Regional Conference for SE Asia on Rainwater Harvesting in IWRM
Development of Steinmüller Engineering in the last three Years · Steinmüller Engineering...
Transcript of Development of Steinmüller Engineering in the last three Years · Steinmüller Engineering...
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Development of Steinmüller Engineeringin the last three Years
Speaker: Dr. Hans-Ulrich ThierbachManaging Director
Steinmüller Engineering Conference 2016
1
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Employment Record Dr. Hans-Ulrich Thierbach
2012 - present Steinmüller Engineering GmbH, Gummersbach, GermanyEngineering and Supplies for Power PlantsMember to Board of Directors
2004 - 2012 Steinmüller Engineering GmbH, Gummersbach, GermanyEngineering and Supplies for Power PlantsHead of Power Plant Technologies Department
2000 - 2003 Striko Westofen GmbH, Wiehl, GermanyProcess Engineering and Design of Industrial Furnacesfor FoundriesHead of Engineering Department
1999 - 2000 Babcock Borsig Power GmbH, Oberhausen, GermanyEngineering and Supplies for Power PlantsHead of R&D Department for Coal, Oil and Gas Firing Systems
1991 - 1999 L. & C. Steinmüller GmbH, Gummersbach, GermanyEngineering and Supplies for Power PlantsProcess and Design Engineer for Coal, Oil and Gas Firing Systems
1987 - 1991 University of Rostock, GermanyInstitute of Technical ThermodynamicsDoctor Thesis in Technical Thermodynamics, Research onDynamic Behaviour of Energy Systems
2
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Introduction, History & Steinmüller FY 2013
Steinmüller FY 2014 – Acquisition by IHI
Steinmüller FY 2015 / Short FY 2015/16
Summary and Outlook
Agenda - Development of SE in the last three Years
3
Steinmüller Engineering Conference 2016
General Information SE Former L. & C. Steinmüller…
4
Steinmüller Engineering Conference 2016
History – Steinmüller EngineeringBased on History of L. & C. Steinmüller as Boiler Supplier
1914
Largest employer inGummersbach, 1000employees. L&CSteinmüller GmbHregarded as leader inpipe/tube steamboiler factory, 1/3turnover abroad.
1872
L&C SteinmüllerGmbH was legallyfounded by Lebrechtand Carl Steinmüller
1997
L&C Steinmüller‘s mostsuccessful year in thehistory of the companywith 5,650 staff, salesof 1.74 billion and netincome before tax of79.2 million DeutscheMark
1995
Steam Boilerconstruction (BoilerHeight 160m; SteamTemp 580°C;Pressure 285 atm;Steam Quantity 2428t/h
2002
Babcock insolvent,consequently the fallof L&C SteinmüllerGmbH. Successorcompanies arose,including SteinmüllerEngineering GmbH in2003.
1999
Acquisition of L&CSteinmüller GmbH byDeutsche BabcockAG. Shorty therafterlarge job cuts from1,500 to 700 staff.
2003
1st Contract:Engineering Servicesfor Iskenderun, Turkey
20041st Bituminous coalSMV - LNB forAltbach CHP2
2005
1st Lignite RSM - LNBfor Jänschwalde PS
2009
60% shares ofSteinmüller EngineeringGmbH acquired bySiemens AG.
2012
Remaining 40% sharesof SteinmüllerEngineering GmbHacquired by Siemens AG.
2006 - 2014
§ Maritsa 3 – EPC Lignite Low-NOx-Firing Retrofit§ Paroseni - FGD retrofit§ Stanari – consultancy for a power
plant to be realised by thecustomer§ Albbruck - 1st EPC for Low-Nox-
Firing System retrofit§ Hemweg – 1st FGD revamp§ Chalampe first new heat
exchanger supplied
2014
100% shares ofSteinmüller EngineeringGmbH acquired by
IHI Corporation
1874
L&C SteinmüllerGmbH built the firststeam boiler.
1.5 meters high andmaximum steampressure of 3 atm
1967
Expansion ofproduction rangeincludingconstruction ofboilers. Exportsuccess in SouthAfrica (subsidiary inChamdor)
2003
Establishment of SteinmüllerEngineering GmbH in 2003.
First OwnerGreat Grandsonsof Carl SteinmüllerNot the legal successor ofL&C Steinmüller, but theSteinmüller name continued.
