DH02 Survey Report
No.Instrument/ Equipment
Activities Site photo / Remarks
1PI-09303PT-09303
Check for existing: as photo
The pressure gauge PI-09303 is not available.
The transmitter PT-09303 is available:
- Cable was connected to IJB-9631 (tested from transmitter to Marshalling cabinet).
2TT-09304,
Check for existing: installed directly on piping as photo.
The TT-09304 is not available:
- Cable shall be connected to IJB-9632 (tested from JB to Marshalling cabinet).
TOPAZ LPS – E&I Offshore Site Survey Report
3PT-09305PT-09308
The transmitters are available:
- Cable was connected to IJB-9631 (tested from transmitter to Marshalling cabinet).
4 TT-09302
The TT-09304 is available:
- Cable shall be connected to IJB-9632 (tested from JB to Marshalling cabinet).
TOPAZ LPS – E&I Offshore Site Survey Report
5PZT-09307
The transmitters are available:
- Cable was connected to IJB-9531 (tested from transmitter to Marshalling cabinet).
TOPAZ LPS – E&I Offshore Site Survey Report
6HCV-09301
The valve is not available:
- Cable ZT-09301 connected to IJB-9636 (tested from cable ending to Marshalling cabinet).
- Cable SV-09301A/B connected to IJB-9640 (tested from cable ending to Marshalling cabinet).
- Cable ZSC-09301 connected to IJB-9636 – pair 24 (tested from JB to Marshalling cabinet). Running a new cable.
TOPAZ LPS – E&I Offshore Site Survey Report
7 SV-09302
The valve is available:
- Cable SV-09302 connected to IJB-9542 (tested from JB to Marshalling cabinet).
- Cable ZSC/O-09302 connected to IJB-9536 (tested from JB to Marshalling cabinet).
8 SV-09303
The valve is available:
- Cable SV-09302 connected to IJB-9542 (tested from JB to Marshalling cabinet).
- Cable ZSC/O-09302 connected to IJB-9536 (tested from JB to Marshalling cabinet).
The valve indicator was broken.
TOPAZ LPS – E&I Offshore Site Survey Report
9SXV-09301SXV-09302
The WHCP module are available, but the Pressure gauge for SCSSV in front of module is damaged as photo.
TOPAZ LPS – E&I Offshore Site Survey Report
No.Instrument/ Equipment
Activities Remarks
1
PI-10303PT-10303PI-12303PT-12303
Check for existing pressure gauges: as photo
The transmitter PT-10303, PT-12303 shall be installed:
- Cable to be connected to IJB-9638 (tested from transmitter to Marshalling cabinet).
TT-10304TT-12304
The transmitters shall be installed:
- Cable shall be connected to IJB-9638 (tested from JB to Marshalling cabinet).
2
TOPAZ LPS – E&I Offshore Site Survey Report
3
PT-10305PT-10308PT-12305PT-12308
The transmitters shall be installed:
- Cable was connected to IJB-9638 (tested from JB to Marshalling cabinet).
4TT-10302TT-12302
The new TT cables shall be installed on the existing tray (big one in photo)
- Cables shall be connected to IJB-9638 (tested from JB to Marshalling cabinet).
TOPAZ LPS – E&I Offshore Site Survey Report
5PZT-10307PZT-12307
The transmitters shall be installed:
- Cable was connected to IJB-9531 (tested from JB to Marshalling cabinet).
6
SV-10302SV-10303SV-12302SV-12303
The valves to be installed:
- Cable SV-10302/12302, SV-10303/12303 to be connected to IJB-9539 (tested from JB to Marshalling cabinet).
- Cable ZSC/O-10302/12302, ZSC/O-10303/12303 to be connected to IJB-9534 (tested from JB to Marshalling cabinet).
TOPAZ LPS – E&I Offshore Site Survey Report
7 HCV-10301
The valve is not available:
- Cable ZT-10301/12301 to be connected to IJB-9636 (tested from JB to Marshalling cabinet).
- Cable SV-10301A/B, SV-12301A/B to be connected to IJB-9640 (tested from JB to Marshalling cabinet).
- Cable ZSC-10301 connected to IJB-9636 – pair 22/23 (tested from JB to Marshalling cabinet). Running new cables.
TOPAZ LPS – E&I Offshore Site Survey Report
8
SCSSV-10301SSV-10301SSV-10302
The WHCP module are available:
Tubings shall be installed as drawing WHP-DH2-I-D-7001-602.
9
PT-09309/09310/09311PT-10309/10310/10311PT-12309/12310/12311
The transmitters are available:
- Cable was connected to JB-TX – 101_TB2 (tested from JB to Marshalling cabinet).
TOPAZ LPS – E&I Offshore Site Survey Report
10
Junction box:DH2 – IJB – A- 9531DH2 – IJB – A – 9636DH2 – IJB – A – 9638
DH2 – IJB – A- 9531 Has 13 empty inputDH2 – IJB – A- 9638 Has 11 empty input DH2 – IJB – A- 9636 Has 5 empty input
Area of concerns:
The pressure transmitters PT-09303/09305/09307/09308 should be re-calibrated & function test: