PROJECT SYNOPSIS
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
ii
1. About town Kaup Town Panchayat will have Kaup, Mallaru and Uliyargoli gram panchayats with a total
population of 12,733 as 2001 and 21,877 as per 2011 census data. Kaup, pronounced as Kapu
in the local Tulu language, is a small village on the Western Coast National Highway 13 kms
south of the city of Udupi and 40 km north of Mangalore in southern Karnataka, India. It lies
on the way between Udupi and Mangalore beside National Highway 66 (previously NH-17).
Name of the Town Kapu comprising of Kapu, Mallaru and Uliyargoli gram
panchayats
Area (Sq.kms) 23.416
Population (2011) 21,887
Population (2016) 26,464
Households (2016) 4,814
No of Wards 19
Road Length (kms) 88
Hotels 15
Marriage halls 3
Meat stalls 5
Commercial establishments 500
2. Existing SWM in Kapu
2.1 Waste generation and collection estimate The total waste generation as per generator based assessment (sum of waste collected from
Households, Commercial establishments, Markets and street sweeping) 10.24 tons per day.
The normative estimate is 10.24 tons per day (Total Population * Per Capita waste). The
waste generation of 10.24 tons per day is adopted as a realistic waste generation. An average
of about 9.8 tons per day of waste is collected. The collection efficiency is about 80%.
2.2 Waste generation by generator type There are various sources of wastes from which waste is generated in Kapu town. About 5
major waste generators were identified for estimating the quantity of waste generated in the
town. The amount of waste generated is estimated as follows.
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
iii
Sl. No Waste Generators
No of Generators
Avg. waste /
day (Kgs)
Total waste (Kgs)
Total ( Tonnes)
1 Households 25,549 0.276 7,061 7.06
2 Commercial establishments 500 1.07 535 0.54
3 Marriage halls 3 250 750 0.75
4 Street sweeping waste 35 32.5 1,138 1.14
5 Drain Cleaning waste 38 20 760 0.76
10.24
2.3 Physical and Chemical properties of waste collected
Sl. no Components Unit Results
1 Physical characteristics
(i) Biodegradable
Paper/cardboard % 15.20
Organic Waste % 29.46
Wood % 6.28
(ii) Non-Biodegradable
Rubber & Leather % 5.08
Plastics % 31.02
Rags/Textiles % 9.50
Metals % 0.27
(iii) Inerts
Glass & Crockery % 1.09
Stone & Grits % 2.10
2 Chemical Characteristics
Bulk density gm/cc 0.29
pH 7.11
3 Proximate Analysis
Moisture % 43.14
Volatile % 32.16
Fixed carbon % 5.34
Ash content % 19.36
4 Ultimate Analysis(on Dry basis)
Carbon as C % 41.06
Hydrogen as H % 5.08
Oxygen as O % 27.17
Nitrogen as N % 0.19
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
iv
Sl. no Components Unit Results
Sulphur as S % 0.11
Phosphorus as P % 0.04
Potassium as K % 0.18
C/N ratio % 216.76:1
5 Heavy Metals
Arsenic as (As), Lead as (Pb), Cadmium as (Cd), Mercury as (Hg), mg/kg Not detected
Zinc as (Zn) mg/kg 0.72
Copper as (Cu) mg/kg 0.013
Nickel (Ni) mg/kg 0.015
Iron as (Fe) mg/kg 4.71
6 Gross calorific value Kcal/Kg 1190
2.3 Present system of waste management
2.3.1 Collection & Transportation It has observed that the town does not store the waste at source and instead dispose the
waste into the streets, open spaces, drains, as and when waste is generated. Segregation of
waste is not practiced. Most of the recyclable material is disposed of along with domestic and
trade waste. Therefore, recyclable waste is generally found mixed with garbage on the streets
and at the dumpsites.
There is no door to door collection facility in the town. The collection is carried out based on
demand. The waste collection activities are being carried out using mini-truck doing three
trips a day. The waste collected is transported directly to the temporary disposal site near the
highway in Kapu. There are no bins or waste storage depots in the town.
2.3.2 Processing and Disposal Kapu town does not have any processing and disposal facility and hence the waste collected
from Kapu town is disposed without any treatment in the disposal site near the highway in
Kapu.
The proposed waste disposal site for the Kapu TMC is located in the Yellur village which is
situated at a distance of10 kms from the TMC.
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
v
2.3.3 Bio- medical waste There are two primary health care centres and one hospital in Kapu. The bio-medical waste
is collected by private contractor and transported to “common bio medical waste treatment
facility” for processing and disposal. KTMC is not involved in collection, transportation or
disposal of bio-medical waste.
