Detector Development for Terascale Physics: Working group summary See agenda + slides at: + 1.
-
Upload
grace-mills -
Category
Documents
-
view
220 -
download
1
Transcript of Detector Development for Terascale Physics: Working group summary See agenda + slides at: + 1.
Detector Development for Detector Development for Terascale PhysicsTerascale Physics::
Working group summaryWorking group summary
See agenda + slides at:See agenda + slides at: https://indico.triumf.ca/conferenceDisplay.py?confId=618https://indico.triumf.ca/conferenceDisplay.py?confId=618
+ 1 August plenary talks from Lyn Evans and Chris + 1 August plenary talks from Lyn Evans and Chris AdolphsenAdolphsen
Opportunities for Innovation and Research Opportunities for Innovation and Research
TRIUMF Town Meeting TRIUMF Town Meeting
1-3 August 20071-3 August 2007
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
2
https://https://indico.triumf.ca/conferenceDisplay.py?confIdindico.triumf.ca/conferenceDisplay.py?confId=618=618
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
3
The Higgs: can’t live without itThe Higgs: can’t live without it A Higgs (or Higgs-like) particle is required in the SMA Higgs (or Higgs-like) particle is required in the SM Not just a mathematical trick, but effects measurable Not just a mathematical trick, but effects measurable
processesprocesses Eg:Eg:
LEP EWWG, hep-ex/0312023LEP EWWG, hep-ex/0312023
ee++ee-- W W++WW--
Contribution which grows Contribution which grows like mlike mee
22s cancels between s cancels between Higgs diagram and othersHiggs diagram and others
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
4
Constraints on Higgs boson Constraints on Higgs boson HH00SMSM
EW Fits: MH free Param.Data from LEP, SLD, Tevatron
MH (summer 2006)MH (summer 2006) 2 2 minimum:minimum:
85 GeV 85 GeV Direct Search LEP:Direct Search LEP:
> 114 GeV @ 95% C.L.> 114 GeV @ 95% C.L. Precision EW + LEP direct Precision EW + LEP direct
search limitsearch limit < 199 GeV @ 95% C.L.< 199 GeV @ 95% C.L.
Complete the SM:Complete the SM:FindFind HH00
SMSM??Beyond the SM @ 1TeVBeyond the SM @ 1TeV
New symmetries, New symmetries, compositeness , ...compositeness , ... Strongly motivated to Strongly motivated to avoid MH fine-tuning avoid MH fine-tuning
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
5
Next projectsNext projects Requirements for light Higgs-like scalar very strongRequirements for light Higgs-like scalar very strong
Can only be discovered and studied with direct productionCan only be discovered and studied with direct production
Indications for ~ TeV scale new physics compelling, but Indications for ~ TeV scale new physics compelling, but nature of new physics unknownnature of new physics unknown There is no substitute for pushing direct energy reach into the TeV regimeThere is no substitute for pushing direct energy reach into the TeV regime
Can see this clearly by Can see this clearly by generalgeneral constraints on new physics models constraints on new physics models which are dominated by high-energy collider resultswhich are dominated by high-energy collider results
Many more physics areas as wellMany more physics areas as well Top Mass/BR, W/Z physics, Gauge couplings, QCD, heavy flavour physics, Top Mass/BR, W/Z physics, Gauge couplings, QCD, heavy flavour physics,
meson spectroscopy / exotics, tau physics, …meson spectroscopy / exotics, tau physics, …
Two colliders of relevance to next TRIUMF 5YPTwo colliders of relevance to next TRIUMF 5YP LHC: Large Hadron (p-p) Collider at CERNLHC: Large Hadron (p-p) Collider at CERN
ATLAS detector: major ongoing Canadian effortsATLAS detector: major ongoing Canadian efforts Major upgrades needed after ~ 3 years of full rate data-takingMajor upgrades needed after ~ 3 years of full rate data-taking
ILC: International Linear (eILC: International Linear (e++ee--) Collider ) Collider
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
6
Terascale Detector WGTerascale Detector WG Discussed overall SLHC (ATLAS upgrade) and ILC Discussed overall SLHC (ATLAS upgrade) and ILC
detector plansdetector plans Overviews by Dean Karlen and Nigel Hessey (ATLAS upgrade Overviews by Dean Karlen and Nigel Hessey (ATLAS upgrade
coordinator)coordinator) Emphasis on Canadian (potential) contributionsEmphasis on Canadian (potential) contributions
Reviewed detector mechanical design needs, Reviewed detector mechanical design needs, assessed commonalitiesassessed commonalities
Reviewed detector electronics design needs, Reviewed detector electronics design needs, assessed commonalitiesassessed commonalities
Did not discuss, eg, renewal of electronics group Did not discuss, eg, renewal of electronics group basic infrastructure, computing hardware basic infrastructure, computing hardware renewal, accelerator contributions in detailrenewal, accelerator contributions in detail But this is still essential to our program and needs 5YP inclusion!But this is still essential to our program and needs 5YP inclusion!
