DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and...
Transcript of DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and...
![Page 1: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/1.jpg)
DIA Survey Requirements
Thomas Breitnauer, PLS
DIA Land Surveyor
December 10, 2014
![Page 2: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/2.jpg)
Survey Requirements
- During Pre-Construction meeting
- Contractor should receive a survey packet with template for:
- Survey Statement of Work (SSOW)
- Survey and Quality Control Plan (SQCP)
- Weekly Project Status Report
- Final Project Report
- It would be fitting for the Contractor to submit the SSOW and
the SQCP for their project prior to the Pre-Survey meeting.
- The DIA Survey Section needs to review and approve.
- This process could take approximately a week or more.
![Page 3: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/3.jpg)
Pre-Survey Meeting
– No survey work can commence until the SSOW and the
SQCP is approved.
– Best to be completed prior to the Pre-Survey Meeting.
– During this meeting, the DIA Survey Section will provide all
necessary data.
– NGS datasheets. (Do not retrieve them from NGS’ website)
– Current projection parameters.
– Coordinate list.
– Map of the points.
![Page 4: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/4.jpg)
Control Network
– Contractor set their control network for their project
– Submit all field notes, raw files and reports to the DIA
Survey Section for review.
– Raw files must be read by Trimble Business Office (TBC).
– Reports must be in MS Word or MS Excel format
– Control Network must have DIA Survey Sections approval
before any survey work can begin.
![Page 5: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/5.jpg)
Questions?
– Questions?
![Page 6: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/6.jpg)
DIA Survey Requirements
Thomas Breitnauer, PLS
DIA Land Surveyor
December 10, 2014
![Page 7: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/7.jpg)
*
AIM Asset Management, BIM & Survey
Requirements
Brendan Dillon
BIM Manager
December 10th, 2014
![Page 8: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/8.jpg)
AIM Asset Management Group
*
AIM Asset Management
Research and Analytics
Maintenance Planning
Programs Building
Information Modeling
MAXIMO Administration
![Page 9: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/9.jpg)
What is BIM?
Building Information Modeling (BIM) is a digital
representation of physical and functional characteristics of a
facility. A BIM is a shared knowledge resource for
information about a facility forming a reliable basis for
decisions during its life-cycle; defined as existing from
earliest conception to demolition.
- USNBIMS
*
BIM is an approach to design, construction and facilities
management that makes the information generated at each
step more usable and accessible at every other step.
![Page 10: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/10.jpg)
What does BIM at DIA mean?
─ All design work is to be delivered to DIA in an .rvt format for work and
as Civil 3D generated .dwgs for horizontal/civil work.
─ Contractors follow a VDC (Virtual Design & Construction) process for
laying out and planning their construction path.
─ Commissioning of all DIA systems designated as Assets is required.
─ DIA uses the final Reconciled Model to feed into our BIM database.
─ BIM database connects to our GIS and Maximo Asset Management
systems.
─ BIM database is in a neutral SQL database, enabling it to connect to
a number of other systems for future uses such as our condition
assessment program, commercial tenant management, and other
programs
─ When a new project occurs in an area with existing BIM work, the
team will have better information on existing conditions than
previously available. *
![Page 11: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/11.jpg)
Integration with Maximo
– Jet-Bridge Conditions Assessment
![Page 12: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/12.jpg)
BIM Software
─ 3 Software Platforms
─ Autodesk Revit – Buildings and building systems
─ Autodesk AutoCAD Civil 3D – Site and site utilities
─ Autodesk Navisworks – Used for Spatial Coordination & Clash Detection
![Page 13: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/13.jpg)
Software - Revit - About
─ Modeling instead of drafting|
─ Live schedules reflect actual counts, lengths, areas and volumes of elements, rooms and spaces in the project
─ Change something in one view and it is automatically updated in others. i.e. change door number on plan and it is updated in schedule, move a door in plan, it is reflected in elevation and sections
![Page 14: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/14.jpg)
Software - Revit - About
─ 4 Versions
– Architecture
– MEP
– Structure
– Revit - Three Previous in One
─ Not Backwards Compatible
─ Cannot open a Revit 2014 file in Revit 2013. Once you open a Revit 2013 file in 2014, it becomes a 2014 file permanently
─ DIA Upgrades versions first quarter each year
![Page 15: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/15.jpg)
Software - Civil 3D - About
– Surface and Site Utility modeling
– Very similar to standard AutoCAD using Object Based
Data Tables
– Live schedules reflect actual counts, lengths, areas and
volumes of earth, pipe, equipment, etc.