2.3.4 Cost of waste management The ULB is incurring an expenditure of Rs. 10 lakhs/year.
2.3.5 Total expenditure incurred on SWM and total revenue generated at present
i. Expenditure details
Sl. no Activities
Expenditure / year (Lakhs)
1 Door to door collection ( Salaries + maintenance charges)
10
2 Dry waste collection centre ( if exists)
3 Street sweeping & other cleaning activities ( salaries, fuel expenses, contract amount if any, vehicle maintenance)
4 Secondary collection & transportation including transfer stations ( Dumper placer, compactor, tractor placer salaries, fuel cost etc)
5 Processing cost at the landfill site
6 Disposal/landfilling
7 Leachate collection & treatment
8 Bio-mining/ capping
9 Others
Total 10
ii. Revenue details
Sl. no. Particulars
Amount (lakhs)
1 % of Property tax reserved towards SWM and cleaning activities --
2 SWM Cess collected annually in 2015-16 --
3 Sale of compost, recyclables, RDF etc in 2015-16 --
4 Components of Town planning Fee, advertisement tax, birth / death certificate fee etc towards SWM and cleaning activities
5 Fines and fees available for SWM cleaning activities in 2015-16 --
6 Others (SFC Grants)
Total
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
vi
3. Proposed Plan for Management of MSW
3.1 Collection & Transportation
• It is proposed to ban the littering of waste on the streets by introducing
segregation of waste at the source and storage of segregated waste i.e. wet,
dry and domestic hazardous waste at the source.
• The waste will be collected separately on a daily basis. The wet waste shall be
transported to processing facility and the dry waste shall be transported to the
dry waste collection centres.
• The system of door to door collection through containerized auto-tippers shall
be implemented in the city.
• The auto-tippers shall unload the waste into tipper trucks for transportation
to the processing facility.
• The vehicles deployed for collection of waste from street sweeping activities
will also collect the waste from markets and bulk generators.
The details of the vehicles and equipment recommended for Kapu are as below
Type of Vehicles Proposed
(DPR) Existing nos Nos. to be procured
Push carts 9 -- 9
Auto tippers / Mini tippers 6 -- 6
Tractor trailers -- -- --
Tipper trucks 2 1 1
Compactors -- -- --
Weighbridge 1 -- 1
Baling machines -- -- --
Pre-sorting trommel screen (200mm/100mm etc)
-- -- --
Screening machines (trommel / vibratory screens) 40mm/25mm/16mm/4mm
-- -- --
Front end loader with backhoe
-- -- --
Skid steer loader -- -- --
Others (Pl. specify) -- -- --
Compost Plant & Machinery (10 TPD)
1 -- 1
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
vii
3.2 Processing and Disposal
3.2.1 Technology Selection
Based on the above analysis it is recommended to have aerobic windrow composting based
waste management facility. This would be supported by the recycling of plastics and other
inorganics. This technology proposed is simple and easy to implement with potential to
meet the overall objectives of waste management elucidated above. This is cost effective.
3.2.2 Design requirement for Processing and disposal plan
Projected waste for Kapu townis 13 TPD for the design period 2020 (Five years period). Out
of total waste, the dry waste is directly transported to the dry waste collection centre and
street sweeping waste is disposed off in sanitary landfills.
Kapu generates about 10 TPD of waste and the projected waste 13 TPD for the design period
2020 (five years period). The processing facilities has a design capacity to cater to the waste
generated next five years i.e. 10 TPD. A landfill facility of 3,100 sqm has been proposed to
handle 20% of rejects for the subsequent five years.
Technological Options for MSW Processing in Different Categories
Sl. No Particulars Unit
Quantity
1 Design Year (Five years period) Year 2017 2022
Projected waste TPD 11.27 14.38
Wet waste TPD 7.34 9.37
Dry waste TPD 1.84 2.34
Street sweeping waste TPD 2.09 2.66
2 Plant Design Capacity
Windrow Composting Plant TPD 10
Sanitary landfill @ 20% (5 years) TPD 11
3.2.3 Construction and Demolition Waste
It is the responsibility of any generator of construction and demolition debris to employ
reasonable and practical means, including source reduction, reuse or recycling, in order to
prevent construction and demolition debris from being disposed finally in low lying areas.
The construction debris should be disposed off in low lying areas. The TMC shall identify the
dedicated low lying area/ location for dumping of construction debris. The existing tipper
vehicle in the TMC shall use for transportation of C & D waste.
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
viii
3.2.4 Capital cost for proposed MSWM
Capital Cost for Collection & Transportation Operations
Sl. No Particulars
Proposed (nos)
Available (nos)
Net (nos)
Unit Rate (Rs.)
