"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators, and manager. It is not surprising, then, that a control engineer may know more about the plant than perhaps any other individual associated with it.“
F. Greg Shinskey, "Energy Conservation Through Control" Academic Press, Inc. 1978
DIGITAL FEEDWATER CONTROL
PROJECTS
FOR
TENNESSEE VALLEY AUTHORITY
![Page 3: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/3.jpg)
Major Topics
• Operational and Maintenance Challenges in Existing Nuclear Plants
• Cost vs. Benefits of Digital Systems
• Digital Feedwater Controls Implemented with TVA
• Post Upgrade Challenges
3
![Page 4: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/4.jpg)
Operations Challenges
• Improving Reliability and Assurance of Continued Operations
• Reducing Single Points of Vulnerability (SPV)
• Replace Aging or Poorly Performing Equipment
• Reduction of Unplanned Downtime/Outages
• Reduction of Manual Operator Interaction
• Operations Acceptance
4
![Page 5: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/5.jpg)
Maintenance Challenges
• Reduction of Equipment Cost• Reduction of Equipment Maintenance Time• Reduction of Surveillance Testing • Replacement of Obsolete Analog and Digital
Controls
5
![Page 6: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/6.jpg)
6
Cost vs. Benefit
Cost
– Assumed Scope and Cost of the Upgrade
– Spares– Re-Training
Benefit
– Staffing Impact– Spare Parts Cost– Testing Requirements– Consolidate Training– Risk Reduction– Additional Diagnostic
Capabilities– Operational Flexibility– Plant Performance
![Page 7: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/7.jpg)
Plant Performance
Digital systems and Advanced Controls can provide tighter, more efficient control
• Improved Cycle Efficiency• Reduced Fuel Expense for Same Generation• Increased Operating Margin• Reduced Instrument Uncertainties
7
![Page 8: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/8.jpg)
Advanced Digital Controls for Feedwater Systems at TVA
• Single Points of Vulnerability Elimination• Fault Tolerant Control Processing
• Redundant Control Networks
• Redundant Inputs and Outputs
• Redundant Sensor Algorithms
• Integrated 1E/3E Advanced Controls Philosophy
8
![Page 9: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/9.jpg)
Redundant Sensor Algorithms• Allow the system to suffer a partial or complete loss of one of the
redundant input signals with minimal upset to plant operations
• Signals monitoring the same process variable are brought into digital controller on separate I/O devices (segregation of measurements)
• Signals are monitored for health and deviation tolerance from other values
• A faulted/suspect signal is bypassed, allowing for maintenance of the offending device, while operations continue
• If no valid signal is detected, control action is blocked, fail safes imposed, and controls transferred to manual
9
![Page 10: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/10.jpg)
PWR – Redundant Signals
Slide 10
FT FT
FT FT
LT
LT
LT
![Page 11: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/11.jpg)
Dual Transmitter Input Algorithm
11
Upside• Upon Failure of Signal, the bad
signal can be bypassed and control may continue using healthy signal
• Optionally may block control actions
• Can optionally choose average, high or low select.
• Conditional Alarming
Downside• Deviation between signals
requires operator interaction to select best signal
![Page 12: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/12.jpg)
Dual Transmitter Input Algorithm with Arbiter (Voter)
12
Upside• Same as Basic Dual Input
Algorithm
• Uses Arbiter Signal as “tracking” value to automatically select healthy signal when one deviates
Downside• Limited applications, Arbiter
signal not often availableTVA Implementations Steam Flow Feedwater Flow
![Page 13: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/13.jpg)
Triple Transmitter Input Algorithm
13
Upside• Upon Failure of Signal, the bad signal
can be bypassed and control may continue using healthy signal
• Optionally may block control actions if two or more signals fail
• Can optionally choose average, high or low select.
• Deviation of one signal is measured against the other two to automatically select healthy signal if one begins to deviate
TVA Implementations Main Steam Pressure Feedwater Pressure Steam Generator Level
![Page 14: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/14.jpg)
Segregation of Redundant Signals
Slide 14
![Page 15: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/15.jpg)
Control Scheme
Operations Engineering/Maintenance
Fault-tolerant Network
Digital Control System Overview
Measure and Control
![Page 16: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/16.jpg)
Original Bench Handstations
Slide 16
![Page 17: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/17.jpg)
New Bench Handstation
• Fully interactive with digitally resident, more robust control
strategies
• Fully functional in absence of Workstation or Dual Network.
Slide 17
![Page 18: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/18.jpg)
New Feedwater Process Graphic
• Mimics Bench functionality
• Seamless Parallel Controls
• Reduces training by providing equivalent control with display integration
Slide 18
![Page 19: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/19.jpg)
Control & Measure
Operations Engineering/Maintenance
Fault-tolerant Network
Digital Control System Overview (with new Handstation)
New Handstation
• Allows for continued operation in presence of multiple control system failures
![Page 20: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/20.jpg)
Traditional Single Element / Three Element Control for Steam Generator Level
• Single element control (SG Level) at low power using only Start-Up Bypass valve to maintain level.
• Above ~25% power, three element control engaged using Steam Flow, Feedwater Flow, and Main Feedwater Regulatory Valve
• Operator intensive manual procedure to transfer from single element bypass valve to three element main valve as reactor moved up through 20-25% power
• Similar operator intensive manual procedure for reactor power decrease
• Many unplanned trips with manual procedures
20
![Page 21: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/21.jpg)
Enhanced Single Element / Three Element Control for Steam Generator Level
• Startup Bypass FW Valve and Main FW Valve are split ranged such that they automatically sequence as if there is one full range valve.
• Three element control transfer can be enabled at a much lower level, improving dynamic performance
• Advanced controls automatically sequence single element to three element over this split range valve.
• No operator manual action is required, controls transfer over at a consistent reactor power, both increasing and decreasing
• Automatic transfer to single element upon loss of all Steam Flow or all Feedwater flow signals, allowing for SG level to be maintained while maintenance can be performed on the offending signals
• If Steam Generator Level signals are lost, the controls of the valves revert to manual
21
![Page 22: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/22.jpg)
Enhanced Single Element / Three Element Control
22
![Page 23: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/23.jpg)
Post Upgrade Operations Challenges
• Training
• New Failure Modes
• New Interaction
23
![Page 24: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/24.jpg)
Maintenance Challenges
• New/Changing Calibration requirements, techniques
• Documentation
24
![Page 25: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE VALLEY AUTHORITY](https://reader035.fdocuments.in/reader035/viewer/2022062517/56813569550346895d9ccf24/html5/thumbnails/25.jpg)
TVA Improvements:
• ~30 SPV removed per Unit
• Automated transfer from startup valves to main valves with improved effect on Steam Gen Level
• Failure of BOTH Steam Flows at 100% power, controls remained in AUTO (1E)
• Additional Data available on plant computer as a result of upgrade aided troubleshooting in multiple events
• Automated FW Pump balancing on startup of second pump
• Extensive simulator work allowed for minimal tuning during startup
Summary