Introduction
3 A presentation by Wood. Confidential
Introduction
- Objectives
- Development process
- Features
- Benefits
Objectives
5 A presentation by Wood. Confidential
Digital vision
Minimise documentation
Milestones based on
data maturity
Automated design
Assurance & MoC tools
Automated reporting
Single source of truth
for asset design data
Basis of asset lifecycle data
Digital pipeline
6 A presentation by Wood. Confidential
Connected design
Concept FEED Detailed design
Connected build
Execution
Connected ops.
Operation
Dig
ital p
ipelin
eD
ata
matu
rity
Project timeframe
Survey data
Design data
Asset data
Documents
Costing and quantities
Operating data
Video
Basis of design
7 A presentation by Wood. Confidential
Connected design ecosystem
Digital pipeline Asset dataDesign dataGeospatial data Documents TagsBoD
Automated GIS toolkit
Profiling
Alignment sheet generation
Routing
Terrain analysis
Data management
Data models
PODS SSDM
CFIHOS PDEF
Data QA/QC
Document control
Automated Design –Pipelines
Design data input &
visualisation
Assurance & change
management
Design calculations
Reporting
Digital twins
Dashboarding
2D map view
3D view
Logical/asset view
Data search & visualisation
8 A presentation by Wood. Confidential
Drivers
Customers
More certainty
Greater pace
Increased cost effectiveness
Digital delivery
Engineers
Avoid searching for data
Eliminate repetitive tasks
More time engineering
Increased job satisfaction
Business
Increased competitiveness
Attract and retain talent
Increased agility
Development process
Engineers at
the centre
Engineers
interpret & make
design decisions
10 A presentation by Wood. Confidential
Approach
Evolution, not
revolution
Next iteration of
Wood’s verified
design toolkit
Single source
of truth
Centralised,
verified design
database
Eliminate
manual tasks
Get rid of
repetitive tasks
& data handling
Apply
automation
Automate
calculations
& reporting
11 A presentation by Wood. Confidential
Development process
Proof of concept
Jul 18 Jan 19 Jun 19 Jan 20
Investigate
Prototype
Minimum viable product
Scale & extend
Launch
35
7
20+
Deploy
Features
13 A presentation by Wood. Confidential
Features
Design data
Calculations
Assurance
Reporting
15 A presentation by Wood. Confidential
Project and asset data• Basis of design
• Design inputs
• Asset data
Libraries• Materials, S-n curves
• Linepipe (DNVGL, API)
QA & revision control
Change management
Features
Design data
Calculations
Assurance
Reporting
Calculation setup
Calculations & FE analysis• Wall thickness (DNVGL, API, ASME, BS, CFR)
• On bottom stability
• Spanning (Level 1-4)
• DNVGL combined loading (LCC, DCC)
Analysis modes• Design – identify requirements
• Verify – confirm safety margin
Input comparison• Sensitivity analyses
• QA
Review, visualisation and comparison of results
17 A presentation by Wood. Confidential
Features
Design data
Calculations
Assurance
Reporting
• Bottom roughness
• End expansion
• Buckle arrestor
• Crossing design
21 A presentation by Wood. Confidential
Basis of design compliance
Design consistency
Features
Design data
Calculations
Assurance
Reporting
23 A presentation by Wood. Confidential
Charting
Calculation inputs/outputs
Design results
Material take offs
Features
Design data
Calculations
Assurance
Reporting
Benefits
More optimised
design in less
time
27 A presentation by Wood. Confidential
Benefits
Greater design
maturity earlier
in project
Rapidly evaluate
design changes
& operational
anomalies
Optimise total
installed cost
and reduce
TOTEX
40 years’
experience &
verification
28 A presentation by Wood. Confidential
Benefits
Manhours
Design cases addressed
Proof ofconcept
Previousdesign toolkit
Prototype Minimumviable product
Man
ho
urs
100%
TBD*
Desi
gn
case
s ad
dre
ssed
100%
-25%
-40%
* to be determined during piloting
29 A presentation by Wood. Confidential
Deployment & future developmentD
ep
loy
Develo
p
MVP
Dynamic risers
Flexibles & umblicals
Launch
Hypercare
Dynamic drilling risers
Pipeline pilot 1
Pipeline pilot 2
Training & support
Pipeline global roll-out
Upgrades & maintenance
Spools
Enhanced reporting Enhanced automation
Pilot extensions & enhancements
Global roll-out of extensions & enhancements