– Change something in one view and it is automatically
updated in others. i.e. change grading on plan and it is
updated in schedule
![Page 16: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/16.jpg)
Software – Spatial Coordination/Clash Detection
─ Navisworks - 3 Versions
– Freedom - Free viewer. Good for most consultants
– Simulate - Premium Design Suites. Create/Track Clash Views
– Manage - Ultimate Design Suites. Automated Clash Detection
tools
– BIM 360 Glue – Cloud hosted option for Spatial
Coordination/Clash Detection with more advanced tracking
features
– Revit - Spatial Coordination can be done within Revit during
Design, though it is not recommended
![Page 17: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/17.jpg)
Software – Other Recommended Tools
─ SysQue
─ Model Review Add-In
─ BIM 360 Field
─ Bluebeam
![Page 18: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/18.jpg)
Hardware
─ Revit Hardware Requirements / Civil 3D Hardware Requirements
– Windows 7
– Multi-Core Intel® Pentium®, Xeon®, or i-Series processor or
AMD® equivalent with SSE2 technology.
– 4GB RAM
– 5gb Storage
─ Navisworks - Generally part of Design Suite, any system that runs Revit/Civil 3D will run Navisworks.
─ Glue360 – Cloud Based
![Page 19: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/19.jpg)
Wetware / Users
No hardware or software can compensate for a user knowledge base shortfall, while a knowledgeable user can get around many hardware and software limitations ─ Train existing staff
─ Hire new staff
─ Subconsultant
– In-House
– Out-of-House
─ Which approach? ALL!
![Page 20: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/20.jpg)
DEMO HTC – Model integration
![Page 21: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/21.jpg)
Who is Implementing BIM?
Denver International Airport USACE / GSA Other Airports
– Tampa International Airport
– Cleveland Airport
– Honolulu
– LaGuardia
University of Colorado Children's Hospital City of Denver BIM adoption will be ubiquitous within 5-10 years for all longterm facility owners
*
![Page 22: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/22.jpg)
Analytics & BIM Deliverables Tracking
─ Every proposal is reviewed for conformance to DIA standards
─ BIM model is evaluated at each deliverable
─ RFI's, Change Orders, Bulletins, etc. tracked
─ All reviews are documented and recorded in our cross referenced database for project and full project team evaluation, including internal DIA performance
*
![Page 23: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/23.jpg)
Questions so far?
*
![Page 24: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/24.jpg)
DSM 12
─ 7 Chapters plus Appendix & Attachments
─ White Papers Coming Soon!
─ Conformance to DSM standards is a requirement for all projects. No exceptions!
*
![Page 25: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/25.jpg)
DSM 12 - Chapter 1 & 2
─ Chapter 1- Electronic Data Collection and Interchange (EDCI) Compliance Policy
– References and summary of FAA NextGen and A-GIS requirements
– 5 pages
─ Chapter 2 - BIM Introduction Overview
– Organization strategy
– Implementation
– PXP Introduction
– Objectives & Application
– BIM Process Summary
– 16 Pages
*
![Page 26: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/26.jpg)
DSM 12 - Chapter 3 & 4
─ Chapter 3 - Subsurface Utilities Data Standard
– Requirements for surveying and documenting
underground utilities
– 4 Pages
─ Chapter 4 – BPXP Instructions
– Guidelines for working with the DIA BIM Project
Execution Plan
– 7 Pages
*
![Page 27: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/27.jpg)
DSM 12 - Chapter 5
─ CADD Procedures Manual
– Includes Requirements and Procedures
– Applicable to Civil work only (>5’ from building footprint)
– File management and naming
– File configuration
– Layer standards
– Best practices
– GIS Data requirements
– File delivery
– 88 Pages
*
![Page 28: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/28.jpg)
DSM 12 - Chapter 6
─ BIM Standards
– Introduction
– Project Setup
– Project File Standards
– Content Modeling Standards
– Modeling Requirements – Design
– Modeling Requirements – Construction
– Spatial Coordination
– R300
– Data Commissioning
─ 44 Pages *
![Page 29: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/29.jpg)
DSM 12 - Chapter 7
*
Tenant BIM Standards Restaurants, Shops, etc. Design team not typically contracted by
DIA, but still required to meet DIA standards.
– Introduction
– Project Setup
– Project File Standards
– Content Modeling Standards
– Modeling Requirements – Design
– Modeling Requirements – Construction
– Spatial Coordination
─ 44 Pages
![Page 30: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/30.jpg)
BIM Project Execution Plan
─ Project Information
─ Project Processes
─ Data Requirements
─ Collaboration Procedures
─ Model Structure
─ Deliverables
*
![Page 31: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/31.jpg)
Level of Development Matrix
─ Organized by UNIFORMAT II
– Additional Level 1 Major Group Elements “L – Airport
Equipment”
– Level of Development definitions as defined by BIMForum 2013
LoD Specification
– Indicates whether a sub-element category is:
– considered an Asset by DIA
– Requires Commissioning
– Requires training for DIA staff
– Toggle for indicating which sub-element categories are in the
scope of that project
*
![Page 32: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/32.jpg)
Level of Development Matrix
~Chapter Summary~
*
![Page 33: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/33.jpg)
DIA Templates & Kit of Parts
─ Updated Annually
─ Always growing
─ Available to everyone, for any
project, at DIA or not.
─ 4,000+ Families, not counting
system families in Container files
*
![Page 34: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/34.jpg)
Project Process & Deliverables
─ Proposal
─ Award
─ Pre-Design
─ Schematic Design
─ Design Development
─ Construction Documents
─ Bid Phase
─ Construction Phase
─ Commissioning
─ Project Closeout
*
![Page 35: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/35.jpg)
Project Process & Deliverables
─ Proposal
– Review current DSM
– Review provided BIM backgrounds, scan and survey
information for proposal
─ Award
– Submit BPXP within 30 days of NTP.
– DIA will return with comments within 14 days.
– Submit base model for each discipline to insure each consultant
is using correct template and Shared Coordinates
─ Pre-Design
– Preliminary programmatic spaces modeled *
![Page 36: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/36.jpg)
Project Process & Deliverables
─ Schematic Design
– All rooms and spaces placed
– Model submitted at end of phase for high level review
─ Design Development
– Needed equipment families should be developed
– Model submitted at end of phase for high level review
*
![Page 37: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/37.jpg)
Project Process & Deliverables
─ Construction Documents
– Model submissions at 30, 60, 90 & 100%
– Modeled elements conform to LoD Matrix
– New families submitted for review as created
Family and model reviews returned within 14 days
– All rooms/spaces named and placed
– All equipment modeled
– Systems (duct, pipe, conduit, etc) modeled to tolerances in DSM
*
![Page 38: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/38.jpg)
Project Process & Deliverables
─ Bid Phase
– Update BIM Model with Addenda as appropriate
– Contractors review DSM, BPXP
─ Construction Phase
– Contractor model created and coordinated
– Design model updated with RFI’s, Change Orders, etc.
– R300 Model
─ Commissioning
– Commissioning data integrated into models
─ Project Closeout
– Construction, Design & Facilities models delivered to DIA
*
![Page 39: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/39.jpg)
Model Review Process & Document
─ Breakdown of
requirements
─ Numerical Grading
─ Reference to DSM
location
─ Framework to
discuss next steps
*
![Page 40: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/40.jpg)
What if...
...you don't know
Revit or Civil 3D
well enough to
meet DIA's
standards?
*
Let’s discuss it.
![Page 41: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/41.jpg)
Resources
DIA – Free resource for clarification and guidance, NOT training.
Youtube - Free
AUGI.com - Autodesk User’s Group International - Free
Autodesk University - videos available free to Autodesk Subscription holders
RoMBIS - Rocky Mountain Building Information Society
BoB Tech – Boulder Building Technology Group
Publications
Mastering Autodesk Revit Architecture 2015
Mastering Autodesk Revit MEP 2015
Autodesk Revit Architecture Essentials 2015
Autodesk Revit MEP Essentials 2015
Autodesk Revit Architecture 2015: No Experience Required
The Aubin Academy: Revit MEP 2015
Exploring Autodesk Revit Structure 2015
*
![Page 42: DIA Survey Requirements - Denver International Airport · ─BIM database connects to our GIS and Maximo Asset Management systems. ─BIM database is in a neutral SQL database, enabling](https://reader030.fdocuments.in/reader030/viewer/2022041116/5f286e92ac9f6241185a3a91/html5/thumbnails/42.jpg)
*
AIM Asset Management, BIM & Survey
Requirements
Brendan Dillon
BIM Manager
December 10th, 2014