Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

82
Detailing Considerations for Multi2Story Wood Frame Buildings Presented by: Lisa Podesto, PE, MS Senior Technical Director

Transcript of Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Page 1: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Detailing)Considerations)

for)Multi2Story)Wood)

Frame)Buildings)

Presented(by:(Lisa(Podesto,(PE,(MS(Senior(Technical(Director(

Page 2: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

“The(Wood(Products(Council”(is(a(Registered(Provider(with(The(American(Institute(of(Architects(Continuing(Education(Systems((AIA/CES),(Provider(#G516.((!Credit(s)(earned(on(completion(of(this(course(will(be(reported(to(AIA(CES(for(AIA(members.(Certificates(of(Completion(for(both(AIA(members(and(nonQAIA(members(are(available(upon(request.(((

This(course(is(registered(with(AIA(CES(for(continuing(professional(education.(As(such,(it(does(not(include(content(that(may(be(deemed(or(construed(to(be(an(approval(or(endorsement(by(the(AIA(of(any(material(of(construction(or(any(method(or(manner(of(handling,(using,(distributing,(or(dealing(in(any(material(or(product.(___________________________________________

Questions(related(to(specific(materials,(methods,(and(services(will(be(addressed(at(the(conclusion(of(this(presentation.((

(

Page 3: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Course)Description)

This(seminar(will(provide(an(overview(of(detailing(issues(related(to(the(design(of(fourQ(and(fiveQstory(woodQframe(buildings(under(the(International*Building*Code.((Provided(by(an(expert(in(wood(design(and(engineering,(it(will(cover(common(detailing(choices(related(to(fire(and(life(safety,(such(as(detailing(at(exterior(walls,(as(well(as(balconies(and(shafts.(Examples(of(various(building(configurations(and(site(layouts(will(be(used(to(illustrate(common(detailing(choices.(

Page 4: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Learning)Objectives)

1.  Evaluate(examples(of(midQrise(buildings(with(an(emphasis(on(configurations(and(site(layouts(

(2.  Recognize(common(detailing(used(in(multiQstory(structures(

across(the(country(for(exterior(wall(to(floor(intersections(

3.  Identify(IBC(requirements(for(fire(walls(and(their(impact(on(detailing(choices.(

(

4.  Discuss(detailing(options(related(to(the(design(of(balconies(and(shafts(in(multiQstory(wood(buildings(

Page 5: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(•  Fire(Rated(Wall(Assemblies(

Page 6: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Mid2Rise)Construction)Overview)

Page 7: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Walk2up/)Tuck)Under)

Benefits:(

•  Eliminates(need(for(SQ2(parking(garage(

•  Can(be(all(wood(

•  Least(expensive(overall(but(lowest(densification(rates(

(

(

First(floor(walk(up(units(with(private(garage(

Page 8: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Wrap2Around))

Benefits:(

•  enhanced(security((

•  Centralized(access(to(parking(

•  Visual(appeal(from(street(

•  More(expensive(than(walk/up(tuckQunder(

•  5(story(yields(60Q80(units/acre((

(

(

(

(

Walk(up(units(surround(parking(structure(

(

(

Page 9: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Podium)

Benefits:(•  Increased(number(

of(stories(•  Accommodates(

MixedQuse(occupancies(

•  Most(expensive(but(can(allow(increased(density(

(((

Multiple(stories(of(wood(over(an(elevated(concrete(deck(

(

(

Page 10: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Podium)

4(stories(of(residential(over(podium((parking(or(retail)((

•  60Q80(units/acre(

(

(

Inman(Park(Condos,(Atlanta,(GA(Davis(&(Church(

Page 11: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Podium)

5(stories(over(subterranean(parking(

5(stories(over(retail(

•  100Q120(units/acre(

(

(

(

AvalonBay(Stadium,(Anaheim,(CA(VanDorpe(Chou(Associates(

Inman(Park(Condos,(Atlanta,(GA(Davis(&(Church(

Page 12: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Podium)

5(stories(over(residential(podium(

•  120Q140(units/acre(

(

(

(

Page 13: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Podium)

5(stories(with(mezzanine(+(residential(podium(

•  125Q145(units/acre(

(

(

(

120(Union,(San(Diego,(CA(Togawa(Smith(Martin(

Page 14: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Sloped)Sites)

