)
1 31/12/06
NR/L2/CTM/012 Competence and Training In Signal Engineering (formerly NR/SP/CTM/012)
3 02/06/12
NR/L2/CTM/205
Competence and Training for the Maintenance of Traction and Rolling Stock and On-track Machines
1 02/06/12
NR/L2/CTM/209 Competence and Training in Safe System of Work Planner
1 04/06/11
NR/L2/SIG/19807 Prioritisation Of Signal Engineering Equipment Defects (Formerly NR/SP/SIG/19807)
3 04/09/10
Unrestricted 61
6) Sixth priority: requirements for supporting telecommunications systems.
Number Title Issue Compliance Date
NR/L2/CTM/013 Training and competence in telecom engineering
2 05/02/2011
NR/L2/TEL/30098 Testing & commissioning of telecoms equipment and systems
2 26/08/2008
NR/L2/TEL/31001 Telecommunications maintenance testing & failure investigation
4 02/06/2018
NR/L3/TEL/40047 Management of Safety Related Reports for Telecoms Failure Appendix
2 03/06/2017
NR/PS/TEL/00025 Synchronous Digital Hierarchy Multiplexing Equipment
2 01/04/2006
7) Lowest priority: user requirements for CDAS.
N/A
See Appendix B for further details on the proposed updates.
Unrestricted 62
7 Next Steps
7.1 Introduction A significant number of new standards and updates to existing standards have been identified to
support deployment of DR technologies across the GB rail network. The following are the
recommendations for the next steps.
1. Creation of a dedicated project team to create new standards where required, manage and
deliver the necessary Network Rail company standards changes and liaise with the relevant
bodies for changes to industry standards (e.g. RSSB).
2. Review the output from the IJDG, refine and agree the prioritisation based on the proposed
digital “work” portfolio and risk.
3. Group the new standards as a specific suite of ‘Digital’ standards that take precedence over
other standards when DR technology is being delivered.
7.2 Dedicated Project Team. Given the volume of standards work required and the need for consistent delivery approaches and
system application across projects, the forming of a dedicated project team to manage and deliver
the standards work would be prudent. This core project team would consist of a project manager,
planner and at least two engineers to produce and independently check standards proposals.
Additionally, SMEs and project engineers from recent / live DR projects would be required on an
call-off basis to support the work. Whilst the core team would need to be supplier independent to
avoid biasing any one solution, involvement of a broad range of supplier representatives as SMEs is
essential to ensuring robust outputs.
The project team would be accountable for deciding how the standards work and will be delivered
and for managing the schedule of the work such that the standards are available when needed by
projects and the wider industry. This project team could be set up either under DR or within Network
Rail Safety, Technical & Engineering (STE) team. Key will be the agreement of a clear schedule and
targets for the delivery of the standards work that support the DR projects portfolio.
7.3 Output Review This report identifies the standards work required. It needs to be reviewed in conjunction with the
current project portfolio to agree the priorities for the work. The review will also need to consider the
available resources to undertake the work.
7.4 Digital Standards Suite An approach that DR should consider is to produce a suite of “Digital” standards, that include the
changes required to the existing standards suite. This approach was taken for the roll-out of TASS
and allowed the update to impacted standards to be undertaken when there was a major change to
that standard.
Given a large proportion of the changes have been identified to older standards that have not yet
been updated in line with the latest standard policy, this could save significant time and effort that
would be associated with updating and agreeing the impacted standards in the new form.
Unrestricted 63
7.5 Rough order of magnitude estimates of workload
7.5.1 Overview
The following section provide rough order magnitude estimates of the workload involved, at senior /
principal grades, to develop the proposed new standards and prepare proposals for updates to
existing ones. In addition to labour, the project team would need access to SMEs, delivery projects
and RSSB / Network Rail standards owners.
7.5.2 Development of proposed new standards
Priority Standard Estimated
Person-Days *
Highest ETCS design and installation 130
Highest Euroradio key management 10
Highest ETCS national identities management 10
Highest TM & CDAS design and installation 60
Highest Business change for introducing Digital Railway technologies
60
Highest ETCS processes for signallers, drivers and technicians 30
Total 300
Second Commissioning Digital Railway projects 60
Second Digital Railway geographic data management 100
Second Record of Digital Railway parameters 50
Total 210
Third Application of ETCS functions on Network Rail infrastructure
120
Total 130
Fourth TM user requirements 100
Fourth LINX 100
Total 200
Fifth Digital railway maintenance 140
Total 140
Sixth Telecoms requirements for Digital Railway 50
Total 50
Lowest CDAS user requirements 50
Total 50
GRAND TOTAL 1080
* based on 10 person days effort per bullet point in recommended scope of proposed standard and 100 person days for
LINX standard.