2006
SteinmüllerEngineering GmbH’sfirst contract withEskomReview activities forMedupi and Kusile
2014
1st LowNOX-Burnerretrofit with Eskom inCamden PS
General Information - Company History
1st SE-Conference20th April 2013
5
Steinmüller Engineering Conference 2016
Report about 1st SE-Conference – for the SE Control Board in 2013
57 Guests from Germany; Russia; Netherlands; UK ; Japan andSouth Africa
SE- Product Presentations• Steinmüller Engineering Process Engineering• Competence Steam Generation – Concepts and Supplies• Revamp and New Build of Firing Systems• Revamp and Retrofit of FGD Plants• SCR Retrofit for Power Plants• Local and International Project Execution• Consulting Activities
Feedback• impressive development of Steinmüller Engineering• respectable business opportunities for the future
Conclusion: Next SE-Conference in two or three years
6
Steinmüller Engineering Conference 2016
General Information – Location of Steinmüller Engineering
★Gummersbach
Location
★Lünen
SE - Head Office
2nd Steinmüller EngineeringConference 17th March 2016
…relyongoodexperiences.
7
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016 8
Product-Engineering and Supply
Bituminous coal
Lignite
Oil and gas
Waste gases and liquid
Fluidized bed boilers
Biomass power plants
Combustion Systems EnvironmentalTechnology
Flue gas cleaning for powergeneration and wasteincineration plants
- Particulate removal- DeNOx- Desulphurization- Removal of toxic
components and heavymetals
Thermal recycling of domestic-,industrial- and hazardous waste
Steam Generation
Fired Steam generator
Heat recovery
Process gas heat exchangers
Coal gasificationcomponents
Solar thermal plants
Consultingand Planning
Concept and feasibilitystudies
Tender preparation and bidevaluation
Design review andsupervision during projectrealization period
Owners Engineering
PlanningEngineering
Steinmüller Engineering GmbH – Fields of Competence
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
CFB-LicenceEskomSouth Africa
OE March 2013
ConsultingEFT – StanariBosnia Herzegovina
First new power plant with SE-Consulting contribution
Spotlights SE-FY 2013
Project „Clear Skies“Ø May - Siemens decided to sell the
Environmental Business (+SE)Ø July - electronic Data room availableØ Autumn - Management PresentationsØ December- First non binding Bid´s
Renaissance of the product lineIndustrial Heat exchanger
Rodia ChalampéEngineering supplyFrance
• Supply May 2013• PAC Aug. 2013
Grow How 1+2Engineering supplyGreat Britain
• Grow How 1(OE in Feb. 2013)
• Grow How 2(OE in Aug. 2013)
9
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Agenda - Development of SE in the last three Years
Introduction, History & Steinmüller FY 2013
Steinmüller FY 2015 / Short FY 2015/16
Summary and Outlook
Steinmüller FY 2014 – Acquisition by IHI
10
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
SE-Tray supply and installationMIBRAG – DeubenGermany
First EPC-Contract for FGD-Trayinstallation
Additionally 4 Trays have been designedand/or installed for different units
Spotlights SE-FY 2014Project „Clear Skies“Ø January - Management PresentationsØ February - binding Bid´s and IHI selected as
preferred bidderØ March- June Contract Negotiation IHI-SiemensØ 30. June IHI took over a 100% Share of SE
Advantages for SE and our Clientsby integration into IHI-Group
Ø Long term of cooperation between SE(LCS) – IHIØ Similar Products as a good basis for collaborationØ Additional Know How, Products and ServicesØ Increased capabilities for Own Product developmentØ Professional capacity supportØ Complementary Market Activities Dual Flow Tray Tower
De SOx Fleet Study – Eskom South Africa
Development of Concept and Basic Designs for differentreduction technologies with individual optimized Solutionfor each of the Eskom Power Stations to reduce SOxemissions
11
Steinmüller Engineering Conference 2016
Integration into IHI Corporation
12
Aioi Works
Yokohama Works
Aioi CastingWorkshop
Aichi Works
President andChief Executive Officer
Tamotsu Saito
President andChief Executive Officer
Tamotsu SaitoCorporate
Energy & Plant Operations
Nuclear Power Operations
Aero-Engine & Space Operations
Rotating Machinery Operations
Vehicular Turbocharger Operations
Machinery & Logistics SystemsOperations
Infrastructure Operations
Offshore Project &Steel Structures Operations
Urban Development Operations
Mizuho Works
Kure No.2 Works
SomaNo.1 Works
SomaNo. 2 Works
Global Marketing Headquarters
Sales Headquarters
Resources,Energy and
Environment
SocialInfrastructureand Offshore
Facilities
IndustrialSystems
And General-Purpose
Machinery
