I I I I I I I I I I I I I I I I I I I Report on Diamond Drill Program As conlpleted by Billiken Management Services Inc. For: Noront Resources Ltd. and Greenstone Exploration Ltd. On their Double Eagle Property Grid 1 over claims P 3012264 P-3012259 to 3012262 & 3012256 Located in BMA 526862 and 527862 RECEIVED APR 18 2008 GEOSCIENCE ASSESSMENT OFFICE all of which are centered on or about: 547202E, 5843646N using NAD 83 datum UTM Zone 16 April 12, 2008 By Neil Novak P.Geo. 2·37763

Transcript of DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83...

Page 1: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

Report on Diamond Drill Program

As conlpleted by

Billiken Management Services Inc.

For:

Noront Resources Ltd. and Greenstone Exploration Ltd.

On their Double Eagle Property Grid 1

over claims P 3012264

P-3012259 to 3012262 & 3012256

Located in BMA 526862 and 527862

RECEIVED

APR 1 8 2008 GEOSCIENCE ASSESSMENT

OFFICE

all of which are centered on or about: 547202E, 5843646N using NAD 83 datum UTM Zone 16

April 12, 2008

By Neil Novak P.Geo.

2·37763

Page 2: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

Introduction

During August and September 2007, Billiken Management Services Inc. was contracted to carry out an all inclusive diamond drilling program on ground Grid 1 covering portions of claims in BMA 527862 and 526862 held by Noront Resources Ltd. and Greenstone Exploration Ltd. Noront has been exploring the general area since 2002 when Volcanic hosted Massive Sulphide (VMS) mineralization was discovered near McFaulds Lake by De Beers Canada Exploration Inc. who at the time was in a joint venture with KWG and Spider exploring for diamonds. The initial discovery has led the KWG/Spider joint venture to eight other VMS showings or prospects in the general area, and attracted the attention of other exploration compames. Noront acquired their claims by staking in April 2003.

Billiken staff initially reviewed the available regional airborne survey as completed by Fugro in the summer of 2003, that was immediately followed up with local ground geophysical surveying (HLEM, VLF and Magnetics) by Scott Hogg & Associates. The proposed drill sites were selected by Billiken staff in discussion with Scott Hogg and their staff, in consultation with Neil Novak ofNoront. The target anomaly was selected and holes were spotted in the field as required and position was verified using hand held GPS. In addition to locating the drill hole with GPS a number of claim posts were also located on the ground grids and position recorded by GPS providing reasonable assurance of claim post location with respect to drill hole location.

Drilling commenced on August 25 and was completed by Sept 4, 2007 for this phase of the exploration program. The intended target was a coincident magnetic and HLEM target with limited strike length, striking NE-SW. The target was intriguing as it had kimberlite geophysical characteristics as well as Massive Sulphide style mineralization protential.

Each hole was designed to test a strong airborne Geotem and Magnetic anomaly that was ground verified using Max-Min and ground magnetics. Four holes totaling 642 meters were drilled in this program and are hereby presented in detail. Logs and assay certificates for each hole are presented as appendices. Location and claim information are presented as maps incorporated into the body of the report.

2

Page 3: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

Location and Access (see figure 1)

The property is located approximately 20 kilometers WSW of the McFaulds Lake discovery area in the James Bay Lowlands area of Northern Ontario. Figure 1, shows location of the claim group in northern Ontario, some 200 km. west (or upstream) from the First Nation community of Attawapiskat on the western shore of James Bay, or conversely 80 km. east of the First Nation community of Webeque. More specifically, the center using UTM co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 .

Billiken employees and the diamond drill crew operated from a large base camp, located at McFauld's Lake, approximately 20 kilometers to the ENE of the project area. Access to the drill site was by helicopter, based at McFaulds Lake, the drill crew flew daily to and from the site. Access to the McFaulds base camp is by fixed wing (float planes in summer, ski planes in winter) as well as helicopter year round. This camp is serviced out of Nakina, Ontario.

Claims (see figure 2, Appendix I)

The drilling campaign covered 1 claim numbered 3012264 (the Condor Claim"), recently optioned by Noront Resources Ltd., from Greenstone Exploration Inc. and Condor Diamond. The option agreement called for at least one drill hole into the geophysical anomaly, as well as certain share payments to earn up to 100% interest. (Appendix I is a copy of this option agreement, confirming Noront's interest in the property). Subsequent to the fulfillment of drilling one hole (Hole reported upon herein), Condor transferred 90% interest in the Condor claim to Noront, Greenstone transferred 50/0 interest to Noront, and was left holding 50/0 interest at present. An additional four claims involved in this project are contiguous to the subject claim, located to the east and to the south, being claims P 3012256 (immediately to East in BMA 527862) and P 3012259, P 3012260, P 3012261, P3012262 (to the south in BMA 526862) These claims are all located within the Porcupine Mining District.

The claims were originally staked and recorded on April 22, 2003.

3

Page 4: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I

FIGURE 1

LOCATION MAP

" ",. "

J

• N

I "'

~".~

" ," . - 4. ' . " " , ." .

, ' ~ ", -;' "~~ . ~:, 'J

- ,

"' "

Page 5: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

~~ .!

It' ., " !.

-~·. ~ · ·~:t· -':;ll6' ~: : ;~:': ... - . . ~~.<:: ... --.~~:- - ';-,}./,& Fl , U:R~

.- ...•. .. : .. ::~. ~:~: .. ::'~u.-

.~i:1J!f1C i::l ;'¢5.t~~t.~- .. ·:'~~;~'I:~:l-·---­~;;l:~~t'.'tf~~~,~~~~ . '~ft~?r-

.~ -::. ~~:;~:;t:::~':.£ ';'::' ~:'=: -:-I • f . '--'-:~ ! .: -

. ~~~~~:;~. --------------·r·-~ -

4226709

':':':. :-

f·- ,'," ..... _

5&400OQI'< .~., 'il14' ~.~ -:-Jt..- ':~5622

UTM Zone 16 5000m grid - - -

I I, •• • ... '\, .- I ... -.... l ; ,I, .

i ".; ~~~·I~;;rp;.J.~" -::'7.~:;-;~·~

545000E

- - - - - -

p

3005670

. .. 30067QZ .

3006708

3012256

- - - - - - - - - -

Page 6: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

Personnel

Billiken contracted the drilling to Heath & Sherwood (1986) Inc., and used Howard Lahti Ph.D., P.Geo., (senior geologist), and Neil Novak P. Geo. (project manager) Vice President of Noront, to complete the work described herein. A helicopter B2 Astar under contract to Billiken from Les Helicoperes Abitibi Ltee., of La Sarre PQ. was used for moving men back and forth, as well as the drill move to and from the site.

General Geology

The survey area is underlain by Archean metavolcanic assemblages consisting of gabbro and felsic - intermediated tuffs. These rocks form part of the Eastern Sachigo sub province, or more locally the Ekwan belt. The area is cored by 3 billion year old supracrustal rocks, the Ekwan belt has been dated at 2.72 billion years. Nearby to the east there is a thick blanket of Paleozoic sediments that cover much of the James Bay Lowlands area. These Paleozoic rock types vary with depth, changing from dolomite to limestone to calcareous and/or arenaceous sandstone to unconsolidated or poorly cemented sandstone, their thickness wanes to none existent a few kilometers east of the project site. Kimberlites of Jurassic age are known to intrude the Paleozoic carbonates, there are 22 identified kimberlites in the an area 130 kilometers east the property that were discovered by De Beers, Spider Resources Inc.IKWG Resources Inc. JV, and CanabravalNavigator JV. In addition there are 5 Proterozoic age kimberlites that were located below the aforementioned Paleozoic rocks, these kimberlites are referred to as the Kyle style kimberlites, discovered by the KWG/Spider joint venture during 1994 and 1995. DeBeers was exploring this specific area (in joint venture with KWG and Spider) looking for kimberlites, when they discovered volcanic hosted massive sulphide style mineralization near McFaulds Lake, beneath 9 meters of Overburden and an additional 37 meters of Paleozoic rock. The target rock type for this project is massive sulphide, copper, zinc, gold and silver being the commodities of interest.

Drill program

A crew of four drillers (2 day shift and 2 night shift) were employed by Cabo Drilling (formerly Heath & Sherwood (1986) Inc.) a diamond drill contractor from Kirkland Lake Ontario. They used a Longyear 37 style diamond drill, and drilled BQ core for the project. Drill supervision was

4

Page 7: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

done out of the Billiken base camp, Howard Lahti Ph.D., P.Geo. was the drill geologists, working under the auspices of Neil Novak P.Geo. in the capacity of project manager.

After the completion of local line cutting and ground geophysics (subject of a different report by Scott Hogg and Associates dated April 2005) as well as a few trips back and forth to the drill site by the helicopter with various Billiken personnel for drill site selection purposes, 4 drill holes were selected to test agreed upon anomalies identified by various ground geophysical surveys completed including Horizontal Loop electromagnetic, and magnetic surveying.

The drill program commenced on August 25, 2007 and was completed by September 4, 2007. In light of the drill results, drilling continued on the subject property and continues to date.

Hole NOT-07-01 (see Appendix II)

Drill hole NOT-07-01 was collared on claim P 3012264, at GPS location 547202E, 5843646N using NAD 83 datum UTM Zone 16. The initial azimuth of the hole was 136 degrees (grid south), with an initial dip of -45 degrees. Additional dip tests were taken at 41 m, 92m and 140 meters down hole, flattening to 34.3 degrees at 140m. The hole had a final depth of 140 meters. The target anomaly was classified as a Magnetic and Max-Min anomaly with a conductor axis that is centered at ground grid 1 location L 51 +00 mE, at 11 +25 mN. The drill hole was collared at L 51 +00 mE at 12+25 mN.

After passing through 8 meters of overburden followed by dolomitic limestone and sandstone, this hole entered granodiorite at 12.7 meters and remained in granodiorite until 31.8 meters passing through a few mafic dikes then entering a sulphide zone at 56 meters. The hole remained in the sulphides until 125 meters, for a total mineralized intersection of 69 meters. The hole then entered peridotite and was stopped in peridotite. Included in the mineralized zone was net textured sulphide bearing zone that contained an estimated 25% olivine crystals (ghosts) set in a sulphide matrix of 15% chalcopyrite pyrite and 25% fine pyrrhotite and pentlandite. The sulphide zone was surrounded by peridotite, intruded into granodiorite. Samples were selected for analysis, starting at sample number 28251 through to

5

Page 8: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

28299 and were submitted to ALS Chemex in Thunder Bay, Ontario for sample preparation, then forwarded to the ALS Chemex Lab in Vancouver B.C. for assay. The assay certificates TB07096124 and TB07100236 for this hole are appended to this report, along with the diamond drill log detailing the various textures and rock units encountered, along with a vertical cross section looking NE. Hole NOT-07-01 averaged 1.11 % Ni, 0.86% Cu, 0.7 glt Pd 2.14 glt Pd, 0.1 glt Au and 2.8 g.t Ag over 71.5 meters core length.

Hole NOT-07-02 (see appendix III)

Drill hole NOT-07-02 was collared on claim P 3012264, at GPS location 547202E, 5843646N using NAD 83 datum UTM Zone 16. The initial azimuth of the hole was 136 degrees (grid south), with an initial dip of -65 undercutting hole NOT -07 -01 degrees. Additional dip tests were taken at 41m, 92m, 143m and 191 meters down hole, flattening to 50.7 degrees at 191m. The hole had a final depth of 191 meters. The target anomaly (as described above) was classified as a Magnetic and Max-Min anomaly with a conductor axis that is centered at ground grid 1 location L 51 +00 mE, at 11+25 mN. The drill hole was collared at L 51 +00 mE at 12+25 mN.

After passing through 5 meters of overburden followed by dolomitic limestone and sandstone, this hole entered granodiorite at 10.5 meters and remained in granodiorite until 88.4 meters passing through a few mafic dikes then entering a chill margin transition zone between 88.4 and 91.1 meters. The hole then entered a mineralized sulphide and remained in the sulphides mixed with peridotite until 175.1 meters, for a total mineralized intersection of 84 meters. The hole then entered a complex deformation zone consisting of mostly peridotite and was stopped in peridotite at 191 meters. Included in the mineralized zone was net textured sulphide bearing zone that contained an estimated 25% olivine crystals (ghosts) set in a sulphide matrix of 15% chalcopyrite pyrite and 250/0 fine pyrrhotite and pentlandite as well as short massive sulphide sections containing up to 75% sulphides (chalcopyrite, pentlandite and pyrrhotite. The sulphide zone is hosted by the peridotite that was intruded into the surrounding granodiorite. Samples were selected for analysis, starting at sample number 28300 through to 28362 and were submitted to ALS Chemex in Thunder Bay, Ontario for sample preparation, then forwarded to the ALS Chemex Lab in Vancouver B.C. for assay. The assay certificates TB07100236 and TB07102170 for this hole are appended

6

Page 9: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

to this report, along with the diamond drill log detailing the various textures and rock units encountered, along with a vertical cross section looking NE. Hole NOT -07 -02 also encountered significant assays results averaging 1.89% Ni, 1.17% eu, 0.99 glt Pd 3.17 glt Pd, 0.13 glt Au and 4.1 g.t Ag over 86.41meters core length.

Hole NOT-07-03 (see appendix IV)

Drill hole NOT-07-03 was collared on claim P 3012264, at local grid co­ordinate L52+00E at 12+25N. The initial azimuth of the hole was 140 degrees (grid south), with an initial dip of -45 degrees. This hole was designed as a northeasterly step out, along the magnetically inferred strike of the sulphide zone encountered in holes NOT-07-01 and NOT-07-02. Additional dip tests were taken at 11m, 65m, 116m and 158 meters down hole, flattening to 30.9 degrees at 158 m. The hole had a final depth of 178 meters. The target anomaly (as described above) was classified as a Magnetic and Max-Min anomaly with a conductor axis that is centered at ground grid 1 location L 52+00 mE, at 11+30 mN. As stated above, the drill hole was collared at L 52+00 mE at 12+25 mN.

After passing through 8 meters of overburden followed by dolomitic limestone and sandstone, this hole entered regolith at 1 7 meters, followed by an intermediate to mafic dike until 26.24 meters when the hole entered granodiorite, then in an out of several mafic dikes then back into granodiorite until 179 meters. No mineralized was encountered in this hole, consequently no samples were taken.

Hole NOT-07-04 (see appendix V)

Drill hole NOT-07-04 was collared on claim P 3012264, at local grid co­ordinate L50+00E at 12+25N. The initial azimuth of the hole was 140 degrees (grid south), with an initial dip of -45 degrees. This hole was designed as a southwesterly step out, along the magnetically inferred strike of the sulphide zone encountered in holes NOT-07-01 and NOT-07-02. Additional dip tests were taken at 17m, 68m, and 116 meters down hole, flattening to 44.5 degrees at 116 m. The flattening was rectified by replacing the BQ rods with NQ rods. The hole had a final depth of 133 meters. The target anomaly (as described above) was classified as a Magnetic and Max­Min anomaly with a conductor axis that is centered at ground grid 1

7

Page 10: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

location L 50+00 mE, at 11 +40 mN. As stated above, the drill hole was collared at L 52+00 mE at 12+25 mN.

After passing through 8 meters of overburden followed by dolomitic limestone and sandstone, this hole entered saprolite at 14.7 meters, granodiorite until end of hole at 124.4 meters. No mineralized was encountered in this hole, consequently no samples were taken.

Conclusion and Recommendations

A limited length geophysical anomaly located on Noront IGreenstone Grid Grid 1 was drill tested during the latter part of August and the first few days of September 2004. Out of the four holes drilled, two holes intersected semi­massive to massive sulphides with visible chalcopyrite, pentlandite and pyrrhotite, net textured mineralization was also encountered in both holes, olivine cumulates surrounded by fine grained sulphides. The sulphide mineralization was restricted to a peridotite intruded into granodiorite. The geological setting is likely magmatic massive sulphide style with excellent potential for much quite significant base and precious metal concentrations, at the base of the intrusion in contact with the granodiorite. Base metals would accumulate or drop out of the magma into basal traps or pooling locations in the magma chamber as it cooled and the metals dropped out. This is evident in holes 1 and 2 of this program. Assays for the mineralized sections proved to be extremely encouraging, Hole NOT -07 -01 averaged 1.11 % Ni, 0.86% Cu, 0.7 glt Pd 2.14 glt Pd, 0.1 glt Au and 2.8 g.t Ag over 71.5 meters core length. Similarly, Hole NOT-07-02 also encountered significant assays results averaging 1.89% Ni, 1.17% Cu, 0.99 glt Pd 3.17 glt Pd, 0.13 glt Au and 4.1 g.t Ag over 86.41 meters core length. The magnetic unit that hosts this new discovery is considered a prime exploration prospect for additional base and precious metal mineralization and should be followed up by additional geophysics to better define the attitude of the peridotite intrusive unit, followed by detail diamond drilling. The other two holes drilled failed to intersect any sulphide mineralization, however they can be used to limit the extent of the mineralization in the northeast and

8

Page 11: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I I I I I I I I I I I I I

CERTIFICA TE

I, Neil Novak, P.Geo. of 88 Cottonwood Crescent Cambridge, Onto do hereby certify that:

1. I am a registered professional geologist in the Province of Ontario and a Member in good standing of the Canadian Institute of Mining, Metallurgy and Petroleum with in excess of twenty-six years of experience in the evaluation of mineral deposits and projects. I have an B.Sc. from University of Waterloo, Waterloo, Ontario and I am a "qualified person" for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects (the "National Instrument").

2. I visited the Project (as defined in this report) several times between January 2002 and April 2008, my last visit to property was in April 2008.

3. I am responsible for the preparation of this report, except as provided for or disclaimed in the report, based on the sources and documents described in the report.

4. As of the date of this report, I am not aware of any material fact or material change with respect to the subject matter of this report, which is not reflected in this report, the omission to disclose which makes this report misleading.

5. I am the VP Exploration and a director of Noront Resources Ltd. and oversaw Billiken Management Services Inc. the consulting firm that was hired to complete the diamond drilling exploration program described herein by N oront.

6. I hereby give my consent to Noront Resources Ltd, and Greenstone Exploration Limited to use this report in support of their application for assessment credit on the subject property.

Neil'

9

Page 12: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I

APPENDIX I

OPTION AGREEMENT

I NORONT - CONDOR DIAMOND - GREENSTONE

I MAY 3, 2007

I I I I I I I I I I 10

Page 13: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I Noront R<,sourCcs Ltd. I :5 T orooto Slreet Suite IOOQ, •

'::1~

'1 'I

, Tclcphene (416) 864-1451: Tclefax (416) 367 -544c

email: inf«~non:mtresourt:es_cQIT

I I I I I I I I I I I I I I I I I I

Toron~9t Ontario !\;is(' 21-:3

'.1 ,,'I

it'>l:] it: . . '" ..... -----. 1 J M' :; .~ .... [.07 I t. .~~ ,I, /,."

Gentlemen: I i\: .. '.} I I'· ,r:

Rc: ...... , t,fj .. :· .~~~. ","'''

R~ ~he "OptlOllnr:r arM Ni:'cnl Res()'\~rcc,> !. :~.·berell~ft: .•. :, rt:;k:a~ to a;; ~Optl{~Il~" Clalltl Nt.). 1)30] 2264 llf!d j-',3G J2265 cnmpn: ilof 8 Cla." lS Units PorcupUlc Mmmg Diviskm t '. '::,~

.------------.. ----.... ---.---.---------------------;if-~------·'" ·.·i ... ---------.-----------I ~'· '"

FUI',tI'Kll' tc: our di!>CI!::Jsio.'l!;, thi'.l lG~t,.;;· ""'!!i tKtr. ~. ~nd d~~: 'll'~:1~ (\ pr~rx.')sal n:E.I~ with

respect to tile op1'Jon ofrv<o dam):; :,& Ci8.trn t!fllhi) 1(1.~'~.".: ...•... 1O thep.,; ...... 'cupmc M.lill.ng Dlvt!>l()n as more particularly s(.~t out in SchC(h;!(~";\ ". ut1ached and .en,il"l.9ftt:r··· "rred to Bl' the "Property" .

. i·::~' . " in tJlis Ici't£.f agceement, Cop do;, ,. )inmOll(l CO: }and G .. , l'ln~ Expiomtion Company

Ltd. wiI! be rererred to S,$ tho ''Op~;onvl's'' ~m!.l N"ronliesouroes L(" will be referred to as the "'Option~" ~"' .. "' .. :

1.

2.

., "k· Th.c le.m~ ofoa;" agrremel'lt ct:~ ~s 101I.ow::;: t-The Optionor.; represoot 8.,rl wnrr;.>;l! t·;: th~ \J?~'1i~ee that: ':;

{a) 111e Pro~rty i~ ;:tro~rly and ~,.::c~\,·<.u:I*::~esCJ.'"tlx:d ":, Schedule "'1\" hereto and registcr:::d to tl]C 0t:1k'ln(l;s: IF' .::'"

{'o) Tf.) the rest of th;;: Opt;ol~'Jr's knol,\·k~info .• ;" r: ::md beliet: each of the minii18 units com~1ri~;1'g the: :.)I'OPc:rt:!~., ... tavllJ. been ....•.... opwly sh'tked. iagged and rocod.::d t.ndm·lnw(; '_~ftlK; f"'r-.:;.vinc~' l,r.rio; <:

(c) The Optiono~ have the tll!~ dgi1t and ~\~Orll¥ to en( . ikH~'" this agreement; (d) The:-e are no adv~r;;;e il'l"..el"e'lts (.1' mh'lf 1i=ments a'fi;' ctir.g tile J').I'Operty~ lc) Th(; Ptn~}I.!rty is j"'!:IC Hi1U (;a:tlf Or:l tFliens and " a.:umb\"ance:s, recorded or

mttecol1.\~d. ~ , (t) 'nlcrc arc no ouh>tlndng :-;; !)l';i1dil18 lll·fions., suits ·~Iajms affecting aU or aliy

pat't of IllC Prop>l.~rty; 'H,d . t . ~

The Optlonofs do by the C;(c';:H.ti·on h~:'COf1'~ttO the 0-': (t,mee lhe opti<.m to !:lequire a 100% inlerest in tilt: Propetly ~,ll~ie{:~ ~~) 'lje' retentio~: hy the O[)tionors of!:1 ono 'Pcroonl { I :,,) Net Smd!r:r f!:"'lt.1}']' f: \)y!\!!yc'S~~ on~l mihl:1rnis or I:i1lY diamonds pnyJuced {mm ~h~ pr;:'1~rly 1:l} ;:::,.:nng ';1 J9J:itiono~:; t to- '\vho-nl&l<Cvcr they !nay direct. i. totai of l/OO,OGO c~::.mm(ll~ S;-al'~.()r ,.the O'~(I'lW and making certain exploratiml cX!1:::ndit~lrc,s as hc'X::im~ft« .. ~::(~ :j: . .'"

(D £:·;:'-!.IC 1.0 cn~: Opti-un:~r;; ,1 wtul !':t\lrjl'~7 to tlw -lll'rl'c,,,,d :~:- tl1

000c::-SiL8-L08

Page 14: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I ,:~

'!

I I

(E)

I I I 3,

I 4.

I I I I I COilC.ior Diamond C~)r;J.

I Per.

I I I

p.

I I I :: ..

I 0002 :;i.S-i.OS £...002 , .

Page 15: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I

, ,"

"

I I

: ~- '

;;;;".,JiE' "DULE " \_:.,,_ .... ; ~ . .

i{ Schcdu!c ",D," io fin i\',:'rI>~,~,6ttdat(.,-d Y 7'h, 2007 made be1we~n ..... , ~.' " .

Condor DkmlOn-d Cnrp. ;;lndGl"~(;fld4>n~ F..xp '. on Conlpnny Ltd. (Optionot·~) and No(cr-t Rd$urCes Ltd)'tbptioncc) :r' ,:;:

I ;t~

I r.', ' .' ,: ,

I ~, . ~: ' '

I I I I I I I I I I I I t:"d

Page 16: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I Appendix II

I Hole NOT-07-01

I Drill hole Location Plan

I Vertical Cross Section

I Drill log

I Assay Certificate

I I I I I I I I I I

11

Page 17: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

5844000\' ~ 't: 't: i 't: 't 't:

~ § ~ § ~ 1-m '"

584J 800\' S84)800~

1-0 :'>:0

:>

~ ~~ 1-0

~>v~ 584J600~ ?> 584J600N

'0-, '17~ NO'~ ,",' ." ~

Claim 301225E

534 )400;\1 584}400N

Claim 3012264

- - - -.---

Claim 301225~ 584J 1OON 584J1OON

SURPAC MINrx GROUP

Claim 3012258 Noront Resources Inc.

I 't: 't:

Q~ ~G~ Doobk Eagle Project

§ ~ Ij Drillliok Plan VICW

'" '" '" $;::610: , 2500 II"t..S!) I D~ JI .AD'~ --XP:' : J,{f',V; - 5l.1rpac- Mil"lf'x Grc>'Jp

t:.;~ ~ "~ lcJ I ' ~

I~ , ';t.

N~~OVAA -t -do C/)

0- PRA S!t\:G r_~c:M8ER 'i . 0490 . Of) r j.\ tl ' 0 - -- - - - - - - - - - - - - - - - - - -

Page 18: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Assay Legend

%Cu %Ni

<0.25% <0.25%

0.25-0.50% 0.25-0.50%

0.50-1.0% 0.50-1.0%

>1.0% >1.0%

I

- - - - - - - - - - - -

Geology Legend

OVB. Ovorburdon

lS, Umcs!ol"\C

GRD. GrallOOlOl'lle

PER, PeodoIJIO,<2% Sulph

PEA NT. Nel-Tt'J(tlJred Peridotite

GAB. Gttbbco

MD. Marl!.: Dyke

NORONT RESOURCES

Noronl Resources Double Eagle

Eagle One

Drill Hole Sec lion NOT-07-I,2

~k

n ---"-'---+-----'--4 AN J C 1-----------1

- - - - - - -

Page 19: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Project: Noront Resources

Hole Number: NOT-07-01

Units of Measurement: metric

Location NTSSheet: 1;tP19 Township: BMN 526862 Claim No: Grid: Easting: L51+00E Northing: 12+25N Elevation:

GPS Co-ordinates: Zone: NAD83 (if applicable) Datum: f:16

Easting: Northing:

Collar Dip: Collar Azimuth: 137? Hole Length: 140m Core Size: 00 Recovery: 98+

Logged By: Howan Lahti

Date: Start: Finish:

- - - - - -

3012264

179

547202 §843646

-45

26-Aug 27-Aug

-

Billiken Management

INCLINATION TES DEPTH DIP All COLLAR -45

41 43.3 92 36.4

140 34.3

- - - -

Comments

Tesl magnetic and EM (MAX-MIN) anomaly. The semi-massive (15-30%) sulphides that includes pyrrhotite, chalcopyrite, pentlandite, and minor pyrite. The first 36m assayed 1.54% copper and 1.84% nickel.

- - - - - - - -

Page 20: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Project: Noront IHoie #:NOT-07-01 Wage:

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH

0 8 Overburden .~---

. __ .-- - - ..

Swamp and glacial till with granite boulders. .- ... ~---. 1--· ........ f---.--- -- - --_ ...... -

---Dolomitic Limestone (Paleozoic)

- 1---- --

8 9.6 ---I·· ------ ---- --.

...... _----Highly fractured, light brown to buff, occaisionallarge vug with calcite

- - - .... - , - -----

----- -_.-crystals, grity. This unit grades into the one below. i- -- --- ~~~ - -~-.----. ----

~. --- ---_. -----

---_ .... -_ .. i Sandy Dolomitic limestone 9.6 10.9 -I ------- ~ ---~ 1-

-~-- Medium to dark gray, increase in ssand and grit, mottled to spotted, i- 1-- ----~ - 1-

~- ----- 1----- - parts like a calcirudite (limestone fragments). i- - -----~-~

----- - -----

-- -------- ---- i--

---- ------- - ------ - -

Conglomerilic Sandstone .- .. - --~ 1------10.9 12.73

.----~- . --- - --Dark grey, very vriable, core highly broken. Fine to medium grained with ------larger pebbles of qtz.

----

Granodiorite -----_. . -- ---

31.78 1- -I -- --- --

12.73 --,-Massive, hard, with a porphyritic to coarse grained, comprised of albite, -- ---- -

microcline (orange Kspar) harnblende (biotite) and large crystals of ---- ...

quartz. Minor fine grained phases within the intrusive.The rock has -- -_.- ~ -- -- .. ~ f----

.- under gone kspar alteration especially near some fractures. Minor --- --- - .-------.

. sericite and sausseritization of the feldspars. Color varies from pinkish ---- _ ... -~ ----

-.-- gray to gray. -- -_ ... --- . - ------- ,-- ...... --

1-- As Above _. --- ----- ..... - ---

Corase grained granodiorite, locally enriched with kspar crystals. The ----. - 1--- ._ .... ._-

54.97 color varies from gray 10 porangy gray where there is a greater ...... _---- .. _-

31.78 concentration of kspar. Minor zones with good euhedral pheocrysts of ----- ------ --_ .... ----~--. -------- --

albite (fwhite feldspar). Rare hematite in kspar rich zones and in the ._-1-' dikes. The contacts and dikes themselves have been sheared. Rare

..... _. -- -- _.- I-~- ----~ ,_ .. - - 1-

---- ~

_ .. -- -- ---

gray qtz veins 1cm thick in 50° fractures. - -- -_ .... - . ...

40-59-46.33- Black Mafic Dike-Fine grained, black, sheared at ----1- ----

contacts. Upper contact 600 lower 55°. -28251 -1.0'3

.. ~-- ._-- -------

54.97 56 ----- -------- .-f-- ------ -- f--

---- .... _--"-- -- ---- ----- ~~--.. i------

.--- -- -,,-

- - - - - - - - - - - - - - - - - - -

Page 21: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

PROJECT:Noront IHOLE NO:NOT-07-01 IPAGE:

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH Cu Ni Au Pt Pd

31.78 56 As before Cont'd . - -~---- ~--.

.-.. _ ... --- - ~-.. ---

... Red hematite in qtz veinlet at 45.16m exhibiting microfolding. Xenoliths ----- .- -_. ---- ~- -- ._-

--of granodiorite in the dike with a dark gray color and partially . _- .. ~ .. -------- .....

assimilated and altered. 1------ . - --_ . ---- ---- _.

49.56-50.61 Mafic Dike- Massive, fine grained, parts for felsic probably --- --- - i-'

_.-assimilatedgranodiorite xenolith. Upper contact 500 lower 40°. -- .~ ---- c---. 1----- .--- -

33.91-34.46-Fault Zone-Core highly broken, some gauge and with clay _. - ._--_. ~--- --

alteration. Contact 40°. .._--- -----

------ ._.- .-~ ,.--- ._- i-'

Mineralized Zone --... . ----- .. -

- ...... .... ~ ---- . ... - -56 125 Host rock an altered (weakly serpentized) and segregated peridotite ._- ... -1 -- ------- ._ .. ---

_ .. _. __ .- with coarse, black phocrysts of altered olivine gradually decreasing in - i ...... ·_· ...

-- ------ .... size from 56 to 62m. The upper contact is 45° with the granodiorite. . - .. -- . ---- .

The core comprises black altered olivine, pyroxine, pyrrhotite, .... -------- --

--chalcopyrite and possibly white pentlandite. The sulphides are nol --- .. ,,- - ----

disseminated but fill in the intersitial space between the olivine, ..... _--- -- .... - ....... _ . -

. -pyroxine and plagioclase. It appears unit is overturned ie drilling bottom

----- i-_ ..

first. Minor flakes of serpentine. The concentration is variable from 5% to 25% but over all is around

"" i-·-- --_. --

20% conbined sulphides. The core is very magnetic and the conductor ------ - -- --

.. _-_ .... can be explained by the mass pyrrhotite at 58.67-59 and the massive - I· -

-- ---------- "-- chalcopyrite vieins aI74.65-74.74 and 74.86-74.95. - - ... - I .. . ... -

" ...... -- Upper contact 10cm 50% po-(cpy).Rest 3-4% cpy, 6% po. . ...... _ .... - ---

-- ---... 1-2% cpy, 10% po (dift to estimate cpy) i·· .. ·· i- .... -----

Massive po, 1-3% diss cpy (95% sui), pent. i .... ~ "-1-- .. -

------ 15% sui, 2-5% cpy, 10-13% po, pent. --28252 --

1.5 , .. ---- ..

1.48 25% sui, 5% cpy, 20% po, pentiindite. 56 57.5 0.635 ---- ----. --- --- ().725 - f--

25% sui 6% cpy, 19% po, penllindite. 28253 57.5 58.67 1.17 1.88 .-.- - i--58.61

i-' 30% sui, 8% cpy, pent. 28254 59 0.33 0.592 7.68

- ---

6Q.5 f-- --------- ~~ ..... . _. -

As Above 28255 59 1.5 2.39 1.36 -~--

_. _.-

""'62 i,,-1:~ -----

25% sul4% cpy, 21% po, pent. 28256 60.5 1_ 1.965 1.86 - 1--- ------ -28257 30% sui, 4% cpy 26% po, pent 62 63.5 L~ 2.02 1.78

----- ._. - .-~ ...

-'-1 28258 63.5 65 1.5 1.56 .. _ .. ---_ ...... ________ w,.,···.

1--- 66.5 28259 .. ~~ 1.5 1.725 .42

i~ ._--1.5 1.02 -- 229- ---

28260 66.5 68 ._-._.

.. 1.5, -----:-:s ----

28261 68 69.5 1.27 1- ~ --- 1--- i----· - 1--- .............

I - --- --- ....... "- I- ...

- - - - - - - - - - - - - - - - - - -

Page 22: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

PROJECT:Noront IHOLE NO:NOT-07-01 PAGE:

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH Cu Ni Au Pt Pd

56 89.5 Mineralization Zone Can't - -- ------ .. _--_._- - ---- --

---

30% sui, 4% cpy 26% po, pent. 28262 69.5 -~~ 1.5 1.295 1.52 ---As Above. 282~~ 71 1.5 1.49

1- 2.09 ---

--- ----- --_--0:: - ----- 3.26 ---- ---- -~

20% sui, 4% cpy, 16% po, pent. 28264 72.5 74 1.5 0,904 . -- ,

25% sui, 8% cpy (2 mass viens total20cm) 17% po fg- 4.96 c-----··· 1---28265 74 75.5 1.13

20% sui 3% cpy, 17% po, pent . __ ._ 28266 ---_ ... - ----~-

75.5 77 1.5 1.76

1 1.68 -- 20% suI 5% cpy, 15% po, pent. -1]5 --- ----

28267 77 78 1 2.7 -~- --- --

--- ---- 15-20% sui, 5-7% cpy, rest po, pent - ----- ---..

80 -~--- --~ -.~- ~-

28268 78 2 2n, 1.82 ------ - 15% sui, 4-6% cpy, rest po, pent. -- ........ --~--

f5 -- f--- - --------28269 80 81,5 1.11 2.39

12% po, <: 1 % cpy. Kspar and hematite in some hairline fractures. -i82-70 815 83 1--- 1,g .----- 0.528 ~-- As Above but with 15cm vein of mass po with coarse diss py,Tr cpy, -- ---- ---- --

15-20% po, trace cpy. 28271 83 84.5 .5 O.52/, 1,95 28272

-...... :.~ -----00 1.5 0.329 -_ ..

f? As Above 84,5 ~ --- --

28273- --86 As Above but with 2.5cm veinlet of mass po, pent and cpy, 87.5 1.5 0.43 1.87

.. --- -_.--- --~ --- ~ 1--20% po, tr cpy, pent. 28274 87.5 89 1.5 0,604 2.04

28275 89 90.5 1.5 0.351 _t~ --

--- -- --

Mineralized Zone Coni'd -- ---- ~- --

89.5 112,5 As Above- Weakly serpentized peridotite, with sulphides gradually

--1---

.. -

decreasing Le, 20% at 89,5, 8% at 96 and 5-6% 111 m. Also several --- . - --

- dikes cut the peridotite at 93.01-95,05; 99,76-100.13; 100.76-101,6; - --- ----_. ----

106.68-101.87, Dikes a light gray, felsic with zenoUths of granodiorite. - --- ._---

After 108 core starts to have a spotted or banded texture with the dark ..... _--- --- 1---- - 1-'

--- --- -~- -- mafic minerals forming hairline texture parallel to the foliation about 40° ,---_. --

to CA. Some fractures with flakes of serp. 1- ---- -~ -- ----- -----,---_. -~ -

. _--- Possible minor fine grained magnetite. Rare carb veinlets . --- I- . - -- ----

....• --.. - -- I----·~- --- ~- --- _ ..... ----- -- 20% sui, 19% po, 1% cpy, interstial sulphides --- c--- .- -_ ......

1--- -- --15-20% sui, 1% cpy the rest po (pent?)

~276 c· ~----- --- ---

Felsic dike trace sui 90.5 92 15 0.643 1.9 - --

93m ~-.-

1m ----- 1--

6-8% sui po trace cpy 28277 9" .. . - ~ -.-~ .. ~~,

~--- 2,04 ~----

1-2% po trace diss cpy, rare hiarline fractures with cpy, serp. 28278 93.01 95.05 --1-3% po, trace cpy 96.25

.~ --- - .- ---

28279 95.05 1.2 As Above minor magnetite? 28280

--

9625 ---- -- -_ ..

98 1.75 !.~ --- --

-28281 ,---- ---- .... -

-~

98 99.5 1.5 c--100.76

I~--

126 --- - ... --- --I~ -

28282 99.5 .- - -------- '1-- -

---- -- ---- -- ---- ---- ---~ - ~-

I 1 ! , I i

- - - - - - - - - - - - - - - - - - -

Page 23: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

PROJECT:McFaulds IHOLE NO:MCF-07-01 PAGE:

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH Cu Ni Au Pt Pd

8~ 112.58 Mineralized Zone Cont'd ----- - --- - ---_ ..

,-----_._-100.76

~-- --~ -- _. -_.

Felsic Dike, fine grained no sulphides 28283 1~~ 0.84 ----~------- ----.

2-3% po, trace diss cpy, (mag) 28284 101.6 2.4 ---- --- -------

As above, rock less altered -28285 104 105.5 1.5 ._- ------

2-3% po, trace cpy ------....

1:5 ---.~-

_ .... ----28286 .105,:§ 107 --- ..... _-

2-3% po, trace cpy 28287 ---

f-- 108.5 - . ---

107 1.5 1-- -- ---1-2% po, trace cpy f08.5

,- -

28288 110 1.5 --As Above ---

-~ ---_ ..

28289 110 111.5 -- 1 % +/- po rock mass black pyroxine -~ .... 1 --- - ---- --

28290 111.5 113 ----- 1 ,---- -- - ------- ---

1-12.58 1------ -- --- As above -- ---. -- '--

1 __ .. 125 .. _- -- ----- -- ----- --I-

- Sulphide all but disappear by 122m but the same rock goes to 135.53m ,-where the rock changes. Magnetism largely due to magnetite. -- I- -- --- --- - -------- --

-~- -~ -- -. --

- --

1-2% po, white sui? - --

1-2% po, trace cpy and cpy in hairline thin fractures « 1% 1- 28291

-

114.5 ---- ---- ,-~--

Mixture granodiorite xenoliths in felsic dike no suI. 113 1---1.5

-- -~--

< 1 % po, trace cpy. 28292 1145 116.32 1.5 «1 % po-py mainly in ultra-thin fractures.

- --------117.82 1.5 28293 11~~ --

<1% po, mag, (note all above with minor diss magnetite.) 1- _. 28294 117.82 119 1.18 ----------- .. Serp, minor mag tr sui 28295 119 120.5 JJi 1--- Serp, trace mag -- --

__ 2~~ 120.5 122 1.5 -- - -

Peridotite 28297 122 123.5 1.5 ----- --- - --- ..... _---

28298 123.5 125 1.5 -------- ----- ----- ---

----- Serpentinized, fine grained, soft, dark green, parts medium grained. -- - -----

1--125 140 Weak foliation. Foliation 600 at 129.5. Almost all of the crystals altered f--- - -- --- ---- ----- -----

and very fuzzy but can see the general outline. The matrix is a mass of ----- - - -----black altered rock. 28299 125 126.5 1~ _ -------- -- -- ----

---- -~------ ----~ t- - i- ------ /--125-128.Core altered, fractured, serpentinite-carb in veinlets some -----... --- - 1-- .. _- 1----minor faulting with gauge, core still magnetic due to fine grained

1---- ----- 1-- --disseminated magnetite. Color a light greenish gray.

---- --~-----.-1- -- _ ....... ----

l I~------- ----- EOH \ 1---- - ------- ------ --

--- \ ~~ --- t--- - 1- -- -- 1-- --

~ -- 1---I --- -----_ .. - ---

N 1--------- 1---- ---140

- - - - - - - - - - - - - - - - - - -

Page 24: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

ALS Chemex '0: BILLIKEN MANAGEMENT SERVICES INC. Page: 1 Finalized Dine: 22-SEP-2007

Account: TRJ EXCELLENCE IN ANAL YTICAL CHEMISTRY AlS Canada Lid,

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www,alschemex.com

CERTIFICATE TB07096124

Project: NORONT I McFAULDS

P.O. No.: This report is for 26 Drill Core samples submitted to our lab in Thunder Bay, ON, Canada on 30-AUG-2007.

The following have access to data associated with this certificate: HOWARD LAHTI I BRIAN NEWTON I NEIL NOVAK

To: BILLIKEN MANAGEMENT SERVICES INC. ATTN: BRIAN NEWTON SUrrE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

SAMPLE PREPARATION ALS CODE DESCRIPTION

WEI·21 Received Sample Weight

LOG·22 Sample login· Red wlo BarCode

CRU·31 Fine crushing • 70% <2mm

CRU·QC Crushing QC Test

PUL·QC Pulverizing QC Test

SPL·21 Split sample· riffle splitter PUL-31 Pulverize split to 85% <75 urn

ANALYTICAL PROCEDURES ALS CODE DESCRIPTION

ME·OG62 Ore Grade Elements· Four Acid Cu-OG62 Ore Grade Cu - Four Acid Ni-OG62 Ore Grade Ni - Four Acid PGM·MS24 Pt, Pd and Au 50g FA ICP·MS PGM·ICP27 Ore grade Pt, Pd and Au by ICP ME·MS61 48 element four acid ICP-MS

INSTRUMENT

ICP-AES VARIABLE

VARIABLE ICp·MS

ICp·AES

This is the Final Report and supersedes any preliminary report with this certificate number. Results apply to samples as sUbmitted. All pages of this report have been checked and approved for release. Signature:

~,,~~ Lawrence Ng, Laboratory Manager - Vancouver

------ - - - - - - - - - - - - -

Page 25: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Analyte

Units Sample Description LOR

8028251 8028252 8028253 8028254 8028255

8028256 8028257 B028258 B028259 B028250

8028261 8028282 B028263 B028264 B028265

8028266 8028267 8028268 B028269 8028270

B028271 B028272 B028273 B028274 B028275

B028276

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY AlS Canada LId.

212 Brooksbank Avenue North Vancouver BC V7J 2Cl Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

WEI·21 ME·MS61 ME·MS61 ME·MS61 ME·MS61 ME·MSBI RecvdWt. Ag AI As Ba Be

kg ppm % ppm ppm ppm

0.02 0.01 0.01 0.2 10 0.05

1.20 0.02 7.47 0.2 210 1.05 2.14 2.57 1.61 0.9 10 0.08 1.45 2.45 1.13 1.2 <10 <0.05 0.59 6.45 0.03 2.8 <10 0.18 1.90 5.88 1.00 0.6 <10 0.06

2.10 5.62 0.72 0.7 <10 <0.05 2.06 6.13 0.84 1.7 10 <0.05 2.32 5.36 0.86 1.5 30 <0.05 2.18 4.26 1.01 0.9 30 <0.05 2.04 4.59 0.75 1.3 40 <0.05

2.13 5.81 0.75 0.9 10 <0.05 2.21 4.48 0.86 1.0 10 <0.05 2.07 4.40 0.66 1.0 10 <0.05 2.03 7.63 0.83 0.8 30 <0.05 2.11 10.50 1.25 <0.2 50 0.15

1.99 6.15 0.68 0.8 10 <0.05 1.42 9.12 0.54 1.1 20 <0.05 2.49 7.06 0.55 0.7 40 <0.05 2.08 4.35 0.75 0.9 10 <0.05 2.01 4.58 0.54 1.1 10 <0.05

2.16 2.53 1.01 1.1 60 0.08 1.91 1.99 0.90 0.7 30 0.06 2.19 1.56 0.91 0.7 30 0.07 2.17 2.44 0.65 0.9 20 0.06 2.08 2.10 0.89 0.7 30 0.09

2.00 2.30 0.75 0.9 20 0.08

. Comments: REE s may not be totally soluble In MS61 method .

- - - - - - - - -

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 • 15 TORONTO STREET TORONTO ON M5C 2E3

Project: NORONT I McFAULDS

I CERTIFICATE OF ANALYSIS

ME·MSSI ME·MS61 ME·MS61 ME·MS61 ME·MS61 ME·Ma61 Bi Ca Cd Ce Co Cr

ppm % ppm ppm ppm ppm 0.01 0.01 0.02 0.01 0.1 1

0.82 2.38 0.06 49.20 9.5 16 1.46 1.75 0.10 10.35 393.0 3140 1.45 0.67 0.34 3.15 463.0 3080 4.08 0.10 0.23 0.96 1785.0 726 2.26 0.48 3.80 3.03 349.0 3330

1.88 0.15 2.15 2.95 485.0 2150 1.44 0.25 1.29 4.12 512.0 1660 1.31 0.33 1.52 3.17 436.0 1655 1.64 0.49 1.85 5.62 396.0 1430 1.94 0.30 1.56 3.96 550.0 1605

1.86 0.13 2.67 3.94 475.0 2140 1.66 0.24 2.68 3.86 418.0 1090 1.84 0.19 1.37 3.35 516.0 1625 2.06 0.43 6.90 4.06 245.0 1930 3.71 0.98 5.64 7.25 364.0 1570

2.13 0.20 3.45 5.09 489.0 1605 2.28 0.07 4.18 5.48 493.0 2070 2.11 0.16 3.92 3.72 483.0 2030 2.19 0.23 2.09 4.32 613.0 1105 1.88 0.08 3.92 5.41 859.0 1385

1.38 0.33 0.80 5.45 497.0 2630 1.42 0.29 0.41 5.30 435.0 2190 1.32 0.27 0.59 4.99 436.0 1605 1.71 0.10 0.26 4.19 491.0 1730 1.13 0.11 0.35 2.75 450.0 1590

1.28 0.10 0.20 5.26 470.0 2010

Page: 2·A Total.". r"ages: 2 (A - D)

Finalized Date: 22-5EP·2007 Account: TRJ

T807096124 ]

ME·Ma61 ME·Ma61 ME·MSSI C. Cu Fe

ppm ppm %

0.05 0.2 0.01

0.41 40.1 2.02 0.33 6350.0 14.35 0.08 7250.0 17.40

<0.05 5920.0 48.40 0.08 >10000 17.75

0.07 >10000 20.10 0.08 >10000 21.40 0.07 >10000 19.25 0.11 >10000 18.35 0.10 >10000 21.10

0.11 >10000 20.50 0.16 >10000 18.80 0.12 >10000 19.85 0.28 >10000 18.30 0.82 >10000 20.10

0.19 >10000 20.00 0.18 >10000 21.40 0.22 >10000 20.20 0.22 >10000 20.50 0.19 5280.0 22.20

1.08 5270.0 22.30 0.32 3290.0 19.35 0.39 4300.0 18.95 0.15 6040.0 19.75 0.19 3510.0 18.30

0.15 6430.0 18.40

- - - - - - - - - -

Page 26: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Anal)/'ta

Units Sample Description LOR

8028251 B028252 B028253 B028254 B028255

8028256 B028257 B028258 8028259 8028260

B028261 B028262 8028263 B028264 B028265

8028266 8028267 B028268 B028269 B028270

B028271 8028272 B028273 8028274 8028275

B028276

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd,

212 Brooksbank Avenue North Vancouver BC V7J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61

Ga Ge HI In K La

ppm ppm ppm ppm % ppm 0,05 0.05 0,1 0,005 0,01 0,5

17.45 0.08 3.0 0.017 0,77 27.8 4.12 0.69 0,2 0.236 0.08 5.9 3_11 0.79 0.2 0.348 0.01 1.5 0,83 2.43 <0.1 0.029 <0.01 0,6 3.59 0.74 0.2 0.317 0.01 1.4

2,45 1.16 0.1 0.149 <0.01 1.6 2.13 0.81 0.1 0.269 <0.01 1.9 2.32 0.69 0.2 0.203 <0.01 1,6 2.33 0.64 0.2 0.182 0.01 3.4 2.24 0.94 0.1 0.113 0.02 1.9

2.23 0.79 0.1 0.291 0.03 2.0 1.72 0.70 0.2 0.287 0.03 2,0 1.89 0.90 0.2 0.207 0.03 1.8 2.40 0.54 0.2 0.496 0.06 2.1 4.21 0,72 0.9 0.427 0.16 3,6

2.44 0,85 0.1 0.238 0.02 2.3 2.65 0.86 0.1 0.340 0.Q1 2.5 2.40 0.87 0,2 0.326 0.02 1.4 1.84 1,04 0,1 0.242 0,02 1,9 1.96 1.18 <0.1 0.142 0,03 2.5

4.90 1.02 0.4 0.220 0.18 2.5 3.73 0.91 0.2 0.179 0.08 2.4 3.21 0.92 0.3 0.176 0,12 2.3 2,68 0,95 0.3 0.179 0.04 2.2 2.74 0.93 0.3 0.114 0.05 1.0

3.13 0.95 0.4 0.130 0.03 2.7

. Comments: REE S may not be totally soluble In MS61 method.

- - - - - - - - -

0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

Project: NORONT I McFAULDS

I CERTIFICATE OF ANALYSIS

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61

LI Mg Mn Mo Na Nb

ppm % ppm ppm % ppm 0,2 0.Q1 5 0.05 0,01 0,1

35.2 0,80 254 0.23 3.82 6.2 14,4 15.95 1340 1.90 0.10 0.6 8.5 14.95 1150 2.07 0.03 0.5 1,1 0.69 176 7.36 <0,01 0.4 8.3 15.55 1300 1.82 0.01 0.4

7.0 15.15 1010 2.36 <0.01 0.4 6.6 17.60 969 2.40 0.01 0.4 5.6 16.10 962 2,14 0.Q1 0.3 5.5 16.80 934 1.87 0.02 0.5 4.5 15.80 1060 2.86 0.Q1 0.7

4.0 17.60 1180 2.40 0.Q1 1.1 6.4 17.50 922 1.86 0.03 0.9 4.9 15.85 995 2.44 0.02 0.8 8.1 16.35 949 1.56 0.05 0.8

21,0 13,95 1120 2.01 0.20 1.0

8.0 16.00 1020 2.19 0.04 0.4 5.7 16.10 994 2.43 0,01 0.4 7.2 15,35 1020 2.53 0.02 0.3 8.5 16,60 1030 2.81 0.04 0.3 6.3 16.30 1010 3.13 0,01 0,3

20.4 15.65 1090 2.62 0.11 1,0 13.1 16.70 968 2.31 0.04 0,6 13.7 16.55 941 2.32 0,05 0,9 5.0 16.45 783 2.45 0.Q1 0.8 5.0 17.10 736 2.32 0.Q1 0.8

6.2 17.00 798 2.33 0.01 1.1

Page: 2 - B Total ..... age8: 2 (A· D)

Finalized Date: 22·SEP·2007 Account: TRJ

T807096124 ]

ME-MS61 ME·MS61 ME-MS61

Ni P Pb

ppm ppm ppm 0,2 10 0,5

153.5 400 10.7 >10000 90 9.9 >10000 70 10.3 >10000 <10 9.9 >10000 60 16,1

>10000 50 28.2 >10000 60 28.0 >10000 70 21.2 >10000 60 19.3 >10000 50 21.5

>10000 50 33.0 >10000 40 31.9 >10000 40 29.4 9040.0 50 43.0 >10000 100 28,9

>10000 40 37.2 >10000 40 38.7 >10000 40 35,6 >10000 30 30,0 >10000 20 28,6

>10000 80 15,3 >10000 70 16,2 >10000 60 18,1 >10000 50 17,5 >10000 70 22,3

>10000 110 15.7

.-

- - - - - - - - - -

Page 27: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method An.lyle

Units Sample Description LOR

B028251 B028252 B028253 B028254 B028255

B028256 B028257 B028258 B028259 B028260

B028261 B028262 B028263 B028264 B028265

B028266 B028267 B028268 B028269 B028270

B028271 B028272 B028273 B028274 B028275

B028276

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME·MS61 ME·MS61 ME·MS61 ME·MS61 ME-MS61 ME-MS61

Rb Re S Sb Sc Se

ppm ppm % ppm ppm ppm

0.1 0.002 0.01 0.05 0.1 1

16.1 <0.002 0.04 0.18 5.5 1 3.4 0.022 4.58 0.31 9.1 15 0.3 0.029 5.87 0.24 8.0 22 0.5 0.077 >10.0 0.21 0.8 97 0.6 0.017 5.48 0.24 7.6 24

0.3 0.D15 6.85 0.14 6.6 30 0.3 0.013 7.42 0.14 6.5 28 0.3 0.D15 6.12 0.10 6.6 23 0.7 0.D16 6.02 0.10 7.1 22 1.0 0.D18 7.26 0.10 6.1 33

0.9 0.014 6.49 0.11 6.2 28 1.4 0.012 6.26 0.11 6.5 27 1.1 0.011 6.35 0.10 5.9 29 2.4 0.009 6.19 0.11 6.3 29 7.5 0.003 7.63 0.21 6.1 35

0.7 0.013 6.78 0.11 6.1 31 0.6 0.D15 7.30 0.10 5.7 35 0.9 0.014 6.84 0.11 5.4 32 0.9 0.013 6.80 0.10 6.6 30 1.0 0.D16 7.38 0.07 5.7 35

9.8 0.011 6.30 0.11 6.5 30 3.3 0.008 5.19 0.08 7.0 24 4.1 0.008 5.39 0.08 6.7 24 1.8 0.009 6.34 0.07 5.7 28 2.4 0.010 5.43 0.32 6.8 24

1.7 0.011 5.91 0.11 6.3 23

, Comments. REE S may not be totally soluble In MS61 method.

- - - - - - - - -

0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: NORONT I McFAULDS

Page: 2· C Total tf. ... ages: 2 (A· D)

Finalized Date: 22·SEp·2007 Account: TRJ

CERTIFICATE OF ANALYSIS TB07096124

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61

Sn Sr Ta Te Th Ti TI U V

ppm ppm ppm ppm ppm % ppm ppm ppm

0.2 0.2 0.05 0.05 0.2 0.005 0.02 0.1 1

1.4 341.0 0.45 5.38 5.9 0.198 0.10 1.4 33 1.4 15.7 0.06 2.23 0.5 0.052 0.24 0.1 65 1.9 6.4 0.05 2.57 0.2 0.043 0.20 <0.1 58 1.2 1.3 0.05 13.05 <0.2 0.007 0.18 <0.1 33 2.5 4.9 0.11 5.38 0.2 0.038 0.29 <0.1 88

1.5 2.9 0.16 4.07 0.2 0.024 0.40 <0.1 52 1.7 4.2 0.05 2.42 <0.2 0.025 0.43 <0.1 44 1.1 5.2 0.05 1.82 0.2 0.029 0.31 <0.1 46 1.0 6.5 0.06 2.21 0.2 0.043 0.28 <0.1 48 1.5 5.3 <0.05 4.43 <0.2 0.062 0.35 0.1 61

1.8 6.7 <0.05 3.79 <0.2 0.073 0.43 0.1 75 2.3 5.6 <0.05 4.30 <0.2 0.045 0.37 0.1 43 1.9 5.0 0.05 4.69 <0.2 0.052 0.33 0.1 54 3.1 7.1 <0.05 5.02 <0.2 0.060 0.49 0.1 64 3.0 36.4 0.09 9.77 0.8 0.090 0.49 0.2 70

1.7 7.8 0.06 4.84 <0.2 0.031 0.34 <0.1 53 1.6 6.6 <0.05 5.64 <0.2 0.033 0.35 <0.1 63 1.4 19.0 <0.05 4.22 <0.2 0.032 0.30 <0.1 61 1.4 12.2 <0.05 3.77 <0.2 0.021 0.27 <0.1 35 0.8 5.6 <0.05 3.68 <0.2 0.019 0.31 <0.1 47

1.4 17.5 0.06 1.99 0.5 0.108 0.27 0.1 126 1.0 9.0 <0.05 1.97 0.2 0.060 0.23 0.1 88 0.9 9.3 0.06 1.83 0.3 0.048 0.26 0.1 75 0.6 4.6 <0.05 1.83 0.3 0.039 0.22 0.1 65 0.6 51.9 0.05 1.30 0.3 0.042 0.20 0.1 60

0.7 6.0 0.08 1.55 0.6 0.061 0.21 0.1 80

]

- - - - - - - - - -

Page 28: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Analyte

Units Sample DeSCription LOR

B028251 B028252 B028253 B028254 B028255

B028256 B028257 B028258 B028259 6028260

8028261 8028262 6028263 6028264 6028265

8028266 8028267 8028268 8028269 6028270

6028271 6028272 8028273 8028274 8028275

8028276

ALS Chemex EXCELLENCE IN ANALYTICAL CHEMISTRY ALS Canada LId.

212 Brooksbank Avenue North Vancouver BC V7 J 2Cl Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME-MS61 ME-MS61 ME-MS61 ME-MSSI Cu-OG62

W y Zn Zr Cu

ppm ppm ppm ppm %

0.1 0.1 2 0.5 0.001

0.4 10.5 16 94.8 0.3 4.0 69 8.0 0.2 2.5 79 5.8 0.3 0.2 25 <0.5 0.2 2.1 217 5.3 2.39

0.1 1.8 117 3.5 1.965 0.2 2.1 105 2.8 2.02 0.1 1.9 113 4.4 2.21 0.1 2.3 97 5.8 1.725 0.1 1.8 84 5.5 1.020

0.1 1.7 162 5.3 1.270 0.1 1.8 158 5.9 1.295 0.2 1.6 118 5.7 1.490 0.1 1.8 282 5.9 3.26 0.2 5.1 222 30.1 4.96

0.1 2.6 199 4.4 1.765 0.1 3.0 236 4.9 2.78 0.1 2.2 208 5.8 2.75 0.1 1.8 162 3.4 1.110 0.1 2.3 267 1.2

0.1 3.4 96 17.3 0.1 2.5 71 8.0 0.2 3.0 97 10.2 0.2 2.9 49 10.7 0.2 3.2 61 12.2

0.2 3.6 57 20.4

Ni-OG62

Ni

% 0.01

1.48 1.88 7.68 1.36

1.86 1.78 1.56 1.42 2.29

1.80 1.52 2.09

1.13

1.68 1.65 1.82 2.39 2.79

1.95 1.70 1.87 2.04 1.85

1.90

. Comments: REE S may not be totally soluble In MS61 method.

- - - - - - - - -

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

Project: NORONT I McFAULDS

I CERTIFICATE OF ANALYSIS

PGM·MS24 PGM·MS24 PGM·MS24 PGM·ICP27 PGM-ICP27 PGM·ICP27

Au PI Pd Au PI Pd

ppm ppm ppm ppm ppm ppm

0.001 0.0005 0.001 0.03 0.Q3 0.03

0.026 0.616 >1.00 0.03 0.65 2.11 0.034 0.724 >1.00 0.04 0.77 3.34 0.087 >1.00 >1.00 0.09 3.54 4.26 0.066 >1.00 >1.00 0.06 3.13 14.25 0.287 >1.00 >1.00 0.16 1.25 4.55

0.186 0.735 >1.00 0.28 0.76 4.21 0.382 0.345 >1.00 0.36 0.23 3.16 0.258 0.531 >1.00 0.21 0.39 1.97 0.174 0.271 >1.00 0.24 0.28 2.85 0.094 >1.00 >1.00 0.12 1.49 4.07

0.172 >1.00 >1.00 0.17 1.49 3.48 0.172 >1.00 >1.00 0.20 2.35 3.48 0.086 >1.00 >1.00 0.12 2.64 3.63 0.206 >1.00 >1.00 0.26 1.78 2.79 0.259 >1.00 >1.00 0.22 1.86 3.69

0.079 >1.00 >1.00 0.09 1.90 4.82 0.082 >1.00 >1.00 0.10 1.19 4.45 0.138 >1.00 >1.00 0.10 0.87 3.63 0.051 0.882 >1.00 0.08 1.07 4.28 0.036 0.939 >1.00 0.04 0.94 3.50

0.062 0.609 >1.00 0.07 1.14 2.75 0.039 0.791 >1.00 0.04 0.42 2.59 0.060 0.615 >1.00 0.06 0.49 2.60 0.037 0.322 >1.00 0.08 0.26 2.67 0.041 0.312 >1.00 0.06 0.34 2.26

0.055 0.337 >1.00 0.07 0.32 2.74

Page: 2·0 Total,. ...-ages: 2 (A. D)

Finalized Date: 22-5EP-2007 Account: TRJ

TB07096124 ]

- - - - - - - - - -

Page 29: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

· w •.

ALS Chemex 0: BILLIKEN MANAGEMENT SERVICES INC. Page: 1 Finalized Do,"': 25-SEP-2007

Account: TRJ

Project: Double Eagle P.O. No.:

EXCELLENCE IN ANALYTICAL CHEMISTRY ALS Canada ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

CERTIFICATE T8071 00236

This report is for 77 Drill Core samples submitted to our lab in Thunder Bay, ON, Canada on 10-SEP-2007.

The following have access to data associated with this certificate: HOWARD LAHTI I BRIAN NEWTON I NEIL NOVAK

To: BILLIKEN MANAGEMENT SERVICES INC. ATTN: BRIAN NEWTON SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

SAMPLE PREPARATION ALSCODE DESCRIPTION

WEI-21 Received Sample Weight

LOG-22 Sample login - Red w/o BarCode

CRU-31 Fine crushing - 70% <2mm

lOG-24 Pulp Login· Red w/o Barcode

SPl-21 Split sample· riffle splitter

PUl·31 Pulverize split to 85% <75 um

CRU-OC Crushing QC Test

PUl-OC Pulverizing QC Test

ANALYTICAL PROCEDURES ALSCODE DESCRIPTION

ME-OG62 Ore Grade Elements - Four Acid

Cu-OG62 Ore Grade Cu • Four Acid

Ni-OG62 Ore Grade Ni - Four Acid

PGM-ICP24 Pt, Pd, Au 50g FA ICP

Au-GRA21 Au 30g FA-GRAV finish

PGM-ICP27 Ore grade Pt, Pd and Au by ICP ME-MSS1 48 element four acid ICP-MS

INSTRUMENT

ICP-AES

VARIABLE

VARIABLE

ICP-AES

WST-SIM

ICP-AES

This is the Final Report and supersedes any preliminary report with this certificate number. Results apply to samples as submitted. All pages of this report have been checked and approved for release. Signature: ~"~1/

Lawrence Ng, Laboratory Manager - Vancouver

- - - - - - - - - - - - - - - - - - -

Page 30: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method An.lyle

Units Sample Description LOR

28277 28278 28279 28280 28281

28282 28283 28151 28284 28285

28286 28287 28288 28289 28152

28290 28291 28292 28153 28293

28294 28295 28296 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28306 28155

28307 28308 28309 28156 28310

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada lid.

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.aJschemex.com

WEI-21 ME-MSBI ME-MS61 ME-MS61 ME-MOO! ME-MOO1

RecvdWt. AQ AI Aa Ba Be kg ppm % ppm ppm ppm

0.02 0.01 0.01 0.2 10 0.05

1.44 1.57 1.94 1.7 30 0.15 2.47 0.08 6.19 2.2 220 1.03 1.32 1.19 1.76 0.5 10 0.12 2.09 1.4 1.94 0.5 20 0.12 2.06 1.35 2.07 0.7 10 0.13

1.72 1.11 2.38 0.4 30 0.16 1.02 0.08 7.23 0.2 490 0.77 0.08 1.02 7.72 51.5 470 0.87 3.09 1.19 2.06 0.6 10 0,1 1.74 1.33 1.9 0.5 10 0.07

1.77 1 2.55 0.4 50 0,15 1.65 1.48 1.93 0.5 10 0.13 1.95 1.38 1.94 0.2 20 0.08 0.96 1.66 1.79 0.8 20 0.09 0.87 1.32 1.76 1.3 20 0.07

2.06 1.21 1.71 0.8 20 0.05 1.95 1.3 1.68 1,1 10 0,1 2,10 1.14 1,89 0,8 30 0,09 1.19 <0.01 7.15 0.5 440 1.12 2,02 0.29 6.53 0.8 350 0,75

1.12 0.96 1,75 1.4 <10 0.08 1,78 0.85 1.73 1.3 10 0,11 2.40 0.98 1.75 0.6 <10 0.11 1.54 0.04 2,05 1,3 <10 0,11 2.29 0.04 2,11 1.7 <10 0.11

1.74 0,24 2,18 1,9 <10 0,1 1.45 0.07 7.15 0,7 420 1,15 0,09 0.85 7,76 52.4 470 0,9 6,56 0.16 6.72 O.S 320 0.9 2,03 4.98 3.7 0,2 100 0.19

1.27 2.19 1.08 2.7 <10 0,08 2.37 1.75 0.77 0.9 <10 <0,05 1.75 3,15 0.86 0.7 <10 0.05 0,94 3.63 1.07 0.6 <10 0,07 0.95 3.86 1.12 0.7 <10 0.09

2.09 5.94 0,98 0.4 <10 <0.05 2,11 8.19 1.19 0.7 <10 0,05 1.92 8.74 1.11 0.7 <10 0.07 1.03 0.13 7.59 0,3 460 1.14 2,11 11,1 1.03 0.8 <10 0.07

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project Double Eagle

I CERTIFICATE OF ANALYSIS

ME-MS61 ME-MOO1 ME-Msal ME-MOO1 ME·MS61 ME·MSB1 Eli Ca Cd Ce Co Cr

ppm % ppm ppm ppm ppm 0.01 0.01 0.02 0.01 0.1 1

1.46 1.33 0.63 9.22 226 1260 0.26 3.51 0.2 59.9 39.2 328 0.36 1.24 0.18 5.91 208 2890 0.35 1.24 0.39 5.8 220 3470 0.43 1.34 0.3 5.46 211 3730

0.36 1.76 0.17 15.7 179.5 3530 0.06 3.67 0.11 31.7 34.1 340 0.05 3.62 0.03 19.6 32 861 0.32 1.37 0.26 4,79 197 4180 0.45 1.26 0,28 4.96 201 3360

0.39 2.05 0.15 7.51 189 3000 0.39 1.17 0.25 4.63 207 3010 0.38 1.42 0.36 3.77 203 3260 0.42 1.37 0.37 3.83 201 3410 0.37 1.34 0.33 3.63 194.5 3380

0,38 1,29 0,22 4.49 189 3680 0.45 1.23 0.28 4.52 205 4020 0.39 1.28 0.11 5.05 184,5 3620 0.08 2.09 0,03 49.1 8.8 51 0.14 3.99 0.48 31.1 69 827

0.51 1.62 0.14 4,53 192.5 3870 0.39 1.42 0,1 5.18 191 4160 0.21 1.23 0.2 4.75 180 3440 0.1 1.64 0.03 3.89 106.5 3010

0,13 1.68 0,05 4.02 112.5 3320

0,15 2.48 0.07 7.34 96.5 3190 0.09 1.76 0.11 39,7 9,5 67 0.05 3,59 0,04 19,8 30.6 910 0.19 2.16 0.09 34.9 48.8 945 0.63 4.44 0.12 5,36 93.8 3330

2.24 1,86 0.06 3.49 680 2100 1.33 0.18 0,24 2.06 562 2220 1.19 0.27 0,6 1.58 489 3470 1.17 0,56 0,85 2.26 463 1890 1,36 0,58 1.02 2,41 468 2050

0.99 0.32 4,09 2.62 347 4190 0.9 0.66 8,78 3.11 208 1810 1.07 0,55 8.96 2,62 220 2080 0.12 2,2 0,18 49,2 10.4 54 0.88 0.49 11.75 3.11 214 2340

Page: 2· A Total. r'ages: 3 (A - E)

Finalized Date: 2S-SEP-2007 Account: TRJ

T8071 00236 ] ME·MOO! ME-MS61 ME-MS61

Cs Cu Fe

ppm ppm %

0.05 0.2 0.01

0.44 5850 12 0.75 187.5 4.8 0.28 2430 10.35 0.26 3170 10.25 0.27 3170 9.78

0.75 2090 8.34 0.57 134 3.83 0,86 128.5 4.67 0.24 2860 9.34 0,21 2740 9.04

0.42 1450 8.56 0.5 2650 9.37 0.36 2770 9.64 0.29 2540 9.27 0.28 2410 9.1

0.3 2570 8,83 0.28 2660 9.14 0.58 1870 8.31 0,55 36.8 2.23 1.13 480 5.38

0,26 2300 8,73 0.27 1840 8.8 0.21 1980 8.42 0.26 23.2 6,95 0.21 25,2 7.26

0.33 69.8 6,31 0.73 17.3 1.92 0,87 137.5 4.64 1.7 431 3.26

3.11 1360 6,6

0.14 2180 22.2 0.08 1870 19,55 0.08 8260 18.35 0.09 >10000 17.5 0.09 >10000 17.8

0.09 >10000 18.45 0,11 >10000 15.6 0.1 >10000 16.35 0.52 517 2.51 0,09 >10000 17,55

Comments: Additional Au results for sample 28158 are 6.02 ppm and 3,50 ppm. REE's may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - - - - - -

Page 31: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method An.1yte

Unlta Sample DeSCription LOR

28277 28278 28279 28280 28281

28282 28283 28151 26284 28285

28286 28287 28288 28289 28152

28290 28291 28292 28153 28293

28294 28295 28296 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28306 28155

28307 28308 28309 28156 28310

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY AlS Canada lid.

212 Brooksbank Avenue North Vancouver Be V7 J 2C1 Phone: 6049840221 Fax: 604 984 0218 www.alschemex.com

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61

Ga Ge HI In K la

ppm ppm ppm ppm % ppm

!l05 0.05 0.1 0.005 0.01 0.5

4.55 0.6 0.5 0.164 0.1 4.3 14.9 0.2 4.9 0.035 0.57 32.8 4.79 0.53 0.4 0.058 0.06 2.8 4.75 0.51 0.5 0.067 0.1 2.7 5.06 0.51 0.3 0.067 0.06 2.6

5.95 0.42 0.9 0.053 0.14 8.1 15.2 0.15 4.1 0.028 1.12 15.7 14.75 0.2 1.4 0.044 1.06 9.6 4.86 0.52 0.2 0.064 0.08 2.3 4.33 0.45 0.3 0.058 0.06 2.5

5.73 0.44 0.5 0.056 0.13 3.6 4.44 0.47 0.3 0.063 0.12 2.3 4.19 0.5 0.3 0.062 0.12 1.9 4.31 0.51 0.2 0.064 0.09 1.8 4.13 0.49 0.2 0.055 0.09 1.7

4.08 0.44 0.2 0.061 0.07 2.1 4.2 0.49 0.2 0.065 0.07 2.2

4.48 0.44 0.2 0.055 0.12 2.2 18.2 0.1 3.2 0.029 1.52 25.4 16.45 0.25 3.7 0.048 1.09 14.8

4.29 0.47 0.2 0.057 0.03 2 4.43 0.47 0.2 0.049 0.03 2.3 4.31 0.41 0.2 0.045 0.03 2.1 4.81 0.25 0.2 0.016 0.03 1.8 5.02 0.28 0.2 0.017 0.02 1.7

5.8 0.29 0.1 0.022 0.02 3.5 19.2 0.14 3.3 0.012 1.27 20.4 15.35 0.26 1.4 0.045 1.06 9.8 18.05 0.26 3.2 0.029 1.41 17.5 9.21 0.41 0.9 0.073 1.18 1.9

3.86 2.12 <0.1 0.181 0.01 2.2 2.52 1.78 <0.1 0.074 0.Q1 1.4 3.2 1.47 <0.1 0.128 0.Q1 1

2.77 1.33 <0.1 0.174 0.01 1.3 2.92 1.26 0.1 0.191 0.Q1 1.4

3.6 1.08 <0.1 0.754 0.Q1 1.4 2.68 0.78 <0.1 0.798 0.01 1.8 2.79 0.79 <0.1 0.704 0.Q1 1.5 20 0.15 3.2 0.036 1.58 25.2

2.88 0.81 <0.1 0.682 0.02 1.8

·0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 - 15 TORONTO STREET TORONTO ON NlSC 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61

U Mg Mn Mo Na Nb

ppm % ppm ppm % ppm

0.2 0.01 5 0.05 0.01 0.1

10.4 18 1075 1 0.12 1.3 38.4 5.58 881 0.36 3.55 8.1 6.8 18.2 684 0.7 0.14 0.8 6.5 19.1 636 0.74 0.15 0.9 5.8 18.85 619 0.79 0.13 0.8

16.7 17.1 701 0.64 0.26 1.2 42.1 4.96 801 0.2 3.25 6.9 7.8 1.6 779 16.05 2.26 6.1 5.9 19.1 699 0.74 0.17 0.7 4.8 18.3 711 0.7 0.15 0.7

11.7 17.6 725 0.64 0.32 0.8 12.5 19.4 688 0.59 0.2 0.6 6.9 19.95 764 0.57 0.21 0.6 5 18.85 724 0.59 0.14 0.6

4.6 18.45 706 0.58 0.13 0.6

5.6 18.5 665 0.59 0.09 0.6 5.5 18.8 669 0.69 0.13 0.6 9.9 18.2 748 0.57 0.12 0.6

27.1 0.77 388 0.29 2.94 6.1 50.7 6.76 895 0.65 2.68 5.4

5.7 18.45 662 0.61 0.07 0.6 5.9 18.8 786 0.55 0.08 0.6 4.8 19.2 857 0.53 0.09 0.6 3.5 19.7 905 0.25 0.13 0.6 3.2 20.1 1010 0.28 0.12 0.6

7.2 18.55 737 0.21 0.05 0.7 36.7 0.95 224 0.23 3.58 5.9 8.8 1.58 774 16.25 2.26 6 50 3.11 460 0.6 2.89 5.2

23.5 13.5 1745 0.85 0.13 1.5

9.7 12.75 1255 2.87 0.02 0.6 7.2 15.35 1005 2.32 0.01 0.3 4.6 15.7 1255 1.72 0.01 0.3 4 15.8 1080 1.68 0.03 0.3

4.1 16.1 1130 1.67 0.04 0.3

3.2 17.5 1325 1.59 0.02 0.4 4.1 16.85 1040 0.78 0.03 0.3 3.7 16.5 1090 1.31 0.03 0.3

29.1 0.88 421 0.38 3.11 6.6 3.3 16.15 1225 1.14 0.02 0.4

Page: 2· B Total .. r'ages: 3 (A - E)

Finalized Date: 2S-5EP-2007 Account: TRJ

T8071 00236 ] ME-MS61 ME-MS61 ME-MSfil

Ni P Pb ppm ppm . ppm

0.2 10 0.5

7600 160 6.3 947 1100 9.7

5190 110 3.9 5560 130 5.2 5290 110 4.4

4400 140 3.8 526 650 15.8 886 540 3.3

4750 100 6.5 5150 100 6.8

4690 170 5.8 5220 90 5.1 5040 90 5.7 5000 90 5.4 4780 80 5.3

4770 80 4.8 4990 90 5.9 4210 80 4.4 61.7 380 6.5 1120 740 16.7

4410 80 5 4460 90 6.3 3740 80 4.3 1730 60 1.3 1800 90 1.3

1580 70 2.1 79.8 330 56.3 904 530 3.3 1540 330 12.9 3000 150 2.3

>10000 60 10.9 >10000 40 7.6 >10000 40 11.9 >10000 80 9.5 >10000 90 9.5

>10000 80 15.3 6970 40 7.9 7080 60 9.2 136.5 410 6.4 6990 80 12.2

.. . Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method .

- - - - - - - - - - - - - - - - - - -

Page 32: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Analyte

Units Sample Description LOR

28277 28278 28279 28280 28281

28282 28283 28151 28284 28285

28286 28287 28288 28289 28152

28290 28291 28292 28153 28293

28294 28295 28296 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28306 28155

28307 28308 28309 28156 28310

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2Cl Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME·MS61 ME·MS61 ME·MS61 ME·MS61 ME·MS61 ME·MOO1

Rb Re S Sb Sc Se ppm ppm % ppm ppm ppm

0.1 0.002 0.Q1 0.05 0.1 1

4.2 0.004 3.57 0.51 8.3 11 12.6 <0.002 0.2 0.37 14 2 2.2 0.006 2.54 0.24 11 7 3 0.006 2.5 0.12 10.3 7

2.5 0.008 2.35 0.13 10.4 6

5.4 0.006 2.01 0.12 10.4 6 30.4 <0.002 0.18 0.11 19.3 2 19.8 0.002 0.32 8.88 14.3 4 2.4 0.007 2.32 0.14 10.9 6 2 0.007 2.24 0.11 10.2 6

4.2 0.006 2.08 0.12 10.6 6 3.2 0.008 2.3 0.12 11.3 6 2.9 0.006 2.36 0.11 10.8 6 3.1 0.001 2.34 0.13 10.9 6 3 0.001 2.28 0.16 10.6 6

2.6 0.007 2.23 0.14 10.4 6 2.5 0.007 2.31 0.12 11 6 4.8 0.006 2.07 0.17 11.6 6

41.7 <0.002 0.03 0.13 5.1 2 30.4 0.003 0.51 0.14 18.9 3

1.5 0.006 2.21 0.2 11.2 6 1.8 0.007 2.06 0.17 11.6 6 1.4 0.005 1.45 0.11 12 4 1.4 <0.002 0.08 0.2 12.8 1 1.1 <0.002 0.07 0.16 13.1 1

1.6 <0.002 0.17 0.18 13 1 29.5 <0.002 0.02 0.17 5.5 1 19.7 0.002 0.32 9.05 15.2 4 26.7 0.003 0.46 0.93 8 3 45.2 0.006 0.95 0.3 20.9 4

0.9 0.027 >10.0 0.41 6.8 33 0.4 0.016 7.84 0.22 6.6 24 0.3 0.013 6.7 0.15 6.8 21 0.4 0.014 7.05 0.19 7.2 20 0.4 0.013 7.07 0.14 1.1 21

0.4 0.015 6.43 0.13 7.1 20 0.5 0.008 6.53 0.25 8.2 20 0.4 0.D16 1.07 0.15 7.5 22

40.6 <0.002 0.14 0.1 5.7 2 0.6 0.016 7.16 0.57 7.3 21

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

[ CERTIFICATE OF ANALYSIS

ME·MS61 ME·MSal ME·Msal ME·MSal ME'MOO1 ME·MOO1

Sn Sr Ta Te Th Ti

ppm ppm ppm ppm ppm %

0.2 0.2 0.05 0.05 0.2 0.005

1.2 11.4 0.1 3.97 0.5 0.118 2.1 236 0.53 0.38 4.4 0.584 0.5 11.1 0.06 1.15 0.7 0.118 0.6 12.2 0.07 1.05 0.5 0.125 0.6 11.2 0.06 1.28 0.4 0.103

0.6 14.5 0.12 1.02 1.1 0.119 2 317 0.54 0.12 2.2 0.114

2.5 223 0.36 0.21 1.7 0.302 0.6 15.1 0.06 1.03 0.4 0.098 0.6 13.8 0.05 1.04 0.4 0.1

0.5 41.9 0.06 0.9 0.5 0.116 0.6 20.7 0.05 1.13 0.3 0.094 0.6 22.4 0.05 1.11 0.3 0.098 0.6 14.5 <0.05 1.04 0.3 0.09 0.6 13.4 0.05 0.95 0.3 0.088

0.5 10.9 <0.05 1.01 0.3 0.088 0.6 12 <0.05 1.19 0.3 0.088 0.5 10.6 0.05 1.1 0.3 0.088 1.1 319 0.57 <0.05 5.9 0.204 1.3 261 0.42 0.28 3 0.621

0.4 8.9 <0.05 1.21 0.3 0.085 0.4 9 <0.05 1.05 0.3 0.091 0.4 9.9 <0.05 0.63 0.3 0.089 0.2 14.1 0.05 <0.05 0.3 0.097 0.2 17.2 0.05 0.06 0.3 0.1

0.2 20.8 0.05 0.13 0.3 0.095 0.8 290 0.48 <0.05 5 0.188 2.5 224 0.36 0.18 1.6 0.305 0.9 253 0.42 0.52 4.1 0.193 1.1 13.8 0.11 1.5 0.1 0.189

0.9 10.8 <0.05 4 0.2 0.044 0.5 3.2 <0.05 1.98 <0.2 0.022 0.9 3.3 <0.05 1.75 0.2 0.032 1.2 5.1 <0.05 1.95 0.4 0.026 1.2 5.5 <0.05 2.31 0.4 0.028

4.4 4 0.05 2.18 0.2 0.043 4.3 5.5 <0.05 2.66 0.2 0.026 3.4 5.1 <0.05 3.44 0.2 0.031 1.3 337 0.59 0.06 5.4 0.214 2.9 6.9 <0.05 2.42 0.2 0.043

Page: 2-C Total ~ rages: 3 (A - E)

Finalized Date: 25-SEP-2007 Account: TRJ

T8071 00236 ]

ME·MS61 ME·MOO1 ME·MS61

n u V ppm ppm ppm

0.02 0.1 1

0.2 0.2 65 0.09 0.9 195 0.08 0.1 81 0.1 0.1 78

0.09 0.1 73

0.15 0.3 78 0.08 0.9 185 1.05 0.7 97 0.13 0.1 73 0.11 0.1 67

0.15 0.1 70 0.2 0.1 65 0.15 0.1 68 0.15 0.1 66 0.16 0.1 65

0.16 0.1 66 0.21 0.1 68 0.23 0.1 69 0.22 1.7 34 0.26 0.9 256

0.26 0.1 67 0.3 0.1 72

0.19 0.1 72 0.02 0.1 72

<0.02 0.1 77

0.12 0.1 74 0.16 2 30

1 0.7 98 0.5 1 48 0.9 0.2 122

0.42 0.1 78 0.29 <0.1 48 0.45 <0.1 74 0.34 <0.1 47 0.33 <0.1 50

0.41 <0.1 78 0.24 <0.1 36 0.24 <0.1 48 0.2 1.8 34

0.27 <0.1 58 . .

Comments: AddItIonal Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method .

- - - - - - - - - - - - - - - - - - -

Page 33: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Analyte

Unltlro Sample Description LOR

28277 28278 28279 28280 28281

28282 28283 28151 28264 28285

28286 28287 28288 28289 28152

28290 28291 28292 28153 28293

28294 28295 28296 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28306 28155

28307 28306 28309 28156 28310

ALS Chemex EXCELLENCE IN ANALYTICAL CHEMISTRY ALS Cam.da Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2Cl Phone: 604 964 0221 Fax: 604 984 0218 www.alschemex.com

ME-MS61 ME-MS61 ME-MS61 ME-M561 Cu-OG62

W y Zn Zr Cu

ppm ppm ppm ppm %

0.1 0.1 2 0.5 0.001

0.3 4.6 83 21.2 0.4 16.1 42 146 0.1 4.4 57 16.9 0.1 4.5 61 19.3 0.1 4 65 16.9

0.1 5.4 54 31.6 0.6 18.9 22 122.5 4.6 14.4 40 39.5 0.1 3.7 61 13.9 0.1 3.8 54 14

0.1 4.2 50 20.2 0.1 3.7 53 15.2 0.1 3.5 64 14.8 0.1 3.4 57 13.7 0.1 3.3 57 12.6

0.1 3.3 55 12.4 0.1 3.4 61 13 0.1 3.6 56 13.3 0.1 10 45 99.1 0.2 22.8 50 111.5

0.2 3.5 62 12.3 0.2 3.6 61 12.3 0.1 3.5 60 12.1 0.1 3.8 55 12.6 0.2 4 66 12.7

0.2 3.7 57 10 0.2 8.6 14 94.9 4.6 14.3 40 39 0.2 8 45 94.6 0.1 8.4 114 31.6

0.2 1.7 35 8.3 0.2 1.1 46 2.6 0.1 1.7 99 5.9 0.1 2.2 70 12.2 1.100 0.1 2.3 81 12 1.090

0.1 1.8 234 7.3 1.865 0.1 1.8 335 5.1 2.86 0.1 1.7 345 5 3.19 0.1 10.4 49 95.7 0.1 1.9 436 7.1 3.77

Ni-OG62

Ni

% 0.01

2.75 2.26 1.79 1.66 1.63

1.09

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 - 15 TORONTO STREET TORONTO ON MSC 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24

Au Au Check Pi Pi Check Pd Pd Check

ppm ppm ppm ppm ppm ppm 0.001 0.001 0.005 0.005 0.001 0.001

0.165 0.983 1.910 0.009 0.078 0.247 0.073 0.314 1.080 0.080 0.264 0.972 0.077 0.323 1.000

0.057 0.259 0.836 0.004 0.032 0.064 0.787 0.413 1.465 0.119 0.242 0.916 0.054 0.262 0.877

0.037 0.264 0.805 0.070 0.275 0.895 0.052 0.293 0.860 0.081 0.289 0.933 0.073 0.218 0.975

0.067 0.293 0.964 0.080 0.244 1.000 0.047 0.292 0.896 0.001 <0.005 0.008 0.035 0.061 0.224

0.069 0.332 1.010 0.080 0.283 0.641 0.056 0.206 0.600 0.002 0.013 0.068 0.003 0.021 0.112

0.001 0.055 0.076 0.002 <0.005 0.006 0.750 0.394 1.410 0.013 0.116 0.332 0.025 0.393 0.755

0.035 >10.0 7.06 0.026 0.980 3.10 0.092 1.660 2.91 0.074 0.808 2.86 0.066 0.691 2.92

0.323 0.225 2.75 0.562 0.172 1.510 0.195 0.599 1.740 0.002 0.007 0.030 0.252 0.611 1.660

Page: 2· D Total,*, rages: 3 (A· E)

Finalized Date: 2S-8EP-2007 Account: TRJ

T8071 00236 ]

Au-GRA21 PGM-ICP27 PGM-ICP27

Au Au PI

ppm ppm ppm 0.05 0.03 0.03

0.05 12.35

.. Comments: Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - - - - - -

Page 34: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Analyta

UnlU Sample Description LOR

28277 28278 28279 28280 28281

28282 28283 28151 28284 28285

28286 28287 28288 28289 28152

28290 28291 28292 28153 28293

28294 28295 28296 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28306 28155

28307 28308 28309 28156 28310

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada ltd.

212 Brooksbank Avenue North Vancouver Be V7J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

PGM-ICP27

Pd

ppm 0.03

7.01

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 - 15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

Page: 2 - E Total h- .--age5: 3 (A - E)

Finalized Date: 25-8EP-2007 Account: TRJ

T8071 00236 ]

. . Comments: Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method .

- - - - - - - - - - - - - - - - - - -

Page 35: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

M<othod Analyta

Units Sample Description LOR

28311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28337 28338 28339 28340 28161

28341 28342

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

WEI·21 ME·MS61 ME·MS61 ME·MS61 ME·MS61 ME-MS61

RecvdWI. Ag AI As Sa Be kg ppm % ppm ppm ppm

0.02 0.01 0.01 0.2 10 0.05

2.75 6.58 0.93 0.7 10 0.08 3.92 11.95 0.01 3.2 <10 <0.05 2.45 8.37 0.97 0.7 10 0.07 2.11 14.9 0.93 1.1 10 <0.05 2.22 9.35 1.09 0.6 10 0.D7

1.91 9.63 1.12 0.8 20 0.05 2.16 4.4 0.9 0.8 10 0.07 0.09 0.88 7.75 52 470 0.82 2.04 5.87 1.02 0.8 10 0.08 2.36 3.13 0.86 0.8 20 0.05

1.81 2.09 1 0.7 20 <0.05 2.14 3.9 0.57 0.6 10 <0.05 1.92 3.29 0.73 0.8 20 <0.05 1.01 5.56 0.88 0.8 10 <0.05 0.85 6.82 0.88 0.5 10 0.00

2.04 2.67 0.96 0.8 20 0.05 2.14 2.46 0.76 0.5 10 <0.05 2.10 4.81 0.79 0.9 10 <0.05 1.44 0.01 7.36 0.2 460 1.1 1.99 6.54 0.85 0.7 10 <0.05

2.05 4.21 0.58 0.8 10 <0.05 2.15 3.45 0.66 1 10 <0.05 2.07 2.58 0.99 0.7 60 <0.05 1.99 3.57 1.02 0.5 10 <0.05 2.13 3.03 1.07 0.4 20 <0.05

2.20 2.96 1.05 0.2 10 0.07 1.95 3.74 1.47 0.4 20 0.07 0.09 1.29 7.73 49.2 460 0.92 2.05 2.96 0.74 0.9 <10 <0.05 1.25 3.74 0.92 0.8 <10 <0.05

1.01 0.17 8.89 <0.2 380 0.85 1.95 5.38 1.25 1.5 40 0.00 1.10 1.17 7.35 0.3 270 0.59 0.51 4.37 0.86 0.9 10 <0.05 0.58 4.49 0.82 0.8 10 <0.05

2.12 5.67 0.96 1.4 30 0.09 1.85 3.42 0.91 0.3 10 <0.05

~o: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 -15 TORONTO STREET TORONTO ON MSC 2E3

Project: Double Eagle

I CERTIFICATE OF ANAL VSIS

ME-MS61 ME·MS61 ME·MS61 ME-MS61 ME-MS61 ME-MS61

Bi Ca Cd Ce Co c.. ppm % ppm ppm ppm ppm

0.01 0.01 0.02 0.01 0.1 1

0.79 0.38 3.37 3.93 372 2720 4.62 0.01 0.63 0.28 2220 78 1.09 0.39 2.6 2.87 311 2440 1.61 0.38 11.5 2.81 639 1370 1.05 0.5 3.91 4.85 233 2880

1.23 0.58 4.3 5.5 264 2200 1.26 0.42 1.02 3.42 465 2440 0.05 3.6 0.05 19.25 29.4 885 1.3 0.49 1.8 2.07 430 2200

1.35 0.4 0.59 1.93 579 2230

1.16 0.44 0.38 2.11 543 1700 1.3 0.22 0.75 1.6 549 2290 1.3 0.17 0.62 1.54 620 1620

2.25 0.27 1.33 1.9 508 1750 2.2 0.26 1.24 1.98 505 1790

3.75 0.51 0.42 1.76 546 2000 2.15 0.22 0.36 1.37 563 2050 1.62 0.29 1.63 1.4 516 1860 0.08 2.17 0.04 50.4 9.3 23 1.49 0.51 2.6 1.6 449 2160

1.4 0.22 1.68 1.25 545 2100 1.73 0.23 2.62 1.24 554 2170 1.21 0.41 0.63 1.44 562 1270 1.37 0.22 0.51 1.59 516 1950 1.14 0.39 0.36 1.84 486 1730

1.14 0.42 0.45 1.86 515 2430 2.13 0.9 1.28 3.15 391 1930 0.00 3.56 0.04 20.4 30.9 900 1.73 0.18 0.16 1.33 604 1750 2.37 0.41 0.61 1.95 597 1660

0.05 9.37 0.12 30.3 23.8 16 1.86 0.52 0.83 3.13 541 1740 0.81 6.56 0.51 29.2 232 345 1.95 0.33 0.79 2.95 660 2010 1.85 0.23 1.4 2.68 645 1950

1.n 0.29 0.97 3.76 1000 884 0.83 0.21 0.43 2.2 576 1180

Page: 3·A Totallf I'ages: 3 (A - E)

Finalized Date: 2S·SEP·2007 Account: TRJ

TB071 00236 ] ME-MS61 ME-MS61 ME·MS61

Cs Cu Fe

ppm ppm %

0.05 0.2 0.01

0.11 >10000 17.35 <0.05 >10000 >50 0.38 >10000 18 0.24 >10000 22.8 0.3 >10000 16.7

0.44 >10000 16.75 0.33 >10000 19.2 0.84 141.5 4.68 0.34 >10000 18 0.36 5860 19.25

0.34 3580 18.7 0.25 8960 19.05 0.3 6120 19.25

0.34 >10000 18.7 0.33 >10000 18.95

0.49 6360 18.8 0.37 3710 19.55 0.31 >10000 18.75 0.69 63.2 2.38 0.3 >10000 18.2

0.21 >10000 20.1 0.21 9830 19.35 0.2 4790 17.95 0.24 8760 18 0.22 4420 16.4

0.16 4750 17.45 0.32 9790 14.75 0.85 133.5 4.58 0.07 2870 16.65 0.19 5180 17.45

0.62 201 4.03 0.81 >10000 17.95 0.76 2290 10.7 0.19 8060 21 0.19 >10000 20.9

0.54 >10000 24.9 0.26 5460 17.2

.. Comments: Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - - - - - -

Page 36: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Analyle

Units Sample Description LOR

28311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28337 28338 28339 28340 28161

28341 28342

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7J 2Cl Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME·MS61 ME·MS61 ME·MS61 ME-MS61 ME-MS61 ME-MS61

Ga Ge Hf In K La

ppm ppm ppm ppm % ppm

0.05 0.05 0.1 0.005 0.01 0.5

2.71 1.09 <0.1 0.268 0.03 2 0.52 5.67 <0.1 0.03 <0.01 <0.5 2.76 1.08 <0.1 0.2 0.06 1.2 2.2 1.84 <0.1 0.177 0.04 1.2

2.87 0.82 <0.1 0.247 0.05 1.6

2.85 0.89 <0.1 0.207 0.05 1.7 2.66 1.4 <0.1 0.097 0.05 1 15.05 0.22 1.5 0.041 1.07 9.4 2.65 1.27 <0.1 0.158 0.05 1 2.43 1.47 <0.1 0.072 0.05 0.8

2.29 1.58 <0.1 0.054 0.06 0.9 2.24 1.61 <0.1 0.093 0.04 0.7 1.9 1.85 <0.1 0.069 0.05 0.7

2.15 1.56 <0.1 0.187 0.05 0.8 2.16 1.58 <0.1 0.175 0.05 0.9

2.35 1.5 <0.1 0.089 0.08 0.9 2.19 1.7 <0.1 0.072 0.06 0.6 2.06 1.53 <0.1 0.142 0.05 0.6 19.75 0.15 3.4 0.027 1.63 25.5 2.3 1.41 <0.1 0.258 0.05 0.8

2.03 1.66 <0.1 0.126 0.04 0.6 2.02 1.57 <0.1 0.179 0.05 0.6 1.89 1.55 <0.1 0.106 0.06 0.7 2.17 1.49 <0.1 0.095 0.08 0.8 2.26 1.48 <0.1 0.086 0.08 0.9

2.49 1.54 <0.1 0.059 0.05 0.9 3.03 1.2 0.1 0.158 0.07 1.6 14.45 0.24 1.4 0.038 1.05 10.2 1.79 1.68 <0.1 0.063 0.01 0.7 2.45 1.66 <0.1 0.173 0.02 1

18.6 0.18 2.7 0.029 0.62 15.8 3.31 1.48 <0.1 0.155 0.1 1.3 13.95 0.73 2 0.063 0.48 13.2 2.55 1.76 <0.1 0.187 0.03 1.2 2.38 1.67 <0.1 0.251 0.03 1.1

2.69 2.76 0.3 0.148 0.17 1.5 1.9 1.51 <0.1 0.063 0.08 1.1

~o: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 - 15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

Page: 3 - B Total ff- r"ages: 3 (A - E)

Finalized Date: 25-5EP-2007 Account: TRJ

CERTIFICATE OF ANALYSIS TB071 00236

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME·MS61 ME-MS61

Li Mg Mn Mo Na Nb Ni P Pb

ppm % ppm ppm % ppm ppm ppm ppm

0.2 0.01 5 0.05 0.01 0.1 0.2 10 0.5

3.3 15.75 1190 1.49 0.03 0.4 >10000 50 11.1 0.2 0.15 54 7.96 <0.01 0.5 >10000 10 6.6 7.8 16.05 1180 1.49 0.03 0.8 >10000 60 11.8 5.1 12.8 837 2.57 0.02 0.7 >10000 50 9.7 5.6 16.9 1225 1.18 0.05 0.6 7450 40 13.2

6.3 16.35 1230 1.33 0.05 0.7 8320 60 11.2 5.7 15.85 1145 2.27 0.06 0.8 >10000 60 6.7 8.3 1.61 780 16.1 2.27 6 922 540 3.2 5.2 16.6 1055 2.12 0.05 0.9 >10000 60 8.2 5.1 15.75 1025 2.74 0.04 0.9 >10000 50 8

5.1 15.95 1030 2.5 0.05 0.6 >10000 60 7.3 4.7 14.75 925 3.02 0.D1 0.7 >10000 40 7.9 4.2 15.35 909 3.17 0.02 0.5 >10000 50 8.3 5.5 15.8 969 2.63 0.03 0.5 >10000 50 8.6 5.5 15.9 977 2.72 0.03 0.5 >10000 40 8.8

7.8 16.15 1025 2.43 0.04 0.5 >10000 50 7.5 6.5 15.85 971 2.63 0.03 0.5 >10000 50 7.7 5.5 15.4 896 2.38 0.03 0.4 >10000 40 8.8

35.5 0.7 393 0.34 3.12 6.8 114.5 410 7.5 6 15.6 885 2.16 0.05 0.5 >10000 50 10.1

4.9 15 823 2.57 0.01 0.4 >10000 40 12.2 5.2 14.95 813 2.28 0.02 0.4 >10000 60 14.3 4.9 16.4 779 2.03 0.03 0.3 >10000 50 7.5 6.6 17.1 991 1.95 0.02 0.4 >10000 60 6.6 6.5 16.15 812 1.85 0.05 0.4 >10000 50 5.9

6.3 16.75 779 1.91 0.03 0.5 >10000 50 7.1 10.9 16 775 1.5 0.08 0.5 >10000 80 7.1

9 1.58 762 15.65 2.22 5.8 889 520 3.2 4.2 15.65 529 2.22 0.D1 0.3 >10000 40 7.1 7.5 16.1 610 2.25 0.03 0.4 >10000 50 9.9

58 3.47 1040 0.34 2.37 2.5 240 820 11.7 20.5 15.65 736 2.14 0.04 0.5 >10000 80 7.3 63.7 5.43 975 1.38 1.67 2 7990 670 9.8 12.3 15.75 552 2.56 0.02 0.5 >10000 60 8.1 12.1 15.6 544 2.48 0.02 0.5 >10000 50 8.2

22.9 10.65 505 3.48 0.02 0.7 >10000 70 6.1 9.1 15.6 518 1.98 0.03 0.3 >10000 50 4.9

]

.. Comments: Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - - - - - -

Page 37: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Analyh

Units Sample Description LOR

28311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28337 28338 28339 28340 28161

28341 28342

ALS el1amax EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61

Rb Re S Sb Sc Sa

ppm ppm % ppm ppm ppm 0.1 0.002 0.01 0,05 0,1 1

0.9 0.017 6.89 0,13 6,8 21 0.1 0.055 >10.0 0.06 <0.1 118 2.2 0.017 7.12 0.18 6.6 23 1.4 0.024 9.98 0.2 5.4 44 1.9 0.024 6.34 0.16 7 19

2.6 0.017 6.81 0.15 7.2 21 2.2 0.02 7.35 0.16 6.3 24 19.7 0.002 0.33 9.1 14.4 4 2.1 0.013 7.08 0,16 7 23 2.3 0.018 7.79 0.14 6.4 24

2.5 0.017 7.19 0.13 6.6 23 2 0.018 7.39 1.33 5.7 25 2 0.02 7.91 0.13 6 25

2.1 0.Q18 7.86 0.13 6.5 26 2.1 0.02 8.08 0.11 6.5 26

3.2 0.019 7.79 0.18 6.5 26 2.3 0.021 8.13 0.24 6 26 2 0.021 8.03 0.15 5.9 25

46.1 <0,002 0,05 0,1 5,6 2 1.9 0.02 8.21 0.16 6.4 26

1.5 0.021 8.37 0.13 5.4 28 1.7 0.021 8.03 0.2 5,5 25 2.3 0.017 7.11 0.17 6.1 23 2.7 0.018 7.34 0.12 6.4 22 2.4 0.018 6,52 0.1 6.2 20

1.5 0.021 6.88 0.17 6.4 20 1.9 0.Q19 6.06 0.15 6.8 18

23.6 <0.002 0.32 8,66 14.4 4 0.4 0.026 7.74 0,14 5.5 24 0.9 0.027 8.01 0.15 6.2 25

9.7 <0.002 0.11 0.1 12.2 2 3.6 0.024 8.84 0.31 6.3 29

12.1 0.004 4.45 7.65 10.1 16 1.1 0.029 9.91 0.17 6.1 32 1.2 0.028 9.93 0.15 6 32

7 0.029 >10.0 0.16 4.2 48 2.4 0.026 7.82 0.16 5.6 23

·0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 • 15 TORONTO STREET TORONTO ON MSC 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61 ME-MS61

Sn Sr Ta Te Th Ti ppm ppm ppm ppm ppm % 0.2 0,2 0,05 0.05 0,2 0.005

1.6 7 <0,05 2.02 <0.2 0,048 <0.2 1 <0.05 16.1 <0.2 <0,005 1.4 6,3 <0.05 2.58 <0.2 0.066 0.9 6.4 <0.05 4.75 <0.2 0.042 1.4 6,4 <0.05 1.92 <0.2 0.07

1.2 8.1 <0.05 2.18 0.2 0.062 0.8 7.2 <0.05 3.06 <0.2 0.062 2.5 223 0.36 0.13 1.7 0.306 1.1 8.2 <0.05 2.95 <0.2 0.061 0.7 6.9 <0.05 2.32 <0.2 0.064

0.8 7.5 <0.05 2.38 <0.2 0.058 0.8 4.9 <0.05 2.49 <0.2 0.06 0.6 5.3 <0.05 2.14 <0.2 0.048 1.4 6.2 <0.05 3.85 <0.2 0.053 1.4 6.3 <0.05 3.78 <0.2 0.052

1.1 8.6 <0.05 5.55 <0.2 0.053 0.8 5.4 <0.05 3.01 <0.2 0.054 1 6.5 <0.05 3.26 <0.2 0.05

1.2 334 0.6 <0.05 6 0.22 1.3 8.9 <0.05 2.79 <0.2 0.051

0.8 5.1 <0.05 3.31 <0.2 0_047 1.1 4.9 <0.05 3 <0.2 0.046 1.1 5.3 <0.05 2.87 <0.2 0.039 1.1 5.6 <0.05 3.42 <0.2 0.048 1 6.8 <0.05 2.31 <0.2 0.05

0.7 5.5 <0.05 2.15 <0.2 0.064 1.1 27.5 <0.05 3.49 0.2 0.06 2.4 217 0.34 0.21 1.9 0.3 0.7 2.8 <0,05 2.86 <0.2 0.036 1.2 5.2 <0.05 5.9 <0.2 0.044

0.9 496 0.16 0.06 2 0.335 1.2 7.4 <0.05 4.12 0.2 0.058 1.5 353 0.12 3.18 1.6 0.276 1.3 5.4 <0,05 7.56 <0.2 0.052 1.6 4.3 <0.05 5.54 <0.2 0.053

1.5 4.2 0.05 5.65 0.4 0.045 0.7 6.3 <0.05 2.64 0.2 0.037

Page: 3· C Total". ... ages: 3 (A. E)

Finalized Date: 2S-5EP·2007 Account: TRJ

TB071 00236 ]

ME-MS61 ME-MS61 ME-MS61

TI U V

ppm ppm ppm 0,02 0,1 1

0.27 <0.1 57 0.16 <0.1 21 0.24 0.1 62 0.19 0.1 44 0.2 0.1 69

0,21 0.1 58 0.13 0.1 60 1.03 0.6 97 0.12 0.1 58 0.15 0.1 60

0.14 0.1 52 0.13 0.1 63 0.13 0.1 47 0.13 0.1 50 0.13 0.1 52

0.14 0.1 56 0.13 <0.1 55 0.17 0.1 50 0.25 1.7 36 0,2 0.1 53

0.26 <0.1 52 0.36 0.2 53 0.33 0.3 40 0.41 0.1 49 0.37 0.3 48

0.41 0.1 60 0.5 0.3 52 1.05 0.9 95 0.48 0.1 41 0.65 0.1 42

0.14 0,5 107 0.8 0.2 48

0.22 0.7 101 0.64 0.9 53 0.63 0.3 51

0.64 0.4 39 0.49 0.2 35

.. Comments: AdditIonal Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - - - - - -

Page 38: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

M<Hhod An.1yle Unl.

