ltpiy T*j FO-2-1 July 20, I W Anavada itotit Corporatian AtUBt'Ofil Mr. C. J . Zruk« 1200 Hii**, 6th floor Houston, TSJBVI 77002 uxyitl Bafarano* ls mads to /our Initial Davalop^aot Operations CoortfiaatiatJ Dooutfastit (DOCD) rscsistKJ July 8, 19o6, for Las^aa OCS-fl 5412- ami W L Blocks 205, 20ft, smi 225> f raapactivaly, ftouta Tiabsitar Irsa. This DuCD inolusiss ths sctivitiaa propesad for Platf orm t in Elock 205, rutfora A in clock 206, sod 12 riaila. ir. acccjxisncs wit* 30 CFR 250.3*, Uus L/0CV i s haraby daCBtaci susr.it*-ad r.od Ifl now i i . - considered for approve Tour SfiBfrfyf nurbor LC U-^07O an/; r.'.jould ba raferooce<: in your aou«asil- catlou sad oorraspoodoncs cono*. tiXOfc tfcii DOCD. sincaraly yocrs, . S r ;?r ^ D. J . Scurgaols Rs^lonal Ai^snri*or Piald Oparatlrais bcc: Laaaa OCS-G ^612 (GPS~3-«) (FILE ROOM) Laaaa OCS-C 5613 (0*3-3-2) (FILE BOON) Laaaa OCS-0 5224 (OPS-3-2) {PILE ROOM) LOP5-3-4 v/Publio infb. Copy aa 7 tba DOCD (PUBLIC WWiUisiiaoiisooki07/U/862doodcori Office of Prog'am Services JUL 2 2 1988 information Services Section - Ws 1 . !S - i t ''ft

Transcript of DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT …

I« ltpiy T*j FO-2-1 July 20, I W

Anavada itotit Corporatian AtUBt'Ofil Mr. C. J . Zruk« 1200 Hii**, 6th floor Houston, TSJBVI 77002

uxyitl

Bafarano* l s mads to /our I n i t i a l Davalop^aot Operations CoortfiaatiatJ Dooutfastit (DOCD) rscsistKJ July 8, 19o6, for Las^aa OCS-fl 5412-ami W L Blocks 205, 20ft, smi 225>f raapactivaly, ftouta Tiabsitar I r s a . This DuCD inolusiss ths sct iv i t iaa propesad for Platf orm t in Elock 205, rutfora A in clock 206, sod 12 riaila.

ir. acccjxisncs wit* 30 CFR 250.3*, Uus L/0CV i s haraby daCBtaci susr.it*-ad r.od Ifl now i i . - considered for approve

Tour SfiBfrfyf nurbor LC U-^07O an/; r.'.jould ba raferooce<: in your aou«asil-catlou sad oorraspoodoncs cono*. tiXOfc tfcii DOCD.

sincaraly yocrs,

. S r ;?r

^ D. J . Scurgaols Rs^lonal Ai^snri*or Piald Oparatlrais

bcc: Laaaa OCS-G 612 (GPS~3-«) (FILE ROOM) Laaaa OCS-C 5613 (0*3-3-2) (FILE BOON) Laaaa OCS-0 5224 (OPS-3-2) {PILE ROOM)

LOP5-3-4 v/Publio infb. Copy aa7 tba DOCD (PUBLIC

WWiUisiiaoiisooki07/U/862doodcori

Office of Prog'am Services

JUL 2 2 1988 information Services

Section

-Ws1. !S

-

i t

''ft

RMERRDR HEBS CDRPDRRTIDN

ISOO M I L A M . OTH F L O O R H O U S T O N . T E X A S 77002

711-0 90-0770

July 5, 1988

Mr. Daniel J . Bourgeois Regional Supervisor Minerals Management Service, FO-2-1 1201 Elmwood Park Blvd. New Orleans, Lcj isiana 70123-2394

Subject: South Timbalier Block 205 and Block 206 OCS-G 5612 and OCS-G 5613

In i t i a l Development Operations and Coordination Document

Dear Nr. Bourgeois: In accordance with 30 CFR 250.34 et seq. and Notice to Lessees and Operators No. 84-01, Amerada Hess Corporation hereby submits for your approval the Development Operations and Coordination Document (DOCD) for South Timbalier Block 205 and Block 206 area, OCS-G 5612 and OCS-G 5613.

Enclosed are five (5) copies of the subject DOCD for confidential use and four (4) copies for public information. Because the development location 1s located off the coas* of Louisiana, an Environmental Report and Coastal Zone Management Plan Consistency Certifioation is required and enclosed.

Should the Minerals Managements. Service require any additional information, please do not hesitate to contact me at (713) 951-5680.

Very truly yours,

Environmental Regulatory Special ist

SJZ:db/091 Enc.

R M E R R D R H E B S CDRPORRTIUN

DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT INITIAL PLAN

GULF OF MEXICO: OFFSHORE LOUISIANA SOUTH TlMBAUER AREA, BLOCK 205 AND BLOCK 206

LEASES OCS-G 5612 AND OCS-G 5613

UNITED STATES EXPLORATION AND PRODUCTION OFFSHORE REGION OPERATIONS

HOUSTON, TEXAS

DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT

INITIAL PLAN

GULF OF MEXICO: OFFSHORE LOUISIANA

SOUTH TIMBALIER AREA, BLOCK 205 AND BLOCK 206

LEASES OCS-G 5612 and OCS-G 5613

OPERATOR

AMERADA HESS CORPORATION

1201 LOUISIANA, SUITE 700

HOUSTON, TEXAS 77002-5681

CONTACT: S. J. ZRAKE (713) 951-5680

JULY 1983

PUBLIC INFORNATION

AMEkADA HESS CORPORATION DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT SOUTH TIMBALIER AREA. BLOCK 205 AND BLOCK 206

LEASES OCS-G 5612 AND OCS-G 5613

IN ACCORDANCE WITH 30 CFR 250.34 ET SEQ. AND NOTICE TO LESSEES AND OPERATORS NO. 84-01, AMERADA HESS CORPORATION HEREBY SUBMITS THE FOLLOWING INFORMATION FOR THE PLANNED DEVELOPMENT AND PRODUCTION.