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
7
Cdn ATLAS Upgrade ProjectsCdn ATLAS Upgrade Projects
Forward Calorimetry at high ratesForward Calorimetry at high rates Significant potential problems with (largely Cdn built) ATLAS Significant potential problems with (largely Cdn built) ATLAS
calorimeters at SLHCcalorimeters at SLHC Boiling liquid argon? Ion mobility at high rates? …Boiling liquid argon? Ion mobility at high rates? …
Possible solution:Possible solution: New high rate calorimeter “shielding” LAr FCALNew high rate calorimeter “shielding” LAr FCAL
Hadronic Endcap (HEC) electronicsHadronic Endcap (HEC) electronics Cdn-built detector may have pre-amp radiation failureCdn-built detector may have pre-amp radiation failure R&D on new technologies now, ready for replacementR&D on new technologies now, ready for replacement
TrackingTracking Complete ATLAS tracker replacement needed after ~ 3 years Complete ATLAS tracker replacement needed after ~ 3 years
of high rate data takingof high rate data taking Strong Canadian leadership in diamond pixel detectorsStrong Canadian leadership in diamond pixel detectors Strong Canadian interest in tracking front-end readoutStrong Canadian interest in tracking front-end readout
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
8
Cdn ILC Detector ProjectsCdn ILC Detector Projects Time Projection ChamberTime Projection Chamber
Strong Cdn leadership for ILC TPC, synergies with T2KStrong Cdn leadership for ILC TPC, synergies with T2K Endplate sections with readout (GEM/MicroMegas)Endplate sections with readout (GEM/MicroMegas) Calibration system, gas systemCalibration system, gas system Overall system integration engineeringOverall system integration engineering Readout electronicsReadout electronics DAQDAQ
Hadronic calorimetryHadronic calorimetry Fine grain Scintillator + SiPM readoutFine grain Scintillator + SiPM readout Allows particle ID, matching to tracking detectors with overlap Allows particle ID, matching to tracking detectors with overlap
suppressionsuppression Best resolution from full energy-flow techniquesBest resolution from full energy-flow techniques
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
9
Detector Mechanical Needs, 2010-2015Detector Mechanical Needs, 2010-2015SystemSystem Engineering Engineering
(FTE/year)(FTE/year)Technician Technician (FTE/year)(FTE/year)
DescriptionDescription
SLHCSLHC PixelsPixels 11 11 Detector support …Detector support …
SLHCSLHC Warm caloWarm calo 0.5 (or)0.5 (or) 0.50.5 Overall engineering, Overall engineering, cooling …cooling …
Cold caloCold calo 11 0.50.5
ILCILC TPCTPC 0.60.6 0.60.6 Gas systemGas system
1.51.5 1.51.5 Endplate + readout panelEndplate + readout panel
0.50.5 00 Overall design integrationOverall design integration
0.50.5 11 CalibrationCalibration
ILCILC HCALHCAL 00 0.50.5 Scintillator prototypingScintillator prototyping
ILCILC Si trackerSi tracker 0.50.5 00 Mechanical designMechanical design
SupportSupport 00 0.50.5 calibrationcalibration
TOTALTOTAL 5.65.6 5.65.6
+ 8.4 FTE/year designers+ 8.4 FTE/year designers
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
10
Electronics Needs, 2010-2015Electronics Needs, 2010-2015SystemSystem Engineering Engineering
(FTE/year)(FTE/year)Technician Technician (FTE/year)(FTE/year)
DescriptionDescription
SLHCSLHC Inner Det FEInner Det FE 0.50.5 0.50.5 Custom ASICsCustom ASICs
SLHCSLHC ID back endID back end 0.50.5 0.250.25 FPGA, digital boardsFPGA, digital boards
SLHCSLHC Calo ASICCalo ASIC 0.50.5 0.50.5 Custom ASICsCustom ASICs
ILCILC FE readoutFE readout 0.50.5 0.50.5 Custom ASICsCustom ASICs
0.50.5 00 DAQDAQ
ILCILC SiPMSiPM 0.50.5 0.50.5 Custom ASICsCustom ASICs
0.50.5 00 PCBPCB
TOTALTOTAL ASICASIC 2.02.0 0.50.5
Layout etc.Layout etc. 1.51.5 2.252.25
~ +100 k$ equipment (probe station, faraday cage for low noise tests, …)~ +100 k$ equipment (probe station, faraday cage for low noise tests, …)
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
11
Outline of whitepaper (how long??)Outline of whitepaper (how long??) 1. Physics of the Terascale - Rob1. Physics of the Terascale - Rob
The big questions in physics and how The big questions in physics and how they are answered by TeV scale they are answered by TeV scale colliderscolliders
draw from and refer to many recent draw from and refer to many recent documents on the subjectdocuments on the subject
indicate synergies between hadron indicate synergies between hadron and electron experimentsand electron experiments
2. Experiments at the Terascale 2. Experiments at the Terascale 2.1 Accelerators2.1 Accelerators
2.1.1 LHC - Chris + Rob - brief 2.1.1 LHC - Chris + Rob - brief overview overview
2.1.2 sLHC - Chris + Rob2.1.2 sLHC - Chris + Rob parameters, timescalesparameters, timescales
2.1.3 ILC - Dean2.1.3 ILC - Dean parameters, design, parameters, design,
timescalestimescales 2.2 Detectors2.2 Detectors
2.2.1 ATLAS - Colin + Gerald2.2.1 ATLAS - Colin + Gerald brief overviewbrief overview
2.2.2 ATLAS upgrades for sLHC - Colin + 2.2.2 ATLAS upgrades for sLHC - Colin + GeraldGerald
main challenges, current conceptsmain challenges, current concepts 2.2.3 ILC - Dean, Madhu, Mauricio2.2.3 ILC - Dean, Madhu, Mauricio
main challenges, current concepts main challenges, current concepts
3. Canada at the Terascale3. Canada at the Terascale refer to NSERC LRP – Williamrefer to NSERC LRP – William
past and future contributions from past and future contributions from Canada:Canada:
3.1 LHC,sLHC3.1 LHC,sLHC 3.1.1 accelerator Chris + Rob3.1.1 accelerator Chris + Rob 3.1.2 detector - Colin + Gerald + 3.1.2 detector - Colin + Gerald +
William William 3.2 ILC3.2 ILC
3.2.1 accelerator - Dean + Nigel3.2.1 accelerator - Dean + Nigel 3.2.2 detector - Dean, Madhu, 3.2.2 detector - Dean, Madhu,
MauricioMauricio 4. Roles for TRIUMF infrastructure4. Roles for TRIUMF infrastructure
explain how TRIUMF and explain how TRIUMF and NSERC/Universities work together – NSERC/Universities work together – WilliamWilliam
4.1 Detector development - Chris + Dean 4.1 Detector development - Chris + Dean + Alain+ Alain
detector design, simulation, engineering, detector design, simulation, engineering, constructionconstruction
list a set of projects, indicate list a set of projects, indicate commonalities, indicate TRIUMF FTEs commonalities, indicate TRIUMF FTEs required for the work, indicate any new required for the work, indicate any new infrastructure requiredinfrastructure required
4.2 Electronics development - Colin + 4.2 Electronics development - Colin + Leonid Leonid - as above - as above
3 August 2007 McPherson --Terascale Detector Development TRIUMF Town Meeting
12
Other notesOther notes Assume all production people from NSERC Assume all production people from NSERC
Here: just TRIUMF infrastructure for design, developmentHere: just TRIUMF infrastructure for design, development
Did not discuss, eg, renewal of electronics group basic Did not discuss, eg, renewal of electronics group basic infrastructure, computing hardware renewal, accelerator infrastructure, computing hardware renewal, accelerator contributions (contributions ( plenary) in detail plenary) in detail But this is still essential to our program and needs 5YP inclusion!But this is still essential to our program and needs 5YP inclusion!
Recommend review of other infrastructure (eg, clean Recommend review of other infrastructure (eg, clean rooms) considering detector development needsrooms) considering detector development needs
Also clarify mechanisms for allocation of personnel / time, Also clarify mechanisms for allocation of personnel / time, especially for outside usersespecially for outside users
Also discussed central role of TRIUMF in Geant4 supportAlso discussed central role of TRIUMF in Geant4 support With ~ 3 FTE in this area, could be world leading contributorWith ~ 3 FTE in this area, could be world leading contributor Short term, with ~ 1.75 FTE, leader in ILC/SLHC simulation detector designShort term, with ~ 1.75 FTE, leader in ILC/SLHC simulation detector design
White-paper draft by end of AugustWhite-paper draft by end of August