DH02 Survey Report No . Instrument / Equipment Activities Site photo / Remarks 1 PI-09303 PT-09303 Check for existing: as photo The pressure gauge PI-09303 is not available. The transmitter PT-09303 is available: - Cable was connected to IJB-9631 (tested from transmitter to Marshalling cabinet). 2 TT-09304, Check for existing: installed directly on piping as photo. The TT-09304 is not available: - Cable shall be connected to IJB- 9632 (tested from JB to Marshalling cabinet).

description

Khảo sát ĐH

Transcript of DH02 FL _ Site Survey NNB_Equipment

Page 1: DH02 FL _ Site Survey NNB_Equipment

DH02 Survey Report

No.Instrument/ Equipment

Activities Site photo / Remarks

1PI-09303PT-09303

Check for existing: as photo

The pressure gauge PI-09303 is not available.

The transmitter PT-09303 is available:

- Cable was connected to IJB-9631 (tested from transmitter to Marshalling cabinet).

2TT-09304,

Check for existing: installed directly on piping as photo.

The TT-09304 is not available:

- Cable shall be connected to IJB-9632 (tested from JB to Marshalling cabinet).

Page 2: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

3PT-09305PT-09308

The transmitters are available:

- Cable was connected to IJB-9631 (tested from transmitter to Marshalling cabinet).

4 TT-09302

The TT-09304 is available:

- Cable shall be connected to IJB-9632 (tested from JB to Marshalling cabinet).

Page 3: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

5PZT-09307

The transmitters are available:

- Cable was connected to IJB-9531 (tested from transmitter to Marshalling cabinet).

Page 4: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

6HCV-09301

The valve is not available:

- Cable ZT-09301 connected to IJB-9636 (tested from cable ending to Marshalling cabinet).

- Cable SV-09301A/B connected to IJB-9640 (tested from cable ending to Marshalling cabinet).

- Cable ZSC-09301 connected to IJB-9636 – pair 24 (tested from JB to Marshalling cabinet). Running a new cable.

Page 5: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

7 SV-09302

The valve is available:

- Cable SV-09302 connected to IJB-9542 (tested from JB to Marshalling cabinet).

- Cable ZSC/O-09302 connected to IJB-9536 (tested from JB to Marshalling cabinet).

8 SV-09303

The valve is available:

- Cable SV-09302 connected to IJB-9542 (tested from JB to Marshalling cabinet).

- Cable ZSC/O-09302 connected to IJB-9536 (tested from JB to Marshalling cabinet).

The valve indicator was broken.

Page 6: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

9SXV-09301SXV-09302

The WHCP module are available, but the Pressure gauge for SCSSV in front of module is damaged as photo.

Page 7: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

No.Instrument/ Equipment

Activities Remarks

1

PI-10303PT-10303PI-12303PT-12303

Check for existing pressure gauges: as photo

The transmitter PT-10303, PT-12303 shall be installed:

- Cable to be connected to IJB-9638 (tested from transmitter to Marshalling cabinet).

TT-10304TT-12304

The transmitters shall be installed:

- Cable shall be connected to IJB-9638 (tested from JB to Marshalling cabinet).

2

Page 8: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

3

PT-10305PT-10308PT-12305PT-12308

The transmitters shall be installed:

- Cable was connected to IJB-9638 (tested from JB to Marshalling cabinet).

4TT-10302TT-12302

The new TT cables shall be installed on the existing tray (big one in photo)

- Cables shall be connected to IJB-9638 (tested from JB to Marshalling cabinet).

Page 9: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

5PZT-10307PZT-12307

The transmitters shall be installed:

- Cable was connected to IJB-9531 (tested from JB to Marshalling cabinet).

6

SV-10302SV-10303SV-12302SV-12303

The valves to be installed:

- Cable SV-10302/12302, SV-10303/12303 to be connected to IJB-9539 (tested from JB to Marshalling cabinet).

- Cable ZSC/O-10302/12302, ZSC/O-10303/12303 to be connected to IJB-9534 (tested from JB to Marshalling cabinet).

Page 10: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

7 HCV-10301

The valve is not available:

- Cable ZT-10301/12301 to be connected to IJB-9636 (tested from JB to Marshalling cabinet).

- Cable SV-10301A/B, SV-12301A/B to be connected to IJB-9640 (tested from JB to Marshalling cabinet).

- Cable ZSC-10301 connected to IJB-9636 – pair 22/23 (tested from JB to Marshalling cabinet). Running new cables.

Page 11: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

8

SCSSV-10301SSV-10301SSV-10302

The WHCP module are available:

Tubings shall be installed as drawing WHP-DH2-I-D-7001-602.

9

PT-09309/09310/09311PT-10309/10310/10311PT-12309/12310/12311

The transmitters are available:

- Cable was connected to JB-TX – 101_TB2 (tested from JB to Marshalling cabinet).

Page 12: DH02 FL _ Site Survey NNB_Equipment

TOPAZ LPS – E&I Offshore Site Survey Report

10

Junction box:DH2 – IJB – A- 9531DH2 – IJB – A – 9636DH2 – IJB – A – 9638

DH2 – IJB – A- 9531 Has 13 empty inputDH2 – IJB – A- 9638 Has 11 empty input DH2 – IJB – A- 9636 Has 5 empty input

Area of concerns:

The pressure transmitters PT-09303/09305/09307/09308 should be re-calibrated & function test: