Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) &...

16
Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group Meeting 11 th March, 2011

Transcript of Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) &...

Page 1: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

Developing a cap and floor regime for the GB-Belgium Interconnector:

NEMO

Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem)

10th FUI Stakeholder Group Meeting11th March, 2011

Page 2: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

2

Contents

• State of play in GB and Belgium:– The challenge– Current regulatory background– Drivers for change

• Project NEMO– GB-Belgium interconnector– Details and status of development– Coordinated approach from GB & Belgium

• Developing an alternative model for regulation– High level principles– Cap and floor, outline– Implications for GB and Belgium

• Next Steps for Ofgem and CREG

210th FUI Stakeholder Group Meeting, 11/03/2011

Page 3: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

3310th FUI Stakeholder Group Meeting, 11/03/2011

GB: Context for the challenge

Nordpool

Central West Europe

Single Electricity Market

Existing

Construction

Proposed

2.5 GW4 GW>10 GW

Page 4: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

4

• “Light touch” regulation• Separate Interconnector licence• Merchant interconnection• Business case = congestion rents• All upside and downside borne by investors• Apply for exemption from EU legislation

410th FUI Stakeholder Group Meeting, 11/03/2011

GB: Current regulatory regime (for interconnectors only)

Page 5: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

5

• Regulatory “risk” of exemptions (BritNed case)– Need for risk sharing between consumers and investors

• Exemptions the exception not the rule– European model, national TSOs deliver interconnector

investment

• Merchant-exempt route not possible for several project partners– Need for a common / coordinated approach to regulation of

shared assets?

• Potential for commercially viable interconnection– But pure merchant financing of projects less viable …

510th FUI Stakeholder Group Meeting, 11/03/2011

GB: Drivers for change

Page 6: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

6

Existing

Proposed

610th FUI Stakeholder Group Meeting, 11/03/2011

Belgium: Context for the challenge

Page 7: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

7

• Interconnections are integrated in the (national) transmission system

• No separate interconnector licence• Fully regulated regime• Interconnection included in the Regulated Asset Base

– Remuneration of the investment based neither on the level of revenues received from auctioning its capacity nor on the level of costs related to it

– The yearly fair margin available for the TSO’s shareholders is guaranteed and based upon the RAB

• Congestion recycled in order to decrease tariffs

710th FUI Stakeholder Group Meeting, 11/03/2011

Belgium: Current regulatory regime(for national TSO, including interconnection)

Page 8: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

8

• Different risk profile of DC, subsea cables– Scale of investment– Complexity and risk of project

• National TSO (Elia) requesting enhanced rate of return to reflect risks

• In addition, project identified as bringing benefits for the security of supply, economic welfare and competition

• Alternative regulatory approach envisaged to fill the regulatory gap BE-GB

810th FUI Stakeholder Group Meeting, 11/03/2011

Belgium: Drivers for change

Page 9: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

9

• Regulatory challenges:– Significant differences between current GB and Belgian

regimes– With current national regimes, risk of asymmetric

interests for investors involved in the shared interconnector project

• Issues converge with “Project NEMO”– GB – Belgium interconnector– Press release from National Grid & Elia, Feb 2008

• More on NEMO …• And on solving the regulatory challenges …

910th FUI Stakeholder Group Meeting, 11/03/2011

GB-Belgium interconnector:Project NEMO

Page 10: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

101010th FUI Stakeholder Group Meeting, 11/03/2011

GB-Belgium interconnector:Project NEMO

• 1 GW HVDC connection• Isle of Grain to Zeebrugge

• Marine– Sub sea survey– MMO contact– Consents and permits (GB and Be

Marine organisations)– Contact w. fisherman

• Onshore work– Consents & permits (Planning,

environmental surveys, etc)– Early preparation of landing site

(GB)

Page 11: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

11

1. Developers should be exposed to the market's valuation of interconnector capacity,

2. Consumers should be protected from the cost implications of excessive returns or market power that might accrue to interconnector owners,

3. Developers should be exposed to levels of investment risk that are commensurate with the level of regulatory intervention to mitigate excessive revenues and market power,

4. Regulatory treatment of developers should be coordinated between Regulatory Authorities at either end of the shared asset,

and• (For GB and future IC developments) Treatment of potential

interconnector developers should be impartial and unbiased between TSOs and non-TSO developers

1110th FUI Stakeholder Group Meeting, 11/03/2011

High level principles for the new regime

Page 12: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

12

• Recoup profits within bounds of pre-set revenue cap and floor

• Returns over cap – paid back to consumers

• Returns fall below floor – triggers payment from consumers

• Allows revenue regulation, protects consumers from market power

• Maintains element of market valuation of interconnection

• Moves closer to regulated regime favoured by Third Package

• Can provide tailored incentives on top of regulated regime

1210th FUI Stakeholder Group Meeting, 11/03/2011

What is a cap and floor ...

Page 13: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

13

• What activates the cap and floor?– Profit or similar (e.g. revenue, IRR)

• How often is it assessed?– > 1year, <lifetime of project– Cumulative perspective?– When is the cap paid back (or floor paid out)?

• When is the cap/floor set?– Ex-ante, on forecast costs …

• How long does the cap/floor persist?– Lifetime of investment? Lifetime of interconnector?– Should it be reassessed at any point?

• Additional requirements/obligations: – standards for operational efficiency and IC availability – requirements for capacity allocation (e.g. price coupling)

1310th FUI Stakeholder Group Meeting, 11/03/2011

Design of the cap and floor

Page 14: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

14

• The drivers for change in regulation of new interconnector investment

• The high level principles behind the regime and rationale for option(s) considered

• Design of the cap and floor - setting out the different parameters for the regime (e.g. what is the cap/floor levied on? How often is it assessed etc.)

• Indicative levels for the cap and floor (not specific to NEMO)• Additional requirements/obligations on the

developer/operator• List of requirements for application to NRAs for a cap and floor

(relevant for GB)

1410th FUI Stakeholder Group Meeting, 11/03/2011

Plans for joint consultation

Page 15: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

15

• Consultation – Launch: end of April / May 2011– Conclusions: Q3 2011

• Work on integrating the cap and floor into the GB and Belgian regimes (ongoing):– GB (Licence amendments, integration into price control

etc.)– Belgium (Necessary changes in current legal framework,

transposition of Third Package still ongoing …)• Continue discussions with other NRAs (GB)• Links with other projects: North Seas Countries Offshore

Grid Initiative, energy infrastructure package etc.

1510th FUI Stakeholder Group Meeting, 11/03/2011

Process & Next steps

Page 16: Developing a cap and floor regime for the GB-Belgium Interconnector: NEMO Pascal Boucquey (CREG) & Charlotte Ramsay (Ofgem) 10 th FUI Stakeholder Group.

Thank you for your attention!