Developing the AMC/A6 CONOPS For CVC and CMDSproceedings.ndia.org/jsem2007/4057_Roux.pdf · 2019....

24
AMC Communications & Information AMC Communications & Information Developing the AMC/A6 CONOPS For CVC and CMDS Why a CMDS? Enabling Capabilities Operational View (OV-1) Concept of Operations (CONOPS) Greg Roux 23 May 2007 JSEM/Geospatial -- 4057

Transcript of Developing the AMC/A6 CONOPS For CVC and CMDSproceedings.ndia.org/jsem2007/4057_Roux.pdf · 2019....

  • AMC Communications & InformationAMC Communications & Information

    Developing the AMC/A6 CONOPSFor CVC and CMDS

    • Why a CMDS?• Enabling Capabilities• Operational View (OV-1)• Concept of Operations (CONOPS)

    Greg Roux

    23 May 2007

    JSEM/Geospatial -- 4057

  • AMC Communications & InformationAMC Communications & Information

    Communications InfrastructureMost Complex AF Mission Data Set (MDS)• Multidirectional, Multiple Media, High Granularity• Currently handled via Hardcopy “CSIR Process”• Microstation Drawing Records [KS,CD,MH,CV,BL]

    Communications MDS (CMDS)• Significant Achievement by 38th EIG/GF• Comprehensive, well-designed data model• Captures “Outside Plant” Path/Cable/Equipment• Geospatial Data consistent w CIP & other MDS’s• 38th EIG Planning for CSIR transition to CMDS

  • AMC Communications & InformationAMC Communications & Information

    Why CMDS Implementation?

    CS activities “escalating questions”• Where exactly are Comm assets located?• What are those Comm assets at each location?• What is theoretical capacity and how much used?

    Objective 1: Facilitate dig permits & minimize line cutsNeed: Accurate Comm-Path & “live” GeoBase CIP context

    Objective 2: Complete Comm Asset CharacterizationNeed: CSIR-type detail for Cables/Equipment but GeoSpatial

    Objective 3: Effective Planning [Base Blueprint & ER]Need: Query for Duct/Cable Capacity & Impacted SystemsNeed: CMDS links to TeleManagement Sys, Cable Records, etc.

  • AMC Communications & InformationAMC Communications & Information

    Transformation: Enabling Capability

    C4ISR Infrastructure Planning System (CIPS)• Managing Comm Planning & Investments

    Geospatial: CIPS Visualization Component (CVC)CVC v. 3.2.1 “Thick Client” since 2006• ArcGIS Extension [desktop] for CSIR conversion to CMDS• Replacement for CSIR sheets:

    • Manhole & Vault Diagrams [MH, VT] “Butterflies”• Cable Diagrams [CD] “Grid Section Sheets”

    • Capability: Outside Plant Cables/ContainersCVC Enterprise Version: “CIPS Spatial” [April 2007]• GOTS on Oracle Spatial, Workspace Manager• Allows viewing, editing, posting on remote server• Local Data Stewardship – Stored on CIPS central server(s)

  • AMC Communications & InformationAMC Communications & Information

    Results of CVC ImplementationCurrent Situation:CSIR Drawing Set• Paper-space section maps at

    fixed scale• Obsolete infrastructure

    backdrop, invariable• Electronic version-control at

    38th EIG• Latest data version is red-

    lined hardcopy at Base• Paper Maps copied &

    recopied for users• Query = “Read Annotation”

    New Business Process:CMDS Baseline Layers• Geo-referenced, seamless map

    layers (zoom & pan)• Overlays CIP, aerial imagery &

    other GeoBase MDS• Each installation is its own

    Data Steward• Latest data is electronic and

    updated in SCX/SCM• View and edit through Web

    browser map services• Ready for Flexible Query &

    Analysis through variety of software tools

    • Self-Service Print Capability

  • AMC Communications & InformationAMC Communications & Information

    CAD CMDS Transformation Plan*

    Desktop CVC 3.2.1

    *Courtesy of 38th EIG/GFEnterprise CIPS Spatial

  • AMC Communications & InformationAMC Communications & Information

    Status: AMC CMDS Project

    FY 05-06: Survey Comm-Path 12 AMC bases FY 05-06: CVC Pilot Implementation• Scott AFB, Dover AFB with CVC Desktop• Both currently accessible through CIPS Spatial

    FY 07: Current Implementation Activities• CONOPS Development• Create CVC-CMDS for additional AMC bases

    • McChord AFB, MacDill AFB: Near Complete (QC)• McGuire AFB, Travis AFB, Fairchild AFB: Initiated

    • Training & “Baton Pass” to CSAFMC: Hill AFB & Wright-Patterson AFB

  • AMC Communications & InformationAMC Communications & Information

    Drawing Records CIP

    Individual CSIR sections Mosaicked & GeoReferenced to

    Create “GeoCSIR” overlay on CIP

  • AMC Communications & InformationAMC Communications & Information

    Field Survey Features on CIP

    1. Points on CIP Datasets

    2. Comparison to GeoCSIR

    3. Toned lines added

    12

    3

  • AMC Communications & InformationAMC Communications & Information

    AMC Comm-Path Deliverables

  • AMC Communications & InformationAMC Communications & Information

  • AMC Communications & InformationAMC Communications & Information

  • AMC Communications & InformationAMC Communications & Information

  • AMC Communications & InformationAMC Communications & Information

  • AMC Communications & InformationAMC Communications & Information

    AMC GeoBase CMDS CONOPS

    AMC Operational CONOPS = Implementation Plan• 38th EIG responsible for CVC

    A6 requires CONOPS for• Further investments• Installation-level adoption• Clear roles & responsibilities

