DETAILED UNIT PRICE ANAL PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GU Location: Guiwan Elementary School, Bougainvillea Road, Item No./Description: SPL -1 Clearing and Grabing Unit of Measurement: sq.m. Output per day: 78.18 sq.m. /day Quantity: 32.00 sq.m. Designation No. Person A. Labor a. Construction Foreman/Eng'g Assist. 1 b. Skilled Laborer 4 b. Laborer 2 Sub-Total for A Name and Capacity No. of Units B. Equipment N/A Sub-Total for B C. Total (A+B) D. Output per day = 78.18 sq.m. /day Name and Specifications Quantity E. Materials N/A Sub-Total for E F. Direct Cost (C+E) G. Overhead, Contingencies & Miscellaneous H. Contractor's Profit (CP)

Transcript of DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED...

Page 1: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: SPL -1 Clearing and Grabing

Unit of Measurement: sq.m.

Output per day: 78.18 sq.m. /day

Quantity: 32.00 sq.m.

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 4

b. Laborer 2

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

N/A

Sub-Total for B

C. Total (A+B)D. Output per day = 78.18 sq.m. /day

Name and Specifications Quantity

E. Materials

N/A

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

Page 2: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

I. Value Added Tax (VAT)

J. Total Cost

k. Total Unit Cost

Page 3: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

No. of Days Daily Rate Amount

0.40 524.00 209.60

0.40 366.00 585.60

0.40 317.00 253.60

P 1,048.80

No. of Days Daily Rate Amount

P -

1,048.80

Unit Unit Cost Amount

P -

1,048.80

12% per D.O. 22 s 2015 125.86

0% per D.O. 22 s 2015 -

Page 4: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

0% per D.O. 22 s 2015 -

1,174.66

36.71

Page 5: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: SPL - 2 Demolition Works

Unit of Measurement: sq.m.

Output per day: 8.00 sq.m. /day

Quantity: 32.00 sq.m.

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 4

b. Laborer 2

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

a. Compressor w/ Jack Hammer 1

b. Angular Grinder 1

c. Minor Tools (10% of labor cost)

Sub-Total for B

C. Total (A+B)D. Output per day = 8.00 sq.m. /day

Name and Specifications Quantity

E. Activitiesa.

b. Removal of existing damaged and non-functioning water closet:

3 sets @ ground floor

3 sets @ second floor

c. Removal of existing damaged PVC Door Jamb and PVC Door

3 sets @ water closet, 1 set main door (ground floor)

3 sets @ water closet, 1 set main door (second floor)

d. Disposal of wastes and debris

Removal of existing dilapidated soil pipe at ground floor comfort room.

Page 6: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

I. Value Added Tax (VAT)

J. Total Cost

k. Total Unit Cost

Page 7: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

No. of Days Daily Rate Amount

4 524.00 2,096.00

4 366.00 5,856.00

4 317.00 2,536.00

P 10,488.00

No. of Days Daily Rate Amount

1 10,406.56 10,406.56

1 300.00 300.00

1,048.80

P 11,755.36

22,243.36

Unit Unit Cost Amount

Page 8: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

P -

22,243.36

12% per D.O. 22 s 2015 2,669.20

0% per D.O. 22 s 2015 -

0% per D.O. 22 s 2015 -

24,912.56

778.52

Page 9: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: 103 Layout and Excavation Works

Unit of Measurement: cu.m.

Output per day: 18.96 cu.m. /day

Quantity: 3.37 cu.m.

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 4

b. Laborer 2

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

N/A

Sub-Total for B

C. Total (A+B)D. Output per day = 18.96 cu.m. /day

Name and Specifications Quantity

E. Materials

N/A

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

Page 10: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

I. Value Added Tax (VAT)

J. Total Cost

k. Total Unit Cost

Page 11: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

No. of Days Daily Rate Amount

0.20 524.00 104.80

0.20 366.00 292.80

0.20 317.00 126.80

P 524.40

No. of Days Daily Rate Amount

P -

524.40

Unit Unit Cost Amount

P -

524.40

12% per D.O. 22 s 2015 62.93

0% per D.O. 22 s 2015 -

Page 12: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

0% per D.O. 22 s 2015 -

587.33

174.28

Page 13: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: 104 Embankment

Unit of Measurement: cu.m.

Output per day: 40.00 cu.m. /day

Quantity: 4.00 cu.m.

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 4

b. Laborer 2

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

a. Plate Compactor 1

Sub-Total for B

C. Total (A+B)D. Output per day = 40.00 cu.m. /day

Name and Specifications Quantity

E.

a. Filling Materials (loose volume) 4

Note: Use Filling Materials for Backfill and Fill

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

I. Value Added Tax (VAT)

J. Total Cost

Materials (25% Shrinkage Factor)

Page 14: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

k. Total Unit Cost

Page 15: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

No. of Days Daily Rate Amount

0.10 524.00 52.40

0.10 366.00 146.40

0.10 317.00 63.40

P 262.20

No. of Days Daily Rate Amount

0.10 984.00 98.40

P 98.40

360.60

Unit Unit Cost Amount

cu.m. 315.00 1,260.00

P 1,260.00

1,620.60

12% per D.O. 22 s 2015 194.47

0% per D.O. 22 s 2015 -

0% per D.O. 22 s 2015 -

1,815.07

Page 16: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

453.77

Page 17: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: 405 Structural Concrete

Unit of Measurement: cu.m.

Output per day: 4.41 cu.m. /day

Quantity: 0.54 cu.m.

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 4

b. Laborer 2

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

a. Concrete Bagger Mixer 1

Sub-Total for B

C. Total (A+B)D. Output per day = 4.41 cu.m. /day

Name and Specifications Quantity

E. MaterialsPortland Cement 6

Washed Sand 0.30

Gravel 0.60

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

I. Value Added Tax (VAT)

J. Total Cost

Page 18: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

k. Total Unit Cost

Page 19: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

No. of Days Daily Rate Amount

0.10 524.00 52.40

0.10 366.00 146.40

0.10 317.00 63.40

P 262.20

No. of Days Daily Rate Amount

0.10 1,376.00 137.60

P 137.60

399.80

Unit Unit Cost Amount

bags 260.00 1,560.00

cu.m. 1,000.00 300.00

cu.m. 1,000.00 600.00

P 2,460.00

2,859.80

12% per D.O. 22 s 2015 343.18

0% per D.O. 22 s 2015 -

0% per D.O. 22 s 2015 -

3,202.98

Page 20: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

5,931.44

Page 21: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: SPL - 3 Tile Works

Unit of Measurement: sq.m.

Output per day: 1.52 sq.m. /day

Quantity: 5.44 sq.m.

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 1

b. Laborer 1

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

a. Angular Grinder 1

Sub-Total for B

C. Total (A+B)D. Output per day = 1.52 sq.m. /day

Name and Specifications Quantity

E. Materialsa. 200mm. x 200mm. Unglazed Ceramic Floor Tiles 150

b. Portland Cement 1

c. Tile Adhesive (25kg./bag) 1

d. Tile Grout (2kg./pack) 2

f. 1

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

I. Value Added Tax (VAT)

100mm.Ø Grinding Dics

Page 22: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

J. Total Cost

k. Total Unit Cost

Page 23: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

No. of Days Daily Rate Amount

4 524.00 2,096.00

4 366.00 1,464.00

4 317.00 1,268.00

P 4,828.00

No. of Days Daily Rate Amount

4 300.00 1,200.00

P 1,200.00

6,028.00

Unit Unit Cost Amount

pcs. 15.00 2,250.00

bag 260.00 260.00

bag 253.00 253.00

packs 56.00 112.00

pc. 94.00 94.00

P 2,969.00

8,997.00

12% per D.O. 22 s 2015 1,079.64

0% per D.O. 22 s 2015 -

0% per D.O. 22 s 2015 -

Page 24: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

10,076.64

1,853.69

Page 25: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 25 of 56

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: SPL - 4 Plumbing Works

Unit of Measurement: fixtures

Output per day: 2.00 fixtures /day

Quantity: 9.00 fixtures

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 2

b. Laborer 2

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

a. Portable Electric Handrill 1

b. Portable Pipe Threader 1

Minor Tools (10% of labor cost)

Sub-Total for B

C. Total (A+B)D. Output per day = 2.00 fixtures /day

Name and Specifications Quantity

E. Materials1. Fixtures and Accessories

@ 1st Floor

a. 100mm. x 100mm. Stainless Floor Drain w/ Double Strainer 1

b. 3

@ 2nd Floor

Note: Replacing existing damaged and non-functioning plumbing fixtures

Siphonic Wasdown Watercloset, Single Flush (Trip Lever),

Round-front, Snap-on Ball cock w/ Float rod w/ Flush

valve w/ flapper and seat cover

Page 26: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 26 of 56

a. 100mm. x 100mm. Stainless Floor Drain w/ Double Strainer 2

b. 3

2. Sanitary Pipes

@ 1st Floor

a. 6

b. 8

c. 2

Siphonic Wasdown Watercloset, Single Flush (Trip Lever),

Round-front, Snap-on Ball cock w/ Float rod w/ Flush

valve w/ flapper and seat cover

Note: Replacing existing dilapidated sanitary pipelines and fittings

100mm.Ø x 90o Sanitary PVC Elbow, S-1000

100mm.Ø x 100mm.Ø Sanitary PVC Wye, S-1000

100mm.Ø x 50mm.Ø Sanitary PVC Wye, S-1000

Page 27: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 27 of 56

d. 12

e. 3

f. 50mm.Ø Sanitary PVC P-Trap, S-1000 2

g. 3

h. 2

i. 100mm.Ø x 3.00m. Sanitary PVC Pipe, S-1000 15

j. 100mm.Ø Sanitary PVC Coupling, S-1000 3

k. 50mm.Ø x 3.00m. Sanitary PVC Pipe, S-1000 2

l. PVC Pipe Cement Solvent (200cc/can) 5

@ 2nd Floor

a. 50mm.Ø x 3.00m. Sanitary PVC Pipe, S-1000 1

b. 50mm.Ø Sanitary PVC P-Trap, S-1000 1

c. 2

d. 100mm.Ø x 100mm.Ø Sanitary PVC Tee, S-1000 1

e. 1

f. 1

g. 100mm.Ø Sanitary PVC Coupling, S-1000 1

h. 100mm.Ø x 3.00m. Sanitary PVC Pipe, S-1000 3

i. PVC Pipe Cement Solvent (200cc/can) 1

j. 2

k. 50mm.Ø Sanitary PVC Coupling, S-1000 1

l. PVC Pipe Cement Solvent (200cc/can) 2

3. Cold Pipe

@ 1st Floor6

12mm.Ø G.I. Coupling, ANSI B16.3 Class 150-Standard 9

12mm.Ø x 12mm.Ø G.I. Tee, ANSI B16.3 Class 150-Standrad 6

17

12mm.Ø Plain Bibb Chrome Faucet 3

12mm.Ø G.I. Union Patent, ANSI B16.3 Class 150-Standard 1

19mm. Teflon Tape 8

Pipe Clamp 80

#14 x 1 1/2" Tox w/ Screw (10pcs./pack) 8

100mm.Ø x 45o Sanitary PVC Elbow, S-1000100mm.Ø Sanitary PVC Clean Out Adaptor and Plug, S-1000

50mm.Ø x 90o Sanitary PVC Elbow, S-1000

50mm.Ø x 45o Sanitary PVC Elbow, S-1000

50mm.Ø x 90o Sanitary PVC Elbow, S-1000

100mm.Ø x 50mm.Ø Sanitary PVC Wye, S-1000100mm.Ø Sanitary PVC Clean Out Adaptor and Plug, S-1000

50mm.Ø x 45o Sanitary PVC Elbow, S-1000

Note: Replacing existing cold waterline pipe at ground floor comfort room to new one (cold waterline pipe is expose to wall and should be

fastened with pipe wall fastener)

12mm.Ø x 6.00m. G.I. Pipe ASTM A53-90A Heavy Gauge

Standard

12mm.Ø x 90o G.I. Elbow, ANSI B16.3 Class 150-Standard

Page 28: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 28 of 56

@ 2nd Floor

12mm.Ø Plain Bibb Chrome Faucet 2

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

I. Value Added Tax (VAT)

J. Total Cost

k. Total Unit Cost

Page 29: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 29 of 56

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

No. of Days Daily Rate Amount

5 524.00 2,620.00

5 366.00 3,660.00

5 317.00 3,170.00

P 9,450.00

No. of Days Daily Rate Amount

5 300.00 1,500.00

5 500.00 2,500.00

945.00

P 4,945.00

14,395.00

Unit Unit Cost Amount

unit 269.00 269.00

units 3,080.00 9,240.00

Page 30: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 30 of 56

units 269.00 538.00

units 3,080.00 9,240.00

pcs. 99.00 594.00

pcs. 159.00 1,272.00

pcs. 78.00 156.00

Page 31: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 31 of 56

pcs. 76.00 912.00

pcs. 78.00 234.00

pcs. 102.00 204.00

pcs. 33.00 99.00

pcs. 33.00 66.00

pcs. 693.00 10,395.00

pcs. 66.00 198.00

pcs. 260.00 520.00

can 166.00 830.00

pc. 260.00 260.00

pc. 102.00 102.00

pcs. 33.00 66.00

pc. 178.00 178.00

pc. 130.00 130.00

pc. 78.00 78.00

pc. 66.00 66.00

pcs. 693.00 2,079.00

can 166.00 166.00

pcs. 33.00 66.00

pc. 17.00 17.00

cans 166.00 332.00

pcs. 746.00 4,476.00

pcs. 18.00 162.00

pcs. 30.00 180.00

pcs. 30.00 510.00

pcs. 423.23 1,269.69

pc. 97.00 97.00

rolls 31.00 248.00

pcs. 10.00 800.00

packs 44.00 352.00

Replacing existing cold waterline pipe at ground floor comfort room to new one (cold waterline pipe is expose to wall and should be

Page 32: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Page 32 of 56

pcs. 423.23 846.46

P 47,248.15

61,643.15

12% per D.O. 29 s 2011 7,397.18

0% per D.O. 29 s 2011 -

0% per D.O. 29 s 2011 -

69,040.33

7,671.15

Page 33: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: SPL - 5 Installation of PVC Jamb and Doors (main door and at water closet)

Unit of Measurement: sets

Output per day: 2.00 sets /day

Quantity: 10.00 sets

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

b. Skilled Laborer 1

b. Laborer 1

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

N/A

Sub-Total for B

C. Total (A+B)D. Output per day = 2.00 sets /day

Name and Specifications Quantity

E. Materialsa. 10

b. Bathroom Lockset 2

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

0.60m. x 2.10m. PVC Doors w/ PVC Jamb and complete accessories

Page 34: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

I. Value Added Tax (VAT)

J. Total Cost

k. Total Unit Cost

Page 35: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Installation of PVC Jamb and Doors (main door and at water closet)

No. of Days Daily Rate Amount

5 524.00 2,620.00

5 366.00 1,830.00

5 317.00 1,585.00

P 6,035.00

No. of Days Daily Rate Amount

P -

6,035.00

Unit Unit Cost Amount

sets 2,530.00 25,300.00

sets 824.73 1,649.46

P 26,949.46

32,984.46

12% per D.O. 29 s 2011 3,958.14

0% per D.O. 29 s 2011 -

Page 36: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

0% per D.O. 29 s 2011 -

36,942.60

3,694.26

Page 37: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Location: Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Item No./Description: SPL - 6 Supply and Installation of 5.5mm thk. Glass Jalousie Window

Unit of Measurement: sq.m.

Output per day: 1.36 sq.m. /day

Quantity: 2.72 sq.m.

Designation No. Person

A. Labor

a. Construction Foreman/Eng'g Assist. 1

Sub-Total for A

Name and Capacity No. of Units

B. Equipment

N/A

Sub-Total for B

C. Total (A+B)D. Output per day = 1.36 sq.m. /day

Name and Specifications Quantity

E. Materialsa. 9

Sub-Total for E

F. Direct Cost (C+E)

G. Overhead, Contingencies & Miscellaneous

H. Contractor's Profit (CP)

550mm x 550mm, 5.5mm thk.Clear Glass Jalousie Window w/ Aluminum Holder

Note: Include labor and equipment needed for installation.

Page 38: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

I. Value Added Tax (VAT)

J. Total Cost

k. Total Unit Cost

Page 39: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

DETAILED UNIT PRICE ANALYSIS

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL

Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Supply and Installation of 5.5mm thk. Glass Jalousie Window

No. of Days Daily Rate Amount

2 524.00 1,048.00

P 1,048.00

No. of Days Daily Rate Amount

P -

1,048.00

Unit Unit Cost Amount

sets 683.88 6,154.92

P 6,154.92

7,202.92

12% per D.O. 29 s 2011 864.35

0% per D.O. 29 s 2011 -

Page 40: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

0% per D.O. 29 s 2011 -

8,067.27

2,963.18

Page 41: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Republic of the PhilippinesZAMBOANGA CITY WATER DISTRICT

Pilar St., Zamboanga City

GANTT CHARTPROJECT : REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOLLocation : Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga CityProject Cost : Php 157,210.68 Project Duration : Twenty-two (22) Calendar DaysManpower Requirements : 7 Manpower (1-Construction Foreman/Eng'g Assist., 2-Laborers and 4-Skilled Laborers)

Work Item Amounts % PerfectedC A L E N D A R D A Y S

1 2 3 4 5

Mobilization/Demobilization PhP 1,391.24 0.88%SPL -1 Clearing and Grabing PhP 1,174.66 0.75%

SPL - 2 Demolition Works PhP 24,912.56 15.85%

SPL - 3 Tile Works PhP 10,076.64 6.41%

SPL - 4 Plumbing Works PhP 69,040.33 43.92%

SPL - 5 PhP 36,942.60 23.50%

SPL - 6 Supply and Installation of 5.5mm thk. Glass Jalousie Window PhP 8,067.27 5.13%

103 Layout and Excavation Works PhP 587.33 0.37%104 Embankment PhP 1,815.07 1.15%405 Structural Concrete PhP 3,202.98 2.04%

TOTAL PROJECT COST Php 157,210.68 100%

CASH OUTLAY REQUIREMENT Php157,210.68

TARGETED COMPLETION THIS PERIOD 100.00%

COMMULATIVE COMPLETION TO DATE 100.00%

Recommending

Prepared by: Checked & Submitted by: Approved by: Project Implementation:

FELIXBERTO R. CAARE, JR. RMP EDITO M. BAUTISTA MARLI ACOSTA-DE FIESTA ARNULFO A. ALFONSO

Installation of PVC Jamb and Doors (main door and at water closet)

Page 42: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Researcher/Analyst A (J.O.) Officer-In-Charge Officer-In-Charge Assistant General ManagerPlanning Division Design Division Engineering and Construction Department Technical Services Group

Page 43: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Republic of the PhilippinesZAMBOANGA CITY WATER DISTRICT

Pilar St., Zamboanga City

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOLGuiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

C A L E N D A R D A Y S6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Php157,210.68

100.00%

100.00%

Recommending

Project Implementation: Approved for Project Implementation:

ARNULFO A. ALFONSO LEONARDO REY D. VASQUEZ

Page 44: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Assistant General Manager General ManagerTechnical Services Group

Page 45: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Republic of the PhilippinesZAMBOANGA CITY WATER DISTRICT

Pilar Street, Zamboanga CityStandard Form Number: SF-INFR-01

Revised on: July 28, 2004

APPROVED BUDGET FOR THE ADMIN.

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOLGuiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Stations : Length :

DESCRIPTION QUANTITY UNIT

MARK-UPSITEM ESTIMATED IN PERCENTNO. DIRECT COST

OCM PROFIT

(1) (2) (3) (4) (5) (6) (7)

Mobilization/Demobilization 1 lot 1,391.24 0% 0%SPL -1 Clearing and Grabing 32.00 sq.m. 1,048.80 12% 0%SPL - 2 Demolition Works 32.00 sq.m. 22,243.36 12% 0%SPL - 3 Tile Works 5.44 sq.m. 8,997.00 12% 0%SPL - 4 Plumbing Works 9.00 fixtures 61,643.15 12% 0%SPL - 5 10.00 sets 32,984.46 12% 0%

SPL - 6 Supply and Installation of 5.5mm thk. Glass Jalousie Window 2.72 sq.m. 7,202.92 12% 0%

103 Layout and Excavation Works 3.37 cu.m. 524.40 12% 0%104 Embankment 4.00 cu.m. 1,620.60 12% 0%405 Structural Concrete 0.54 cu.m. 2,859.80 12% 0%

TOTAL 140,515.73

Prepared by: Checked & Reviewed by: Approved by:

FELIXBERTO R. CAARE, JR., RMP EDITO M. BAUTISTA, JR. MARLI ACOSTA - DE FIESTA

Researcher/ Analyst A (J.O.) Officer-In-Charge Officer-In-Charge

Installation of PVC Jamb and Doors (main door and at water closet)

Page 46: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Planning Division Design Division Engineering & Construction Department

Approved for Project Implementation:

LEONARDO REY D. VASQUEZGeneral Manager

Page 47: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Republic of the PhilippinesZAMBOANGA CITY WATER DISTRICT

Pilar Street, Zamboanga CityContract Reference Number

Name of the Contract

Location of the Contract

APPROVED BUDGET FOR THE ADMIN.

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOLGuiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

Contract Duration: Twenty-two (22) Calendar Days

TOTAL MARK-UPVAT TOTAL COST

TOTAL UNIT

% VALUEINDIRECT COST COST

(8)(9) (10) (11) (12) (13)

(5)X(8) 5%((5)+(9)) (9)+(10) (5)+(11) (13)/(3)0% 0.00 0.00 0.00 1,391.24 1,391.24

12% 125.86 0.00 125.86 1,174.66 36.7112% 2,669.20 0.00 2,669.20 24,912.56 778.5212% 1,079.64 0.00 1,079.64 10,076.64 1,853.6912% 7,397.18 0.00 7,397.18 69,040.33 7,671.1512% 3,958.14 0.00 3,958.14 36,942.60 3,694.26

12% 864.35 0.00 864.35 8,067.27 2,963.18

12% 62.93 0.00 62.93 587.33 174.2812% 194.47 0.00 194.47 1,815.07 453.7712% 343.18 0.00 343.18 3,202.98 5,931.44

16,694.95 157,210.68

Recommending Project Implementation:

MARLI ACOSTA - DE FIESTA ARNULFO A. ALFONSO

Assistant General Manager

Page 48: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Engineering & Construction Department Technical Services Group

Page 49: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

PROJECT/LOCATION OF PROJECT: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

BREAKDOWN OF EXPENDITURESI - ESTIMATED COST

A. DIRECT COST:1. Mobilization/Demobilization . . . . . . . . . . . . . . . . . . . . . 2. Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2.1 Supply Delivery . . . . . . . . . . . . . . . . . . . . . . . . .2.2 Testing Materials . . . . . . . . . . . . . . . . . . . . . . . .

3. Labor (including fringe benefits) . . . . . . . . . . . . . . . . . .4. Equipment Expenses . . . . . . . . . . . . . . . . . . . . . . . . .

B.1. INDIRECT COST:1. Overhead contingency Miscellaneous . . . . . . . . . . . . . . 2. Profit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B.2. VAT & INCIDENTAL EXPENSES:1. Comprehensive All Risk Insurance . . . . . . . . . . . . . . . .2. Value Added Tax (5% of EDC, OCM and Profit) . . . . . . 3. Materials Testing 7% of 1% of OCM . . . . . . . . . . . . . .

S U B - T O T A L (CONTRACT COST)

II - ESTIMATED GOVERNMENT EXPENDITURES1. Engineering & Administrative Overhead2. POW/Site Acquisition/Pre-Engineering3. Materials to be furnished by the government4. Materials Quality Control & Hydrology (MQCH)5. Retention for RO & C.O.

S U B - T O T A L

III - CONTINGENCIES/RESERVED:

1. Physical (up to 5% of the Estimated Contract Cost) . . . . . . .

2. Price Escalation (up to 12% of the Estimated Contract Cost) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. Preliminary Engineering . . . . . . . . . . . . . . . . . . . . . . . . . .

TOTAL ESTIMATED PROJECT COST

PREPARED BY: CHECKED & SUBMITTED BY:

FELIXBERTO R. CAARE, JR., RMP EDITO M. BAUTISTA, JR.

Page 50: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Researcher/Analyst A (J.O.) Officer - In - ChargePlanning Division Design Division

APPROVED BY: RECOMMENDING PROJECT IMPLEMENTATION:

MARLI ACOSTA - DE FIESTA ARNULFO A. ALFONSOOfficer - In - Charge Assistant General Manager

Eng'g and Construction Department Technical Services Group

APPROVED FOR PROJECT IMPLEMENTATION:

LEONARDO REY D. VASQUEZGeneral Manager

Page 51: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City

% OF TOTAL AMOUNT

0.80 1,391.24 49.88 87,041.53

19.45 33,946.60 10.39 18,136.36

9.57 16,694.95

S U B - T O T A L (CONTRACT COST) 157,210.68

0.90 1,572.11

1,572.11

4.50 7,860.53 4.50 7,860.53

100.00 174,503.86

CHECKED & SUBMITTED BY:

EDITO M. BAUTISTA, JR.

Page 52: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Officer - In - ChargeDesign Division

RECOMMENDING PROJECT IMPLEMENTATION:

ARNULFO A. ALFONSOAssistant General ManagerTechnical Services Group

APPROVED FOR PROJECT IMPLEMENTATION:

LEONARDO REY D. VASQUEZGeneral Manager

Page 53: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT

Pilar Street, Zamboanga City

INDIVIDUAL PROGRAM OF WORK

PROJECT/LOCATION OF PROJECT: APPROPRIATE:REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY SCHOOL SOURCE OF FUNDS:

ISSUED OBLIGATED:Guiwan Elementary School, Bougainvillea Road, Brgy. Guiwan, Zamboanga City AUTHORITY RELEASED:

CALENDAR DAYSPROJECT CATEGORY: TO COMPLETE:

DESIRABLE STARTING DATE:School Facility

CONTRACT / /PROJECT DESCRIPTION:

Rehabilitation of existing comfort room.

MININUM EQUIPMENT REQUIRED TECHNICAL PERSONNEL REQUIREDDescription No. Description No. Description

1 Compressor w/ Jack Hammer 1 Construction Foreman/Eng'g Assist.1 Angular Grinder 1 Carpenter1 Portable Electric Drill 1 Mason1 Portable Pipe Threader 2 Plumber1 Plate Compactor 2 Laborers1 Concrete Bagger Mixer

ESTIMATED COST OF PROPOSED PROJECTS

ITEM NO. DESCRIPTION UNIT

Mobilization/Demobilization 0.99% lot

SPL -1 Clearing and Grabing 0.75% sq.m.SPL - 2 Demolition Works 15.83% sq.m.SPL - 3 Tile Works 6.40% sq.m.SPL - 4 Plumbing Works 43.87% fix.SPL - 5 23.47% sets

SPL - 6 5.13% sq.m.

103 Layout and Excavation Works 0.37% sq.m.

104 Embankment 1.15% sq.m.

405 Structural Concrete 2.04% sq.m.

TOTAL 100%

PREPARED BY: CHECKED & SUBMITTED BY:

FELIXBERTO R. CAARE, JR., RMP EDITO M. BAUTISTA, JR.Researcher/Analyst A (J.O.) Officer - In - Charge

Planning Division Design Division

% OF TOTAL

Installation of PVC Jamb and Doors (main door and at water closet)Supply and Installation of 5.5mm thk. Glass Jalousie Window

Page 54: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

APPROVED BY: RECOMMENDING PROJECT IMPLEMENTATION:

MARLI ACOSTA - DE FIESTA ARNULFO A. ALFONSO

Officer - In - Charge Assistant General Manager

Eng'g and Construction Department Technical Services Group

APPROVED FOR PROJECT IMPLEMENTATION:

LEONARDO REY D. VASQUEZ

General Manager

Page 55: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT

Pilar Street, Zamboanga City

INDIVIDUAL PROGRAM OF WORK

16-Apr-15

APPROPRIATE: Php174,503.86SOURCE OF FUNDS:ISSUED OBLIGATED:AUTHORITY RELEASED:CALENDAR DAYS Twenty-two (22) Calendar DaysTO COMPLETE:DESIRABLE STARTING DATE: upon Approval

CONTRACT / / ADMINISTRATION / X /

TECHNICAL PERSONNEL REQUIREDDescription No. Description

Construction Foreman/Eng'g Assist.CarpenterMasonPlumberLaborers

ESTIMATED COST OF PROPOSED PROJECTS

QTY.DIRECT COST

TOTAL UNIT COST1.00 1,391.24 1,391.24 1,391.24

32.00 1,048.80 32.78 36.71 32.00 22,243.36 695.11 778.52 5.44 8,997.00 1,655.08 1,853.69 9.00 61,643.15 6,849.24 7,671.15

10.00 32,984.46 3,298.45 3,694.26

2.72 7,202.92 2,645.70 2,963.18

3.37 524.40 155.61 174.28

4.00 1,620.60 405.15 453.77

0.54 2,859.80 5,295.93 5,931.44

140,515.73

CHECKED & SUBMITTED BY:

EDITO M. BAUTISTA, JR.Officer - In - Charge

Design Division

ADJUSTED UNIT COST

Page 56: DETAILED UNIT PRICE ANALYSIS - …docshare01.docshare.tips/files/26335/263359636.pdf · DETAILED UNIT PRICE ANALYSIS PROJECT NAME: REHABILITATION OF COMFORT ROOM AT GUIWAN ELEMENTARY

RECOMMENDING PROJECT IMPLEMENTATION:

ARNULFO A. ALFONSO

Assistant General Manager

Technical Services Group

APPROVED FOR PROJECT IMPLEMENTATION:

LEONARDO REY D. VASQUEZ

General Manager