Flow of Activities for
DG Installation
Plant room
• Plant room with clear height of 5.5 Meter clearance and the width as per
the service consultant drawing.
• The final location of HSD tank and the routing of fuel pipe as per the
service consultant drawings.
• The Cable / Buss bar routing as per the service consultants.
• A clear space for the Crain to enter the plant room to shift the DG sets
from trucks to the proper location.
• The plant room to be fully equipped with the fire extinguishers as lot of
insulating material and fire hard material will be used during the
installation of complete system.
• No water should stop in the Plant room and for that all the drainage system
to be ready before DG set arrive to the plant room
Civil works
IPS @ plant room
DG set plat form
HSD Tank Construction• As per the service consultants drawing the required height for the
HSD tank …… Meters need to be constructed
• Plat form for HSD tank
• The concrete trench for fuel pipe and LT Cables
• Concrete road for the fuel truck to come for refueling
Concrete wall for HSD tank
Plat form for HSD tank
HSD tank
Fuel Tank
for DG
Cooling Tower
HSD tank