Who are Turner & Townsend Advisory
Programme performance
Asset and facilities management
Data and analytics
Capital projects
BIM
Solutions advisory
Business wide transformation
Focussed improvement
Procurement and contract strategy
Dispute resolution
Contract execution and management
Lean programmes
Contract
services
Consulting
Technology -
76
Operational
excellence
Setup Delivery Operation
Evolution or Revolution?
BIM
CAD
Board
Art
Cave
Late 20th and now 21st
Mid 20th and now 21st
Early 18th and still in the 21st
Early 10K BC and still in 21st
Early 35K BC and still in 21st
37
,000
Yea
rs
Why BIM/Digital?
Public sector clients - BIM either has been, or will soon be,
formally adopted by Governments in:
■ UK – All Government
departments
■ Netherland
■ Denmark
■ Finland
■ Norway
■ UAE – Dubai Municipality
■ European Union
■ USA
■ Singapore
■ Hong Kong –
Housing authority
■ South Korea
■ Canada
■ South Africa
■ Chile
■ China
■ Russia
People have to
People want to
The need
■ Quality information
■ Better decision making
■ Cost certainty and predictability
■ Health and safety on site and during operation
■ Whole lifecycle approach to projects
Have you seen this before?
Relationship of information management elements
Models Client
Requirements
PAS1192-3
(Asset)
PAS1192-2
(Project)
Data Uses 3D design coordination
Asset management
Assurance and data validation
Bespoke BIM object library authoring
Building systems analysis
Cost estimation and management
Data classification
Design (BIM) authoring
Digital fabrication
Disaster planning
Drawing generation
Energy analysis
Existing & record modelling
Field management tracking
Lighting analysis
Pedestrian simulation for hazard and dwell time
Planned maintenance
Planning, sequencing and simulation
Possessions and permit to work
Reviews
Site analysis
Spatial optimisation, management and tracking
Structural analysis
Sustainability evaluation
Visualisation and communication
Data Uses 0
Strategic
Definition
2
Concept
Design
3
Developed Design
4
Technical Design
5
Construction
6
Handover and
Close Out
7
In Use
Construction system design
Digital fabrication
3D control and planning
Field management tracking
Data transfer and authoring - CAFM
Hard / Soft FM procurement and market test
Possessions and permit to work
Agency – marketing / leasing / disposal to market Development appraisal
Building systems analysis
Disaster planning
Space management and tracking
Asset management & PPM
Pedestrian simulation
Existing conditions modelling Record modelling
Cost estimation & Cost management
Construction sequencing and simulation
Spatial planning and optimisation
Site analysis
Design reviews
Data classification
Design (BIM) authoring & Bespoke BIM object library authoring
Drawing generation
Energy analysis & Structural analysis & Lighting analysis
Sustainability evaluation
Code regulations compliance
Visualisation and communication
3D Co-ordination & Assurance and data validation
Achievable Decision to add a use to the scope of works Achievable / challenging Unachievable
1
Preparation
and Brief
Data Uses
Construction system design
Digital fabrication
3D control and planning
Field management tracking
Data transfer and authoring - CAFM
Hard / Soft FM procurement and market test
Possessions and permit to work
Agency – marketing / leasing / disposal to market Development appraisal
Building systems analysis
Disaster planning
Space management and tracking
Asset management & Planned maintenance
Pedestrian simulation
Existing conditions modelling Record modelling
Cost estimation & Cost management
Construction sequencing and simulation
Spatial planning and optimisation
Site analysis
Design reviews
Data classification
Design (BIM) authoring & Bespoke BIM object library authoring
Drawing generation
Energy analysis & Structural analysis & Lighting analysis
Sustainability evaluation
Code regulations compliance
Visualisation and communication
3D Co-ordination & Assurance and data validation
Achievable Decision to add a use to the scope of works Achievable / challenging Unachievable
0
Strategic
Definition
2
Concept
Design
3
Developed Design
4
Technical Design
5
Construction
6
Handover and
Close Out
7
In Use
1
Preparation
and Brief
Data Uses
Construction system design
Digital fabrication
3D control and planning
Field management tracking
Data transfer and authoring - CAFM
Hard / Soft FM procurement and market test
Possessions and permit to work
Agency – marketing / leasing / disposal to market Development appraisal
Building systems analysis
Disaster planning
Space management and tracking
Asset management & Planned maintenance
Pedestrian simulation
Existing conditions modelling Record modelling
Cost estimation & Cost management
Construction sequencing and simulation
Spatial planning and optimisation
Site analysis
Design reviews
Data classification
Design (BIM) authoring & Bespoke BIM object library authoring
Drawing generation
Energy analysis & Structural analysis & Lighting analysis
Sustainability evaluation
Code regulations compliance
Visualisation and communication
3D Co-ordination & Assurance and data validation
Achievable Decision to add a use to the scope of works Achievable / challenging Unachievable
0
Strategic
Definition
2
Concept
Design
3
Developed Design
4
Technical Design
5
Construction
6
Handover and
Close Out
7
In Use
1
Preparation
and Brief
Data Uses
Construction system design
Digital fabrication
3D control and planning
Field management tracking
Data transfer and authoring - CAFM
Hard / Soft FM procurement and market test
Possessions and permit to work
Agency – marketing / leasing / disposal to market Development appraisal
Building systems analysis
Disaster planning
Space management and tracking
Asset management & Planned maintenance
Pedestrian simulation
Existing conditions modelling Record modelling
Cost estimation & Cost management
Construction sequencing and simulation
Spatial planning and optimisation
Site analysis
Design reviews
Data classification
Design (BIM) authoring & Bespoke BIM object library authoring
Drawing generation
Energy analysis & Structural analysis & Lighting analysis
Sustainability evaluation
Code regulations compliance
Visualisation and communication
3D Co-ordination & Assurance and data validation
Achievable Decision to add a use to the scope of works Achievable / challenging Unachievable
0
Strategic
Definition
2
Concept
Design
3
Developed Design
4
Technical Design
5
Construction
6
Handover and
Close Out
7
In Use
1
Preparation
and Brief
Step 1 Step 2 Step 3
CAPex
BIM Ready
MIDP
Strategic set up Appointment / Procurement
EIR BEP OIR
AIR
CDE set up and configuration
Common Data
Environment
Client
Project
Manager
Information
Manager
BIM Leader
Cost Manager
Health & Safety
EIR
PEP
BEP
CIC
Pro
tocol
BIM
Coordinator
Design Team
BIM
Coordinator
Main
Contractor
Pro
jec
t co
nfi
gu
rati
on
T
imelin
e
Mobilise
Status
report
Discovery
CIC Protocol
Step 4 / 5
Assessm
en
t
Opex 1 2 3 4 5
PIM AIM
Common Data Environment
Maintenance / Operations Key data drops / Decision points
Assurance for Design, Construction, Asset Modelling / Contract Compliance Assurance
BIM Information Management
Consultant Appointment
Client Designer or
Consultant
Request for Proposal
EIR Capability
Assessment
Consultant Proposal
Pre-Contract BEP
Completed Capability
Assessment
Contractor Appointment
Client Contractor
Request for Proposal
EIR Capability
Assessment
Contractor Proposal
Pre-Contract BEP
Completed Capability
Assessment
Consultant BEP
Design Model
Impact on costing
LO
D 7
LO
D 5
& 6
LO
D 4
LO
D 3
LO
D 1
& 2
Operation Class A Class B Class C Class D
Te
nd
er
Fin
al
ac
co
un
t
Simple £/m2 benchmark
Elemental – shell & core
Composite component level
BoQ component level
Cost in use
What do we see FM being asked for?
• Full Asset List
• Precise definition of what an asset is
• Space Names and Schema
• Space Classification
• Full asset data scheme of data names, types and values
• Validation of the above
• A timetable of when that will be required
Asset Information Model Definition
Hosted
Linked
Referenced
3D object
Space/Room
asset
Systems model
Asse
t in
form
atio
n
linka
ge
Mo
de
l
pla
ce
ho
lde
r
type
Assets modelled
as individual items.
Assets
identified
within a room
and
referenced as
a zone or
space.
Assets modelled and
referenced as a zone
or space depicting all
items in a system.
Information
referenced to an
external data source.
Information is
linked from
model to O&M
data.
Information
embedded
within the
model.
Traditional delivery
0 1 2 3 4 5 6 7
Client
PM / CM
Architect
Design
Contractor
Supply
Operations
PREPARE DESIGN BUILD OPERATE
New Bespoke
Document
Data Led delivery
0 1 2 3 4 5 6 7
Client
Digital PM
delivery
Architect
Design
Contractor
Supply
Operations
PREPARE DESIGN BUILD OPERATE
Client Brief
IMMS
Assurance
BIM Manager
Design Data
Asset Data
Operational Data
Key
Single BIM
Key Features
Single Dataset created
for many to use
Ownership of the data
transfers @ end of
each phase
1