Developed by: Faculty of Engineering Universiti Putra Malaysia Marketed by: UPMHoldings Sdn. Bhd....
-
Upload
barnard-watkins -
Category
Documents
-
view
217 -
download
2
Transcript of Developed by: Faculty of Engineering Universiti Putra Malaysia Marketed by: UPMHoldings Sdn. Bhd....
Developed by:
Faculty of EngineeringUniversiti Putra Malaysia
Marketed by:
UPMHoldings Sdn. Bhd.
MyOBEMyOBEOutcome Based Education Management SystemOutcome Based Education Management System
Patent Pending - PI 2010003169Copyrights SD
WHAT IS OBE? What do you want the
students to have or able to do? – programme / course outcomes
How can you best help the students achieve it? – Teaching / Learning Strategy
How will you know that they have achieved it? – Appropriate Assessment
How do you close the loop? - CQI
The
Proc
ess
The SystemMyOBE is a web-based OBE Management System MyOBE is designed to be generic for the use of
administrators and lecturers in order to manage: Teaching and learning process Course Outcome assessment Programme Outcome assessment Mapping between course outcomes with programme
outcomes Reports for harmonization and Continual Quality
Improvement Programme Objective assessment and evaluation
MyOBE license is based on subscriptions
Process Module
Lecturer’s Profile
Administrator’s(Head of
Programme) Page
Teaching Assignment and its status
Define your OWN Programme Outcomes
Define Your Programme/ Curriculum Structures
Enter Courses to be offered
Lecturers’ Module: Enter Teaching Plan
Lecturers’ Module: Assign Course Outcomes with Programme Outcomes
Lecturers’ Module: Enter all course assessment marks
Generated Course Assessment Summary
Head of Programme: View Programme Assessment
Histogram – Total Assessed PO
Summary of cohort and programme outcomes attainment
Trend Analysis for each Cohort
Trend Analysis for each Course
Programme Outcome Attainment for EACH student – based on cohort
Programme Outcomes Attainment Per StudentProgramme Outcome Attainment for EACH student
Programme Outcome Attainment for EACH student
Histogram Programme Outcomes Attainment Per Student
List of Students who ATTAINED or
FAILED to ATTAIN PO
for each programme
List of Students
who ATTAINED
or FAILED to ATTAIN PO
for each course
Web-based Exit Survey
Real Time Results for Stakeholder’s Survey – Attainment of PO and PEO
Web-based Alumni Survey
Real Time Results for
Stakeholder’s Survey –
Attainment of PO and PEO
Summary:
Real Time Results for
Stakeholder’s Survey –
Attainment of PO and PEO
Web-based Employer Survey
AdvantagesReduce costReduce timeMinimise paperworkEasy customisation – Generic system for ALLUser-friendly Lecturers only do Teaching Plan and enter Assessment
MarksReal-time monitoring of attainment of outcomes Facilitates accreditation exercisesAutomated report generation (see sample reports)Trend analyses (trend of student, cohort, course and
program )Easy access anytime and anywhere
Other Sidekicks:Rubrics for Assessment of various outcomes, including MOHE’s KISurvey instruments
Interested?Subscriptions:
Per year Per user Per programme
Contact:UPM Holdings Sdn. Bhd.First Floor, Banquet Hall,Universiti Putra Malaysia,
43400 UPM Serdang, Selangor.Tel: 0389471160Fax: 0389417408
Att: Assoc Prof Dr Mohd Kamil Yusof
Email: [email protected]
Developed by:Faculty of EngineeringUniversiti Putra Malaysia
Marketed by:
UPMHoldings Sdn. Bhd.
MyOBEMyOBEOutcome Based Education Management SystemOutcome Based Education Management System
Patent Pending - PI 2010003169Copyrights SD
Thank youPartly funded by MOHE for pilot implementation