Development Status of
Dismantling Technology
for Old Steam Generator &
RV in Kori unit 1
2016. 8.
Doosan Heavy Industries & Co. Ltd
Research Institute
Kwang Soo Park
Doosan Experience
Development of Dismantling Tech. for RV in Kori unit 1
Development of Dismantling Tech. for Old Steam Generator
1
2
3
Summary 4
1-1
SGR Process
2
Foundation technology would be established from technology development & performing the steam
generator replacement for Han Wool unit 3 / 4.
• Performed pipe cutting
using developed cutting
technology
• Performed pipe decon.
from the cooperated
Nuvision
• To learned fields-applied
technology of cutting &
decontamination for pipe
3
1-1
Decommissioning PJT : TRIGA MARK II & III Research Reactor Decommissioning
PJT Period : 1997 2014
Performed dismantling the research reactor, peripheral facility and concrete and so on
Items Research Reactor Unit 1 Research Reactor Unit 2
Type TRIGA Mark-II TRIGA Mark-III
Operating Start 1962 1972
Shut Down 1995. 1. 31 1995. 12. 31
Power output 250 KW 2 MW
Operating Time 36,000 hr 55,000 hr
1-2
4
We had experience of research reactor dismantling for Triga Mark II / III.
From this experience, we had work capability of dismantling field.
• To obtain various work
know-how from dismantling
PJT
• To establish dismantling
data-base
• To have PJT management
technology like schedule,
process control etc.
1-2
5
Doosan Experience
Development of Dismantling Tech. for RV in Kori unit 1
Development of Dismantling Tech. for Old Steam Generator
1
2
3
Summary 4
7
PJT Name
Period
Target
Main
Contents
Development of dismantling technology for old steam generator
2-1
2013. 09. ~ 2016. 08 (Total 36 month)
Development of Dismantling System for large radioactivity metal waste
To design dismantling process
To develop cutting & segmentation technology
- Shell, Tube Sheet, Internal Structure and so on
To develop decontamination technology
- U-tube decontamination
To design radiation safety management
Participating
Institute Doosan Heavy Industries Co. Ltd (Managing Department)
EnesG Co. Ltd
Hana Nuclear Power Engineering Co. Ltd
HNEnertech
KHNP (Consultation)
Mockup design & fabrication
[ Shell Mockup ] [ Channel head Mockup ] [ Shroud Mockup ]
In order to perform the cutting test, we design & fabricate the various mockup.
We performed the performance test of developed equipment using the these mockup.
8
2-2
Segmentation : Band Saw + Circular Saw
Oxygen Cutting
Circular Saw
Wire Saw
Circular Saw
Inner Circular Saw Face Cutter
• Circular Saw
• Bans Saw
• Diamond Wire Saw
• Inner Cutter (Wheel)
• Face Cutter
• Thermal Cutting
• Others
To obtain mechanical &
thermal cutting
technology
9
2-3
Circular saw cutting Technology
[ Chip ] [ Cutting Head ] [ View after cutting ]
•Size : 6100(OD) x 1300W mm
•Cutting Capability : max. 170 mm
•Cutting Process :
Endless Rotation
• Easy Installation/Disassemble
Characteristics
10
2-3
Diamond wire saw cutting Technology
[ Diamond Wire Saw ]
[ Cutting ]
•Size
- 6,650L x 2,520W x 6,450H mm
•Cutting Capability :
max. 3,250 mm
• Easy Installation/Disassemble
11
Characteristics
2-3
[ View after cutting ]
Band saw cutting Technology
[ Band Saw Equipment ]
• Size :
- 9,000L x 8,500W x 8,500H mm
•Cutting Capability :
max. 3,200 mm
• Vertical / Horizontal cutting
• Easy Work using the Turn Table
[ View after cutting (두께 600 mm) ]
12
Characteristics
2-3
Blasting Decontamination Technology
[ Layout of Equipment ]
[ Simulation ]
•Medium circulation type
• Blasting Media : Grit
• Blasting Media Type:
Al Oxide or SiC
•Multi-operated work function
13
Characteristics
2-4
[ Milling Equipment]
• Channel head inner wall decon.
