Developing BankableProjects in ASEAN
Bangkok May 2018
INSTITUTIONAL
ENABLERS
The Infrastructure Investment Situation in ASEAN
Goals (2030)Impact (2021)OutcomeOutput
required todeliverresults
A need to work with the Demand and
Supply sides to facilitate project
developers and local government build new sustainable
productive infrastructure
Outcome
Developing Pipelines: Sourcing and Linking of Projects
Goals (2030)Impact (2021) 3
MPAC 2025GMS RIF
2022Nat Plans
ASEAN connectivity sustainable infrastructureand seamless logistics investments
Policy and Plans
INSTITUTIONAL
ENABLERS
Developing and Financing Pipelines: UNCDF Solutions
Goals (2030)Impact (2021)OutcomeOutput
required todeliverresults
Outcome
UNCDF De Risking Instruments
Goals (2030)Impact (2021) 5
reducing the high Up Front Costs for projects
15% to 20%total project value
facilitating Partnerships for projects (SPVs)
PPPs
BoT
Operate & Maintain
structuring Project Finance reducing interest
leveraging Capital for projects
1 to 20ODA / Capital
Blending
Credit Guarantees
Equity
Project ExampleICD Myawaddy
Outcome
ICD Project – Myawaddy Mae Sot UNCDF Methodology
Goals (2030)Impact (2021) 7
Outcome
ICD Project – Myawaddy Mae Sot PIM
Goals (2030)Impact (2021) 8
Project Information Memorandum
Detailed Technical StudyTraffic / logistics Trade flow projectionsLegal – legislation base
Financial Modelling (Industry Std)CAPEXRoIFinancing Structure (options)
Outcome
ICD Project – Myawaddy Mae Sot Project Flow Key Stages
Goals (2030)Impact (2021) 9
Project Information MemorandumDeveloped (Financial and Technical)
BoT Discussions / AgreementsMoPF / MoT (Myanmar Gov.)
Investor SearchCurrently discussing
Fund Raising EventsBangkok and Yangon
Outcome
ICD Project – Myawaddy Mae Sot PPP Spectrum
Goals (2030)Impact (2021) 10
Private Sector Owns and Operates Assets
- Utility- Restructuring- Corporatization- Decentralization
- Civil Works- Service
Contracts
Managementand Operating Contracts
Leases/ Affermages
- Concessions
- BOTs
- DBOs
Joint Venture/ Partial Divestiture of Public Assets
Full Divestiture of Public Assets
Public Owns and Operates Assets Public Private Partnerships (PPP)
Low High
• A brownfield project with existing facilities, infrastructure and equipment would typically fall under the concession model
• While a greenfield project where the infrastructure and facilities would have to be developed and built and equipment purchased, would qualify as a BOT
Outcome
ICD Project – Myawaddy Mae Sot PPP Type (suggested)
Goals (2030)Impact (2021) 11
ICD Operator
BOT Company:
• Land• Environmental & Social• Civil Works• Construction• Equipment & Fleet
Public Authority
ICD Operator
BOT Company:
• Civil Works• Construction• Equipment & Fleet
Public Authority:
• Land• Environmental & Social
ICD Operator
BOT Company:
• Construction• Equipment & Fleet
Public Authority:
• Land• Environmental & Social• Civil Works
Viability Gap Funding
Concession Agreement
O&M contract
Various BOT structures may be employed depending on the level of investments
from the developer