A. DESCRIPTION

AMERADA HESS PROPOSES TO DEVELOP SOUTH TIMBALIER BLOCKS 205 AND 206 CONCURRENTLY. FIELD DEVELOPMENT MILL START WITH THE DRILLING OF WELL NO. 3 FROM THE EXISTING TEMPLATE ON BLOCK 205 ATTEMPTING TO PROVE UP ADDITIONAL RESERVES. DETAILED DESIGN, FABRICATION AND INSTALLATION OF PLATFORMS, PRODUCTION FACILITIES AND PIPELINES WOULD THEN BE COMPLETED AND PRODUCTION INITIATED.

THE PLATFORM FOR BLOCK 205 WILL BE A FOUR PILE, UNMANNED FACILITY SET NEXT TO THE EXISTING NINE SLOT TEMPLATE CAPABLE OF PRODUCING 50 MMCFD OF GAS. WELLS NO. 1, 2, AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION USING A CANTILEVER TYPE JACK UP DRILLING PIG.

THE BLOCK 206 PLATFORM WILL BE A 24 SLOT, 8 PILE MANNED STRUCTURE SET OVER THE EXISTING TEMPLATE CAPABLE OF PRODUCING 150 MMCFD. A PLATFORM DRILLING RIG WOULD THEN BE MOVED ONTO THE PLATFORM. WELLS NO. 1 AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION. WELL NO. 2 WILL BE SIDETRACKED, TIED-BACK TO THE PLATFORM AND COMPLETED IN SANDS PREVIOUSLY LOGGED. SIX ADDITIONAL NEW WELLS WILL BE DRILLED TO OPTIMIZE RESERVOIR DEPLETION. SIMULTANEOUS DRILLING AND PRODUCTION WILL TAKE PLACE DURING THE TWO YEAR DEVELOPMENT DRILLING PROGRAM.

PRODUCT TRANSPORTATION WILL USE SUBSEA PIPELINES TO THE NEAREST SHORELINE SYSTEM TAKE POINT THAT RESULTS IN THE BEST OVERALL ECONOMICS. NO NEW NEARSHORE OR ONSHORE PIPELINES OR FACILITIES WILL BE CONSTRUCTED. THE SPECIFIC SYSTEM WILL BE DETERMINED DURING THE NEGOTIATION OF THE GAS MARKETING CONTRACT WHICH IS EXPECTED TO TAKE PLACE DURING THE FIRST HALF OF 1989.

B. SCHEDULE

THE ANTICIPATED SCHEDULE IS PRESENTED BELOW. THE TOTAL TIME TO COMPLETE THIS PROJECT IS ESTIMATED TO BE 21 MONTHS TO INITIAL PRODUCTION WITH AN ADDITIONAL 24 MONTHS TO COMPLETE THE DEVELOPMENT DRILLING PROGRAM.

2

PROPOSED DATES ACTIVITY

DRILL 205/225 WELL NO. 3

DESIGN PRODUCTION FACILITIES

SECURE GAS CONTRACT

FABRICATE AND INSTALL FACILITIES

TIEBACK AND COMPLETE

COMMENCE PRODUCTION - BLOCKS 205 AND 206

BLOCK 206 DEVELOPMENT DRILLING

START

AUG 1988

JUL 1988

ONGOING

FEB 1989

NOV 1989

JAN 1990

JAN 1990

COMPLETE

OCT 1988

FEB 1989

DEC 1988

NOV 1989

JAN 1990

ONGOING

JAN 1992

GEOLOGICAL, GEOPHYSICAL AND CULTURAL RESOURCE

1. SHALLOW HAZARD ANALYSIS

A SITE SPECIFIC SHALLOW HAZARD ANALYSIS WAS COMPLETED AND SUBMITTED AS PART OF THE PLAN OF EXPLORATION. THE WELLS PREVIOUSLY DRILLED AT THESE LOCATIONS VERIFY NO SHALLOW GAC HAZARDS EXIST. SOIL BORINGS WILL BE TAKEN AT THE PROPOSED DEVELOPMENT LOCATIONS TO PROPERLY DESIGN AND SIZE THE PRODUCTION PLATFORMS.

2. SITE SPECIFIC CULTURAL RESOURCE ASSESSMENT

NO IMPACT TO ANY HISTORICAL OR ARCHAEOLOGICAL CULTURAL RESOURCES IS EXPECTED FROM THIS DEVELOPMENT AS IT IS OUTSIDE THE AREA WHERE SIGNIFICANT CULTURAL RESOURCES WOULD BE FOUND. THE HIGH RESOLUTION GEOPHYSICAL SURVEY CONDUCTED ON 8L0CKS 205 AND 206 INDICATED SEVERAL SMALL MAGNETIC ANOMALIES THAT PROBABLY REPRESENT FERROMAGNETIC DEBRIS.

3. STRUCTURE MAP OF SANDS AND WELL LOCATIONS

EXHIBITS 1,2, 3 - CONFIDENTIAL

THE LOCATIONS OF THE EXISTING AND FUTURE DEVELOPMENT WELLS ARE AS FOLLOWS:

WELL # BKL* TVD TYPE

BLOCK 205 A-l CONFIDENTIAL CONFIDENTIAL EXISTING A-2 S/T " " EXISTING A-3 " • PiMHCd

BLOCK 206 A-l A-2 S/T

CONFIDENTIAL CONFIDENTIAL EXISTING PLANNED EXISTING PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED

A-3 A-4 A-5 A-6 A-7 A-S A-9

i t

•SURFACE LOCATION IS AT RESPECTIVE PLATFORM LOCATION.

4. CROSS-SECTIONAL MAP

EXHIBITS 4 AND 5 - CONFIDENTIAL

5. SURFACE LOCATION

EXHIBIT 6 - PUBLIC INFORMATION

6. SPIDER MAP

EXHIBIT 7 - CONFIDENTIAL

D. LOCATION MAP

1. LOCATION MAP OF LEASE BLOCKS

EXHIBIT 6 - PUBLIC INFORMATION

2. LOCATION OF ONSHORE SUPPORT BASE FACILITY

FOURCHON, LOUISIANA IS THE ONSHORE SUPPORT BASE FACILITY. SEE EXHIBIT 6 - PUBLIC INFORMATION

3. WELL AND PLATFORM SURFACE LOCATION

EXHIBIT 7 - CONFIDENTIAL

E. OIL SPILL CONTINGENCY PLAN INFORMATION

1. CONTINGENCY PLAN REFERENCE

AMERADA HESS' GULF OF MEXICO OPERATIONS AR COVERED BY THE APPROVED AMERADA HESS OIL SPILL CONTINGENCY PLAN. AS A MEMBER COMPANY, AMERADA HESS COULD CALL UPON CLEAN GULF ASSOCIATES FOR ASSISTANCE Itf A MAJOR SPILL INCIDENT SHOULD IT BE NECESSARY.

2. EQUIPMENT BASE OF OPERATIONS AND DEPLOYMENT TIME

CLEAN GULF ASSOCIATES' CLEANUP EQUIPMENT WOULD BE DEPLOYED FROM GRAND ISLE, LOUISIANA WITH BACK-UP FROM HOUMA OR VENICE, LOUISIANA. RESPONSE TINE FROM GRAND ISLE TO THE DEVELOPMENT LOCATION WOULD BE

4

ABOUT 9-11 HOURS (INCLUDING RIG UP). THE BACK-UP LOCATIONS WOULD TAKE AN ADDITIONAL I TO 3 HOURS.

F. OTHER

1. WATER DEPTH

THE WATER DEPTH AT EACH DEVELOPMENT LOCATION IS AS FOLLOWS:

(A) BLOCK 205 - 161 FEET

(B) BLOCK 206 - \V> FEET

2. DESCRIPTION OF DRILLING RIG AND POLLUTION PREVENTION EQUIPMENT

A TYPICAL CAN"! I LEVER JACK-UP TYPE RIG WILL BE USED TO COMPLETE THE WELLS ON BLOCK 205. THE BLOCK 206 PLATFORM WILL USE A PLATFORM DRILLING RIG. DECK DRAINAGE FROM BOTH PLATFORMS WILL FLOW INTO A SUMP BEFORE DISCHARGE INTO THE SEA. SANITARY AND PRODUCED WASTEWATER, DRILLING FLUID, AND DRILL CUTTINGS PROCESS AND TREATMENT SYSTEMS WILL BE OPERATED IN ACCORDANCE WITH APPLICABLE RULES AND REGULATIONS. SORBENT PADS WILL BE KEPT ON EACH PLATFORM TO WIPE UP SMALL DRIPS AND SPILLS OF PETROLEUM PRODUCTS AND DAILY VISUAL INSPECTIONS FOR ANY SOURCES OF POLLUTION WILL BE DONE.

3. AIR EMISSION CALCULATIONS'1K2)

AIR EMISSIONS PRESENTED ARE SUMMARIES CALCULATED ON AN ANNUAL BASIS FOLLOWING THE CHRONOLOGICAL STAGES OF DEVELOPMENT BY LEASE BLOCK AS NOTED IN SECTION B. SCHEDULE. THE LAST YEAR'S EMISSIONS LISTED FOR EACH BLOCK ARE REPRESENTATIVE OF REMAINING PRODUCTION YEARS.

(A) BLOCK 205 (TONS/YEAR)

CO VOC N0X SO2 TSP

1988 2.3 .9 10.6 .7 .8

1989 17.5 6.4 79.8 5.3 5.7

1990 2.5 .3 2.0 .2 .2

! l ) "ATMOSPHERIC EMISSIONS FROM OFFSHORE OIL AND GAS DEVELOPMENT AND PRODUCTION," EPA NO. 450/3-77-026, TABLE 4-3, JUNE 1977.

(2) "COMPILATION OF AIR POLLUTANT EMISSION FACTORS," THIRD EDITION, EPA REPORT AP-42 TABLES 3.3.2-1 AND 3.3.3-1, AUGUST 1977.

5

(B) BLOCK 206 (TONS/YEAR)

£Q VOC N0X SO2 TSP

1988 NO FIELC OPERATIONS

1989 62.3 22.9 284.8 18.9 20.4

1990 131.0 274.2 850.8 15.7 18.5

1991 131 .0 274 2 850.8 15.7 18.5

1992 116.0 268.7 783.1 11.2 13.6

(C) EMISSION EXEMPTION (E) CALCULATIONS

FOR CO: E = 3400 D2/3 WHERE 0 = 45 (MILES TO SHORELINE)

E = 3400 (45) 2 / 3 -- 43,070 TONS'YEAR

FOR N0X, VOC, TSP, S02: E = 33.3 (D)

E - 33.3 (45) = 1,499 TONS/YEAR

OFFSHORE: ALL OFFSHORE OPERATIONS FOR DEVELOPMENT AND PRODUCTION ARE EXEMPT FROM FURTHER AIR QUALITY ANALYSIS.