Seattle,(WA(PB(Architects(

Fashion(Valley,(CA(AvalonBay(Communities((

Fashion(Valley,(CA(AvalonBay(Communities((

Page 15: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Hotels((RQ1)(

Apartments((RQ2)(

Condominiums((RQ2)(

Student(housing((RQ2)(

Live/work(units((RQ2)(

Assisted(living((RQ4)(

Nursing(homes((IQ2)(

Typical)Mid2rise)Occupancy)

(AQ2)(Restaurants/cafeterias(

(AQ3)(Workout(facilities(

(AQ3)(Meeting(rooms((

(B()Offices((

(M)(Shops((

(SQ2)(Parking((

(SQ1)(Storage(

(B()Offices((

Page 16: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Mixed)Use)Occupancy)

Located(at(woodworks.org(–(design(tools(–(online(calculators(–(Heights(and(Areas(Calculator(

Page 17: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

2012)Code)Conforming)Wood)

Available(for(Free(Download:(www.awc.org((((

(

(

Page 18: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(

•  Structural((Load(Transfer/Serviceability)(•  Acoustic(•  Building(Envelope((•  Constructability(•  Fire(

•  Fire(Rated(Wall(Assemblies(

Page 19: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Structural((•  Direct(bearing/(no(add’l(

hardware(Constructability(•  Framing(can(be(completed(

before(drywall(and(insulation(are(installed(

•  Common(length(studs(

Platform)Framing)

Page 20: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

No(Scale(

Structural((•  Additional(hardware/no(direct(

bearing(•  Can(help(minimize(building(

shrinkage(Rated(Assemblies(•  May(accommodate(continuity(

in(exterior(walls(in(Type(III(construction(

Constructability(•  Custom(length(studs(

Semi2balloon)Framing)

Page 21: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Structural)Considerations)

(

(

Page 22: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Solution)12)Plain)Unreinforced)Brick2h>30’)

Allows(for(vertical((shrinkage(of(wood((framing(

Veneer(must(be(designed((per(ACI(530(section(2.2(as((plain(unreinforced(masonry(

Anchors/ties(to(be((spaced(a(maximum((of(32”(o.c.(horiz.(And((18”(o.c.(vert.((except((seismic)(

Requires(steel((lintel(at(openings(

Joints(must(allow(for(all(differential((movement((lateral(drift(and((vertical(shrinkage(of(wood(Framing(Etc.).(Weight(of(brick(must(not((be(supported(by(wood(Framing((

Wood(backer(studs(

Brick(goes(into((flexure(when(wall((studs(deflect(

Design)must)be)in)

strict)conformance)

with)ACI)530)section)

6.2.12Alt.)design)

method)(engineered))

)

Design)to)section)2.2)

(ASD))or)3.2.2)

(strength))

Unreinforced)masonry)

)

Brick)veneer)must)be)

self)supporting)and)

not)supported)off)of)

the)wood)framing)

Page 23: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Solution)22)Structural)Reinforced)Brick)

Brick)units)are)similar)to)

CMU’s)where)vertical)and)

horizontal)reinforcing)can)

be)installed)

•  Veneer)spans)floor)to)

floor)without)transferring)

loads)to)walls.)

•  Loads)are)dumped)

directly)into)floor)

diaphragms))

•  Steel)lintels)over)

openings)are)not)required)

•  Intermediate)anchors/ties)

are)not)required)

•  Wall)spans)vert.)&)horiz.)

Between)spaced)anchors)

)

Reinf.(horizontal(bond((beam(or(lintel(units((over(openings(

Spaced(anchors(must(allow((for(all(differential(movement(((lateral(drift,(vertical(shrinkage((of(wood(Framing,(etc.).(Weight((of(brick(must(not(be(supported((by(wood(Framing((

Wood(backer(studs(

Reinforcement((reduces(expansion(and(cracking(

Anchors/ties(are((tied(directly(into((floor(diaphragms(

Veneer(acts(as(complete((unit,(not(as(individual((Segments.(Supports(self((weight(plus(outQofQplane((loads(

#3(or(#4(rebar((typ.)(

Heavier(anchors(are((not(as(prone(to(fire((damage(

4”)nom.)or)greater)

Page 24: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(

•  Structural((Load(Transfer/Serviceability)(•  Acoustic(•  Building(Envelope((•  Constructability(•  Fire(

•  Fire(Rated(Wall(Assemblies(

Page 25: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Acoustic)Detailing)

Page 26: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Acoustic)Detailing)

Page 27: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Acoustic)Detailing)

Page 28: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(

•  Structural((Load(Transfer/Serviceability)(•  Acoustic(•  Building(Envelope((•  Constructability(•  Fire(

•  Fire(Rated(Wall(Assemblies(

Page 29: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

http://www.fpinnovations.ca/ResearchProgram/AdvancedBuildingSystem/designingQenergyQefficientQbuildingQenclosures.pdf(

Buildings(in(Marine(to(Cold(Climate(Zones(in(North(America(

Resources

Page 30: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Buildings)in)Marine)to)Cold)Climate)Zones)in)North)America)

)

Chapter)3:)Moisture,)Air)and)Thermal)Control)

•  Building(as(a(System(•  Climate(Zones(•  Interior(Climate,(HVAC(Interaction(•  Critical(Barrier(Concept(•  Control(of(Rainwater(Penetration(•  Control(of(Air(Flow(•  Controlling(Condensation(•  Construction(Moisture(•  Controlling(Heat(Flow(and(Insulation(•  Whole(Building(Energy(Efficiency(•  Computer(Simulation(Considerations(for(WoodQframed(Enclosures(

Resources

Page 31: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(

•  Structural((Load(Transfer/Serviceability)(•  Acoustic(•  Building(Envelope((•  Constructability(•  Fire(

•  Fire(Rated(Wall(Assemblies(

Page 32: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Case)Study:)University)of)Washington)

UW)West)Campus)Student)Housing)

Location:(Seattle,(WA(

1700(beds(in(3(halls(and(2(apt(bldgs(

$177/sf(

4/5(bldgs(met(2030(challenge((60%(reduction(in(energy(consumption)(

Architect:(Mahlum(Architects(

Engineer:(Coughlin(Porter(Lundeen(

Contractor:(Walsh(Construction(

Page 33: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Case)Study:)Innovations)in)Wood)

Architect:(Cooper(Carry,(The(Preston(Partnership(

Engineer:(Ellinwood(+(Machado,(Pruitt(Eberly(Stone(

Contractor:(FortuneQJohnson(Contracting(

Completed:(2012(

Photo(credit:(Gables(Residential(

Emory)Point)

Location:(Atlanta,(GA(

3(buildings(complete(Q(Luxury(Apt.,(retail,(restaurants(

•  (1)(5(story(Type(III(wood(frame(over(slab(on(grade(

•  (2)(4(stories(of(wood(over(1(story(concrete(podium(

35%(savings((

•  $14/sf((wood(concept)((

•  $22/sf((PT(conc.(Slab(and(frame)(

(

(

(

(

(

Page 34: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Stella)Apartments,)

Marina)Del)Ray,)CA)

Architect:(Design(ARC.((Los(Angeles,(CA(Photos:(Lawrence(Anderson,(www.lawrenceanderson.net(

Page 35: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Case)Study:)Maximizing)View)and)Value)With)Wood)

Architect:(PB(Architects(

Engineer:(Yu(&(Trochalakis(

Contractor:(Norcon,(NW(

Completed:(2009(

Photo(Credit:(Matt(Todd(Photography(

Marselle)Condominiums)

Location:(Seattle(WA(

Type(IIIA(condo(complex(

5(Q1/2(stories(of(wood(over(2(stories(of(concrete(

mezzanine(added($250K(cost(but($1M(in(value(

30%(cost(savings(over(concrete(

Time(savings(over(steel(

Page 36: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(

•  Structural((Load(Transfer/Serviceability)(•  Acoustic(•  Building(Envelope((•  Constructability(•  Fire(

•  Fire(Rated(Wall(Assemblies(

Page 37: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Detailing for Fire Resistance

Different areas of fire design:C b tibilit• Combustibility

• Fireresistance• FireClass• FireClass• FireProtection

Key Differences in Fire Ratings for Construction Types

IIIA IIIB VAExterior wall framing FRT FRT non-FRTExterior wall fire rating 2 hr 2 hr 1 hrFloor assembly fire rating 1 hr 0 hr 1 hrFloor assembly fire rating 1 hr 0 hr 1 hrFire wall rating 3 hr 3 hr 2 hr

Page 38: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire Resistance Rating

Basic assumption is that fires begin at the interior andrated wall assemblies are not required from the exteriorrated wall assemblies are not required from the exteriorunless close to another structure.

Interior

FireProtection onInside ofInside ofBuilding

Exterior

Page 39: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire Resistance Rating IBCTable 601

Page 40: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire Resistance Rating – IBCTable 602Exterior Fire Resistance Rating

Table 601Table 602 establishes requirementsTable 602 establishes requirementsstructures separated by 10’ 30’ they are typically 0 or 1 hour rated

TABLE 602

FIRE SEPARATIONDISTANCE = X (feet)

TYPE OFCONSTRUCTION

OCCUPANCY GROUPH

OCCUPANCY GROUP F1, M, S 1

OCCUPANCY GROUP A, B,

E, F 2, I, R, S 2, Ub

X < 5c All 3 2 1

FIRE RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCEa, e

5 < X <10 IA 3 2 1Others 2 1 1

10 < X < 30 IA, IB 2 1 1d

IIB, VB 1 0 0

Others 1 1 1d

X > 30 All 0 0 0For SI: 1 foot = 304.8 mm.a. Load bearing exterior walls shall also comply with the fire resistance rating requirements of Table 601.b For special requirements for Group U occupancies see Section 406 1 2

e. The fire resistance rating of an exterior wall is determined based upon the fire separation distance of the exterior wall and the story in which thewall is located.

b. For special requirements for Group U occupancies see Section 406.1.2c. See Section 705.1.1 for party walls.d. Open parking garages complying with Section 406 shall not be required to have a fire resistance rating.

Page 41: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire Resistance Rating – IBC 705.5

ExteriorWallsFire Separation > 10’ – shall be rated for exposure fromp pthe inside in accordance with 601 and 602Fire Separation < 10’ – shall be rated for exposure to bothsides in accordance with 601 and 602

X ’Interior

X < 10’

tLine

ExteriorLot

Fire Protection onExteriorWalls When < 30’

Table 601 & 602

Page 42: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Choosing)Fire)Rated)Assemblies)

Tested(assemblies((ASTM(E119)(per(IBC703.2:(•  UL:(http://database.ul.com(((•  Gypsum(Catalog:(www.gypsum.org((•  Other(tools:(www.usgdesignstudio.com(•  AWC(DCA3(•  APA(Fire(Rated(Systems:(

http://www.apacad.org/cad_detail.cfm?id=2((

Alternate(Methods(per(IBC703.3(•  Deemed(to(comply(tables(per(IBC721(•  Calculated(Fire(Resistance(per(IBC722(

Page 43: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(•  Fire(Rated(Wall(Assemblies(

•  Overview(•  Exterior(Walls(•  Fire(Walls(•  Fire(Barriers(•  Fire(Partitions(•  Balconies(

Page 44: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire2resistance)Rated)Wall)Assemblies)

Tested(under(a(standardized(test(fire(exposure(for(a(given(duration(to:((

1.  Prevent(the(passage(of(flame(and(temperature(rise(from(one(side(to(the(other(

2.  Continue(to(provide(vertical(structural(support(when(exposed(to(fire(and(elevated(temperatures((

Page 45: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire2resistance)Rated)Wall)Assemblies)

))))))Fire)Confinement ) ))))Structural)Performance)

Page 46: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire2resistance)Rated)Wall)Assemblies)

There(are(five(basic(types(of(fireQresistance(rated(wall(assemblies:(

•  Light(Frame(Bearing(Walls((IBC(704.4.1)(

•  Exterior(Walls((IBC(705)(

•  Fire(Wall(or(Party(Wall((IBC(706)(

•  Fire(Barrier((IBC(707)(

•  Fire(Partition((IBC(708)(

Page 47: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Light)Frame)Bearing)Walls)(IBC)704.4.1))

Required(fireQresistance(is(the(greater(of:(•  FireQresistance(rating(found(in(Table(601(based(on(the(

building(type(of(construction.((•  The(required(fireQresistance(rating(required(for(fireQ

resistanceQrated(assemblies(supported(by(the(structural(wall.((

www.awc.org(FAQ:((What*is*the*correct*application*of*2012*IBC*Sections*704.2*(Column*Protection)*and*704.3*(Protection*of*the*primary*structural*frame*other*than*columns)*to*wood*construction?*

Page 48: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(•  Fire(Rated(Wall(Assemblies(

•  Overview(•  Exterior(Walls(•  Fire(Walls(•  Fire(Barriers(•  Fire(Partitions(•  Balconies(

Page 49: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Exterior)Walls)(IBC)705))

Exterior(walls(have(to(be(rated(to(which(ever(is(greater(of….((•  Table(601:(The(fireQresistance(rating(required(to(

maintain(vertical(structural(support(and(is(based(on((•  the(type(of(construction((•  whether(or(not(the(wall(is(load(bearing(

•  Table(602:(The(fireQresistance(rating(required(to(prevent(spread(of(fire(from(the(inside(to(the(outside((or(outside(to(inside)(and(is(based(on((•  type(of(construction((•  occupancy(group(•  fire(separation(distance((FSD)(associated(with(the(

exposure(of(the(exterior(wall(

Page 50: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Exterior)Walls)(IBC)705))

An)exterior)wall)is)defined)as)a)wall)that)is)used)as)

an)enclosing)wall)of)a)building)other)than)a)fire)

wall.)There)is)no)requirement)for)an)exterior)wall)to)

extend)to)the)foundation)in)a)stepped)building.))

(

(

(

(

Posts,(beams(or(walls,(that(support(a(rated(exterior(wall(must(be(fire(–resistance(rated(not(less(than(the(rating(of(the(supported(wall((IBC((704.1()(

Page 51: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)Resistance)Rating)–)IBC)705.5))

Exterior)Walls)

Fire(Separation(>(10’(–((shall(be(rated(for(exposure(from(the(inside(in(accordance(with(601(and(602(Fire(Separation(<(10’(–(shall(be(rated(for(exposure(to(both(sides(in(accordance(with(601(and(602((

Interior)

Exterior(

Fire(Protection(on(Exterior(Walls((When(<(30’(

(X(<(10’(

Lot(L

ine(

Table(601(&(602(

Page 52: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

2"HOUR EXTERIOR WALL

FRAMING AT 16" O.C.. MIN. 2 X 4

1 LAYER 5/8" FIBERGLASS MAT GYPSUM SHEATHING

STRUCTURAL WOOD PANEL(S)

WHERE REQUIRED FOR SHEAR

2"HOUR RATING PER UL DESIGN NO. U371

EXTERIOR CEMENT PLASTER, MIN. THICKNESS

3/4" TO FACE OF LATH

MIN. 3" THICK MINERAL

WOOL BATT INSULATION

2 LAYERS 5/8" TYPE 'X' GYPSUM

BOARD AT INTERIOR CONDITIONS

EXTERIOR CEMENT PLASTER OVER FIBERGLASS MAT GYPSUM

SHEATHING AT EXTERIOR CONDITIONS

2)HR)Exterior)Wall)Assembly)–)Type)III)

Common(issues(with(tested(assemblies:(

•  Assembly(AsymmetryQ(separate(assemblies(for(each(side(

(

(

Page 53: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Adding)lateral)resistance)

Common(issues(with(tested(assemblies:(

•  Inclusion(of(wood(structural(panel(–(ESR2586(

•  FRT(may(also(be(substituted(for(untreated(wood(

(

(

Page 54: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

1hr)rated)floor)assemblies)–)Type)IIIA/VA)

Common(issues(with(UL(approved(assemblies:(

•  Shallow(Floor(depthQ((

•  Use(prescriptive(assemblies(Q(IBC(

721.1(2)(assembly(

14Q1.1((

•  Or(use(the(CAM(

method(in(IBC(722((

Page 55: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

No(Scale(

•  5/8”(Type(X(GWB(•  1(layer(for(1hr(rating(•  2(layers(for(2hr(rating(

•  Fire(Retardant(Treated(• Wall(studs,(plates(and(sheathing(((

• Untreated(Lumber(•  Floor(framing((solid(sawn(or(engineered)(

•  Floor(sheathing(((

Type)III)Construction)

1(

Page 56: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

No(Scale(

•  5/8”(Type(X(GWB(•  1(layer(for(1hr(rating(•  2(layers(for(2hr(rating(

•  Fire(Retardant(Treated(• Wall(studs,(plates(and(sheathing(((

• Untreated(Lumber(•  Floor(framing((solid(sawn(or(engineered)(

•  Floor(sheathing(((

Continuity)of)FRT)

2(

Page 57: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

No(Scale(

•  5/8”(Type(X(GWB(•  1(layer(for(1hr(rating(•  2(layers(for(2hr(rating(

•  Fire(Retardant(Treated(• Wall(tuds,(plates(and(sheathing(•  [2x(Blocking((counts(for(1hr(fire(protection(per(NDS(16.2.1)](

•  [Floor(sheathing(4’Q8’(in](((

• Untreated(Lumber(•  Floor(framing((solid(sawn(or(engineered)(

•  Floor(sheathing(((

Type)III)Construction)Detail)Example)

3(

Page 58: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

No(Scale(

•  5/8”(Type(X(GWB(•  1(layer(for(1hr(rating(•  2(layers(for(2hr(rating(

•  Fire(Retardant(Treated(•  Studs,(plates(and(sheathing(•  2x(Blocking((counts(for(1hr(fire(protection(per(NDS(16.2.1)(

•  [Floor(sheathing(4’Q8’(in](((

• Untreated(Lumber(•  Floor(framing((solid(sawn(or(engineered)(

•  Floor(sheathing(((

Type)III)Construction)Detail)Example)

4(

Page 59: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

CONTINUE(GYPSUM(TO(BOTTOM(OF(SHEATHING(

•  5/8”(Type(X(GWB(•  1(layer(for(1hr(rating(•  2(layers(for(2hr(rating(

•  Fire(Retardant(Treated(•  Studs,(plates(and(sheathing(•  [Floor(sheathing(4’Q8’(in](((

• Untreated(Lumber(•  Floor(framing((solid(sawn(or(engineered)(

•  Floor(sheathing(((

Type)III)Construction)Detail)Example)

5(

Page 60: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

AvalonBay)Stadium)

Location:(Anaheim,(CA(

251(Apts.,(13K(sf(retail/restaurant(

Type(III(modified(

50%(of(their(projects(are(podium(

SemiQballoon(framed(at(exterior(walls(

(

(

Case)Study:)Wood)Buildings)Aim)High)

Architect:(Withee(Malcolm(Architects(

Engineer:(VanDorpe(Chou(Associates(

Developer/Contractor:(AvalonBay(Communities(

Photo(credit:(Arden(Photography(

Page 61: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Carbon)Case)Study:)High)Density)Ava

lonB

ay(Stadium

Q(Ana

heim

,(CA(

Page 62: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Type)III)Construction)Detail)Example)

What)is)being)enforced)in)jurisdictions)

you)are)working)in?)

)

)

Page 63: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(•  Fire(Rated(Wall(Assemblies(

•  Overview(•  Exterior(Walls(•  Fire(Walls(•  Fire(Barriers(•  Fire(Partitions(•  Balconies(

Page 64: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)wall))))))))))))))))

(IBC)706))

• Divides(structure(into(separate(buildings(

• Continuous(from(foundation((or(top(of(three(hour(podium)(to(or(through(roof(

• Structural(stability(required((to(allow(collapse(on(either(side(from(fire(without(causing(collapse(of(fire(wall(

• Special(requirements(at(roof(and(intersection(with(exterior(walls(,(at(horizontal(projecting(elements(and((between(stepped(buildings(

• Required(to(be(of(nonQcombustible(construction((except(in(type(V(construction(

• 2(to(4(hour(rated((Table(706.4)(

Fire)Barrier))))))))))

(IBC)707))

• Designed(to(restrict(the(spread(of(fire(with(continuity(through(the(building(

• Divides(structure(into(fire(areas,(and(fire(barriers(are(required(for(various(purposes(such(as(shaft(enclosures,(exit(enclosures,(atrium(separation,(occupancy(separations,(and(control((or(incidental(use(areas.(