Milling Decontamination for
crack area
•U-Tube Free-release
Plasma Decontamination
To apply after blasting decon.
14
Characteristics
2-4
Milling & Plasma Decon. Technology
[ Plasma Decontamination Equipment]
In order to dismantle old steam generator, we design work process, radiation safety
management and waste management and so on.
15
2-5
Process Waste Waste Management Waste Treatment
Thermal cutting of upper shell
• Slag • Prevent scattering • Measure • Drumming
To obtain key dismantling technology for large component such as steam generator
To design work process for dismantling steam generator
“ From this technical development for dismantling of OSG, we obtain
performance capability & dismantling technology of primary component
such as RCP, PZR and so on. ”
16
[ Application part using the developed technology ]
2-6
Doosan Experience
Development of Dismantling Tech. for RV in Kori unit 1
Development of Dismantling Tech. for Old Steam Generator
1
2
3
Summary 4
STADE NPP : 672MWe, PWR (Germany)
CHOOZ “A” : 1,530MWe, PWR (France)
ZION “A” : 1,040MWe, PWR (USA)
RVI
- Underwater - Utilize the cavity
- Mechanical - AREVA
RV - On Air - Utilize the cavity - Thermal+Mechanical - Siempelkamp
RVI
- Underwater - Utilize the cavity
- Mechanical - WEC
RV
- Underwater - Utilize the cavity
- Mechanical - WEC
RVI
- Underwater - Utilize the cavity
- Mechanical - Siempelkamp
RV
- On Air - Utilize the cavity
- Thermal+Mechanical
- Siempelkamp
In order to dismantle the reactor of Kori unit 1, some items is considered such as
safe, economical dismantling, cavity characteristics, infra and so on.
18
3-1
Implication
UGS
CSB
LSS
CS
[ RV/RVI ASS’Y ] [ RV Dismantling ]
RV/RVI
Layout
UGS1
UGS lifting Band saw
installation
UGS cutting
CSB2
Upper CSB cutting Upper CSB lifting Lower CSB lifting
CS3/LSS4
Lower CSB cutting CS/LSS dividing CS/LSS cutting
RV
RV Shell cutting Band Saw
installation
RV Shell cutting
1. Upper Guide Structure 2. Core Support Barrel 3. Core Shroud 4. Lower Support Structure
RV & RVI dismantling work consists of USG, CSB, CS, LSS and RV cutting. After
dismantling RVI, RV dismantling will be performed in RV inside area.
19
3-2
Workshop with Siempelkamp
• From the workshop with siempelkamp,
We get many information & materials.
in order to RV/RVI dismantling for Kori unit 1, we study & review using
the RV/RVI dismantling case.
• We study cavity of Kori unit 1.
• We design dismantling scenario of
RV for Kori unit 1.
20
3-2
RV/RVI Dismantling scenario for Kori unit 1
3-3
Items Expected Value
Cutting Length 603 m
Number of cut-off piece 708 ea
Number of Drum 310 ea
• We designed cutting plan for RV dismantling.
• Cutting method is thermal cutting.
• Container for storage is 200 liter drum.
• We will plan to optimize cutting plan using the
RV characterization result & decided container.
21
Doosan Experience
Development of Dismantling Tech. for RV in Kori unit 1
Development of Dismantling Tech. for Old Steam Generator
1
2
3
Summary 4
• To have PJT management technology &
fields-applied technology - Replacement of SG & RVH - Research Reactor Dismantling
•To understand primary component
•To develop dismantling technology for
large primary component
- Dismantling Eng’g for OSG
Eng’g
PJT
Management
Process & Service
Tech. RV Dismantling
Tech.
• To have service technology using remote
maintenance equipment
• To have many cutting technology
such as mechanical & thermal cutting
Capability
of Doosan
Doosan is being made to obtain key technology of dismantling to serve total
solution of nuclear power plant.
23
• To plan technical development of RV
dismantling for Kori unit 1 using the
government fund
• To design RV dismantling scenario for Kori
unit 1
Thank You