Unrestricted 64
7.5.3 Proposals for update of industry standards
Priority Number of Standards Estimated
Person-Days *
Highest 5 75
Second 0 0
Third 10 150
Fourth 0 0
Fifth 1 15
Sixth 1 15
Lowest 0 0
Total 255
* Based on 15 person days effort per standard: 5 days to produce an update proposal + days to discuss it with RSSB
standards only + 5 days follow-up activity.
7.5.4 Network Rail company standards
By focusing of developing new standards, rather than updating existing ones, negligible effort is
needed in relation to existing Network Rail standards. Updates for DR would only be carried out as
part of other update work.
Unrestricted 65
APPENDIX A: ANALYSIS OF INDUSTRY STANDARDS & GUIDANCE
Date of analysis - 26/06/2018
Provided as separate spreadsheet.
APPENDIX B: ANALYSIS OF NETWORK RAIL COMPANY STANDARDS & GUIDANCE
Date of analysis - 26/06/2018
Provided as separate spreadsheet.
APPENDIX C: EXCLUDED NETWORK RAIL COMPANY STANDARDS & GUIDANCE
Date of analysis - 26/06/2018
Provided as separate spreadsheet.
Unrestricted 66
APPENDIX D: GLOSSARY
Abbreviation Definition
ASA Asset Standards Authority
AWS Automatic Warning System
CCS Command, Control and Signalling
CDAS Connected Driver Advisory System
CRS Customer Requirements Specification
DMI Driver Machine Interface
DMSI Degraded Mode Speed Indicators
DRACAS Defect Reporting And Corrective Action System
DR Digital Railway
DRP Digital Railway Programme
EDS Early Deployment Scheme
ERTMS European Rail Traffic Management System
ETCS European Train Control System
EU European Union
FS Full Supervision
Unrestricted 67
GB Great Britain
GRIP Governance for Railway Investment Projects
GSM-R Global System for Mobile Communications – Railways
IJDG Interim Joint Delivery Group
IM Infrastructure Manager
IT Information Technology
LS Limited Supervision
LUL London Underground Limited
MA Movement Authority
NNTR Notified National Technical Rule
NR Network Rail
NSW New South Wales
OS On Sight
RAG Red Amber Green
RBC Radio Block Centre
RIS Railway Industry Standard
RSSB Rail Safety and Standards Board
Unrestricted 68
RU Railway Undertaking
SFI Signal Fault Investigation
SH Shunting
SME Subject Matter Expert
SoS System of Systems
SPAD Signal Passed At Danger
SR Staff Responsible
STE Safety, Technical & Engineering
TASS Tilt Authorisation and Speed Supervision
TfNSW Transport for New South Wales
TM Traffic Management
TPWS Train Protection and Warning System
TSR Temporary Speed Restriction
Unrestricted 69
APPENDIX E: REFERENCES
Ref. No. Title Document No. Issue /
Version
Date
1. Digital Railway – System of
Systems (SoS) System
Definition
153821-NWR-REP-ESE-
000002
4.0 27/04/ 2018
2. RSSB Standards Catalogue N/A N/A Downloaded
02/07/2018
3. Catalogue of Network Rail
Standards
NR/CAT/STP/001 108 02/06/2018
4. Company standards update N/A 0.8 02/10/2015
5. ETCS Reference Design N/A N/A October
2016
6. LINX Service Catalogue 140708 7.01.01.03 01/09/2016
7. Digital Railway – Connected
Driver Advisory System (C-
DAS) System Definition
153821-NWR-SPE-ESE-
000009
1.0 11/04/2018
8. Digital Railway – GB
Generic Customer
Requirements Specification
for Connected-Driver
Advisory System
153821-NWR-SPE-ESE-
000010
1.0 27/04/2018
9. Traffic Management System
Definition
153821-NWR-REP-ESE-
000004
1.0 29/03/2018
Unrestricted 70
10. Digital Railway – GB
Generic Customer
Requirements Specification
for Traffic Management
Systems (TMS)
153821-NWR-SPE-ESE-
000011
1.0 26/04/ 2018
11. Digital Railway – GB
Generic Interface
Requirements Specification
153821-NWR-SPE-ESE-
000013
1.0 23/04/2018
12. Digital Railway – European
Train Control System
(ETCS) Onboard System
Definition
153821-NWR-REP-ESE-
000005
1.0 27/03/2018
13. Digital Railway – European
Train Control System
(ETCS) Trackside System
Definition
153821-NWR-REP-ESE-
000006_01
1.0 19/03/2018
14. Digital Railway – GB
Generic Customer
Requirements Specification
for ETCS Trackside
153821‐NWR‐REP‐ESE‐
000007
1.0 23/04/2018
15. Digital Railway – GB
Generic Customer
Requirements Specification
for ETCS Onboard
153821-NWR-SPE-ESE-
000008
1.0 24/04/2018
16. ETCS Baseline 3 – GB
Telecoms Sub-system
Requirements
Specifications
NEPT/ERTMS/REQ/0008 3.0 31st March,
2017
Unrestricted