• Supported(by(construction(of(equal(fire(resistanceQrating((except(for(incidental(use(areas(in(type(IIB,(IIIB(and(VB(construction)(

• 1(to(4(hour(rated((table(707.3.10)(

Fire)Partition))))

(IBC)708))

• Separates(dwelling(units,(sleeping(areas,(corridors,(and(tenant(spaces.(

• May(terminate(at(the(lower(side(of(a(fire(–resistance(rated(floor/ceiling/roof(assembly(

• In(most(instances(fire(partitions(are(not(required(to(be(supported(by(fire(resistanceQrated(construction(in(type(IIB,(IIIB(and(VB(construction((section(708.4)((

• Rated(1(hour(or(less((IBC(section(708.3)(

Page 65: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)Walls)2)706)

Used:(

•  To(create(separate(buildings(

•  As(a(Party(Wall((lot(line)(

Structural(Stability(

•  Allow(for(structural(collapse(on(either(side(while(wall(stays(in(place(

•  OR(double(wall(per(NFPA(221(

(

Page 66: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)Walls)

Design(Options(NFPA(221:(

1.  Single(wall(

2.  Double(Wall(

3.  Cantilevered(Wall(

(

Page 67: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)Walls)–)Diaphragm)Continuity)

Page 68: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)wall)Detailing)

CAD(&(Revit(Details:(www.woodworks.org(((

3"HOUR FIRE WALL AT FLOOR/CEILING

3"HR. ASSEMBLY: 1 5/8" METALSTUDS WITH 3 LAYERS 1/2" TYPE 'X'

GYP. BD. EACH SIDE

3"HOUR FIRE CAULKING

1" AIR GAP

RESILIENT CHANNELS

2 X 4 STUD WALL EACH SIDE, WITHSTRUCTURAL WOOD PANELS AS

REQUIRED FOR SHEAR AND 1 LAYER5/8" TYPE 'X' GYP. BD.

CONTINUOUS 13 1/2" WIDE 14 GA. GALV.SHT. METAL

CONTINUOUS 16 GA. TRACK TOP ANDBOTTOM

FIRE SAFING

CONTINUOUS 16 GA. COMP. CHANNEL

WOOD TRUSS FRAMING WITHOUT WOOD PANEL DIAPHRAGM RUNNING THROUGH FIRE WALL3"HOUR FIRE WALL AT FLOOR/CEILING

3"HR. ASSEMBLY: 1 5/8" METALSTUDS WITH 3 LAYERS 1/2" TYPE 'X'

GYP. BD. EACH SIDE

CONTINUOUS STRUCTURAL WOODPANELS " USE FIRE"TREATED PANELS

THROUGH WALL CAVITY¹

¹CONSULT LOCAL JURISDICTION HAVING AUTHORITY FOR ACCEPTANCE OF FIRE"TREATED WOODPANELS RUNNING THROUGH 3"HOUR ASSEMBLY IN THIS APPLICATION.

RIM JOIST WITH SOLID BLOCKING

3"HOUR FIRE CAULKING

1" AIR GAP

RESILIENT CHANNELS

2 X 4 STUD WALL EACH SIDE, WITHSTRUCTURAL WOOD PANELS AS

REQUIRED FOR SHEAR AND 1 LAYER5/8" TYPE 'X' GYP. BD.

I"JOIST FRAMING WITH WOOD PANEL DIAPHRAGM RUNNING THROUGH FIRE WALL

Page 69: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)Wall)Assemblies)

IBC)706.3)–(Fire(walls(shall(be(of(any(approved(nonQcombustible(materials.(

(Exception:)Buildings(of(Type(V(construction(

(

(

Page 70: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

2)HR)Fire)Wall–)Type)V)

2"HOUR FIRE WALL ASSEMBLY

2 1/2" METAL STUDS AT 24" O.C.

2 LAYERS 5/8" TYPE 'X' GYP. BD. ON EACH SIDE OF METAL STUDS

WOOD STRUCTURAL PANELS WHERE REQUIRED FOR SHEAR

2"HOUR RATING PER GA FILE NO. WP 1548

WOOD STUD WALLS ON EITHERSIDE OF FIRE WALL

AIR

GA

P

0' "

1"

AIR

GA

P

0' "

1"

INTERIOR OR EXTERIOR FINISH AS REQUIRED

BATT INSULATION (OPTIONAL)

http://www.usgdesignstudio.com/wallQselector.asp?framingType=18708&bldgSystem=18620((((((((((((((((

CAD(&(Revit(Details:(www.woodworks.org((

Page 71: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

3hr)Fire)Wall)Assemblies)–)Type)III)

3"HOUR FIRE WALL ASSEMBLY

1 5/8" METAL STUDS AT 24" O.C. MAX.

3 LAYERS 1/2" TYPE 'X' GYP. BD. ON EACH SIDE OF METAL STUDS

WOOD STRUCTURAL PANELS WHERE REQUIRED FOR SHEAR

3 HOURS PER UL DESIGN NO. U435

WOOD STUD WALLS ON EITHERSIDE OF FIRE WALL

AIR

GAP

0' "

1"

AIR

GAP

0' "

1"

INTERIOR OR EXTERIOR FINISH AS REQUIRED

BATT INSULATION (OPTIONAL)

Other(options:(•  NFPA(221(6.5.1(((

(

Page 72: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(•  Fire(Rated(Wall(Assemblies(

•  Overview(•  Exterior(Walls(•  Fire(Walls(•  Fire(Barriers(•  Fire(Partitions(•  Balconies(

Page 73: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Fire)Barriers)–)IBC)707)

Supported(by(assembly(of(equal(or((greater(fire(resistance((with(exceptions(when(required((for(separating(incidental(use(areas(in(type(IIB,(IIIB(and(VB(construction)(Commonly(used(in:(•  Shaft(enclosures(•  Interior(exit(stairway(•  Exit(stairway(enclosures(•  Exit(passageways(•  Incidental(uses((IBC(509)(•  Occupancy(separations(•  Creating(separate(fire(areas(

2012(IBC(Code(&(Commentary(

(

(

Page 74: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Shaft)Walls)

Wood(Design(Focus:(Volume(22,(Issue(3(by(Smith(

Page 75: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Elevator)Shaft)Wall)

Wood(Design(Focus:(Volume(22,(Issue(3(by(Smith(

Page 76: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Interior)Exit)Stairway)Enclosures)

Page 77: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(•  Fire(Rated(Wall(Assemblies(

•  Overview(•  Exterior(Walls(•  Fire(Walls(•  Fire(Barriers(•  Fire(Partitions(•  Balconies(

Page 78: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Outline)

•  MidQrise(Configurations(

•  Design(Considerations(•  Fire(Rated(Wall(Assemblies(

•  Overview(•  Exterior(Walls(•  Fire(Walls(•  Fire(Barriers(•  Fire(Partitions(•  Balconies(

Page 79: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Balconies)–)IBC)1406.3)

Balconies(of(combustible(construction(and(not(FRT(shall(be:(•  Rated(in(accordance(w/(Table(601(for(floors(•  Or(be(of(Type(IV((•  And(shall(not(exceed(50%(of(bldg(perimeter(Exceptions(•  Balconies(in(Type(III,(IV(and(V(can(be(of(type(V(const(

and(shall(not(have(fire(resistance(rating(if(sprinkler(protection(provided(

•  Untreated(wood(is(permitted(for(rails(and(guardrails((

Page 80: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Balconies)–)IBC)1406.3)

So….(

For(Type(III(or(V(balcony(options(are:(

1.  NonQcombustible(–(no(sprinklers/no(fire(rating(

2.  FRT(–(no(fire(sprinklers/no(fire(rating(

3.  Type(IV–(no(fire(sprinklers/no(fire(rating(

4.  Non(treated(–(fire(sprinkler/no(fire(rating(

5.  Non(treated(–(fire(rated(per(601(&(602/(no(sprinkler(

(

Page 81: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Balconies)

Page 82: Detailing)Considerations) for)Multi2Story)Wood) Frame)Buildings

Questions?)

This(concludes(The(American(Institute(of(Architects(Continuing(Education(Systems(Course( Lisa)Podesto,)PE,)MS)

WoodWorks([email protected](