    Operational View (OV-1)

    CONOPS also critical for formalizing external Service

    Level Agreements…

  • AMC Communications & InformationAMC Communications & Information

  • AMC Communications & InformationAMC Communications & Information

  • AMC Communications & InformationAMC Communications & Information

    Three Step TransformationPHASE DESCRIPTION Office of Primary

    Responsibility (OPR)

    BASELINE BASELINE GCMDS CREATED:Initial conversion of legacy CSIR drawing sets to GCMDS

    HQ AMC/A6 Program Mgr

    INTERIM LOCAL DATA STEWARDSHIP:Base CS is trained & assumes O&M responsibilities for GCMDS utilizing CVC

    AMC Base CSO & SCX CSIR Manager

    FINAL CIPS SPATIAL DEPLOYED:CVC Enterprise Version establishedCMDS viewing & editing via Web Interface

    AMC Base CSO38th EIG/TS

  • AMC Communications & InformationAMC Communications & Information

    Roles Defined in CONOPS

    CSIR ManagerPlanners [SCX]Cable Shop [SCM]Network [SCB]O&M ContractorsInstallation GIOInstallation CESAMC/A6AMC/A7CISTEM-BSTEM-C

    Functional Lead = 38th EIG/GFRole of 38th EIG/PK Interface with CITS PMORole of NetCentsPBD 720 ImplicationsConfig Mgmt SurveysPreventive Maintenance InspectionsAFCA HAF/A6 & A7CIJoint Force Communications

  • AMC Communications & InformationAMC Communications & Information

    CommMission

    DataSet

    (CMDS)

    Installation CIP

    Comm Path

    CIP Data

    CIPS DatabaseCIPS Applications

    Target Architecture Data Flow

  • AMC Communications & InformationAMC Communications & Information

    Questions?

    Greg [email protected]

    (703) 582-8122

    mailto:[email protected]

  • AMC Communications & InformationAMC Communications & Information

    AMC Operational CONOPS

    Background• Provides AMC-specific and AF-wide context for the current

    CONOPS.Problem Statement• Specific challenges in a Communications Squadron business

    process that are addressed by the AMC GCMDS CONOPSObjectives• Drivers of process transformation resolving the stated problems.

    Desired Effects• Narrative describing the benefits of new mission capabilities that

    will result from AMC GCMDS CONOPS implementation.Employment Concept• Description of the “Critical and Enabling Capabilities” provided by

    the implementation of CVC and the GCMDS at AMC installations.

  • AMC Communications & InformationAMC Communications & Information

    Sequenced Actions• Narrative description of how the GCMDS CONOPS unfolds

    in a sequence of major activities.CONOPS Operational Roles & Responsibilities• Describes the principal roles and responsibilities under the

    GCMDS CONOPS at an AMC installation.Command Relationships• Identifies the major dependencies upon external and

    internal organizations that may affect the sequenced activities outlined by the CONOPS.

    End State & Time Horizon• Identifies the milestones, timeframes, and capability metrics

    that characterize a completed implementation of the CONOPS.

  • AMC Communications & InformationAMC Communications & Information

    Current CSIR* Process

    WORKCENTER ANNOTATED DRAWINGS SUBMITTED TO THE

    BASE CSIR MANAGER.

    CSIR MANAGER ENSURES UPDATED DATA IS FORMATTED CORRECTLY AND

    INTERIM RECORD MAINTAINED.

    ANNOTATED DRAWINGS RECEIVEDDATA FORMAT CHECKED.WORK ORDER LOGGED IN.

    BASE NOTIFIED OF RECEIPT.

    UPDATE PERFORMED.

    DATA RETURNEDFOR REFORMATTING

    DATA RETURNED TO BASEIF FORMAT IS INCORRECT.

    COMPLETED WORKCHECKED.

    DATA RETURNED FORCORRECTIONS.

    CHECKS COMPLETED WORK.DESTROYS INTERIM RECORDS.

    FILES COPIES, AND SENDSCOPY TO THE WORKCENTER

    WORKCENTER USES UPDATED DRAWING TO MAINTAIN EQUIPMENT

    DRAWINGS INDEXED,REPRODUCED,

    & DISTRIBUTED.

    Base CSIR Manager Plans Flight

    Base WorkcentersMission Systems / Info Sys

    Base WorkcentersMission Systems / Info Sys

    Drafting Contractor

    38th EIG EDSC

    Current 8 Month TAT

    1 Week

    38th EIG EDSCReproduction3 Days2 Days

    AFI 21-404 Developing & Maintaining CSIRs [Drawing Records]

    Base CSIR Manager Plans Flight

    Planning & Implementation FlightMission Systems Flight [Outside Plant]Information Systems Flight [Inside Plant]

    *Communications & Information Systems Installation Records

    Developing the AMC/A6 CONOPS�For CVC and CMDSCommunications InfrastructureWhy CMDS Implementation?Transformation: Enabling CapabilityResults of CVC ImplementationCAD CMDS Transformation Plan*Status: AMC CMDS ProjectDrawing Records CIPField Survey Features on CIPAMC GeoBase CMDS CONOPSThree Step TransformationRoles Defined in CONOPSQuestions?AMC Operational CONOPSCurrent CSIR* Process