ONSHORE: NO NEW FACILITIES WILL BE CONSTRUCTED

(D) AIR EMISSIONS ARE CALCULATED USING THE DOCUMENTS REFERENCED IN FOOTNOTES 1 AND 2 AND THE FOLLOWING ASSUMPTIONS:

• DRILLING THE BLOCK 205 (225) WELL NO. 3 AT RATE OF 200 7DAY TO A TVD OF 11,400 FEET.

• PLATFORM INSTALLATION REQUIRES TWO 7000 HP TUGS OPERAT'NG AT 70X CAPACITY, TWO HELICOPTER LTO CYCLES/DAY, AND THE CRANE BARGE HAS FIVE 2700 HP ENGINES OPERATING AT 50% CAPACITY.

• DRILLING RIG EMISSIONS FOR TIEBACK AND COMPLETION OF WELLS AND DEVELOPMENT DRILLING ARE ESTIMATED TO BE THE SAME AS FOR DRILLING 200 FEET OF HOLE ON A DAILY BASIS.

• PRODUCTION EMISSIONS FOR BLOCK 206 ARE BASED ON THE BURNING OF 1 MMSCF/DAY OF NATURAL GAS FOR POWER GENERATION, ONE HELICOPTER LTO CYCLE/DAY, AND A 3500 HP SUPPLY VESSEL OPERATING 48 HOURS/WEEK AT 70* CAPACITY. PRODUCTION EMI SIONS FOR BLOCK 205 ARE BASED ON ONE HELICOPTER LTO CYCLE/DAY AND A 30 KW GENERATOR OPERAT IN6 AT EIGHT HOURS/DAY. ALL OTHER EMISSIONS ARE CON DERED NEGLIGIBLE.

6

ENVIRONMENTAL REPORT

SEE APPENDIX A - PUBLIC INFORMATION

CZM CONSISTENCY CERTIFICATION

EXHIBIT 10 - PUBLIC INFORMATION

LEASE STIPULATIONS

THE ONLY APPLICABLE LEASE STIPULATION IS NO. 1 CULT AL RESOURCE ASSESSMENT. IN A LETTER TO LESSEES DATED JULY 1, 1983, THE MINERALS MANAGEMENT SERVICE HAS DETERMINED THAT SOUTH TIMBALIER BLOCK 205 AND BLOCK 206 HOULD NOT LIKELY CONTAIN ANY SIGNIFICANT CULTURAL RESOURCES, THEREFORE THE PROVISIONS OF STIPULATION NO. 1 WOULD NOT BE APPLICABLE AND A CULTURAL RESOURCES REPORT WOULD NOT BE REQUIRED.

ESTIMATED LIFE OF RESERVES THE RESERVE LIFE OF THIS DEVELOPMENT IS EXPECTED TO BE APPROXIMATELY 10 YEARS.

DESCRIPTION OF PROPOSED PLATFORM

THE PLATFORM SET ON BLOCK 205 WILL BE AN UNMANNED BOTTOM FOUNDED FOUR PILE DESIGN TO BE SET NEXT TO THE EXISTING TEMPLATE. BLOCK 206 WILL HAVE A MANNED BOTTOM FOUNDED EIGHT PILE DESIGN PLATFORM SET OVER THE EXISTING TEMPLATE. NO NEW OR UNUSUAL TECHNOLOGIES WILL BE DESIGNED INTO EITHER PLATFORM. EXHIBITS 8 AND 9 ILLUSTRATE THE TYPICAL PLATFORM DESIGNS TO BE USED. EXHIBITS 8A ANO 9A DETAIL OUT THE KEY CHARACTERISTICS. EXHIBITS 8, 8A, 9, AND 9A ARE PUBLIC INFORMATION.

OCS-G 5612 205 OCS-G 5613 206

SURFACE LOCATION F

i -12750*

SURFACE LOCATION F

i SURFAv.£ LOCATION I 5000'