Sample Description LOR

26311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 26321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28337 28338 28339 28340 28161

26341 28342

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME·MS61 ME-MS61 ME-MS61 ME-MS61 Cu-0002

W y Zn Zr Cu ppm ppm ppm ppm %

0.1 0.1 2 0,5 0,001

0.1 1.6 169 6 2.01 0.1 0.1 20 <0.5 1.905 0.1 1.6 130 6.2 2.67 0.1 1.4 345 4.7 5.26 0.2 1.5 154 5.4 2.39

0.3 1.8 141 6.8 2.59 0.1 1.7 79 7.1 1.075 4.5 14.5 40 39.8 0.1 1.5 103 5.2 1.665 0.1 1.6 67 6.1

<0.1 1,6 51 6.3 0.1 1.3 78 5.3 0.1 1.5 62 5.9 0.2 1.4 96 5,1 1.595 0.2 1.5 93 5.1 1,460

0,4 1.6 59 6,2 0,6 1.4 54 5 0.4 1.4 99 5 1.595 0.1 10.6 45 96.9 0.3 1.6 136 5,9 2.30

0.2 1.3 103 5.1 1.110 0.2 1.3 157 4.9 0.3 1.3 58 4.8 0.3 1.6 65 5.8 0.1 1.6 41 6

0.1 1.8 48 6.7 0.3 2.2 79 9.5 4.5 14.9 40 40.5 0.2 1.1 22 4.1 0.2 1.4 47 4.4

0.1 8.6 19 86 0.4 1.9 58 7.9 1.445 0.6 8.1 26 65.4 0.2 1.7 50 6.1 0.2 1.7 68 5.7 1.000

0.1 2.2 32 16.7 1.215 0.3 1.3 41 5.5

Ni-OG62

Nj

%

0,01

1.30 9.40 1.14 2.76

1.69

1.52 2.13

2.05 2.24 2.52 1.98 1.94

2.05 2.19 2.03

1.65

2.12 2.17 2.14 1.97 1.92

1.90 1.54

2.42 2.50

1.92

2,21 2.14

3.79 2.16

"0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24

Au Au Check PI PI Check Pd Pd Check

ppm ppm ppm ppm ppm ppm 0,001 0,001 0,005 0,005 0.001 0.001

0.193 0,350 3,04 0.040 3.02 >10.0 0.167 0.595 2.03 0.091 0.626 5.25 1.170 0.396 1.745

0.146 0.345 1.995 0.075 0.480 2.45 0.891 0.494 1.430 0.130 1.065 2.93 0.032 0.456 3.07

0,079 0.462 2.73 0.070 0.662 3.44 0.044 0.383 3.27 0.450 0.711 2.95 >10.0 6.49 0.776 0.676 3.04 3.09

0.047 0.822 2.91 0.060 0.872 2.85 0.153 0.800 3.30 <0.001 0.007 0.014 0.065 1.015 3.00

0.053 1.425 2.94 0.109 0.853 3.75 0.055 0.862 3.15 0.043 0.905 2.70 0.034 0.583 2.40

0.034 0.463 2.57 0.117 0.838 2.70 0.772 0.378 1.430 0.109 0.612 3.39 0.282 1.630 3.92

0.008 0.010 0.036 0.026 1.560 3.40 0.030 0.929 1.845 0.045 1.540 3.83 0.025 1.535 3.71

0.040 1.370 6.40 0.032 0.494 2.65

Page: 3 - D Total. ",ages: 3 (A - E)

Finalized Date: 2S-8EP-2007 Account: TRJ

TB071 00236 ] Au-GRA21 PGM-ICP27 PGM-ICP27

Au Au PI

ppm ppm ppm

0,05 0,03 0,03

0.06 2.86

7.60 -.

Comments: Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - - - - - -

Page 39: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Metbod Aftalytlo

Units Sample Description LOR

28311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28337 28336 28339 28340 28161

28341 28342

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

PGM-ICP27

Pd

ppm

0.03

12.40

fo: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

Page: 3· E Total Jl. t'ages: 3 (A. E)

Finalized Date: 25-5EP-2007 Account: TRJ

TB07100236 1

Comments: Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE's may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - - - - - -

Page 40: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I I I

Appendix III

Hole NOT -07-02

I I

Drill hole Location Plan

Vertical Cross Section

I Drill Log

I Assay Certificate(s)

I I I I I I I I

12

Page 41: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

5844000~ 't. 't:. ~ '(. 't:. 't:. '(.

i ~ ~ ~ , ~ ~ i-

I

5M)800~ f 584)800:-.:

1-0 I /: 0.> I

~~~ I I

1tO I I ~

",.> V

~O I

584]600" ?> 584]600~ '0,.>

'OT~ NOT.'., v~ I

I

I Claim 3012251 I

I S8J]4 00~ I 5S41400'J

I Claim 3012264

I --

f

Claim 301225~ SIH]200~ ~841 200~

,

f I SUIU' _~C ~II~EX GROUP i Claim 3012258 I I Soronl Rc$()Urt'Cs Illc .

I ~ ~ it 't. Double ujI,le Proj«l

~ /0 !rP.LAG~ Drill Hole Plan VIC"'" i

'" " I s..k I· ~ l!0~ ___ !~¥~ I

:~P:..c R P""C - SUIF AC In n.;'. Gr ou r

6~' '8& T'~~ -

"" ~ ;::, 10 -4

c! N~~ C NOVAK -0- r'KAv '?NG MEMBER ~'

0498 L .

°Nri\\1\O

Page 42: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Assay Legend

%Cu %Ni

<0.25% <0.26%

0.25-0.50% 0.25-0.50%

0.50-1.0% 0.50-1.0%

>1.0% >1.0%

.x I' tORP"': - :::: l.z pae Mtno l': Grfl1.l p

- - - - - - - - - - -

Geology Legend

PERf-a. Net· Textured PorlC:SOb~o

MS t.t ,..., u:/lloft

GAR. G lbtltO

'.'.D, MnfICDykC

NORONT RESOURCES

- -

Noro n! Resources Dou ble Eagle

Eagle One

Drill Hole Section NOT-07-1 .2

- - - - - -

Page 43: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Project: Noront

Hole Number: NOT-07-02

Units of Measurement: Metric

location NTS Sheet: 430/9 Township: BMA526862 Claim No: Grid: Easting: L51E Northing: 12+2!)~

Elevation:

GPS Co-ordinates: Zone: NAD83 (if applicable) Datum: Z16

Easting: Northing:

Collar Dip: Collar Azimuth: Hole Length: 191m Core Size: SO Recovery:

logged By: Howard Lahti

Date: Start: Finish:

- - - - - -

3012264

179

547202 5843646

:l>Ji 137

98%

26-Aug 28-Jan

-

Billiken Management

INCLINATION TESTS DEPTH ,DIP AZIMUTH COLLAR -65 140

41 -63.3 135.8

~ -59.1 148 -55.5 168.5 50.7 148.3

- - - -

Comments

Under cut NOT-07-0j by - 30M. Drill hole intersected semi-massive to disseminated pyrrohtite, chalcopyrite and pendlandlite. The mineralization was more extensive than that found in NOT -07 -01. A 2meter thick massive zone of pyrrhotite was intersected witrh coarse grains of pentlandhte and patches of massive chalcopyrite.

- - - - - - - -

Page 44: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Project: Noront Hole #:NOT-07-02 lPage:2

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH

0 5 Overburden ----- ------- -- - - ---- ---- ~-- -- --- -

- - --- - - -

5 7.4 Dolomitic Limestone -- ----, --- -- ---

- - ------ - - - --- ~- ------ --- -

Massive, buff, fossiliferous, stained with iron oxides. --- -- - ~ - - -- - - -~ -- ------

_. Sandstone

---- --- ----- ----- --- --~ - ----- ---

7.4 10.5 ---- - --- - -- - --- - -

-~- ---- -- Dark gray, friable, lost core and highly broken. - -- ----- -- --- --

--- --- ----- - f-- ---- ---- ----- --- ---, ---

- ~-- ---- -----I~ --- ---- ---- ------ -

--- Granodiorite -- -- --- -

10.5 88.4 - ---- -- - - -~ - -- ------- --- ~--

---- - -- Very coarse grained, pinkish color due to extesive kspar alteration. -- - - ---- ---- ---- - -- ----

--- --- -- Composition: quartz, albite, perthite (kspar) hornblende and minor ------ - - -~- -- --

~-

sericite. Good euherdral crystals. Most intense kspar alteration near ~- ---- ------ -

I

- - --- ~-

----- _ fractures. Some brittle fractures and exhibiting surface water weathering -- --

with some hematite .. Some phocrysts 1cmXO.5cm. Core gerenally, --- - --- -- ~ -

gray with black spects of horneblend.Rare pyrite near and in some --- - -- - - -

fractures. Less kspar further down the hole. ----- -- -

- -

54.24-56.65- Dike- Fine grained mafic, probably gabbro or peridiotite. - - - ---- -- ---- -- -- --- -

---- - --- ~- --- ---- -- - - -- --- ---

-- -- 60.05-64.47Mafic Dike- Fine grained, sheared at 55°, with erratic blebs ---- ---- - --- ----- ----- --

and stringers of pyrrhotite, pyrite and trace chalcopyrite. Minor white -~- ----- ,---- --- ----- -- -- - -

---- feldspar <1 mm in size. -- ---- ---- -- ---- - -- ~- ---- --

-- I- -- ----- - --- ----- --- -

75.94- 81.64 Mafic Dike- Fine grained, dark greenish gray, foliation at --- -- ---- -- ----

45° to CA, massive chlorite alteration. ------- ---- ---- - -- - --- -

-- ----- Granodiorite no sulphides --r- ~-- ---- -- -- -- -

-- --- -- -- --- - --

88.4 f-- ----- ---- -- -

_ Transition Zone 28300 87.4 -- --- - -- -----~ -- ------ ------ --- ~-

---- ----- - ---~ - --- --- -- ---- -- ----- -~

88.4 --

91.09 Possibly chill margin, fine grained, massive chlorite, (serpentine?), odd - ---- - --- ---- -- ----- -

large disseminated pyrrhotite. Some 3x4mm porphroblasts of highly -- - -- - -- - --

altered olivine. --- - --- ---- ---- -~- ~

-- ~-1--- Chill margin, peridotite, coarse blebs of po --- ----- .---- --- ---- ---- --- --- -

-- -- As above --- --- --- ---- - -~ --- --- ---

-~- - ------

-89~---- - - - - -- -_.

28301 88.4 --- - f- --

--91.09 ---- - -- --- -- - --

28302 89.68 - 1--- --- -~ -- -- -- - --- - -- -- --

- - - - - - - - - - - - - - - - - - -

Page 45: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Billiken Management

FROM TO DESCRIPTION

91.09 100.12 Mineralized Zone

100.12

- -

134.34

Massive, black peridotite with interstial pyrrhotite, pentlandite and chalcopyrite. Core weakly serpentinized but generaly totally altered. Core highly magnetic. One to 6 percent chalcopyrite up to 20% pyrrhotite and over 1 % pentlandite. Core coarse grained with 1 mm + black altered olivines.

10cm mass po, minor serp, 20% pO,1 % cpy 2-4% cpy, 15% po, pent. 2-4 % cpy, 15-20% po, pent. 3-5% cpy, 10% po, pent. 2-4% cpy, 15% po, pent. As above As Above 3-5% cpy, 3% po As Above Massive po, 2-3% cpy, py, pent. 1-2% cpy, 20% po, pent. 5% po, <1% cpy, pent, plus 30cm vein 20% cpy + 80% po and py. 10% po, 1-2 % cpy, pentlandite, white silvery large penocrysts ..

Mineralized Zone Con't

Peridotite with 20-30% sulphides mainly pyrrhotite with 2-6% chalcopyrite. Some white sulphide of pentlandi!e.

20% sui, 15% po, 4-7% cpy, pent. 15% sui 12% po, 3-6% cpy, pent. 25% sui 20% po, 5% cpy, pent. 6% cpy, 14% po, pent. 5% cpy, 15% po, pent. 25-30% po, 3% cpy, pent. 25-30% po, 3-4% cpy, pent.

- - - - - - -

PRO.IECT:Noront HOLE NO NOT-07-02: PAGE:3

ANALYTICAL RESULTS SAMPLE FROM TO LENGTH

28303 91.09 92 28304 92 93.5 28305 93.5 95

-'

28306 95 96.5 28307 . 96.5 98 28308 98 99.5 28309 99.5 101.00 28310 101 102.5 28311 102.5 104.63 28312 104.63 106.64 28313 -"106.64 108.5 28314 108.5 110 28315 110 111.5

28316 111.5 113 28317 113 114.5 28318 114.5 116 28319 116 117.5 28320 iris 119

119 120.5 120.5 122

122 123.5

- - - - - - - - - -

Page 46: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

PRO.IECT:Noront HOLE NO:NOT-07-02 PAGE:4

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH 100.12 134.34 Mineralized Zone Con't ----- -- -- --- -- -- --- - -- --

-- -- -- ---- -- - --- -

25-30% sui, 7% cpy, 20% po, pent. 28324 123.5 125 1.5 ---- -- --- -- ---

25-30% sui, 4-6% cpy 20+% po, pent. 28325 125 126.5 1.5 - -- - ---- -- --- -- -

30-35% sui, 4-6% cpy, 20% po, pent. 28326 126.5 128 1.5 -- -----

20-25% sui, 2-4% cpy, pent. --- - --- -- ---- --

28327 128 129.5 1.5 ---

As above ---

131 ------ ---- - ----- --

28328 129.5 1.5 --- - 20% sui 1-3% cpy, pent. 132.5

----- --- ------ - -- --- --- ---

28329 131 1.5 - -- --- 30% po, trace cpy, pent. --134 1

---- - ---- -- - ---

28330 132.5 1.5 --- - - -- 25-30% po, 1-3% cpy, pent. - -- --- -- -- --- ---

28331 134 135.5 1.5 ---- ------ -- ---- ----- -- ----- -- -- --- --

--- Mineralized Zone Con't --- --- -- -----

134.34 156.91 - --- -- ----- --- ------- - -- --- -- --- -

-- -- --- 15-20% pyrrhotite plus variable amount of chalcopyrite (2-8%), over ---- - -- - -- --- ---- ---- -1

-

-- - - short intervals higer amounts of cpy and variable amount of pentlandite. _ ----- - -

--- - Modest amount of fracturing at vaious orientations. Minor hematite in - ---- -- ----- --- --- -- -some fractures. Core completely altered to serpentine and chlorite. ---

Minor shear at 146.8 to --- -- -- ---- -- --- - -- ---

147.1 in massive po-py. Some pyrite in some fractures. --- --- - --- - - -- -

142.28-143.3-Felsic Dike- Fine grained, very hard, siliceous,massive - ---- ---- -- -- -

and medium gray color. Trace pyrite. Upper contact 40° lower a fault ---

contact at 35°, Possibly fine grained granodiorite. Coarse olivines. -- --- --- ---

-- 144.77-145.94- Felsic Dike- As Above. Upper contact 60° lower similar. -- ---- ----- -- -- --- - -

-- - -- --- ----- -- --I- --- -----

--- --- 25-30% sui, 25% po, 2-4% cpy, pent. --- ---- ---- ----- ----- ------ -

---- -- - 20-25% po, trace cpy, pent. ----- - --- --- - - - ---

-- - 15% po, trace cpy, pent. -135.5

-- - -- ---- --

8% po, 2-3cm semi-mass cpy at edge of small felsic dike 2833~ 137 1.5 - - --- --- -- --

Felsic dike 28333 137 138.5 1.5 - -140 ------- ---- --- -- --- -- ----

30% sui, 2-4% cpy, pent. 28334 138.5 1.5 -- - ---

28335 141:5 r- - -- -- -- ---

Felsic Dike 140 1.5 --- -- ---- -- -- -- - - -- -

25-30% sui, 1-3% cpy, pent 28336 141.3 142.28 0.98 --- -- - -- -- -- --- -- -

25% po, trace cpy, pent. 28337 142.28 143.3 1.02 - -T43:3 ----"-- -- -- -- -- ---

20% po, trace cpy with 40cm mass po-py with occasional bleb cpy 28338 144.77 1.47 -- --

28339 145:94 1-- -- - ---- -- --

20% po trace cpy, pent. 144.77 1.17 -- ------

30% po, tr cpy, pent. -28340 - ------r-- ---- - ----

145.94 146 1.06 -- -I- - 28341 '----14is -- --- --- ----- -- ---

146 1.5 --- - --

147.5 -- - ----- - -- - -- ---- -

28342 149 1.5 -- - ---149 --- ;--::- -- -- - -- -

28343 150.5 1.5 -- -- ---- --- --- -- - -- -- -- --- ---

--I-- --- ----- - - ---- -- -- _ L_ --

- - - - - - - - - - - - - - - - - - -

Page 47: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

PROJECT: Noront HOLE NO:NOT-07-02 IPAGE:5

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESUL TS

SAMPLE FROM TO LENGTH 134,34 156.91 Mineralized Zone Con't ------

_ ... .-

150.5 i··· 10' .~'-

20% po, 1-2% cpy, pent. 28244 1,5 - ...... ,-

15-20% po, 1% cpy, pent. 28245 152 153,5 1,5 ---~ .. 1··-- ._ ..

20% po, 1-3% cpy, pent 28246 153.5 155 1.5 15% po, trace cpy, pent.

-_ ... _.,- ...... -. - -_ .. 28247 155 156:~ 1.5

. , .. --.. ' -"28248 -TI .....

156.5 158 156.91

--- Mineralized Zone Cont'd ---- ,.-

171.5 i -------

The MZ ends about 171,5 where it is in contact with a fine grained ---... ._ ..... - --"-- - ---

----- ultramafic or volcanic rock., The pyrrhotite and chalcopyrite decrease f---... -- . - -- -- -_ ..... _. -- -_ .. .. .. "

toward the bottom contact. There is a slight change in style of -- _. .... I .. · -

mineralization with occasional patches of pyrrhotite-pyrite found in the 1--- .. ------1-' .. i·'

I·· . i--- core. The core has a few fractures at 45° to CA with carbonate. .._-_ . - ----- --

- --- .... - .. -_. ...... _ •. -- 20-25% po, trace cpy, pent.

--28349 .- T5 - .... - ....

15-20% po tr cpy, pent. 158 159,fi --

15-20% po, tr cpy, pent 28350 159,~i 161 1,5 -- ---- --.- _ ..

20-25% po, tr cpy, pent. 28351 161 162.~i 1.5 . ----- - .... ...... --

3-5% po, tr cpy 28352 162.5 1.5 ....

1-164

- ---

As Above ----

28353 164 165,5 1.5 2-3% po 1,--" ... ''165.5 167 15.

...... --28354

1% po ..... 28355 .... '- ." 1- ..

167 168J ___ 1:~ 1% po, serp - I· .. _. ... _--- -------

28356 168,5 170 1.5 ------ -~- -...... - I

Complex Deformation Zone 28357 170 171.5 1.5 --- ..... _. ------.... _._.

From 171.5 to the end of the hole the core is a mixture of fine grained .. _. ... -. __ . .- - ....

171.5 191 ultramafic with short section of coarse grained peridotite the same as -."-"--- .-.. , .... - ... -- -_. .•.. the mineralized section, This section has numerous brittle fracture --- ---- .. ' __ ..... - 1- ._ ...

... - . .. ". ... ..... - many sub-parallel to the CA Pyrrhotite has flowed into many of the '-1 . - .. _.-_ ... ---1-' fractures with minor chalcopyrite. Locally the core is sheared and highly i'-"" - 1- ..... - ... .. f-- . broken with some gauge. Some of this section may be a dike.

~-~-~-- -_ .... ~ .. " .. .-." -- .._------.

.. Short sections very hard, siliceous, Intermediate feldspar dike? or -'- ---' 0-. ......... -~- . __ ... .. _ .. _-.. _ . .--

volcanic rock. ...

Fine gr ultramafic, fractures with po 3-5%%, sheared and fractured C'.--- ------~ - . .... -"

~-.~---~

Mixed felsic dike with ultramafic 1-2 % po mainly in fractures ...... 1- -~ ... - -- .. _-

-~ .. - ..... -~--

~ ---- ~- ... Fractured sheared, fractures with po and carb 2-3% po 2~~ .5

1-··· 173 1.5

.... _ ... r--- _ ..

tine and coarse grained ultramafic, most po in fractures 1-3% po 28359 173 174,5 -'-1~~ .. ~-28365

-- " ... ... --~---- .. ~.-

174,5 176 . - ..... -- _ ...• .... - . ----~

-"-28361 176 ... _ 171'.:..5 ----;-~

1.5 _. ... ~-~----. .- . ... _ ..

- - - - - - - - - - - - - - - - - - -

Page 48: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Billiken Management

FROM TO DESCRIPTION

171.5 191 Complex Deformation Zone

Chlorite rich rock, minor patches of po <1% core broken. Possibly intermediate volcanic rock or dike mixed with ultramafic.

191 EOH

PROJECT:McFaulds

SAMPLE FROM TO

28362 177.5

- - ----------

HOLE NO:NOT-07-02 PAGE:6

ANALYTICAL RESULTS LENGTH

179 1.5

- - - - -- -

Page 49: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

ALS Chemex 0: BILLIKEN MANAGEMENT SERVICES INC. Page: I Finalized D ..... : 25-5EP·2007

Account: TRJ EXceLLeNce IN ANAL YTICAL cHeMISTRY ALS Canada Ud.

SUITE 1000 • 15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle P.O. No.:

212 Brooksbank Avenue North Vancouver Be V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

CERTIFICATE TB07100236

this report is for 77 Drill Core samples submitted to our lab In Thunder Bay, ON. Canada on 10-SEP·2007.

The following have access to data associated with this certificate: HOWARD LAHTI I BRIAN NEWTON I NEIL NOVAK

To: BILLIKEN MANAGEMENT SERVICES INC. ATTN: BRIAN NEWTON SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

ALSCODE

WEI-21 LOO-22 CRU-31 LOG-24 SPL-21 PUL-31 CRU-QC PUL-QC

ALS CODE

ME-OG62 Cu-OG62 NI-OG62 PGM-ICP24 Au-GRA21 PGM-ICP27 ME-MS61

This Is the Final Report and supersedes any preliminary report with this certlficate number. Results apply to samples as submitted. All pages of this report have been checked and approved for release.

SAMPLE PREPARATION DESCRIPTION

Received Sample Weight Sample login - Red w/o BarCode Fine crushing - 70% <2mm Pulp login· Red w/o Barcode Split sample - riffle splitter Pulverize split to 85% <75 um Crushing ac Test Pulverizing ac Test

ANALYriCAL PROCEDURES DESCRIPTION

Ore Grade Elements - Four Acid

Ore Grade Cu - Four Acid Ore Grade NI • Four Acid Pt, Pd, Au 50g FA ICP Au 30g FA-GRAV finish Ore grade Pt. Pd and Au by ICP 48 element four acid ICP-MS

INSTRUMENT

ICP-AES VARIABLE VARIABLE ICP-AES WST-SIM ICP-AES

Signature: ~~~'5 Lawrence Ng, Laboratory Manager - Vancouver

-------------------

Page 50: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method ""alyle

Units Samp.e De.crlption LOR

28277 28278 28279 28260 28281

28282 28283 28151 28284 28285

28286 28281 28288 28289 28152

28290 26291 28292 28153 28293

28294 28295 28296 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28308 28155

28307 28308 28309 28156 28310

ALS Chemex EXCELLENCE IN ANAL VTICAL CHEMISTRY ALS Canada lid.

212 Brooksbank Avenue North Vancouver Be V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 WIIIM'.alschemex.com

WEI·21 ME-MS61 ME·MS61 ME·MS61 ME·MSBI ME·Msal

ReevdWI. Ag AI As Ba Be kg ppm % ppm ppm ppm

0.02 0.01 0.01 0.2 10 0.05

1.44 1.51 1.94 1.7 30 0.15 2.47 0.08 6.19 2.2 220 1.03 1.32 1.19 1.76 0.5 10 0.12 2.09 1.4 1.94 0.5 20 0.12 2.06 1.35 2.07 0.7 10 0.13

1.72 1.11 2.38 0.4 30 0.16 1.02 0.08 7.23 0.2 490 0.77 0.08 1.02 1.72 51.5 410 0.87 3.09 1.19 2.06 0.6 10 0.1 1.74 1.33 1.9 0.5 10 0.01

1.77 1 2.55 0.4 50 0.15 1.65 1.48 1.93 0.5 10 0.13 1.95 1.38 1.94 0.2 20 0.08 0.96 1.66 1.79 0.8 20 0.09 0.87 1.32 1.76 1.3 20 0.01

2.06 1.21 1.71 0.8 20 0.05 1.95 1.3 1.68 1.1 10 0.1 2.10 1.14 1.89 0.8 30 0.09 1.19 <0.01 7.15 0.5 440 1.12 2.02 0.29 6.63 0.8 350 0.75

1.12 0.96 1.75 1.4 <10 0.08 1.78 0.85 1.73 1.3 10 0.11 2.40 0.98 1.75 0.6 <10 0.11 1.54 0.04 2.05 1.3 <10 0.11 2.29 0.04 2.11 1.7 <10 0.11

1.74 0.24 2.18 1.9 <10 0.1 1.45 0.07 7.15 0.1 420 1.15 0.09 0.85 7.76 52.4 470 0.9 6.56 0.16 6.72 0.6 320 0.9 2.03 4.98 3.7 0.2 100 0.19

1.21 2.19 1.08 2.7 <10 0.08 2.37 1.15 0.77 0.9 <10 <0.05 1.15 3.15 0.86 0.7 <10 0.05 0.94 3.63 1.07 0.6 <10 0.07 0.95 3.86 1.12 0.7 <10 0.09

2.09 5.94 0.98 0.4 <10 <0.05 2.11 8.19 1.19 0.7 <10 0.05 1.92 8.74 1.11 0.7 <10 0.01 1.03 0.13 7.59 0.3 480 1.14 2.11 11.1 1.03 0.8 <10 0.07

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

ME·MSBl ME·MSBl ME·MSBI ME·MSSI ME·MSSI ME·MS61 BI Ca Cd ell Co Cr

ppm % ppm ppm ppm ppm O.ot 0.01 0.02 0.01 0.1 1

1.46 1.33 0.63 9.22 226 1260 0.28 3.51 0.2 59.9 39.2 328 0.36 1.24 0.18 5.91 208 2890 0.35 1.24 0.39 5.8 220 3470 0.43 1.34 0.3 5.46 211 3130

0.36 1.16 0.17 15.1 179.5 3530 0.06 3.67 0.11 31.1 34.1 340 0.05 3.62 0.03 19.6 32 861 0.32 1.31 0.26 4.79 197 4180 0.45 1.26 0.28 4.96 201 3360

0.39 2.05 0.15 7.51 189 3000 0.39 1.17 0.25 4.63 207 3010 0.38 1.42 0.36 3.77 203 3260 0.42 1.37 0.37 3.83 201 3410 0.37 1.34 0.33 3.63 194.5 3380

0.38 1.29 0.22 4.49 189 3680 0.45 1.23 0.28 4.52 205 4020 0.39 1.28 0.11 5.05 184.5 3620 0.08 2.09 0.03 49.1 8.8 51 0.14 3.99 0,48 31.1 69 827

0.51 1.62 0.14 4.53 192.5 3870 0.39 1.42 0.1 5.18 191 4160 0.21 1.23 0.2 4.75 180 3440 0.1 1.64 0.03 3.89 106.5 3010

0.13 1.68 0.05 4.02 112.5 3320

0.15 2.48 0.01 7.34 96.5 3190 0.09 1.76 0.11 39.7 9.5 67 0.05 3.59 0.04 19.8 30.6 910 0.19 2.16 0.09 34.9 48.8 945 0.63 4.44 0.12 5.36 93.8 3330

2.24 1.86 0.06 3.49 880 2100 1.33 0.18 0.24 2.06 562 2220 1.19 0.27 0.6 1.58 489 3470 1.17 0.56 0.85 2.26 463 1890

,1.36 0.58 1.02 2.41 488 2050

0.99 0.32 4.09 2.62 347 4190 0.9 0.86 8.78 3.11 208 1810

1.07 0.55 8.96 2.62 220 2060 0.12 2.2 0.18 49.2 10.4 54 0.88 0.49 11.75 3.11 214 2340 . Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method .

- - - - - - - - - - - - - - -

Page: 2·11 Total 11- rages: 3 (A - E)

Finalized Date: 2S·SEP·2007 Account: TRJ

T807100236-']

ME·MS61 ME·MSBI ME·MSdl Cs Cu Fe

ppm ppm % 0.05 0.2 0.01

0.44 5850 12 0.75 187.5 4.8 0.28 2430 10.3" 0.26 3170 10.2~

0.27 3110 9.18

0.15 2090 8.34 0.51 134 3.83 0.86 128.5 4.67 0.24 2860 9.34 0.21 2740 9.04

0.42 1450 8.56 0.5 2650 9.37

0.36 2170 9.64 0.29 2540 9.27 0.28 2410 9.1

0.3 2570 8.83 0.28 2660 9.14 0.58 1870 8.31 0.55 36.8 2.23 1.13 480 5.38

0.26 2300 8.73 0.27 1840 8.8 0.21 1980 8.42 0.26 23.2 6.95 0.21 25.2 7.26

0.33 69.8 6.31 0.73 17.3 1.92 0.87 137.5 4.64 1.7 431 3.26

3.11 1360 6.6

0.14 2180 22.2 0.08 1870 19.55 0.08 8260 18.35 0.09 >10000 17.5 0.09 >10000 17.8

0.09 >10000 18.45 0.11 >10000 15.6 0.1 >10000 16.35

0.52 517 2.51 0.09 >10000 17.55

- - - -

Page 51: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Mttthod Analyta u_

Samp'a DHcriptlon LOR

28277 28278 28279 28280 28281

28282 28263 28151 28284 28285

28286 28287 28288 282811 28152

28290 28291 28292 28153 28293

28294 28295 28298 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28306 28155

28307 28308 28309 28156 28310

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY AlS Canada lid.

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone; 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME-MS61 ME-MS61 ME-MOO1 ME-MS61 ME.MOO1 ME-MS61 Ga Ge HI In K La

ppm ppm ppm ppm % ppm

0.05 0.05 0.1 0.005 0.01 0.5

4.55 0.6 0.5 0.164 0.1 4.3 14.9 0.2 4.9 0.035 0.67 32.8 4.79 0.63 0.4 0.058 0.06 2.8 4.75 0.61 0.5 0.067 0.1 2.7 5.06 0.51 0.3 0.067 0.06 2.6

5.95 0.42 0.9 0.053 0.14 8.1 15.2 0.15 4.1 0.028 1.12 15.7 14.75 0.2 1.4 0.044 1.08 9.6 4.86 0.52 0.2 0.064 0.08 2.3 4.33 0.45 0.3 0.058 0.06 2.5

5.73 0.44 0.5 0.056 0.13 3.6 4.44 0.47 0.3 0.063 0.12 2.3 4.19 0.5 0.3 0.062 0.12 1.9 4.31 0.51 0.2 0.064 0.09 1.8 4.13 0.49 0.2 0.055 0.09 1.7

4.08 0.44 0.2 0.061 0.07 2.1 4.2 0.49 0.2 0.065 0.07 2.2

4.48 0.44 0.2 0.055 0.12 2.2 18.2 0.1 3.2 0.029 1.52 25.4 16.45 0.25 3.1 0.048 1.09 14.8

4.29 0.47 0.2 0.057 0.03 2 4.43 0.47 0.2 0.049 0.03 2.3 4.31 0.41 0.2 0.045 0.03 2.1 4.81 0.25 0.2 0.016 0.03 1.8 5.02 0.28 0.2 0.017 0.02 1.7

6.8 0.29 0.1 0.022 0.02 3.5 19.2 0.14 3.3 0.012 1.27 20.4 15.35 0.26 1.4 0.045 1.06 9.8 18.05 0.26 3.2 0.029 1.41 17.5 9.21 0.41 0.9 0.073 1.18 1.9

3.86 2.12 <0.1 0.181 0.Q1 2.2 2.52 1.78 <0.1 0.074 0.01 1.4 3.2 1.47 <0.1 0.128 0,01 1 2.77 1.33 <0.1 0.174 0.Q1 1.3 2.92 1.26 0.1 0.191 0.01 1.4

3.6 1.08 <0.1 0.754 0.Q1 1.4 2.68 0.78 <0.1 0.798 0.Q1 1.8 2.79 0.79 <0.1 0.704 0.01 1.5 20 0.15 3.2 0.036 1.58 25.2

2.88 0.81 <0.1 0.682 0.02 1.8

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

ME-MS81 ME·MS61 ME-MOO1 ME-MS61 ME-MOO1 ME-MS61 Ll MIl MIl Mo Na Nb

ppm % ppm ppm % ppm

0.2 0.01 6 0.05 0.D1 0.1

10.4 18 1075 1 0.12 1.3 38.4 5.58 881 0.36 3.55 8.1 6.8 18.2 684 0.7 0.14 0.8 6.5 19.1 636 0.74 0.15 0.9 5.8 18.85 619 0.79 0.13 0.8

16.7 17.1 701 0.64 0.26 1.2 42.1 4.96 801 0.2 3.25 6.9 7.8 1.6 779 16.05 2.26 6.1 5.9 19.1 699 0.74 0.17 0.7 4.8 18.3 711 0.7 0.15 0.7

11.7 17.6 725 0.64 0.32 0.8 12.5 19.4 688 0.59 0.2 0.6 6.9 19.95 764 0.57 0.21 0.6 5 18.85 724 0.59 0.14 0.6

4.6 18.45 706 0.58 0.13 0.6

5.6 18.5 665 0.59 0.09 0.6 5.5 18.8 669 0.69 0.13 0.6 9.9 18.2 748 0.57 0.12 0.6 27.1 0.77 388 0.28 2.94 6.1 50.7 6.76 895 0.65 2.68 5.4

5.7 18.45 662 0.61 0.07 0.6 5.9 18.8 786 0.55 0.08 0.6 4.8 19.2 857 0.53 0.09 0.6 3.5 19.7 905 0.25 0.13 0.6 3.2 20.1 1010 0.28 0.12 0.6

7.2 18.55 737 0.21 0.05 0.7 36.7 0.95 224 0.23 3.58 5.9 8.8 1.58 774 16.25 2.26 6 50 3.11 480 0.6 2.89 5.2

23.5 13.5 1745 0.85 0.13 1.5

9.7 12.75 1255 2.87 0.02 0.6 7.2 15.35 1005 2.32 0.01 0.3 4.6 15.7 1255 1.72 0.01 0.3 4 15.8 1080 1.68 0.03 0.3

4.1 16.1 1130 1.67 0.04 0.3

3.2 17.5 1325 1.59 0.02 0.4 4.1 16.85 1040 0.78 0.03 0.3 3.1 16.5 1090 1.31 0.03 0.3

29.1 0.88 421 0.38 3.11 6.6 3.3 16.15 1225 1.14 0.02 0.4 . Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method •

- - - - - - - -

Page: 2·9 Total.,. r'ages: 3 (A· E)

Finalized Date: 25·SEP·2001 Account: TRJ

TB071 00236 -] . -

ME·MS61 ME-MS61 ME·MS61 Ni P Pb

ppm ppm . pprr,

0.2 10 0.5

7600 180 6.3 947 1100 9.7 5190 110 3.9 5560 130 5.2 5290 110 4.4 _." .. 4400 140 3.8 526 650 15.6 886 540 3.3 4750 100 6.5 5150 100 6.8

• __ fl'

4690 170 5.6 5220 90 5.1 5040 90 5.7 5000 90 5,4 4780 80 5.3 -_ ...... 4770 80 4.8 4990 90 5.9 4210 80 4.4 61.7 380 6.5 1120 740 16.7

~ ... '" ". 4410 80 5 4460 90 6.3 3740 80 4.3 1730 80 1.3 1800 90 1.3 .... _. 1580 70 2.1 79.8 330 56.3 904 530 3.3 1540 330 12.ll 3000 150 2.3

..... ~ >10000 80 10.9 >10000 40 7.6 >10000 40 1Ul >10000 80 9.5 >10000 90 9.5 .... ' >10000 80 15.3

6970 40 7.9 7080 60 9.2 136.5 410 6,4 6990 80 12.2

...

- - - -

Page 52: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I

A M.th .... AlIa". Unl"

Sample DesCription LOR

282n 28278 28279 28260 26281

28282 28283 28151 28284 28285

28286 28287 28288 28289 28152

28290 28291 28292 28153 28293

28294 28295 28296 28297 28298

28299 28300 28154 28301 28302

28303 28304 28305 28306 28155

28301 28308 28309 28156 28310

ALS Chemex I!XCIELLIENCIE IN ANAL "'CAL CHIEMISTRY ALS Canada ltd.

212 Brooksbank Avenue North Vancouver BC V7J 2Ct Phone: 604 984 0221 Fax: 604 984 0218 www.alsohemex.com

ME·MS61 ME·MS61 ME·MS61 ME·MS6! ME-MS6! ME·MS61

Rb Re S Sb So Se ppm ppm % ppm ppm ppm

0.1 0.002 0.01 0.05 0.1 1

4.2 0.004 3.51 0.51 8.3 11 12.6 <0.002 0.2 0.37 14 2 2.2 0.006 2.54 0.24 11 7 3 0.006 2.5 0.12 10.3 7

2.5 0.008 2.35 0.13 10.4 6

5.4 0.000 2.01 0.12 10.4 6 30.4 <0.002 0.18 0.11 19.3 2 19.8 0.002 0.32 8.88 14.3 4 2.4 0.007 2.32 0.14 10.9 6 2 0.007 2.24 0.11 10.2 6

4.2 0.006 2.08 0.12 10.6 6 3.2 0.008 2.3 0.12 11.3 6 2.9 0.006 2.36 0.11 10.8 6 3.1 0.007 2.34 0.13 10.9 6 3 0.001 2.28 0.16 10.6 6

2.6 0.007 2.23 0.14 10.4 6 2.5 0.007 2.31 0.12 /1 6 4.8 0.006 2.07 0.17 11.6 6 41.7 <0.002 0.03 0.13 5.1 2 30.4 0.003 0.51 0.14 18.9 3

1.5 0.006 2.21 0.2 11.2 6 1.6 0.001 2.06 0.17 /1.6 6 1.4 0.005 1.45 0.11 12 4 1.4 <0.002 0.08 0.2 12.8 1 1.1 <0.002 0,07 0.16 13.1 1

1.6 <0.002 0.17 0.18 13 1 29.5 <0.002 0.02 0.17 5.5 1 19.7 0.002 0.32 9.05 15.2 4 28.7 0.003 0.46 0.93 8 3 45.2 0.006 0.95 0.3 20.9 4

0.9 0.027 >10.0 0.41 6.8 33 0.4 0.016 7.84 0.22 6.6 24 0.3 0.013 6.7 0.15 6.8 21 0.4 0.014 7.05 0.19 7.2 20 0.4 0.013 7.07 0.14 7.7 21

0.4 0.015 6.43 0.13 7.1 20 0.5 0.008 6.53 0.25 8.2 20 0.4 0.016 7.07 0.15 7.5 22

40.6 <0.002 0.14 0.1 5.7 2 0.6 0.016 7.16 0.57 7.3 21

·0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 • 15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

ME·MS61 ME·MSII1 ME·MSB1 ME·MSB! ME-MS61 ME·MSB1 Sn Sf Ta Te Th n ppm ppm ppm ppm ppm %

0.2 0.2 0.05 0.05 0.2 0.005

1.2 11.4 0.1 3.97 0.5 0.118 2.1 236 0.53 0.36 4.4 0.584 0.5 11.1 0.00 1.15 0.7 0.118 0.6 12.2 0.07 1.05 0,5 0.125 0.6 11.2 0.00 1.28 0.4 0.103

0.6 14.5 0.12 1.02 1.1 0.119 2 317 0.54 0.12 2.2 0.714

2.5 223 0.36 0.21 1.7 0.302 0.6 15.1 0.00 1.03 0.4 0.098 0.6 13.6 0.05 1.04 0.4 0.1

0.5 41.9 0.06 0.9 0.5 0.116 0.6 20.7 0.05 1.13 0.3 0.094 0.6 22.4 0.05 1.11 0.3 0.096 0.6 14.5 <0.05 1.04 0.3 0.09 0.6 13.4 0.05 0.95 0.3 0.088

0.5 10.9 <0.05 1.01 0.3 0.088 0.6 12 <0.05 1.19 0.3 0.088 0.5 10.6 0.05 1.1 0.3 0.088 1.1 319 0.57 <0.05 5.9 0.204 1.3 261 0.42 0.28 3 0.621

0.4 8.9 <0.05 1.21 0.3 0.085 0.4 9 <0.05 1.05 0.3 0.091 0.4 9.9 <0.05 0.63 0.3 0.089 0.2 14.1 0.05 <0.05 0.3 0.097 0.2 17.2 0.05 0.06 0.3 0.1

0.2 20.8 0.05 0.13 0.3 0.095 0.8 290 0.48 <0.05 5 0.188 2.5 224 0.36 0.16 1.6 0.305 0.9 253 0.42 0.52 4.1 0.193 1.1 13.8 0.11 1.5 0.7 0.189

0.9 10.8 <0.05 4 0.2 0.044 0.5 3.2 <0.05 1.98 <0.2 0.022 0.9 3.3 <0.05 1.75 0.2 0.032 1.2 5.1 <0.05 1.95 0.4 0.026 1.2 5.5 <0.05 2.31 0.4 0.028

4.4 4 0.05 2.18 0.2 0.043 4.3 5.5 <0.05 2.66 0.2 0.026 3.4 5.1 <D.05 3.44 0.2 0.031 1.3 337 0.59 0.00 5.4 0.214 2.9 6.9 <0.05 2.42 0.2 0.043 . Comments. Additional Au results for sample 28156 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method .

- - - - - - - - - - -

Page: 2· C Total ~ I"ag88: 3 (A· E)

Finalized Date: 25-SEP-2007 Account: TRJ

TB071 00236 --]

ME·MS61 ME·US61 ME·M~ til

TI U V ppm ppm pprr.

0.02 0.1 1

0.2 0.2 65 0.09 0.9 195 0.08 0.1 81 0.1 0.1 16

0.09 0.1 73

0.15 0.3 18 0.08 0.9 185 1.05 0.7 91 0.13 0.1 73 0.11 0.1 67

0.15 0.1 70 0.2 0.1 65

0.15 0.1 68 0.15 0.1 66 0.16 0.1 65

0.16 0.1 66 0.21 0.1 68 0.23 0.1 69 0.22 1.1 34 0.26 0.9 256

0.26 0.1 67 0.3 0.1 72

0.19 0.1 72 0.02 0.1 72

<0.02 0.1 17

0.12 0.1 74 0.16 2 30

1 0.7 98 0.5 1 48 0.9 0.2 122

0.42 0.1 78 0.29 <0.1 48 0.45 <0.1 74 0.34 <0.1 47 0.33 <0.1 50

0.41 <0.1 78 0.24 <0.1 36 0.24 <0.1 48 0.2 1.8 34

0.27 <0.1 58

- - - -

Page 53: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method -.,... UnitII

Sample Description LOR

28277 28278 28279 28280 28281

28282 28263 28151 28284 28285

28266 28281 28268 28289 28152

28290 28291 28292 28153 28293

28294 28295 28296 28291 26298

28299 28300 26154 28301 28302

28303 28304 28305 28306 28155

28307 28308 28309 28156 28310

ALS Chemex EXCIlLLENCIl IN ANAL YTlCAL CHEMISTRY AlS Canada lid.

212 Brooksbank Avenue North Vancouver BC V7J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME·MS61 ME-MS61 ME·MSS1 ME·MS61 Ct/.QG62

W Y Zn Zr Cu ppm ppm ppm ppm %

0.1 0.1 2 0.5 0.001

0.3 4.6 83 21.2 0.4 16.1 42 146 0.1 4.4 57 16.9 0.1 4.5 61 19.3 0.1 4 65 16.9

0.1 5.4 54 31.6 0.6 18.9 22 122.5 4.6 14.4 40 39.5 0.1 3.7 61 13.9 0.1 3.8 54 14

0.1 4.2 50 20.2 0.1 3.1 53 15.2 0.1 3.5 64 14.8 0.1 3.4 57 13.1 0.1 3.3 51 12.6

0.1 3.3 55 12.4 0.1 3.4 61 13 0.1 3.6 56 13.3 0.1 10 45 99.1 0.2 22.8 50 111.5

0.2 3.5 62 12.3 0.2 3.6 61 12.3 0.1 3.5 60 12.1 0.1 3.8 55 12.6 0.2 4 66 12.1

0.2 3.7 57 10 0.2 6.6 14 94.9 4.6 14.3 40 39 0.2 8 45 94.6 0.1 6.4 114 31.6

0.2 1.7 35 8.3 0.2 1.1 48 2.6 0.1 1.7 99 5.9 0.1 2.2 70 12.2 1.100 0.1 2.3 81 12 1.090

0.1 1.8 234 1.3 1.865 0.1 1.8 335 5.1 2.86 0.1 1.7 345 I) 3.19 0.1 10.4 49 95.1 0.1 1.9 436 1.1 3.71

NI-QG62 Nl %

0.01

2.75 2.26 1.79 1.66 1.63

1.09

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 - 15 TORONTO STREET TORONTO ON MSC 2E3

Project: Double Eagle

I CERTIFICA"rE OF ANALYSIS

PGM-ICP24 PGM-ICP24 PGM·ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24 Au Au Check pt ptCheck Pd PdCheck ppm ppm ppm ppm ppm ppm

0.001 0.001 0.005 0.005 0.001 0.001

0.165 0.983 1.910 0.009 0.078 0.247 0.073 0.314 1.080 0.080 0.264 0.972 0.077 0.323 1.000

0.057 0.259 0.836 0.004 0.032 0.064 0.787 0.413 1.465 0.119 0.242 0.916 0.054 0.262 0.877

0.037 0.264 0.805 0.010 0.275 0.695 0.052 0.293 0.860 0.081 0.289 0.933 0.013 0.218 0.975

0.067 0.293 0.964 0.080 0.244 1.000 0.041 0.292 0.896 0.001 <0.005 0.008 0.035 0.061 0.224

0.069 0.332 1.010 0.080 0.263 0.841 0.056 0.206 o.sOO 0.002 0.013 0.068 0.003 0.021 0.112

0.001 0.055 0.076 0.002 <0.005 0.006 0.750 0.394 1.410 0.013 0.116 0.332 0.025 0.393 0.755

0.035 >10.0 1.06 0.026 0.980 3.10 0.092 1.660 2.91 0.074 0.808 2.86 0.066 0.691 2.92

0.323 0.225 2.75 0.562 0.172 1.510 0.195 0.599 1.140 0.002 0.007 0.030 0.252 0.611 1.660 . Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method .

- - - - - - - - - - - - - - -

Page:.2· f)

Total". rages: 3 (A - E.) Finalized Date: 25-8EP-2007

Account: TRJ

T8071 00236 --]

Au-GRA21 PGM·ICP27 PGM-ICI'2 Au Au pt

ppm ppm ppm 0.05 0.03 0.03

-.

0.05 12.35

- - - -

Page 54: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Meth ... "".Iye. Unit.

Sample Description LOll

28277 28278 28279 28280 28281

28282 28283 28151 28284 28285

28286 28287 28288 28289 28152

28290 28291 28292 28153 28293 28294 28295 28296 28297 26296

28299 26300 28154 28301 28302

28303 26304 28305 28306 28155

28307 28308 26309 28156 28310

ALS Chemex EXCELU!NCE IN ANAL YTICAL CHEMISTRY AlS canada ltd.

212 Brooksbank Avenue NOtth Vancouver Be V7J 2e1 Phone: 604 964 0221 Fax: 604 964 0218 WW'N.alschemex.com

PGU·ICP27 Pd

ppm

0.03

7.01

.-0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

Page: 2 - f Total ft. rages: 3 (A" E)

Finalized Date: 2S-8EP·2001 Account: TRJ

T8071 00236 -_ .. ] ,.

_ ..

-,..~.

-.. ... "'~

- ... ~~ .

- ... ~

_._-

-""-"

. Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method. -_ ..

- - - - - - - - - - - - - - - - - - -

Page 55: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method ""e'yte

UnJts Sample Description LOR

28311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28337 28338 28339 28340 28161

28341 28342

ALS Chemex EXCELLENCE IN ANAL YTlCAL CHEMISTRY AlS Canada LId.

212 Brooksbank Avenue North Vancouver Be V7J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.oom

WEI·21 ME·MSB1 ME·MS61 ME-llASB1 ME-MSllt ME-MSB1

RecvdWl Ag AI As Ba Be

kg ppm % ppm ppm ppm

0.02 (tOt O.Ot 0.2 10 0.05

2.75 6.58 0.93 0.7 10 0.08 3.92 11.95 0.01 3.2 <10 <0.05 2.45 8.37 0.97 0.7 10 0.07 2.11 14.9 0.93 1.1 10 <0.05 2.22 9.35 1.09 0.6 10 0.07

1.91 9.63 1.12 0.8 20 0.05 2.16 4.4 0.9 0.8 10 0.07 0.09 0.88 7.75 52 470 0.82 2.04 5.87 1.02 0.8 10 0.08 2.36 3.13 0.86 0.8 20 0.05

1.81 2.09 1 0.7 20 <0.05 2.14 3.9 0.57 0.6 10 <0.05 1.92 3.29 0.73 0.8 20 <0.05 1.01 5.56 0.88 0.8 10 <0.05 0.85 6.82 0.88 0.5 10 0.08

2.04 2.67 0.96 0.8 20 0.05 2.14 2.46 0.76 0.5 10 <0.05 2.10 4.81 0.79 0.9 10 <0.05 1.44 0.01 7.36 0.2 460 1.1 1.99 6.54 0.85 0.7 10 <0.05

2.05 4.21 0.58 0.8 10 <0.05 2.15 3.45 0.66 1 10 <0.05 2.07 2.58 0.99 0.7 60 <0.05 1.99 3.57 1.02 0.5 10 <0.05 2.13 3.03 1.07 0.4 20 <0.05

2.20 2.96 1.05 0.2 10 0.Q7 1.95 3.74 1.47 0.4 20 0.07 0.09 1.29 7.73 49.2 460 0.92 2.05 2.96 0.74 0.9 <10 <0.05 1.25 3.74 0.92 0.8 <10 <0.05

1.01 0.17 8.89 <0.2 380 0.85 1.95 5.38 1.25 1.5 40 0.08 1.10 1.17 7.35 0.3 270 0.59 0.51 4.37 0.86 0.9 10 <0.05 0.58 4.49 0.82 0.8 10 <0.05

2.12 5.67 0.96 1.4 30 0.09 1.85 3.42 0.91 0.3 10 <0.05

"'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

ME-MSBt ME·MS6t ME-MSB1 ME-MS61 ME-MS6t ME·MSBt Bi Ca Cd Ce Co Cr

ppm % ppm ppm ppm ppm

O.Ot 0.Q1 0.02 0.01 0.1 1

0.79 0.38 3.37 3.93 372 2720 4.62 0.01 0.63 0.28 2220 78 1.09 0.39 2.6 2.87 311 2440 1.61 0.38 11.5 2.81 639 1370 1.05 0.5 3.91 4.85 233 2880

1.23 0.58 4.3 5.5 264 2200 1.26 0.42 1.02 3.42 465 2440 0.05 3.6 0.05 19.25 29.4 885 1.3 0.49 1.8 2.07 430 2200

1.35 0.4 0.59 1.93 579 2230

1.16 0.44 0.38 2.11 543 1700 1.3 0.22 0.75 1.6 549 2290 1.3 0.17 0.62 1.54 620 1620

2.25 0.27 1.33 1.9 508 1750 2.2 0.26 1.24 1.98 505 1790

3.75 0.51 0.42 1.76 546 2000 2.16 0.22 0.36 1.37 563 2050 1.62 0.29 1.63 1.4 516 1860 0.08 2.17 0.04 50.4 9.3 23 1.49 0.51 2.6 1.6 449 2160

1.4 0.22 1.68 1.25 545 2100 1.73 0.23 2.62 1.24 554 2170 1.21 0.41 0.63 1.44 562 1270 1.37 0.22 0.51 1.59 516 1950 1.14 0.39 0.36 1.84 486 1730

1.14 0.42 0.45 1.86 515 2430 2.13 0.9 1.28 3.15 391 1930 0.06 3.56 0.04 2D.4 30.9 900 1.73 0.18 0.16 1.33 604 1750 2.37 0.41 0.61 1.95 597 1660

0.05 9.37 0.12 30.3 23.8 16 1.86 0.52 0.83 3.13 541 1740 0.81 6.56 0.51 29.2 232 345 1.95 0.33 0.79 2.95 660 2010 1.85 0.23 1.4 2.68 646 1950

1.77 0.29 0.97 3.76 1000 884 0.83 0.21 0.43 2.2 576 1180

Page: 3· A Total Jf I'ages: 3 (A - E)

Finalized Date: 25·SEP·200T Account: TRJ

T8071 00236 ---- ] --

ME-MSBI ME-MS61 ME-MSdl Cs Cu Fe

ppm ppm %

0.05 0.2 0.01

0.11 >10000 17.31 <0.05 >10000 >50 0.38 >10000 18 0.24 >10000 22.c 0.3 >10000 16."1 _ ....

0.44 >10000 16.7, 0.33 >10000 19.~

0.84 141.5 4.68 0.34 >10000 18 0.36 5860 19.2, -..... ~ 0.34 3580 18.1 0.25 6960 19.0t 0.3 6120 19.2;

0.34 >10000 18.1 0.33 >10000 18.9t -... ~ ..... 0.49 6360 18.8 0.37 3710 19.5, 0.31 >10000 18.7, 0.69 63.2 2.38 0.3 >10000 18.~ -- ... ~ 0.21 >10000 20.1 0.21 9830 19.3~

0.2 4790 17.9; 0.24 8760 18 0.22 4420 16.~

---0.16 4750 17.4!; 0.32 9790 14.7h 0.85 133.5 4.58 0.07 2870 18.6;, 0.19 5180 17.4;, _ ..... 0.62 201 4.03 0.81 >10000 17.9,· 0.76 2290 10.;' 0.19 8060 21 0.19 >10000 20.!!

"'~ .~

0.54 >10000 24.9 0.26 5460 17.~

• Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method. ~-,.-~

- - - - - - - - - - - - - - - - - - -

Page 56: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method Anal. Unit.

Sample Description LOR

28311 28312 28313 28314 28315

28316 28317 28151 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28331 28338 28339 28340 28161

28341 28342

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY AlS Canada ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME-MS61 ME·MSB1 ME-MSIl1 ME-MSIl1 ME-MSB1 ME-MS61 Ga Ga HI In K La ppm ppm ppm ppm % ppm

0,05 0.05 0,1 0,005 0,01 0,5

2.71 1.09 <0.1 0.268 0.03 2 0.52 5.67 <0.1 0,03 <0.01 .:0.5

2.76 1.08 <0.1 0.2 0.06 1.2 2.2 1.84 <0.1 0.177 0.04 1.2

2.87 0.82 <0.1 0.247 0.05 1.6

2.85 0.89 <0.1 0.207 0.05 1.7 2.88 1.4 <0.1 0.097 0.05 1 15.05 0.22 1.5 0.041 1.01 9.4 2.65 1.21 <0.1 0.158 0.05 1 2.43 1.47 <0.1 0.072 0.05 0.8

2.29 1.58 <0.1 0.054 0.06 0.9 2.24 1.61 <0.1 0.093 0.04 0.7 1.9 1.85 <0.1 0.069 0.05 0.7

2.15 1.56 <0.1 0.187 0.05 0.8 2.16 1.58 <0.1 0.175 0.05 0.9

2.35 1.5 <0.1 0.089 0.08 0.9 2.19 1.7 <0.1 0.072 0.06 0.6 2.06 1.53 <0.1 0.142 0.05 0.6 19.75 0.15 3.4 0.027 1.63 25.5 2.3 1,41 <0.1 0.258 0.05 0.8

2.03 1.66 <0.1 0.126 0.04 0.6 2.02 1.57 <0.1 0.179 0.05 0.6 1.89 1.55 <0.1 0.106 0.06 0.7 2.11 1.49 <0.1 0.095 0.08 0.8 2.26 1.48 <0.1 0.086 0.08 0.9

2.49 1.54 <0.1 0.059 0.05 0.9 3.03 1.2 0.1 0.158 0.01 1.6 14.45 0.24 1.4 0.038 1.05 10.2 1.79 1.68 <0.1 0.063 0.01 0.7 2.45 1.66 <0.1 0.173 0.02 1

18.6 0.18 2.7 0.029 0.62 15.8 3.31 1.48 <0.1 0.155 0.1 1.3 13.95 0.73 2 0.063 0.48 13.2 2.55 1.16 <0.1 0.187 0.03 1.2 2.38 1.67 <0.1 0.251 0.03 1.1

2.69 2.76 0.3 0.148 0.17 1.5 1.9 1.51 <0.1 0.063 0.08 1.1

"0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 • 15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

ME-MSB1 ME-MS61 ME-MS61 ME·MS61 ME-MSIl1 ME-MSill LI Mg Mn Mo Na Nb

ppm % ppm ppm % ppm 0,2 0.01 5 0,05 0.01 0.1

3.3 15.75 1190 1.49 0.03 0.4 0.2 0.15 54 7.96 <0.01 0.5 7.8 16.05 1180 1.49 0.03 0.8 5.1 12.8 837 2.57 0.02 0.7 5.6 16.9 1225 1.18 0.05 0.6

6.3 16.35 1230 1.33 0.05 0.7 5.7 15.85 1145 2.21 0.06 0.8 8.3 1.61 780 16.1 2.27 6 5.2 16.6 1055 2.12 0.05 0.9 5.1 15.75 1025 2.74 0.04 0.9

5.1 15.95 1030 2.5 0.05 0.6 4.7 14.75 925 3.02 0.01 0.7 4.2 15.35 909 3.17 0.02 0.5 5.5 15.8 969 2.63 0.03 0.5 5.5 15.9 977 2.12 0.03 0.5

7.8 16.15 1025 2.43 0.04 0.5 6.5 15.85 971 2.63 0.03 0.5 5.5 15.4 896 2.38 0.03 0,4

35.5 0.1 393 0.34 3.12 6.8 6 15.6 885 2.16 0.05 0.5

4.9 15 823 2.57 0.01 0.4 5.2 14.95 813 2.28 0.02 0.4 4.9 16.4 119 2.03 0.03 0.3 6.6 11.1 991 1.95 0.02 0.4 6.5 16.15 812 1.85 0.05 0.4

6.3 16.15 119 1.91 0.03 0.5 10.9 16 775 1.5 0.08 0.5

9 1.58 162 15.65 2.22 5.8 4.2 15.65 529 2.22 0.01 0.3 1.5 16.1 610 2.25 0.03 0.4

58 3.47 1040 0.34 2.31 2.5 20.5 15.65 736 2.14 0.04 0.5 63.7 5.43 975 1.38 1.61 2 12.3 15.15 552 2.56 0.02 0.5 12.1 15.6 544 2.48 0.02 0.5

22.9 10.65 505 3.48 0.02 0.7 9.1 15.6 518 1.98 0.03 0.3

. Comments. AddItional AJJ results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method .

- - - - - - - - - - - - - - -

Page: 3· S Total ~ ..... age8: 3 (A E)

Finalized Date: 25-SEP·2007 Account: TRJ

T8071 00236 ---'J ME-MSIll ME·MSB1 ME-MSrl

Ni P Pb ppm ppm ppm

0.2 10 0.5

>10000 50 11.1 >10000 10 6.6 >10000 60 11,8 >10000 50 9.7

7450 40 13.2

8320 60 11.2 >10000 60 6.7

922 540 3.2 >10000 60 8.2 >10000 50 8

>10000 60 7.3 >10000 40 7.9 >10000 50 8.3 >10000 50 8.6 >10000 40 8.8

>10000 50 7.5 >10000 60 7.7 >10000 40 8.8 114.5 410 7.5

>10000 50 10:1

>10000 40 12.2 >10000 60 14.3 >10000 50 7.5 >10000 60 6.6 >10000 50 5.9

->10000 50 7.1 >10000 80 1.1

889 520 3.2 >10000 40 7.1 >10000 50 9.9

240 820 11.7 >10000 80 7.3

1990 610 9.8 >10000 60 8.1 >10000 50 8.2

>10000 70 6.1 >10000 50 4.9

- - - -

Page 57: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method """lyle

Unit. 8ample Description LOR

28311 28312 26313 28314 28315

28316 28311 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 28329 28330 28331 28332

28333 28334 28160 28335 28336

28337 28336 28339 28340 28161

28341 28342

ALS Chemex EXCELLENCE IN ANALYTICAL CHEMISTRY illS Canada ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2Ci Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME·MS6t ME·MS6t ME·MSSl ME·MS61 ME·MS61 ME-MSSt

Rb Re S Sb Sc Sa

ppm ppm % ppm ppm ppm

0.1 0.002 0.G1 0.05 0.1 1

0.9 0.017 6.89 0.13 6.8 21 0.1 0.055 >10.0 0.06 <0.1 118 2.2 0.017 7.12 0.18 6.6 23 1.4 0.024 9.98 0.2 6.4 44 1.9 0.024 6.34 0.16 7 19

2.6 0.017 6.81 0.15 7.2 21 2.2 0.02 7.35 0.16 6.3 24 19.7 0.002 0.33 9.1 14.4 4 2.1 0.013 7.08 0.16 7 23 2.3 0.018 7.79 0.14 6.4 24

2.5 0.017 7.19 0.13 6.6 23 2 0.018 7.39 1.33 5.7 25 2 0.02 7.91 0.13 6 25

2.1 0.018 7.88 0.13 6.5 26 2.1 0.02 8.08 0.11 6.5 26

3.2 0.019 7.79 0.18 6.5 26 2.3 0.021 8.13 0.24 6 26 2 0.021 8.03 0.15 5.9 25

46.1 <0.002 0.05 0.1 5.6 2 1.9 0.02 8.21 0.16 6.4 26

1.5 0.021 8.37 0.13 5.4 28 1.7 0.021 8.03 0.2 5.5 25 2.3 0.017 7.11 0.17 6.1 23 2.7 0.018 7.34 0.12 6.4 22 2.4 0.018 6.52 0.1 6.2 20

1.5 0.021 6.88 0.17 6.4 20 1.9 0.019 6.00 0.15 6.8 18

23.6 <0.002 0.32 8.66 14.4 4 0.4 0.026 7.74 0.14 5.5 24 0.9 0.027 8.01 0.15 6.2 25

9.7 <0.002 0.11 0.1 12.2 2 3.6 0.024 8.84 0.31 6.3 29 12.1 0.004 4.45 7.65 10.1 16 1.1 0.029 9.91 0.17 6.1 32 1.2 0.028 9.93 0.15 6 32

7 0.029 >10.0 0.16 4.2 48 2.4 0.026 7.82 0.16 5.6 23

'0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CER"rlFICA1E OF ANALYSIS

ME-MS61 ME·MS61 ME·MS61 ME·MSS1 ME·Mse1 ME-MSS1

50 Sr Ta Te Th TI ppm ppm ppm ppm ppm %

0.2 0.2 0.05 0.05 0,2 0.005

1.6 1 <0.05 2.02 <0.2 0.048 <:0.2 1 <0.05 16.1 <0.2 <0.005 1.4 6.3 <0.05 2.58 <0.2 0.066 0.9 6.4 <0.05 4.76 <:0.2 0.042 1.4 6.4 <0.05 1.92 <0.2 0.07

1.2 8.1 <0.05 2.18 0.2 0.062 0.8 7.2 <0.05 3.06 <0.2 0.062 2.5 223 0.36 0.13 1.7 0.306 1.1 8.2 <:0.05 2.95 <0.2 0.061 0.7 6.9 <0.05 2.32 <0.2 0.064

0.8 7.5 <0.05 2.38 <0.2 0.058 0.8 4.9 <0.05 2.49 <0.2 0.06 0.6 5.3 <0.05 2.14 <0.2 0.048 1.4 6.2 <0.05 3.85 <0.2 0.053 1.4 6.3 <0.05 3.78 <0.2 0.052

1.1 8.6 <0.05 5.55 <0.2 0.053 0.8 5.4 <0.05 3.01 <0.2 0.064 1 6.5 <0.05 3.26 <0.2 0.05

1.2 334 0.6 <0.05 6 0.22 1.3 8.9 <0.05 2.79 <0.2 0.051

0.6 5.1 <0.05 3.31 <0.2 0.047 1.1 4.9 <0.05 3 <0.2 0.048 1.1 5.3 <0.05 2.87 <0.2 0.039 1.1 5.6 <0.05 3.42 <0.2 0.046 1 6.8 <0.05 2.31 <0.2 0.05

0.7 5.5 <0.05 2.15 <0.2 0.064 1.1 27.5 <0.05 3.49 0.2 0.00 2.4 217 0.34 0.21 1.9 0.3 0.7 2.8 <0.05 2.88 <0.2 0.036 1.2 5.2 <0.05 5.9 <0.2 0.044

0.9 496 0.16 0.06 2 0.335 1.2 7.4 <0.05 4.12 0.2 0.058 1.5 353 0.12 3.18 1.6 0.276 1.3 5.4 <0.05 7.56 <0.2 0.052 1.6 4.3 <0.05 5.54 <0.2 0.053

1.5 4.2 0.05 5.65 0.4 0.045 0.7 6.3 <0.05 2.64 0.2 0.037

Page: 3 - C Totallf rages: 3 (A . EI

Finalized Date: 25-8EP-2007 Account: TRJ

1807100236 _ ... ] -_. _ .. _-ME·MStil ME-MS61 ME·MShl

TI U V

ppm ppm ppm 0.02 0.1 1

0.27 <:0.1 57 0.16 ..cO. 1 21 0.24 0.1 62 0.19 0.1 44 0.2 0,1 69 -_.,

0.21 0.1 68 0.13 0.1 60 1.03 0.6 97 0.12 0.1 58 0.15 0.1 60

-~ .... 0.14 0.1 52 0.13 0.1 63 0.13 0.1 47 0.13 0.1 50 0.13 0.1 52

_#~"

0.14 0.1 56 0.13 <0.1 55 0.17 0.1 50 0.26 1.7 36 0.2 0.1 53 -_ . ..,.

0.26 <0.1 52 0.36 0.2 53 0.33 0.3 40 0.41 0.1 49 0.37 0.3 48

-.. .. "". 0.41 0.1 60 0.5 0.3 52

1.05 0.9 95 0.48 0.1 41 0.65 0,1 42

~-.. 0.14 0.5 107 0.8 0.2 46

0.22 0.7 101 0.64 0.9 53 0.63 0.3 51

~---' 0.64 0.4 39 0.49 0.2 35

. Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method. --'

- - - - - - - - - - - - - - - - - - -

Page 58: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

MMhod An..,.. Units

Sample Description LOR

28311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 28326 28159 28327

28328 26329 28330 28331 28332

28333 28334 28160 28335 28336

26337 28338 28339 28340 28161

28341 28342

ALS Chemex IiXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver Be V7J 2e1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME·MS61 ME-MS61 ME·MS61 ME·MSS1 CU·0G62 W Y Zn Zt CU

ppm ppm ppm ppm %

0.1 0.1 2 0.5 0.001

0.1 1.6 169 6 2.01 0.1 0.1 20 <0.5 1.905 0.1 1.6 130 6.2 2.67 0.1 1.4 345 4.7 5.26 0.2 1.5 154 5.4 2.39

0.3 1.8 141 6.8 2.59 0.1 1.7 79 7.1 1.075 4.5 14.5 40 39.8 0.1 1.5 103 5.2 1.665 0.1 1.6 61 6.1

<0.1 1.6 51 6.3 0.1 1.3 78 5.3 0.1 1.5 62 5.9 0.2 1.4 96 5.1 1.595 0.2 1.5 93 5.1 1.460

0.4 1.6 59 6.2 0.6 1.4 54 5 0.4 1.4 99 5 1.595 0.1 10.6 45 96.9 0.3 1.6 136 5.9 2.30

0.2 1.3 103 5.1 1.110 0.2 1.3 157 4.9 0.3 1.3 56 4.8 0.3 1.6 65 5.8 0.1 1.6 41 6

0.1 1.8 48 6.7 0.3 2.2 79 9.5 4.5 14.9 40 40.5 0.2 1.1 22 4.1 0.2 1.4 47 4.4

0.1 8.6 19 86 0.4 1.9 58 7.9 1.445 0.6 8.1 26 65.4 0.2 1.7 50 6.1 0.2 1.7 68 5.7 1.000

0.1 2.2 32 16.7 1.215 0.3 1.3 41 5.5

NI.QOO2 NI %

0.01

1.30 9.40 1.14 2.76

1.69

1.52 2.13

2.05 2.24 2.52 1.98 1.94

2.05 2.19 2.03

1.65

2.12 2.17 2.14 1.97 1.92

1.90 1.54

2.42 2.50

1.92

2.21 2.14

3.79 2.16

"0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: Double Eagle

I CERTIFICATE OF ANALYSIS

PGM-ICP24 PGM·1CP24 PGM-ICP24 PGM·ICP24 PGM-ICP24 PGM-ICP24 Au Au Check PI PI Check Pd PdCheck

ppm ppm ppm ppm ppm ppm 0.001 0.001 0.005 0.005 0.001 0.001

0.193 0.350 3.04 0.040 3.02 >10.0 0.167 0.595 2.03 0.091 0.626 5.25 1.170 0.396 1.745

0.146 0.345 1.995 0.075 0.480 2.45 0.891 0.494 1.430 0.130 1.065 2.93 0.032 0.456 3.01

0.079 0.462 2.73 0.070 0.662 3.44 0.044 0.383 3.27 0.450 0.711 2.95 >10.0 6.49 0.778 0.676 3.04 3.09

0.047 0.822 2.91 0.060 0.872 2.85 0.153 0.800 3.30

<0.001 0,007 0.014 0.065 1.015 3.00

0.053 1.425 2.94 0.109 0.853 3.75 0.055 0.882 3.15 0.043 0.905 2.70 0.034 0.563 2.40

0.034 0.463 2.57 0.117 0.838 2.70 0.772 0.378 1.430 0.109 0.612 3.39 0.282 1.630 3.92

0.006 0.010 0.036 0.026 1.560 3.40 0.030 0.929 1.645 0.045 1.540 3.83 0.025 1.535 3.71

0.040 1.370 6.40 0.032 0.494 2.65

Page: 3· D Totallf. tlages: 3 (A" E)

Finalized Date: 25-SEP·200T Account: TRJ

T807100236-"'-1 .. .... "., Au-GRA21 PGM-ICP21 PGM·ICP2i'

Au Au PI ppm ppm ppm

0.05 0.03 0.03

0.06 2.86

~'"""--.,

._-,.. ...... ,

7.60 ' "' ... ~~ ..

-.-.....

--_.

.-.

--

. Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method. --", .

- - - - - - - - - - - - - - - - - - -

Page 59: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method ........,.. Un ...

Sample D.scrfptlon LOR

28311 28312 28313 28314 28315

28316 28317 28157 28318 28319

28320 28321 28322 28323 28158

28324 28325 26326 26159 28327 28328 28329 26330 28331 26332

28333 28334 28160 28335 28336

28337 28338 28339 28340 28161

28341 28342

ALS ~hemex EXCEUENCE IN ANAL YTlCAL CHEMISTRY AlS Canada lid.

212 Brooksbank Avenue NOI1h Vancouver Be V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.oom

PGM-ICP21

Pd ppm

0.03

12.40

fo: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

ProJect: Double Eagle

I CERTIFICATE OF ANALYSIS

I Comments. Additional Au results for sample 28158 are 6.02 ppm and 3.50 ppm. REE s may not be totally soluble In MS61 method.

- - - - - - - - - - - - - - -

Page: 3 - E Total .. l'ages: 3 (A - E)

Finalized Date: 25-SEP-2001 Account: TRJ

T8071 00236 --'.'J --

-.... ,~

~-.. ~,.

.----

---

---

-_ ...... , <

- - - -

Page 60: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

ALS Chemex -0: BILLIKEN MANAGEMENT SERVICES INC. Page: 1 Finalized Dene: 29-5EP-2007

Account: TRJ EXCELLENCE IN ANAl. YTICAL CHEMISTRY ALS Canada ltd.

212 Brooksbank Avenue North Vancouver Be V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

CERTIFICATE T807102170

Project: NORONT DOUBLE EAGLE

P.O. No.:

This report is for 77 Drill Core samples submitted to our lab in Thunder Bay, ON, Canada on 12-SEP-2007.

The following have access to data associated with this certificate: MIKE KILBOURNE I BRIAN NEWTON I NEIL NOVAK

To: BILLIKEN MANAGEMENT SERVICES INC. ATrN: NEIL NOVAK SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

SUITE 1000 -15 TORONTO STREET TORONTO ON M5C 2E3

SAMPLE PREPARA"nON ALSCODE DESCRIPTION

WEI-21 Received Sample Weight LOG-22 Sample login - Rcd wlo BarCode CRU-QC Crushing QC Test

PUL-QC Pulverizing QC Test

CRU-31 Fine crushing - 70% <2mm

SPL-21 Split sample - riffla splitter PUL-31 Pulverize split to 85% <75 um

DRY-21 High Temperature Drying

ANALYTICAL PROCEDURES ALSCODE DESCRIPTION

PGM-ICP27 Ore grade Pt, Pd and Au by ICP Ag-AA46 Ore grade Ag - aqua regial AA Cu-AA46 Ore grade Cu - aqua regialAA Ni-AA46 Ore grade Ni - aqua ragialAA PGM-ICP24 Pt, Pd, Au 50g FA ICP

INSTRUMENT

ICP-AES

AAS AAS

AAS ICP-AES

This is the Final Report and supersedes any preliminary report with this certificate number. Results apply to samples as submitted. All pages of this report have been checked and approved for release. Signature: ~"~1/

Lawrence Ng, Laboratory Manager - Vancouver

- - - - - - - - - - - - -- - - - --

Page 61: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Mathod Analyta

Units Sample Description LOR

8028343 B028344 8028345 8028346 8028347

8028348 8028349 8028162 B028350 8028351

8028352 B028353 B028354 8028355 8028163

8028356 8028357 8028358 8028164 8028359

8028360 8028361 B028362 B028363 B028364

8028365 8028366 8028165 8028367 8028368

8028369 8028370 8028371 8028372 B028166

8028373 B028374 B028375 8028167 8028376

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY AlS Canada ltd.

212 Brooksbank Avenue North Vancouver Be V7 J 2C 1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

WEI·21 PGM·ICP24 PGM·ICP24 PGM·ICP24 PGM·ICP24 PGM·ICP24 RecvdWt. Au AuClIeck PI PI Check Pd

kg ppm ppm ppm ppm ppm

0.02 0.001 0.001 0.005 0.005 0.001

1.86 0.085 0.359 2.67 2.05 0.178 0.843 3.50 2.02 0.075 0.724 3.49 2.01 0.131 0.707 3.32 1.82 0.089 2.80 3.77

2.09 0.040 0.629 3.14 2.20 0.035 1.365 3.00 0.09 0.746 0.409 1.365 1.95 0.038 0.926 3.33 2.23 0.027 1.360 3.58

1.89 0.048 1.250 3.15 1.81 0.036 0.863 3.39 2.02 0.012 0.781 2.85 1.14 0.031 0.766 3.20 1.01 0.013 0.921 3.24

1.83 0.011 1.230 2.71 2.01 0.040 0.597 3.24 2.02 0.311 1.835 3.41 0.34 0.001 0.007 0.028 1.95 0.362 0.434 2.47

1.87 0.043 0.331 2.10 2.01 0.175 0.819 2.13 1.96 0.003 0.255 0.902 1.57 0.046 0.606 1.785 2.00 0.156 1.300 4.93

3.32 0.335 0.977 1.735 3.87 0.134 0.419 1.245 0.11 0.052 0.051 0.075 2.81 0.153 0.578 2.78 3.19 0.192 0.546 3.78

1.62 0.046 2.57 8.67 3.00 0.587 1.055 4.65 3.93 0.075 0.541 4.00 1.66 0.061 0.645 4.15 1.65 0.067 0.449 4.34

3.20 0.099 1.355 4.30 3.63 0.069 1.325 4.17 3.20 0.132 1.580 4.24 0.30 0.001 0.010 0.040 3.91 0.117 0.154 0.803 1.795 4.32

·0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 - 15 TORONTO STREET TORONTO ON M5C 2E3

Project: NORONT DOUBLE EAGLE

I CERTIFICATE OF ANALYSIS

PGM·ICP24 PGM·ICP27 PGM·ICP27 PGM·ICP27 Ag·M46 Cu·M46 Pd Check Au PI Pd Ag Cu

ppm ppm ppm ppm ppm % 0,001 0.03 0.03 0.03 1 0.01

5 1.39 5 1.36 4 1.19 3 1.58 2 0.69

2 0.60 1 0.57 1 0.01 1 0.47

<1 0.29

1 0.52 <1 0.40 <1 0.31 <1 0.32 <1 0.36

1 0.21 2 0.40 2 1.36

<1 0.01 <1 1.02

2 0.42 1 0.26 1 0.23 6 1.30 22 5.03

2 0.66 2 0.31

<1 0.26 3 0.54 3 1.01

5 1.04 3 0.59 3 0.43 3 0.45 2 0.38

2 0.79 2 0.89 2 0.73

<1 0.01 4.92 2 0.48

Page: 2-A TOl.a1 # Pages: 3 (A)

Finalized Date: 29-8EP-2007 Account: TRJ

1B07102170 J N;·M46

Ni

% 0.01

1.84 1.97 1.64 1.47 1.37

1.68 1.81 0.10 1.89 2.06

1.85 1.82 1.68 1.73 1.72

1.57 1.81 1.77 0.01 1.30 --1.10 1.01 0.53 1.30 1.58

0.52 0.59 0.22 1.71 2.23

5.01 2.62 2.43 2.58 2.69

2.16 1.89 1.80 0.02 1.66

Comments: Additional Pt result for sample B028376 IS 1.120ppm. for sample 8028377 Pt result IS 1.325ppm. for sample B028380 Au result IS O.084ppm and PI result IS 2.67ppm.

- - - - - - - - - - - - - - - - - - -

Page 62: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Method An.lyte

Units Sample Description LOR

8028377 8028378 8028379 8028380 8028381

8028382 8028383 8028168 8028384 8028385

8028386 8028387 8028388 8028389 8028169

8028390 8028391 8028392 8028170 8028393

8028394 8028395 8028396 8028397 8028398

8028399 8028400 8028171 8028401 8028402

8028403 8028404 8028405 8028406 8028172

8028407 8028408

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 8rooksbank Avenue North Vancouver 8C V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

WEI-21 PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24 PGM-ICP24 RecvdWI. Au Au Check P1 P1 Check Pd

kg ppm ppm ppm ppm ppm

0.02 0.001 0.001 0.005 0.005 0.001

3.62 0.114 0.110 2.04 1.555 5.45 3.64 0.117 2.18 5.73 2.97 0.095 0.138 1.345 1.510 4.39 3.50 0.114 0.399 2.33 3.01 4.93 3.24 0.080 1.260 3.48

3.47 0.074 0.833 4.42 3.12 0.090 1.220 4.06

0.09 0.725 0.402 1.515 3.82 0.054 0.719 5.14 4.58 0.059 1.405 3.15

2.23 0.035 0.051 0.067 4.09 0.198 0.271 2.16 3.79 0.064 1.060 2.87 2.01 0.562 0.416 2.76 1.83 0.422 0.373 2.95

4.17 0.087 2.36 8.42 4.80 0.073 2.000 4.65 5.40 0.087 0.606 7.04 0.39 0.001 <0.005 0.034 5.40 0.101 1.615 7.87

5.21 0.147 4.13 >10.0 5.43 0.269 3.15 7.32 5.29 0.144 0.883 7.14 5.52 0.152 0.091 8.47 5.14 0.204 0.026 7.66

4.91 0.157 0.211 4.47 5.41 0.110 1.440 4.95 0.10 0.039 0.037 0.057 5.30 0.437 0.915 6.87 4.09 0.147 2.80 9.35

5.72 0.081 0.451 6.07 5.28 0.155 0.033 8.70 5.61 0.219 0.036 7.49 2.56 0.184 0.309 9.66 2.63 0.193 0.311 8.27

5.58 0.140 4.45 >10.0 3.85 0.107 2.02 9.67

-0: BILLIKEN MANAGEMENT SERVICES INC. SUITE 1000 ·15 TORONTO STREET TORONTO ON M5C 2E3

Project: NORONT DOUBLE EAGLE

I CERTIFICATE OF ANALYSIS

PGM-ICP24 PGM-ICP27 PGM-ICP27 PGM-ICP27 Ag-AA46 Cu-AA46 Pd Check Au P1 Pd Ag Cu

ppm ppm ppm ppm ppm % 0.001 0.03 0.03 0.03 1 0.01

5.48 2 0.61 2 0.39

4.51 3 0.94 4.87 4 1.42

2 0.77

2 0.60 5 1.37 1 0.02 4 0.81 2 0.42

3 0.60 4 1.35 3 0.94 5 1.93 8 2.76

19 7.10 8 2.72 7 2.25

<1 0.05 5 1.97

0.23 2.71 9.85 6 2.07 7 2.67 7 2.40 7 2.19 8 3.01

6 1.95 6 1.89 1 0.25 7 2.49 5 1.85

3 0.81 6 2.08 6 2.20 7 2.52 7 2.51

0.25 2.41 9.84 10 3.64 10 3.00

Page: 3·A TOtal # Pages: 3 (A)

Finalized Date: 29·SEp·2007 Account: TRJ

T807102170 ]

Ni-AA46 Ni %

0.01

1.61 1.64 1.55 1.41 1.27

1.64 1.49 0.10 1.85 1.55

0.05 1.22 1.82 1.28 1.38

5.40 5.88 6.75 0.11 6.80

7.78 6.87 7.85 7.85 8.03

7.03 7.28 0.22 6.65 8.33

7.72 8.39 8.03 8.25 7.95

6.76 6.54

.. Comments. Additional Pt result for sample 8028376 IS 1.120ppm. for sample 8028377 Pt result IS 1.325ppm. for sample 8028380 Au result IS 0.084ppm and Pt result IS 2.67ppm.

- - - - - - - - - - - - - - - - - - -

Page 63: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I Appendix IV

I Hole NOT-07-03

I Drill hole Location Plan

I Vertical Cross Section

I Drill Log

I I I I I I I I I I 13

Page 64: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

-i !i li1 't li1 ~

* § § t ~ "' '"

584J800N

ito '/>

'0>

~ ~~ I ~~\

~ '/> SM1600N - ~---'O>

.m~"O;M'

I

.~

Claim 3012251

58'3400N _.-_ .....

Claim 3012264

Claim 301225~ "+"00" _.

SURPAC MINEX GROUP

Claim 3012258 Naront R.esourus Inc.

II ~ II li1 Double Eagle Project

~ ~ Drill Hole Plan View

'" Serokl· HOO I E'lar.)ia 1- !h"9f~

- - - - - - - - - - - - - - - - - - -

Page 65: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Assay Legend

%Cu %Ni

<0.25% <0.25%

0.25-0.50% 0.25-0.50%

0.50-1 .0% 0.50-1.0%

>1.0% >1.0%

Geology Legend

OVB. Ovcrburdct"l

GRD. GrallOOtOnlc

PER . PendOOte. <2% Sulph

.' ~ ': '

PERNl', Net·Textured P'eridotite

MS, M3SSlV8 Sulphtdel

GAB. Gabbro

MD. M;lflC Dyke

NORONT RESOURCES

Noronl Resources, Double Eagle Project

Eagle One

DH Section Hole NOT-07-3

~--+--j AN I C

Page 66: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Project: Noront

Hole Number: NOT-07-03

Units of Measurement: metric

Location NTSSheet: 430/9 Township: BMA526862 Claim No: Grid: Easting: L52E Northing: 12+25N Elevation:

GPS Co-ordinates: Zone: NAD83 (if applicable) Datum: Z 16

Easting: Northing:

Collar Dip: Collar Azimuth: Hole Length: Core Size: BQ

Recovery:

Logged By: Howard Lahti

Date: Start: Finish:

- - - - - -

3012264

179

:..42 140 178

99%

30-Aug 02-Sep

-

Billiken Management

INCLINATION TESTS DEPTH DIP AZIMUTH COLLAR -45

11 -43.8 143.9 65 -40.5 169.6

116 -36.4 152 156 -30.9 146.4

- - - -

Comments

Drill moved 100m to the east to test geophysical anomaly. Drilled at 45 dergee dip. Drill hole went through magnetic anomaly but did not encounter any thing to explain the mag anomaly. Hole stopped at 179m. Mineralization down faulted or plunging steeply to the NE.

- - - - - - - -

Page 67: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Project: Noront I Hole #:NOT-07-03 IPage:

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH 0 8 Overburden ..... ... ------- ---- - - -- - - -

. - ,._ ....... 8 11 Paleozoic Dolomitic Limestone

-----.- !..... . .....

_ .. .. - . - .-Highly broken, buff, blochy, massive.

.. ._- .. .- 1-·

Unknown Igneous Rock .- ----- - ------- ______ ~ .. m

11 1I 1-·--····· ..... ... -

-- .---- Chlorite rich, totally weather with clay, core severly ground up, possibly ------

.... . .. .. phase of the granodiorite. Section with lose sand seams . . .... . __ .... ._-

- --- .. .... _-- .. - ----- . ......... - !-.- ----------

Regolith .. _- .... ---------

17 22 _.- I···· _.

, .......... __ .. - Upper weathered section of basement. Totally oxidized so gives core a . --- ... - ------------ . deep maroon color. Last meter with less oxidation but still with clay and ...

core highly ground up and lost. .. _.

Intermediate/Mafic Dike _ .. 1-

22 26.24 .- --- - ......... --_.

Fine to medium grained, massive, dark green, occasional pyrite bleb . .... 1-······-

-

speck, Minor fractures. Totally altered to massive green chlorite. ------------ . 1- --- - ---- -

,- .. _- - . ... 1-·

Porphyritic Granodiorite

26,24 -~~ ......

Coarse grained with euhedral porphroblasts, abundant kspar, quartz, 1-·· ------------ .... -

albite fresh with little alteration. Minor hornblende and trace sericite. .......... ..... . ...

Color of core a grayish pink, Where lesskspar core a pale gray, ......... .. - -_. - .. _._- .. ..

Kspar decrease with depth, ... _._---- _ ...... ._. ------ . ......... 1-··· .... _- 31.4-34.0 Shear with area oxidized by surface water colored reddish ...... --- .. .... ._ .. ----

f---. ---- - .. __ .- brown from hematite and limonite, --- ------ ....

, .... .....

Intermediate Dike 1--·· . __ .. .... _--_. __ .. -

.-. _---_ .. •........ _._- . ......... _-Fine grained, highly deformed, sheared, brecciated and exhibits local 53.26 62.96 .......

micro-folds. Short silicified sections with crackle breccia. Core altered r----................ -- --- ---- ... _ .. -

-- . __ . ......... with chlorite and the fracutre tension gaashes have carbonate . I· ..... __ ... .... - .-

--- . . .. - .. Has a well developed foliation of 500 to 55°, Minor gauge.

- ._._. .

.. --- _. . __ ._-_ ..

. _- -- -- _ .. •....... i- .. - ........

- - - - - - - - - - - - - - - - - - -

Page 68: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

PROJECT:Noront IHOLE NOMCF-07-03: IPAGE:3

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH

53.26 62.96 Intermediate Dike .. ~ ~--

i-"'~~--~-- '-i~- ... _--~

From 59 to bottom contact core massive, weak foliation few fractures. - ------- _ .. - ~~~-~

Lower contact 38° -~----- -r---~--- - --------~

----

62.96 -.~~.--~~-

Porphyritic Granodiorite - ...... _---

104.24 -'- ...... ... ~ .

As before but less kspar. Parts of core more uniform crystal size . 1

.... Mainly albite with quartz, kspar and accessory hornblende and trace .. ~~- -------- I'-~

~~~ - ------- sericite. Most of the kspar alteration is now restricted to fractures and ... ~.- -------- ---------- ------ --

!-. . ~--- adjacent rock . ~ . .......

---- ~ ... 1- . .... ~.

67.36-68- Shear in the Granodiorite. Appears to be fragments of fine . - .--~ i- - . ~~ ---- -

grained black dike material stretch out in direction of shear 30°. ~ ~-.-~ - ~ ~.~ I .. ·· --

-------- .. ~ ..... ~ .. -----

-~ .... --_._- Intermediate Diklet-72.1-72.3 Fine grained, green, some kspar alteration in shear at lower contact. . ~~. ......

85.13-87.84-lntermediate Dike-Highly deformed by shearing, fracturing 1- -

and brecciation. Numerous wide tension gashes filled with carbonate . -.~-~-~~ ~ -.~ .~.~- ~.--~-~ -- - - ----

(qtz). Altered with chlorite and minor sericite? Local silicification. Rare I-'~ ..... !~. .... ~ 1

~- .... pyrite blebs in some fractures. Lower contact sheared at 100 to CA

---- -_ .... Dark green color.

-- ...

......

.. -~ .. - .--~ 1·- -------

!. ~.~~~~~ ... .. - ... ~ .... . Granodiorite -

----- -- - -- - ---- -------- . .. - --- ---

104.24 151.17 Massive, hard, equigranular to porphyritic, composed of albite, kspar, . - ------ ... -~~ . .---- --

quartz and hornblende (5-8%) and trace sericite and pyrite. Majority of . - .. -~.~ ... --~ .. ~. - .. - .... - ..

.. fractures at 30-40°. Quartz vein (2cm) at 112.47m massive white with i- .. ~. - I········ - . ~~ .. - trace sericite in the vein and along the margins in the host rock in the I -- ---- +---

- ---------- porphyritic sections albite porphroblasts can exceed 1.5cm in length ---- - -------

and 1cm wide. .. - .~~ ... ~ -~.~~

148.2-148.7- Intermediate/Felsic Dike- Green, fine grained, massive, .. ~-- .-r-~~" ._-

very hard with qtz, chlorite, with trace fine grained pyrite. Two .~-.~~~ .... - ---- +-

centimetger massive white quartz vein at lower contact. ~---- ~ .. ~~~.-- 1- ~ - -_ ....

---- ... .~.- ._---- ....... ----

... _-- -- ~.--

.---- I~-"

I"~ .~-+ ---------

- - - - - - - - - - - - - - - - - - -

Page 69: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

PROJECT:Noront Double Eagle IHOLE NO:NOT-07-03 PAGE:4

Billiken Management

FROM TO DESCRIPTION ANALYTICAL RESULTS

SAMPLE FROM TO LENGTH 104.24 179 Granodiorite Cont'd

~~ f--~

I~ .~~ -_ ..... .~~--~ ----.. ~

. As Before, equigranular to porphyritic, coarse grained, with . - ~-------. ....

intermediate porphyritic dikes. .. ~.~. ,.~ .... - . ..

•.. ~~ .. - ----154.85-155.38-Massive Intermediate dike, with well developed foliation

.-.. ~ ~~ ..~

1- of 50o~ Dark green with chlorite alteration, white tiny feldspar I- . ~.~ .~~ ~~~--- f---~~ - ---- _.

phenocrysts (1 mmx1 mm). Upper contact 45° and lower 30°. 1- .-

·1·····

~~ I·~~ --_ .. 160.78-161.96- Massive Intermdiate dike, dark green, altered to ... ~~ ~~

.. -~~~- ----- chlorite, soft, and with 1 mm or less white feldspar phenocrysts. .. ~~~ ----- ~ ~ . .. ~ -_.

Upper contact 50° and lower 45°. Moderately developed foliation. I~ ·1···· ~ ~ .-

~~ ~~ - I~~~·~

. ~. \ I· .~~ .. ~.~~~

1-- I~ ------.- EOH \ \ ~ -~~-.. - ~ .. ~. ....

~ !.~-. 179

,\\~ ~~~-- -.

'\ 0 I~ . ... I ~ -

J.f \ I~~~ ~

_.

---- ~ ~~ .~~-~ ~- -------... - ~ ~ ..... --~

~~ ... ...

1 ~ ~ +

.~ . ~~ f·~ ~

.... ,- .----- 1- ~~

k .... ~~. ~+

I-~~-- -----_ ..

~ . _- ---- ~ .. - .... -~~

-- !~-~ .... _- -

... _- ------- .- ---- ~ .. -.-.- -

I~-~~ ~ .~.~

.~ I-~ ~~ -----_.- .. .... ------.... ~--

f-~~-~ .. - ..... _--- ~~~-I~

...• ~

~~~ I····· - . ~ ~

~~-~ _ .. _- .. ~

....... . ~~

~~ ~~. ~ ... ~ ~~ ~--~~. ~ -

I~ -_ ... I~ .. _ .. ~~-.... - ------ ~-... - 1-..

I---~~

_ ... ... ~ ~- f~-

- - - - - - - - - - - - - - - - - - -

Page 70: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

I I I I I Appendix V

I Hole NOT-07-04

I Drill hole Location Plan

I Vertical Cross Section

I Drill Log

I I I I I I I I I I

14

Page 71: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

-i :Ii I~ i I~ i~

'" ~ .~ ~ I~

SI i3S00N

ito 7>'0>

~W ~~ .-fro

~, 7> S843600N '0>

.~ 'Q'~ NOf«.f

i

Claim 301225E

5&4)400N .. !

Claim 3012264

Claim 301225~ 5813200)1

SURPAC MINEX GROUP

Claim 3012258

Noront Resoo.-ces Inc

~ ~ i ~ Double Eagil: FroJoc!

~ Dnll Hok: Plan View

" '" '" '" ... ,,' 2500 I f'IauNo I "'. 1J·A{lrc(18 -

- - - - - - - - - - - - - - - - - - -

Page 72: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Assay Legend

%Cu %Ni

<0.25% <0.25%

0.25-0.50% 0.25-0.50%

0.50-1 .0% 0.50-1.0%

>1.0% ;;-1.0%

DATE

Geology Legend

DVB. Qvef'buroon

lS. Limestone

GRD. GranootOnlC

PER , PendoIJle,<2% Sulph

PERNT. Nct-Textured Poridotite

SMS, Seml·Massive SlJlphlClc&

MS. MassIVe Sulptudes

GI\B. Gabbco

MD. MalIC Dyke

NORONT RESOURCES

" )00

Noronl Resources Double Eagle

Eagle One

DH Section Hole NOT-07-4

-,.::: f----j-----1 AN I C

Page 73: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Project: NORONT

Hole Number: NOT-07-04

Units of Measurement: metric

Location NTSSheet: 430/9 Township: BMA526862 Claim No: Grid: Easting: L50E Northing: 12+25N Elevation:

GPS Co-ordinates: Zone: NAD83 (if applicable) Datum: Z16

Easting: Northing:

Collar Dip: Collar Azimuth: Hole Length: Core Size: NQ Recovery: 98+%

Logged By: Howard Lahti

Date: Start: Finish:

- - - - - -

3012264

179

-45 jiQ

124.4

03-Sep 04-Sep

-

Billiken Management

~ DEPTH

COLLAR -45 17 -44.7 131.5 68 -44.7 125.9

116 -44.5 144.4

- - - -

Comments

Check geophysical MAX-MIN and mag anomalies 100m west of NOT-07-01 and 02, This line has the best conductor? The drill hole did not explain the magnetic anomally or conductive zone,

- - - - - - - -

Page 74: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Billiken Management

FROM TO DESCRIPTION

-

o 8 Overburden

Organic cover, and glacial till.

8 _~2~1 Dolomitic Limestone (Paleozoic)

12.1

Massive, crudely layered, gritty, made in part of fossil parts (calcirudite). Becomes progressively more sandy toward the bottom contact. Color light brown to buff with more gray near the lower contact.

Calcarious Sandstone

- 14.4 Dark gray, medium grained, with limestone fragments. Moderately friable, parts of core broken and washed out.

... Conglomeritic Sandstone

14.4 14.73 Some pebbles 13mmx10mm, rounded, hard, sealed with silica.

Saprolite

14.73 23 Highly weathered granodiorite, very friable, much of core ground and

23

-

washed out. The color is a medium gray, some sand seams, clay alteration. Core with a well developed foliation of about 50° .. After 20m start of kspar alteration and minor hematite. Over 50% of core lost between 20 and 23m.

Granodiorite

Strong evidence of surface water weathering. Core highly broken with 68.41 local areas with more intense weathering. Strong kspar alteration giving

the core a reddish orange cast. In areas of intense shearing and faulting the core is highly weathered with clay and sand both easily washed away. Over 50% of core lost between 26 and 29m. The granodiorite varies from a good porphyritic texture to coarse grained equigranular. RoCk consists of albite, quartz, kspar and hornblende (>10%) with minor sericite.

- - - - - - -

Project: Noront Hole #:NOT-07-04 Page:2

ANALYTICAL RESULTS SAMPLE FROM TO LENGTH

- - - - - - - - - -

Page 75: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Billiken Management

FROM TO DESCRIPTION

23 68.41 Granodiorite Cont'd

68.41

- -

Shearing at 65° at 24.5m. Core still with evidence of surface weathering in areas of faulting and shearing. From 30 to 34m core highly fractured and broken. Some core lost from faults/shears were the rock is crushed and altered to clay and sand size material. Kspar alteration very variable and mainly concentrated near some fractures and shears. Most fractures at 60" to CA. After 41.55 core rock becomes more competant, coarse grained locally porphyritic, equigranular with occasional large feldspar phenocryst. 49.25-49.35- Fault Breccia- Shearing at 30°, zone with fine to coarse fragments and healed with chlorite and carbonate .. Due to alteration and deformation the coarse grained texture totally destroyed. Rock still with strong foliation of 500 in certain sections.

_ Most of the kspar alteraton ends at 55.5m.

65.35-67.25- Intense shearing, totally destroying the primary phencrysts of freldspar, quartz and hornblende. The rock is siliceous, fine grained and black. The shearing is at 25° to 40°. The rock takes on a black and white speckled appearance due to the feldspars and black horneblende. The marics account for 10-12% by volume giving the core a blackish cast. Parts of section may actually be a quartz diorite.

As Above

Massive, with some britle fracturing 700 and a shear 75-75.55m at 60° to 65° and with extensive kspar alteration. Coarse grained with local porphyritic texture. Minor 2-3cm thick fused shears fine grained with

85.83 phenocrysts totally destroyed. Most of kspar alteration in shears or adjacent to fractures.

- - - - - - -

PROJECT:Noront HOLE NO:NOT-07-04 PAGE:3

ANALYTICAL RESULTS SAMPLE FROM TO LENGTH

- - - - - - - - - -

Page 76: DIAMOND DRILLING RPT - Ontario...co-ordinates it is centered upon 547202E, 5843646N using NAD 83 datum UTM Zone 16 . Billiken employees and the diamond drill crew operated from a large

Billiken Management

FROM TO DESCRIPTION

-

85.83 103.4 Granodiorite coarse grained to porphyritic, massive, very hard, composed of albite, scattered ksapr, quartz, hornblende, minor biotite and sericite. Very rare small grains of pyrite. Core non-magnetic. Rock has a general weak foliation that has an irregular pattern.

98.4-98.83- Quartz Filled Shear- Dark gay to black, Intermediate to mafic, possibly highly sheared granodiorite, fractures with chlorite alteration and with carbonate along the margins of the quartz vein. A 7cm thick white quartz vein with massive chlorite occupies the central part of the shear. Core broken between 113-114m.

Intermediate Dikes at 99.17 -99,42-Dark gray, fine grained, numerous tension gashes, minor quartz veins, and with occasional xenolith of granodiorite. Others at 100.06-100.5 and 101.35-102.25. All dikes are strongly sheared with chlorite altereation and carbonate.

As Above

103.4 124.43 Coarse grained to porphyritic textures with phenocrysts of feldspar up

-

to 15mmx5mm and rarely show reverse zoning. Rock with 10-15% mafies, hornblende and biotite. Rock with variable foliation generally aout 60". This sectio with an increase in kspar lacally intense and

..... silicified. Minor shears become black due to the mafic minerals being smeared out along the shearing direction.

124.43

120.1-124.43- As Above but with a more conspicuous porphritic texture. Minor fracturing.

EOH

- - - - - - -

PROJECT:Noront HOLE NO:NOT-07-04 PAGEA

ANALYTICAL RESULTS SAMPLE FROM TO LENGTH

- - - - - - - - - -