AeroEngines
and Space
IHI Europe Ltd.Managing Director:Mr. Kadooka
Steinmüller Engineering Conference 2016 13
Integration into IHI CorporationJanuary 2014 - First visit of Domoto –San
Director of Sector Energy & Plant Operations30th June 2014 - IHI acquires 100 % Shares of Steinmüller Engineering1st July 2014 - All Employees Meeting with IHI Presentation
participation of Domoto-sanAugust 2014 - First Visit of Hamamura-san
Board Director of IHIAugust 2014 - First common visit of SE MD´s at IHI in Tokio
Meeting with Saito-san - CEO of IHIOctober 2014 - First Control Board Meeting in Gummersbach
with Domoto-san and Kuomi-sanDecember 2014 - First visit of Saito-san in Gummersbach
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Steinmüller FY 2015 / Short FY 2015/16
Introduction, History & Steinmüller FY 2013
Agenda - Development of SE in the last three Years
Steinmüller FY 2014 – Acquisition by IHI
Summary and Outlook
14
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Camden LNB-Burner retrofitCooperation between Eskom and SESouth AfricaFirst SMV –Low NOx Burner installation withexcellent operation performance for a veryspecific customized solution
Spotlights from SE-FY 2015 & Short FY 2015/16SE Branch in South AfricaDate of registration: March 27th, 2015Start of operation: July 1st, 2015Directors: Tetsuya Iwasaki,
Dr. Hans-Ulrich ThierbachGeneral Manager: Hans Marquardt
LocationSouth Africa, JohannesburgBuilding 13 The Woodland, Woodlands drive,Woodmead Sandton 2196BusinessConsulting and engineering services for boilers,combustion equipment and air quality controlsystems for ESKOM and other companies inSouth Africa
15
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Acceleration of After Sales Services
• Monitoring PCK Schwedt• Maintenance for Herne 4• Support for Lünen• Operational Optimization grate firing
system Nestle Mainz• Spare part delivery Shell Wesseling
ConsultingKusile Erection acceleration EskomSouth Africa
1st Unit to be synchronized in 2016
Low Nox-Solution for Lignite
Maritza EAST 3, BulgariaTOC last Unit Dec. 20154th Unit – successful retrofit• Excellent technical Performance• Extremely challenging time schedules met
Kostolac BTE-KO / SerbiaTOC 23.12.2015
New contractsRovinariRomelectro /CEO OlteniaRumania / OE Sep. 2015
Aghios Dimitrios 3 & 4Ergotem / PPCGreece / OE 14.12.2015
Spotlights from SE-FY 2015 & Short FY 2015/16
First LNB Supply for Russia Contract signing planned for Mid of MarchPaper Mill ZBK Arkhangelsk – Boiler supply by ZiO Podolsk - LNB-Supply by SE
16
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Steinmüller FY 2015 / Short FY 2015/16
Agenda - Development of SE in the last three Years
Introduction, History & Steinmüller FY 2013
Steinmüller FY 2014 – Acquisition by IHI
Summary and Outlook
17
Steinmüller Engineering Conference 2016
Global Activities and Markets (Europe & Africa)
ESP-Projects- Govora # 7 (ROM)
LNB-Projects(bituminous)
- HKW II (GER)- Herne #4 (GER)- Astana (KAS)
SCR-Projects
- Shell unit 6 Eskom Activities (RSA)
- Hendrina LTE Studie- FGD Engineering- DeNOx Fleet Assessment- DeSOx Fleet-Assessment- LNB-Burner Engineering- Other Professional Services
LNB-Projects(Lignite)
- ME III (BLG)- Kostolac (SER)
CPC- Yara Trinidad
Consulting- PS Stanari
CFBMartech / Vietnam
FGD- Paroseni (ROM)
Concept StudyWaiGaoQiao, China
18
Steinmüller Engineering Conference 2016
Control Board
Board of Directors
Iwasaki , Dr. Thierbach
OperationsKriegeskotte
ProjectManagement
Field Services
Finance & Controlling
QA/QC
Consulting,Marketing & Proposals
Brandau
Consulting(Owners Engineering)
Marketing
Process Design FC
Mechanical Design FC
Process Design SG
Mechanical Design SG
Steam GenerationWill
*1
CommercialAdministrationHohnschopp
Proposals FC
Proposals SG
Proposals CS CFB-Systems
Process Design CS
Mechanical Design CS
Combustion SystemsDr. Thierbach
Flue Gas CleaningTrautner (01.04.16)
Coordination of general issues for Technology (*1)
HR
IT
Contract Management
Purchasing &Commercial
Project Management
Steinmüller Engineering Organization 2016
Special Responsibilities:ComplianceEHS (Environmental Protection, Health Management and Safety)ECC (Export Control and Customs)RIC (Risk and Internal Controls)
19
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Mid Term Plan for further Company Development
Ø Moderate continued GrowthØ Four equal Product AreasØ Expand After Sales Activities
OE Plan by contract type in FY 2016 - 2020
Capacity Forecast (FTE) outof the OE Planning
Mill EUR
FY
FY
20
Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016
Thank you for your attention
21