224 225

ACACt IN P U T

Wii

EXHIBIT 6 VICINITY MAP AND SURFACE LOCATION PUBLIC INFORMATION

PROPOSED MINERAL DEVELOPMENT

GULP OP MEXICO CO«PORA"»ON

EXHIBIT 8 PROPOSED PLATFORM "A" SOUTH TIMBALIER BLOCK 205 PUBLIC INFORMATION

RMERRDR HESS CORPORRTION ARGALI PROSPECT

SOUTH TMBAUER BLOCK 205 PLATFORM "A" DATA SHEET

GENERAL DATA PLATFORM TONNAGE SUMMARY

- FOUR PILE DESIGN

- PLATFORM TO BE SET NEXT TO EXISTING TEMPLATE

- UNGROUTED MAIN PILES ARE TO BE USED

- HEUDECK TO ACCOMMOOATE A BELL MODEL 214 ST HELICOPTER

- SACRIFICIAL ANOOES TO PROTECT THE JACKET FOR A 20 YEAR LIFE

- SPLASH ZONE TO RECEIVE "TIDEGUARD 171" COATING

- PLATFORM TO BE COATED WITH A ZINC, EPOXY, URETHANE SYSTEM

- BOAT LANDING TO USE BARGE BUMPERS FOR ATTACHMENT TO PLATFORM

-JACKET

- PILES - DECK - HELIDECK

PROOUCTION MODULE

500S.T. 500 S.T 81 S T 25 S T

FACILITIES STRUCTURAL 43 S.T

93 S T

- TOTAL 610 S T - WELL BAY AREA TO RECEIVE GRATING - PRODUCTION DECK TO BE DESIGNED FOR 350 PSF LOADING

- WELL BAY AREA TO BE DESIGNED FOR 350 PSF LOADING

- LIFTING EYES ARE TO BE LEFT ON JACKET AND DECK - MAINTENANCE ACCESS TO BE PROVIDED ON ENTIRE PLATFORM

- DECK IS TO BE LIFTED ONTO LOCATION

- JACKET IS TO BE LAUNCHED ONTO LOCATION - PLATFORM IS TO ACCOMMOOATE BOTH SLOT AND CANTILEVER RJGo

- PLATFORM IS TO BE AN UNMANNED FACILITY

- WATER DEPTH: 161 FEET

- 9 SLOT EXISTING TEMPLATE

- PILES: 36 INCH O.D. 2" WALL, 410 FEET LONG

- JACKET LEGS: 38 INCH I D., 1.00 WALL, 190 FEET LONG

- JACKET BASE DIMENSIONS: 80 FEET BY 70 FEET

- DECK COLUMN SPACING 30 FEET B v 50 FEET

- DECK COLUMNS: 36 INCH I D., 1.00 WALL

- PROOUCTION MODULE DIMENSIONS: 30 FEET BY 50 FEET EXHIBIT 8A

- HEUDECK DIMENSIONS: 49 FEET BY 49 FEET PLATFORM "A" DATA S H E E T

- PROOUCTION DECK HEIGHT: 54'-*" ABOVE M.LW. S O U T H TIMBALIER B L O C K 205

APPROXIMATE PLATFORM SIZES

EXHIBIT 9 PROPOSED PLATFORM "A" SOUTH TIMBALIER BLOCK 206 PUBLIC INFORMATION

RMERRDR HEBS CORPORRTION ARGALI PROSPECT

SOUTH TMBAUER BLOCK 206 PLATFORM "A" DATA SHEET

GENERAL DATA PLATFORM TONNAGE SUMMARY EIGHT PLE DESIGN PLATFORM TO BE SET OVER EXISTING TEMPLATE THREE PRODUCING WELLS. TA. MUD UNE HANGERS UNGROUTED MAIN PILES ARE TO BE USED : JELDECK TO ACCOMODATE A BELL MODEL 214 ST HELICOPTER SACRIFICIAL ANOOES TO PROTECT THE JACKET FOR A 20 YEAR LIFE SPLASH ZONE TO RECEIVE "TIDEGUARD 171" COATING PLATFORM TO BE COATED WITH A ZINC. EPOXY. URETHANE SYSTEM BOAT LANDING AND BARGE BUMPERS INSTALLED FOR WATER TRAFFIC WELL BAY AREA TO RECEIVE GRATING PROOUCTION DECK TO BE DESIGNED FOR 350 PSF LOADING WELL BAY AREA TO BE DESIGNED FOR 350 PSF LOADING LIFTING EYES ARE TO BE LEFT ON JACKET AND DECK MAINTENANCE ACCESS TO BE PROVIDED ON ENTIRE PLATFORM JACKET IS TO BE LAUNCHED DECKS ARE TO BE LIFTED INTO LOCA ON WITH ONE UFT PLATFORM IS TO ACCOMMOOATE A PLATFORM DRILLING RIG PLATFORM IS TO BE MANNED WITH 32 BEDS WATER DEPTH: 165 FEET 9 SLOT EXISTING TEMPLATE

- JACKET MAIN STEEL 1913 S.T. - BOAT LANDING AND BARGE BUMPERS 45 S.T. - P1UNG 1961 S T. - CONDUCTORS 320 S.T. - DECK. INCLUDING FACILITIES 2016 S.T. - OUARTERS. HELIDECK CRANE N/A

TOTAL 6.255 3 T.

PLATFORM SIZES - PILES: 4 INTERIOR RLES. 46 INCH OUTSIDE DIAMETER. 2.250 WALL, 596 FEET LONG

4 EXTERIOR PILES. 54 INCH OUTSIDE DIAMETER. 2.250 WALL. 604 FEET LONG - JACKET LEGS: 4 INTERIOR LEGS. 55 INCH OUTSIDE DIAMETER. 2.500 WALL. 187 FEET LONG

4 EXTERIOR LEGS. 61 INCH OUTSIDE DIAMETER. 2 500 WALL. 189 FEET LONG - JACKET BASE DIMENSIONS: 92 FEET BY 177 FEET - DECK COLUMN SPACING: 45 FEET BY 45 FEET - DECK COLUMNS: 48 MCH I D , 1.75 WALL - DRILLING DECK DIMENSIONS 70 FEET BY 160 FEET - DRILLING DECK HEIGHT: 93 -3" ABOVE M.L.W - PROOUCTION DECK DIMENSIONS: 86 FEET BY 170 FEET - PROOUCTION DECK HEIGHT: 66 -3" . A ROVE M.LW. - SUB-CELLAR DECK DIMENSIONS: 26 FEET BY 87 FEET - SUB-CELLAR DECK HEIGHT: 50'-0" ABOVE M.L.W. - HEUDECK DIMENSIONS: 38 FEET BY 52 FEET - HELIDECK HEIGHT: 145 -0" ABOVE M.LW.

EXHIBIT 9A PLATFORM "A" DATA SHEET SOUTH TIMBALIER BLOCK 206

COASTAL 7ONE MANAGEMENT

CONSISTENCY CERTIFICATION

DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT

TYPE OF PLAN

SOUTH TIMBALIER BLOCK 205 AND BLOCK 206 AREA AND BLOCKS

OCS-G 5612 AND OCS-G 5613

LEASE NUMBERS

THE PROPOSED ACTIVITIES DESCRIBED IN DETAIL IN THIS PLAN COMPLY WITH THE STATE OF LOUISIANA'S APPROVED COASTAL ZONE MANAGEMENT PROGRAM AND WILL BE CONDUCTED IN A MANNER CONSISTENT WITH SUCH PROGRAM.

AMERADA HESS CORPORATION LESSEE OR OPERATOR

CERTIFYING OFFICIAL

EXHIBIT 10 PUBLIC INFORMATION

DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT

INITIAL PLAN

GULF OF MEXICO: OFFSHORE LOUISIANA

SOUTH TIMBALIER AREA, BLOCK 205 AND BLOCK 206

LEASES OCS-G 5612 and OCS-G 5613

OPERATOR

AMERADA HESS CORPORATION

1201 LOUISIANA, SUITE 700

HOUSTON, TEXAS 77002-5681

CONTACT: S. J. ZRAKE (713) 951-5690

JULY 1988

PUBLIC INFORMATION

AMERAOA HESS CORPORATION DEVELOPMENT OPERATIONS AND COORDINATION DOCUMENT SOUTH TIMBALIER AREA, BLOCK 205 AND BLOCK 206

LEASES OCS-G 5612 AND OCS-G 5613

IN ACCORDANCE WITH 30 CFR 250.34 ET SFQ. AND NOTICE TO LESSEES AND OPERATORS NO. 84-01, AMERADA HESS CORPORATION HEREBY SUBMITS THE FOLLOWING INFORMATION FOR THE PLANNED DEVELOPMENT AND PRODUCTION.

A. DESCRIPTION

AMERADA HESS PROPOSES TO DEVELOP SOUTH TIMBALIER BLOCKS 205 AND 206 CONCURRENTLY. FIELD DEVELOPMENT WILL START WITH THE DRILLING OF WELL NO. 3 FROM THE EXISTING TEMPLATE ON BLOCK 205 ATTEMPTING TO PROVE UP ADDITIONAL RESERVES. DETAILED DESIGN, FABRICATION AND INSTALLATION OF PLATFORMS, PRODUCTION FACILITIES AND PIPELINES WOULD THEN BE COMPLETED AND PRODUCTION INITIATED.

THE PLATFORM FOR BLOCK 205 WILL BE A FOUR PILE, UNMANNED FACILITY SET NEXT TO THE EXISTING NINE SLOT TEMPLATE CAPABLE OF PRODUCING 50 MMCFD OF GAS. WELLS NO. 1, 2, AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION USING A CANTILEVER TYPE JACK UP DRILLING RIG.

THE BLOCK 206 PLATFORM WILL BE A 24 SLOT, 8 PILE MANNED STRUCTURE SET OVER THE EXISTING TEMPLATE CAPABLE OF PRODUCING 150 MMCFD. A PLATFORM DRILLING RIG WOULD THEN BE MOVED ONTO THE PLATFORM. WELLS NO. 1 AND 3 WILL BE TIED-BACK TO THE PLATFORM AND COMPLETED FOR PRODUCTION. WELL NO. 2 WILL BE SIDETRACKED, TIED-BACK TO THE PLATFORM ANT COMPLETED IN SANDS PREVIOUSLY LOGGED. SIX ADDITIONAL NEW WELLS WILL BE DRILLED TO OPTIMIZE RESERVOIR DEPLETION. SIMULTANEOUS DRILLING AND PRODUCTION WILL TAKE PLACE DURING THE TWO YEAR DEVELOPMENT DRILLING PROGRAM.

PRODUCT TRANSPORTATION WILL USE SUBSEA PIPELINES TO THE NEAREST SHORELINE SYSTEM TAKE POINT THAT RESULTS IN THE BEST OVERALL ECONOMICS. NO NEW NEARSHORE OR ONSHORE PIPELINES OR FACILITIES WILL BE CONSTRUCTED. THE SPECIFIC SYSTEM WILL BE DETERMINED DURING THE NEGOTIATION OF THE GAS MARKETING CONTRACT WHICH IS EXPECTED TO TAKE PLACE DURING THE FIRST HALF OF 1989.

B. SCHEDULE

THE ANTICIPATED SCHEDULE IS PRESENTED BELOW. THE TOTAL TIME TO COMPLETE THIS PROJECT IS ESTIMATED TO BE 21 MONTHS TO INITIAL PRODUCTION WITH AN ADDITIONAL 24 MONTHS TO COMPLETE THE DEVELOPMENT DRILLING PR06RAM.

PROPOSED DATES ACTIVITY START COMPLETE

DRILL 205/225 WELL NO . 3 AUG 1988 OCT 1988

DESIGN PRODUCTION FACILITIES JUL 1988 FEB 1989

SECURE GAS CONTRACT ONGOING DEC 1988

FABRICATE AND INSTALL FACILITIES FEB 1989 NOV 1989

TIEBACK AND COMPLETE NOV 1989 JAN 1990

COMMENCE PRODUCTION -BLOCKS 205 AND 206 uAN 1990 ONGOING

BLOCK 206 DEVELOPMENT DRILLING JAN 1990 JAN 1992

C. GEOLOGICAL, GEOPHYSICAL AND CULTURAL RESOURCE

1. SHALLOW HAZARD ANALYSIS

A SITE SPECIFIC SHALLOW HAZARD ANALYSIS WAS COMPLETED AND SUBMITTED AS PART OF THF PLAN OF EXPLORATION. THE WELLS PREVIOUSLY DRILLED AT THESE LOCATIONS VERIFY NO SHALLOW GAS HAZARDS EXIST. SOIL BORINGS WILL BE TAKEN AT THE PROPOSED DEVELOPMENT LOCATIONS TO PROPERLY DESIGN AND SIZE THE PRODUCTION PLATFORMS.

2. SITE SPECIFIC CULTURAL RESOURCE ASSESSMENT

NO IMPACT TO ANY HISTORICAL OR ARCHAEOLOGICAL CULTURAL RESOURCES IS EXPECTED FROM THIS DEVELOPMENT AS IT IS OUTSIDE THE AREA WHERE SIGNIFICANT CULTURAL RESOURCES WOULD BE FOUND. THE HIGH RESOLUTION GEOPHYSICAL SURVEY CONDUCTED ON BLOCKS 205 AND 206 INDICATED SEVERAL SMALL MAGNETIC ANOMALIES THAT PROBABLY REPRESENT FERROMAGNETIC DEBRIS.

3. STRUCTURE MAP OF SANDS AND WELL LOCATIONS

EXHIBITS 1, 2, 3 - CONFIDENTIAL

THE LOCATIONS OF THE EXISTING AND FUTURE DEVELOPMENT WELLS ARE AS FOLLOWS:

WELL # BHL* TVD TYPE

BLOCK 205 A-l CONFIDENTIAL CONFIDENTIAL EXISTING A-2 S/T " M EXISTING A-3 " " PLANNED

3

BLOCK 206 A-l CONFIDENTIAL CONFIDENTIAL EXISTING A-2 S/T " - PLANNED A-3 " H EXISTING A-4 " " PLANNED A-5 " " PLANNED A-6 • M PLANNED A-7 " » PLANNED A-8 " " PLANNED A-9 " " PLANNED

•SURFACE LOCATION IS AT RESPECTIVE PLATFORM LOCATION.

4. CROSS-SECTIONAL MAP

EXHIBITS 4 AND 5 - CONFIDENTIAL

5. SURFACE LOCATION

EXHIBIT 6 - PUBLIC INFORMATION

6. SPIDER MAP

EXHIBIT 7 - CONFIDENTIAL

D. LOCATION MAP

1. LOCATION MAP OF LEASE BLOCKS

EXHIBIT 6 - PUBLIC INFORMATION

2. LOCATION OF ONSHORE SUPPORT BASE FACILITY

FOURCHON, LOUISIANA IS THE ONSHORE SUPPORT BASE FACILITY. SEE EXHIBIT 6 - PUBLIC INFORMATION

3. WELL AND PLATFORM SURFACE LOCATION

EXHIBIT 7 - CONFIDENTIAL

E. OIL SPILL CONTINGENCV PLAN INFORMATION

1. CONTINGENCY PLAN REFERENCE

AMERADA HESS' GULF OF MEXICO OPERATIONS ARE COVERED BY THE APPROVED AMERADA HESS OIL SPILL CONTINGENCY PLAN. AS A MEMBER COMPANY, AMERADA HESS COULD CALL UPON CLEAN GULF ASSOCIATES FOR ASSISTANCE IN A MAJOR SPILL INCIDENT SHOULD IT BE NECESSARY.

2. EQUIPMENT BASE OF OPERATIONS AND DEPLOYMENT TIME

CLEAN GULF ASSOCIATES' CLEANUP EQUIPMENT WOULD BE DEPLOYED FROM GRAND ISLE, LOUISIANA WITH BACK-UP FROM HOUMA OR VENICE, LOUISIANA. RESPONSE TIME FROM GRAND ISLE TO THE DEVELOPMENT LOCATION WOULD BE

ABOUT 9-11 HOURS (INCLUDING RIG UP). THE BACK-UP LOCATIONS WOULD TAKE AN ADDITIONAL 2 TO 3 HOURS.

F. OTHER

1. WATER DEPTH

THE WATER DEPTH AT EACH DEVELOPMENT LOCATION IS AS FOLLOWS:

(A) BLOCK 205 - 161 FEET

(B) BLOCK 206 - 165 FEET

2. DESCRIPTION OF DRILLING RIG AND POLLUTION PREVENTION EQUIPMENT

A TYPICAL CANTILEVER JACK-UP TYPE RIG WILL BE USED TO COMPLETE THE WELLS ON BLOCK 205. THE BLOCK 206 PLATFORM WILL USE A PLATFORM DRILLING RIG. DECK DRAINAGE FROM BOTH PLATFORMS WILL FLOW INTO A SUMP BEFORE DISCHARGE INTO THE SEA. SANITARY AND PRODUCED WASTEWATER, DRILLING FLUID, AND DRILL CUTTINGS PROCESS AND TREATMENT SYSTEMS WILL BE OPERATED IN ACCORDANCE WITH APPLICABLE RULES AND REGULATIONS. SORBENT PADS WILL BE KEPT ON EACH PLATFORM TO WIPE UP SMALL DRIPS AND SPILLS OF PETROLEUM PRODUCTS AND DAILY VISUAL INSPECTIONS FOR ANY SOURCES OF POLLUTION WILL BE DONE.

3. AIR EMISSION CALCULATIONS 1"2'

AIR EMISSIONS PRESENTED ARE SUMMARIES CALCULATED ON AN ANNUAL BASIS FOLLOWING THE CHRONOLOGICAL STAGES OF DEVELOPMENT BY LEASE BLOCK AS NOTED IN SECTION B. SCHEDULE. THE LAST YEAR'S EMISSIONS LISTED FOR EACH BLOCK ARE REPRESENTATIVE OF REMAINING PRODUCTION YEARS.

(A) BLOCK 205 (TONS/YEAR)

CO VOL N0X SOo TSP

1988 2.3 .9 10.6 .7 .8

1989 NO FIELD OPERATIONS

1990 I8.0 6.6 80.7 5.4 5.8

1991 2.5 .3 2.0 .2 .2

( 1 ) "ATMOSPHERIC EMISSIONS FROM OFFSHORE OIL ANO GAS DEVELOPMENT AND PRODUCTION," EPA NO. 450/3-77-026, TABLE 4-3, JUNE 1977.

"COMPILATION OF AIR POLLUTANT EMISSION FACTORS," THIRD EDITION, EPA REPORT AP-42 TABLES 3.3.2-1 AND 3.3.3-1, AUGUST 1977.

(B) BLOCK 206 (TONS/YEAR)

CO VOC NOx SQ? TSP

1988 NO FIELD OPERATIONS

1989 NO FIELD OPERATIONS

1990 111.2 133.7 612.2 23.8 26.4

1991 131.0 274.2 850.8 15.7 18.5

1992 124.4 271.8 821.0 13.8 16.3

1993 116.0 268.7 783.1 11.2 13.6

(C) EMISSION EXEMPTION (E) CALCULATIONS

FOR CO: E = 3400 D2/3 WHERE D = 45 (MILES TO SHORELINE)

E = 3400 ( 4 5 ) 2 / 3 = 43,070 TONS/YEAR

FOR N0X, VOC, TSP, S02: E = 33.3 (D)

E = 33.3 (45) = 1,499 TONS/YEAR

ONSHORE: ALL OFFSHORE OPERATIONS FOR DEVELOPMENT AND PRODUCTION ARE EXEMPT FROM FURTHER AIR QUALITY ANALYSIS.

ONSHORE: NO NEW FACILITIES WILL BE CONSTRUCTED

(D) AIR EMISSIONS ARE CALCULATED USING THE DOCUMENTS REFERENCED IN FOOTNOTES 1 AND 2 AND THE FOLLOWING ASSUMPTIONS:

• DRILLING THE BLOCK 203 (225) WELL NO. 3 AT RATE OF 200'/DAY TO A TVD OF 11,400 FEET.

• PLATFORM INSTALLATION REQUIRES TWO 7000 HP TUGS OPERATING AT 701 CAPACITY, TWO HELICOPTER LTO CYCLES/DAY, AND THE CRANE BARGE HAS FIVE 2700 HP ENGINES OPERATING AT 501 CAPACITY.

• DRILLING RIG EMISSIONS FOR TIEBACK AND COMPLETION OF WELLS AND DEVELOPMENT DRILLING ARE ESTIMATED TO BE THE SAME AS FOR DRILLING 200 FEET OF HOLE ON A DAILY BASIS.

• PRODUCTION EM SIONS FOR BLOCK 206 ARE BASED ON THE BURNING OF 1 MMSCF/DAY OF NATURAL GAS FOR POWER GENERATION, ONE HELICOPTER LTO CYCLE/DAY, AND A 3500 HP SUPPLY VESSEL OPERATING 48 HOURS/L'EEK AT 701 CAPACITY. PRODUCTION EMISSIONS FOR BLOCK 205 ARE BASED ON ONE HELICOPTER LTO CYCLE/DAY AND A 30 KW GENERATOR OPERATING AT KIGHT HOURS/DAY. ALL OTHER EMISSIONS ARE CONSIDERED NEGLIGIBLE.

6

4. ENVIRONMENTAL REPORT

SEE APPENDIX A - PUBLIC INFORMATION

5. CZM CONSISTENCY CERTIFICATION

EXHIBIT 10 - PUBLIC INFORMATION

6. LEASE STIPULATIONS

THE ONLY APPLICABLE LEASE STIPULATION IS NO. 1 CULTURAL RESOURCE ASSESSMENT. IN A LETTER TO LESSEES DATED JULY 1, 1983, THE MINERALS MANAGEMENT SERVICE HAS DETERMINED THAT SOUTH TIMBALIER BLOCK 205 AND BLOCK 206 WOULD NOT LIKELY CONTAIN ANY SIGNIFICANT CULTURAL RESOURCES, THEREFORE THE PROVISIONS OF STIPULATION NO. 1 WOULD NOT BE APPLICABLE AND A CULTURAL RESOURCES REPORT WOULD NOT BE REQUIRED.

7. ESTIMATED LIFE OF RESERVES

THE RESERVE LIFE OF THIS DEVELOPMENT IS EXPECTED TO EE APPROXIMATELY 10 YEARS.

8. DESCRIPTION OF PROPOSED PLATFORM

THE PLATFORM SET ON BLOCK 205 WILL BE AN UNMANNED BOTTOM FOUNDED FOUR PILE DESIGN TO BE SET NEXT TO THE EXISTING TEMPLATE. BLOCK 206 WILL HAVE A MANNED BOTTOM FOUNDED EIGHT PILE DESIGN PLATFORM SET OVER THE EXISTING TEMPLATE. NO NEW OR UNUSUAL TECHNOLOGIES WILL BE DESIGNED INTO EITHER PLATFORM. EXHIBITS 8 AND 9 ILLUSTRATE THE TYPICAL PLATFORM DESIGNS TO BE USED. EXHIBITS 8A AND 9A DETAIL OUT THE KEY CHARACTERISTICS. EXHIBITS 8, 8A, 9, ANO 9A ARE PUBLIC INFORMATION.

7

\ M I S S j 4 1 4

LOUIS/ANA

OCS-G 5612 205

SURFACE LOCATION

i

OCS-G 5613 206

SURFACE LOCATION 5000

224 225

10.000

tXHIBIT 6 VICINITY MAP ANO SURFACE LOCATION PUBLIC INFORMATION

PROPOSED MINERAL DEVELOPMENT

OULF OP MEXICO