Total (Rs. in lakhs)
1 Pushcarts 9 -- 9 13,700 1.23
2 Auto-Tippers 6 -- 6 520,000 31.20
3 Tipper 2 1 1 12,34,000 12.34
Total 44.89 Capital Cost for Processing Plant &Machinery
Sl. no Description Quantities Rate Total Cost (Rs. in lakhs)
1 Weigh bridge 1 6,20,000 6.20
2 Composting Plant & Machinery (10 )
1 60,00,000 60.00
3 Bailing machine 1 4,40,000 4.40
4 Vehicles
(i) Handcarts 4 13,700 0.55
(ii) Tractor Trailer 1 8,65,000 8.65
Total 79.80 Capital Cost for Civil Works proposed in the processing facility
Sl. no Description Quantities Rate
Total Cost (Rs. in lakhs)
1 Security Office 2.5 m x 2.5 m 33,280 2.08
2 Weighbridge Platform 12 m x 3 m 6,556 2.36
3 Compost Plant 35 m x 85 m 6,176 183.74
4 Workers Rest Room 3.6 m x 3 m 40,370 4.36
5 Toilet block 6.2 m x 3.5 m 28,111 6.10
6 Internal roads 600 m 7,160 64.44
7 Storm water drains 600 m 8,919 56.19
8 Under ground water sump 5 m x 4 m x 2.5
14,000 2.80
9 DG Room 10 m x 10 m 3,520 3.52
10 Compound wall 853 m 8,465 72.21
11 Sanitary Landfill 50 m x 61.5 m 4,490 138.07
12 Electrical (Internal & l)
1 lot 31.28
13 Gates 1 no 1.00
14 Plumbing and sanitary k
1 lot 5.00
15 Green belt 1 lot 5.00
16 Monitoring Bore wells 1 no 1.50
17 Fire fighting 1 lot 1.00 Total 580.65
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
ix
Summary of Capital Cost
Sl. no. Description
Total Estimated Amount(Rs. in
lakhs)
Contingency 3% (Rs. in
lakhs)
Grand Total (Rs. in lakhs)
1 Collection & Transportation 44.89 1.35 46.24
2 Processing Plant
Plant & Machinery 79.80 2.39 82.19
a Civil structures 183.74 5.51 189.25
b Sanitary Landfill 138.07 4.14 142.21
c Other infrastructure 258.84 7.77 266.61
Total 705.34 21.16 726.50
Financial Structuring of the project
Sl. no Government Project contribution source
Amount in (Rs. in lakhs)
% share by Govt. entity
1 Central SBM Grant 254.28 35.00%
2 State Grant towards its share in project 84.76 11.67%
3 Committed contribution by the TMC 500.00
Total 839.04
Surplus 112.53
3.2.5 Operation and Management (O & M) Cost for proposed MSWM
O & M Cost for Collection & Transportation Operations
Sl. No Particulars
No of Units
Unit Rate (Rs.)
Monthly Expenditure
(Rs. in lakhs)
Yearly Expenditure
(Rs. in lakhs)
1 Manpower
Workers 26 nos 19,391 504,166 60.50
Drivers 8 no 16,649 133,192 15.98
Supervisor 1 no 20,123 20,123 2.41
2 Fuel Cost
a Auto (6) 12 60 21,900 2.63
b Tipper (1) 6 60 11,406 1.37
c Tipper(1) 7 60 12,775 1.53
3 Maintenance/yr 10% 47,692 5.72
4 PP Equipments/yr 34 nos 5,000 1.70
5 Contingency 0.5% 3,824 0.46
Total 769,248 92.31
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
x
O & M Cost for Processing &Disposal Facility
Sl. No Particulars
No of Units
Unit Rate (Rs.)
Monthly Expenditure
(Rs. in lakhs)
Yearly Expenditure (Rs. in lakhs)
A Staff Salary/ Wages
1 Manager cum Supervisor 1 20,123 20,123 2.41 2 Workers – Tipping Floor 3 19,391 58,173 6.98 3 Drivers 1 16649 16,649 2.00 4 Security 1 19,391 19,391 2.33 B Power & Fuel charges 1 Power 50 units 7 10,646 1.28 3 Fuel 2 LPD 60 3,650 0.44 C Consumables Microbial Culture LS 5,000 0.60 Hose pipe, pots& shovel LS 0.10 HDPE bags LS 5,000 0.60 Water supply LS 5,000 0.60
D PP Equipments/yr 6 nos 5,000 0.30
E Administrative Charges LS 2,500 0.30
F O & M
Civil items 0.25% 7,258 0.87
Mechanical works 10% 66,498 7.98 G Contingency 1% 2,224 0.27 Total 224,612 27.05
Financing of O&M expenses
Sl. No Particulars (Rs. in lakhs / year) 1 Operational Expenditure proposed 119.36 2 Revenue from user charges 28.50 3 Revenue from sale of Compost 5.88 4 Revenue from sale of Recyclables 1.18 5 SFC Grants for Permanent PKs salaries 0.00 6 SFC untied-Grants for salaries for Contract workers (75%) 69.46 7 Total revenue proposed 105.02 8 Deficit (SWM) 14.35
Chief officer
Kapu TMC
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
xi
Anexure-1
Sl. No
DPR appraisal format
Particulars Details
1 Name of the City Kapu TMC
2 No. of Wards 19
3 Population (2011) 21,887
4 Present Population (2016) 26,464
5 Area 23.416 sq.kms
6 No. of households (2016) 4,814
7 No. of commercial establishments 500
8 Road length (A, B & C) in (Kms) 88 kms
9 Total Qty. of waste generated 10.24 TPD
a. Total quantity of wet waste 6.43 TPD
b. Total quantity of dry waste / recyclable waste 1.7 TPD
c. Total qty. of chicken & mutton waste 0.25 TPD
d. Total qty. of C&D waste < 500 kgs
e. Total qty. of street sweeping waste /silt 1.9 TPD
Sl. no
Financial aspects
Particulars Capital Cost
O & M Cost Civil
Components Vehicles &
Machineries
a Door-to-door collection & transportation -- 46.24 92.31
b Street sweeping & other cleaning activities and transportation -- - 0.00
c Dry waste collection centre / Decentralized waste management centre etc. -- -- --
d Secondary collection & transportation (including transfer station etc) -- -- --
e Waste Processing (Aerobic Composting (organic waste) RDF (Inorganic waste) Including civil works total capital cost)
455.86 82.19 27.05
f Waste disposal and Leachate treatment 142.21 -- --
Total Cost 598.07 128.43 119.36
Cost / ton 49.05 2,902
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
xii
Financial Structuring of the project
Sl. no Government Project contribution source
Amount in (Rs. in lakhs)
% share by Govt. entity
1 Central SBM Grant 254.28 35.00%
2 State Grant towards its share in project 84.76 11.67%
3 Committed contribution by the TMC 500.00
Total 839.04
Surplus 112.53
Design period- 5 years
Revenue (proposed)
Sl. No Particulars (Rs. in lakhs / year) 1 Operational Expenditure proposed 119.36 2 Revenue from user charges 28.50 3 Revenue from sale of Compost 5.88 4 Revenue from sale of Recyclables 1.18 5 SFC Grants for Permanent PKs salaries 0.00 6 SFC untied-Grants for salaries for Contract workers (75%) 69.46 7 Total revenue proposed 105.02 8 Deficit (SWM) 14.35
Chief Officer
Kapu TMC
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
xiii
Annexure-2
Ministry of Urban Development(CPHEEO)
Appraisal Format for Consideration of Projects for Solid Waste Management
1 Proposal Integrated SWM facility at Kapu
2 Name of State/UT Karnataka
3 Name of City Kapu TMC
4 Objectives The objective of this project is to identify the existing MSWM practices in Kapu in Udupi district, recognize deficiencies/gaps in the present system and propose a comprehensive plan for MSWM including segregation, collection, transportation and processing & scientific disposal of waste in compliance with the MSW Rules 2016.
5 Whether CDP is prepared No
6 Background Kaup Town Panchayat will have Kaup, Mallaru and Uliyargoli gram panchayats with a total population of 12,733 as 2001 and 21,877 as per 2011 census data. Kaup, pronounced as Kapu in the local Tulu language, is a small village on the Western Coast National Highway 13 kms south of the city of Udupi and 40 km north of Mangalore in southern Karnataka, India. It lies on the way between Udupi and Mangalore beside National Highway 66 (previously NH-17).
7 Present Status Collection efficiency < 50% Processing – none
8 Service level benchmark (as per annexure) before and after the project
9 Need of Project The collection efficiency is not up to 100% due to lack of vehicles and manpower. The municipality is mot processing the waste at this point of time. The TMC is looking forward to strengthen collection, transportation and processing of waste through this project.
10 Population
- As per 2011 census 21,877
- Base year 2016 26,464
- Design year 2022 31,956
- End year 2030 39,280
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
xiv
11 Solid Waste Generation
- Base year 10.24 TPD
- Design year 14.38 TPD
- End year 21.25 TPD
12 Project Components
i. No. of packages & details Single package
ii. BOQs ready Yes/No Yes
iii. Analysis rate ready Yes
13 Land required under project& status of land availability Available with TMC
14 Estimated cost (Proposed in Lakh Rupees) Rs. 726.50 lakhs
15 Timeline for Implementation 1 year
16 Funding pattern 35% from GOI, 11.67% from GOK and rest to be invested by TMC
17 Whether the project (or part of the project) has been taken up for funding earlier through any other scheme? If yes, please provide detail
No
18 Implementing Agency Kapu TMC
19 Annual O&M expenditure (Rs. Lakh)
-Existing : 2015-16 Rs. 10 lakhs
- Proposed (year 2016-17) Rs. 119.36 lakhs
20 Agency Responsible for O&M Kapu TMC
21 Charges for solid waste management
-Existing : 2015-16
- Proposed (2016-17)
22 Revenue generation (Rs. Lakh)
-Existing : SWM cess 2014-15 (2015-16 till October)
- Proposed (year 2016-17)
23 CPHEEO’s Technical comments :
24 SLSC Approval Detail
a. Approval date :
b. Approval letter No. :
c. SLSC approvals note available :
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
xv
d. State and ULB Share & budget
25 List anticipated hindrances in project implementation
26 Whether the project is recommended for Sanction (Y/N)
27 If not, please mention reasons and area for improving DPR
28 Estimated cost for consideration & approval (INR crore)
Service Level Benchmark Indicators –Solid Waste Management
Sl. no
Indicator
Unit Baseline
before project
Reliability of measurement
After project
Reliability of measurement
1 Household level coverage of SWM services
% 80 % High 100 % High
2 Efficiency of collection of municipal solid waste
% 70 % High 90 % High
3 Extent of segregation of municipal solid waste
% 15 % High 80 % High
4 Extent of municipal solid waste recovered
% 5 % High 80 % High
5 Extent of scientific disposal of solid waste
% 40 % High 100 % High
6 Efficiency in re-dressal of customer complaints
% 80 % Medium 90 % High
7 Cost recovery of SWM services
% 20 % High 50 % High
8 Efficiency of collection of Charges
% 30 % High 80 % High
-
Synopsis of DPR on SWM for Kapu under Swachh Bharat Mission
xvi
Checklist
Sl. no Particulars Yes/No
1 Council resolution attached or not? Yes
2
NOC / Authorization given by KSPCB for landfill site along with permission from other statutory bodies such as airport authority (if applicable), Mines & Geology, Environment Impact Assessment (EIA) (for new landfill sites), NOC from Village Panchayath (if Applicable) attached or not?
Yes
3 Financial model for capital cost (Central share /State Share /ULB share etc) shown or not? Yes
4 Filled MoUD Pro-forma attached or not? Yes
5 Normative Standards / Service Level Benchmark considered or not? Yes
6 Layout plan / designs & drawings attached or not? Yes
7 Waste characterization & quantification done or not? Yes
Chief officer
Kapu TMC
-
DETAILED PROJECT REPORT
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
i
Table of Contents
1. INTRODUCTION ............................................................................... 1
1. 1 Background ................................................................................................................ 1
1. 2 Problems being faced by Urban Local Bodies........................................................... 1
1. 3 Efforts of the Government ......................................................................................... 3
1. 4 Need for the Project ................................................................................................... 6
1. 5 Methodology adopted for the Study .......................................................................... 7
1. 6 Structure of Report .................................................................................................. 13
2. PROJECT AREA PROFILE ............................................................... 16
2. 1 District Profile - Udupi ............................................................................................ 16
2. 2 Town Profile - Kapu ................................................................................................. 19
3. PRESENT SCENARIO OF SWM ....................................................... 23
3.1 Quantification of Waste ........................................................................................... 23
3.2 Characterization and Composition of MSW ............................................................ 25
3.3 Segregation of Waste at Source ............................................................................... 28
3.4 Collection and Transportation of Waste ................................................................. 28
3.5 Linkages with other MSW Management Schemes .................................................. 31
3.6 Proposed MSW Processing & Disposal Site ............................................................. 31
3.7 Legal Framework ..................................................................................................... 32
4. REVIEW OF TECHNOLOGIES ...................................................... 36
4. 1 Introduction ............................................................................................................. 36
4. 2 Recycling of Waste ................................................................................................... 36
4. 3 Processing of Organic fraction of Waste .................................................................. 36
4.3.1 Aerobic / Anaerobic Composting Technology ..................................................... 37
4.3.2 Vermi-Composting Technology ........................................................................... 41
4.3.3 Refuse Derived Fuel (RDF) Processing Technology ............................................ 42
4.3.4 Bio-methanation .................................................................................................. 43
4. 4 Sanitary Landfill ...................................................................................................... 44
5. DESIGN CRITERIA FOR SWM ..................................................... 55
5. 1 Population Growth & Waste Generation Projections .............................................. 55
5. 2 Strategy adopted for Action Plan ............................................................................. 55
5. 3 Proposed Collection & Transportation Plan ............................................................ 57
5. 4 Proposed MSW Processing and Disposal Plan ........................................................ 59
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
ii
5. 5 Compatibility between existing and proposed system ............................................ 59
6. PROPOSED COLLECTION & TRANSPORTATION PLAN ............... 61
6. 1 Road / Street Sweeping ........................................................................................... 61
6. 2 Drain Cleaning ......................................................................................................... 65
6. 3 System of waste storage at Source ........................................................................... 66
6. 4 Collection and Transportation of waste ................................................................... 69
6. 5 Asset & Manpower Requirement ............................................................................. 71
7. PROPOSED PROCESSING & DISPOSAL PLAN ............................. 74
7. 1 Introduction ............................................................................................................. 74
7. 2 Compost Processing Plant ....................................................................................... 74
7. 3 E-Waste Management ............................................................................................ 80
7. 4 Construction and Demolition Waste Management ................................................ 81
7. 5 Bio-medical Waste Management ............................................................................. 81
7. 6 Sanitary Landfill Facility.......................................................................................... 82
7. 7 Proposed Infrastructure .......................................................................................... 84
8. PROJECT FINANCIALS ................................................................ 86
8. 1 Introduction .............................................................................................................86
8. 2 Capital Investment ...................................................................................................86
8. 3 Operational Expenditure ......................................................................................... 87
8. 5 Funding Pattern for Capital Investment ..................................................................89
8. 6 Funding Pattern for Operational Expenditure ...................................................... 90
9. OPERATING FRAMEWORK ......................................................... 93
9.1 Options for Project Implementation ....................................................................... 93
9.2 Option 1: Service delivery by ULB ........................................................................... 93
9.3 Option 2: Service delivery through Private Operator(s) .......................................... 93
10. LEGAL ASPECTS .......................................................................... 96
10.1 Introduction ............................................................................................................. 96
10.2 Proposed Legal Provisions ....................................................................................... 96
11. HEALTH ASPECTS..................................................................... 100
11.1 Low Cost Sanitation Program to prevent Open Defecation .................................. 100
11.2 Covering of Buildings under Construction ............................................................ 100
11.3 Cattle Nuisance ..................................................................................................... 100
11.4 Health Monitoring for Sanitary Workers .............................................................. 100
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
iii
11.5 Prevent Indiscriminate Use of Pesticides ............................................................. 101
12. ROLE OF STAKEHOLDERS ........................................................ 102
12.1 Role of the ULB ..................................................................................................... 102
12.2 Role of the Citizens ............................................................................................... 102
12.3 Role of the Private Operator ................................................................................. 102
13. INFORMATION, EDUCATION AND COMMUNICATION............. 103
13.1 Introduction ........................................................................................................... 103
13. 2 Approaches of IEC Plan ......................................................................................... 103
13.3 Awareness about Reduce, Reuse and Recycle Waste ............................................ 104
13.4 Awareness about segregation of waste at source ................................................... 105
13.5 Strategies for creating Awareness .......................................................................... 105
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
iv
List of Exhibits
Exhibit 1 : Approach and Methodology ......................................................................... 8
Exhibit 2 : Location Map of Kapu Town ...................................................................... 20
Exhibit 3 : Kapu TMC Map .......................................................................................... 21
Exhibit 4 : Brief Profile of Kapu Town ......................................................................... 22
Exhibit 5 : Average Per-capita generation of MSW in Indian Cities .......................... 23
Exhibit 6 : Quantification of MSW in Kapu Town (2015) .......................................... 25
Exhibit 7 : Physical Characteristics of MSW in Indian Cities ..................................... 26
Exhibit 8 : Chemical Characteristics of MSW in Indian Cities ................................... 26
Exhibit 9 : Physical & Chemical Characteristics of Waste .......................................... 27
Exhibit 10 : Primary Collection Vehicle ...................................................................... 28
Exhibit 11 : Existing Scenario of SWM ......................................................................... 29
Exhibit 12 : Road Length ............................................................................................. 29
Exhibit 13 : Primary collection routes in Kapu TMC ................................................... 30
Exhibit 14 : Assets available with the ULB .................................................................. 31
Exhibit 15 : Proposed MSW Disposal Site .................................................................. 32
Exhibit 16 : Sketch copy drawing of the proposed processing site .............................. 32
Exhibit 17 : Evaluation of Location as per CPHEEO Manual ..................................... 34
Exhibit 18 : SWM Service Level Benchmarks at a Glance ........................................... 35
Exhibit 19 : Specifications for Compost Quality ..........................................................40
Exhibit 20 : Population& Waste Projections ............................................................... 55
Exhibit 21 : Kapu Command Areas ............................................................................. 56
Exhibit 22 : Command Areas for Kapu Town (3 villages) ........................................... 56
Exhibit 23 : Proposed Collection & Transportation Plan ............................................ 57
Exhibit 24 : Proposed Processing &Disposal Plan ....................................................... 59
Exhibit 25 : Assumptions for Assets and manpower Requirement ............................ 71
Exhibit 26 : Assets Requirement ................................................................................. 72
Exhibit 27 : Manpower Requirement .......................................................................... 73
Exhibit 28 : Technology Options for Processing MSW .............................................. 74
Exhibit 29 : Area requirement for Compost Processing Plant ................................... 77
Exhibit 30 : Technical Specifications for Manual Sorting Conveyor ......................... 77
Exhibit 31 : Technical Specifications for Rotary Screening Machinery ..................... 78
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
v
Exhibit 32 : Mass Balance for Compost Processing Plant .......................................... 80
Exhibit 33 : Assumptions for area requirement for Sanitary Landfill ........................ 82
Exhibit 34 : Area requirement for Sanitary Landfill ................................................... 82
Exhibit 35 : Proposed Civil Infrastructure for Processing & Disposal Facility ........... 84
Exhibit 36 : Proposed Plant & Machinery for Processing & Disposal Facility ............ 84
Exhibit 37 : Area requirement for Processing & Disposal Facility .............................. 85
Exhibit 38 : Manpower requirement for Processing & Disposal Facility .................... 85
Exhibit 39 : Capital Investment for Collection & Transportation Operations ............ 86
Exhibit 40 : Capital Investment for Plant & Machinery .............................................. 86
Exhibit 41 : Capital Investment for Civil Works .......................................................... 87
Exhibit 42 : Operational Expenditure for Collection& Transportation Operations .. 88
Exhibit 43 : Operational Expenditure for Processing & Disposal Facility ................. 88
Exhibit 44 : Summary of Project Financials ................................................................ 89
Exhibit 45 : Funding Pattern for Capital Investment .................................................. 89
Exhibit 46 : Sources of Income of the ULB ..................................................................90
Exhibit 47 : Proposed User Charges for various Generators ....................................... 91
Exhibit 48 : Revenue from sale of Compost & Recyclables ......................................... 91
Exhibit 49 : Manpower Cost ......................................................................................... 91
Exhibit 50 : Funding for Operational Expenditure ..................................................... 92
Exhibit 51 : Comparative Analysis of risks .................................................................. 95
Exhibit 52 : IEC Modules used at Town Level ........................................................... 109
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
vi
List of Annexures
Annexure 1: Estimates for Civil & Electrical Works
Annexure 2: Survey to assess the Per capita Generation of Waste
Annexure 3: Physical & Characterization of Waste
Annexure 4: Soil Investigation Report
Annexure 5: Quotations
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
vii
Acronyms APM Arithmetic Progression Method
BOD Biological Oxygen Demand
CLF Compact Fluorescent Lamp
TP Town Municipal Council
COD Chemical Oxygen Demand
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering,
Organization
DMA Directorate of Municipal Administration
DPR Detailed Project Report
DUDC District Urban Development Cell
EIA Environmental Impact Assessment
FCO Fertilizer Control Order
GCL Geo synthetic Clay Liner
GIS Geographical Information System
GIS Geographic Information System
GL Ground Level
GPM Geometric Progression Method
GPS Global Positioning System
GSM Global System Mobile
HDPE High Density Polyethylene
HF Horizontal Flow
HP Horse Power
IEC Information, Education and Communication
IIM Incremental Increase Method
IWMF Integrated Waste Management Facility
LEL Lower Explosive Limit
LS Lumpsum
MIS Management Information System
MLA Member of Legislative Assembly
MLC Member of Legislative Corporation
MP Member of Parliament
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
viii
MRF Material Recovery Facility
MSW Municipal Solid Waste
MSWM Municipal Solid Waste Management
NGO Non-Government Organisation
O&M Operation and Maintenance
PGF Planted Gravel Filter
Pk Pourakarmikas
PVC Poly Vinyl Chloride
RDF Refuse Derived Fuel
RFID Radio Frequency Identification
RWA Resident Welfare Association
SBM Swachh Bharat Mission
SBM-U Swachh Bharat Mission - Urban
SLF Sanitary Landfill
SWM Solid Waste Management
TP Town Panchayath
TPD Tons per day
TPH Tones per hour
ULB Urban Local Body
UNESCO United Nation Educational Scientific and Cultural Organisation
VF Vertical Flow
WBM Water Bound Macadam
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
1
1. Introduction
1. 1 Background Solid waste is generated from a number of sources which include households
(kitchen and yard), commercial areas (shops, hotels and restaurants), industries (raw
material and packaging), institutions (schools, hospitals and offices), construction
and demolition sites, wild and domesticated animals (carcasses of dead animals,
manure), parks (fallen branches, leaves from trees), and streets (sand, silt, clay,
concrete, bricks, asphalt, residues from air deposition, and dust).
Municipal solid waste (MSW) includes waste from households, non-hazardous solid
waste from industrial, commercial and institutional establishments (excluding bio-
medical waste in present context), market waste, yard waste, agricultural wastes and
street sweepings. Industrial and community hazardous waste and infectious waste, is
not considered as MSW and should be collected and processed separately. MSW
(Management and Handling) Rules 2000 defines MSW as “commercial and
residential wastes generated in municipal or notified areas in either solid or semi-
solid form excluding industrial hazardous wastes but including treated bio-medical
wastes”. MSW management (MSWM) encompasses the functions of collection,
transfer & transportation, processing & recycling, and disposal of MSW.
1. 2 Problems being faced by Urban Local Bodies Land disposal of solid wastes is a common waste management practice and has been
practiced for centuries. Unscientific disposal of wastes causes an adverse impact on
all components of the environment and human health. One of the major
environmental concerns is release of methane gas, which has 21 times more global
warming potential than carbon dioxide. Improper management of waste contributes
to 6% of India’s methane emissions and is the third largest emitter of methane in
India. This is much higher than the global average of 3% methane emissions from
solid waste. It currently produces 16 million tons of CO2 equivalents per year and
this number is expected to rise to 20 million tons of CO2 equivalents by 2020.
Improper and unorganized disposal of waste in open areas and landfills have a
negative impact on the living conditions of human beings as well as the overall
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
2
environment. It results in spread of communicable and non-communicable diseases
among human beings and animals, thus affecting the welfare, livelihood and
economic productivity. In addition, it causes contamination of soil, surface water,
ground water and generation of toxic and green-house gases.
Population growth and rapid urbanization means bigger and denser cities and
increased MSW generation in each city. The problem of solid waste management
(SWM) in India, in combination with rapid urbanization, population growth and
unplanned development is worsening day by day.
India is the second largest nation in the world, with a population of 1.21 billion,
accounting for nearly 18% of world's human population, but it does not have enough
resources or adequate systems in place to treat its solid wastes. Its urban population
grew at a rate of 31.8% during the last decade to 377 million, which is greater than
the entire population of US, the third largest country in the world according to
population).
There has been significant increase in generation of solid wastes in India over last
few decades and reason is largely associated with population growth. Although
typical urban growth rate has been determined at around 2.5% annually, waste
generation is out pacing the urban population growth in Indian cities. The solid
waste generated in Indian cities has increased from 6 million tons in 1947 to 48
million tons in 1997 and is expected to increase to 300 million tons per annum by
2047.
India is facing a sharp contrast between its increasing urban population and
available services and resources. Waste management is one such service where India
has an enormous gap to fill. More than 25% of the waste generated is not collected at
all; 70% of the Indian cities lack adequate capacity to transport it and there are no
sanitary landfills to dispose of the waste. Proper disposal systems to address the
burgeoning amount of wastes are absent. The current waste management services
are inefficient, incur heavy expenditure and are so low as to be a potential threat to
the public health and environmental quality. Improper solid waste management
deteriorates public health, causes environmental pollution, accelerates natural
resources degradation, causes climate change and greatly impacts the quality of life
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
3
of citizens. MSW management is constrained by institutional weakness, lack of
proper funding, lack of proper management and operational systems, public apathy,
lack of municipal will to become financially self-sufficient through municipal
taxation, etc.
1. 3 Efforts of the Government In recent years, the Government of India has taken several initiatives to improve
existing SWM practices in the country. Some of the key initiatives and
recommendations are discussed below:
(i) Hon’ble Supreme Court of India Recommendations
In recent years, the current MSWM system in India has received considerable
attention from the Central and State Governments and local municipalities. Then
first initiative was taken by the Honorable Supreme Court of India in 1998, which
resulted in the formation of a Committee to study the current status of MSWM in
Indian cities. This Committee identified the deficiencies/gaps in the existing MSWM
system in the country and prepared the “Interim Report on SWM Practices in Class I
Cities”. Class I are cities with a population ranging between one lakh to ten lakhs
(1,00,000 – 10,00,000).
(ii) Municipal Solid Waste Management Rules
As a second initiative, the Ministry of Environment and Forests (MoEF),
Government of India, published “Municipal Solid Waste (Management and
Handling) Rules 2000” (MSW Rules 2000). These rules were developed in
conformance with Sections 3, 6 and 25 of the Environment Protection Act, 1986 and
aim at standardization and enforcement of SWM practices in the urban sector. They
dictate that, “Every municipal authority shall, within the territorial area of the
municipality, be responsible for the implementation of the provisions of these rules
and infrastructure development for collection, storage segregation, transportation,
processing and disposal of municipal solid wastes”. In addition, “the CPCB shall
coordinate with State Pollution Control Boards (SPCBs) and Pollution Control
Committees (PCCs) in the matters of MSW disposal and its management and
handling”.
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
4
(iii) Jawaharlal Nehru National Urban Renewal Mission
The Jawaharlal Nehru National Urban Renewal Mission (JNNURM) is the third
notable initiative undertaken by Government of India. JNNURM provides funding
for urban infrastructure development in 63 cities and towns of the country. This
mission was initiated in 2006 and is slated to continue until 2011.
(iv) Urban Infrastructure Development Scheme for Small and
Medium Towns
The primary objective of this scheme is to improve the urban infrastructure in towns
and cities in a planned manner and to promote public–private partnership (PPP) in
infrastructure development. This scheme was introduced in the year 2005-06 and
will continue for seven years. This scheme is applicable to all cities/towns as per
2001 census, except the cities/towns covered under the JNNURM. One of the
components of this scheme is to renew the old sewerage and solid waste disposal
systems in inner (old) areas.
(v) Swachh Bharat Mission
Swachh Bharat Mission (SBM) was launched on 2nd of October, 2014 with a vision to
achieve a clean India as a tribute to the father of the nation, Mahatma Gandhi, on his
150th birth anniversary, in 2019. SBM is being implemented by the Ministry of
Urban Development (MoUD) and by the Ministry of Drinking Water and Sanitation
(MoDWS) for urban and rural areas with a given set of guidelines for improved
sanitary services and capacity building initiatives.
MSWM a major component of the SBM (urban)-“refers to a systematic process that
comprises of waste segregation and storage at source, primary collection, secondary
storage, transportation, secondary segregation, resource recovery, processing,
treatment, and final disposal of solid waste.”
Under the provisions of MSWM, the local bodies are to prepare Detailed Project
Reports in consultation with the state government based on the identified needs of
the City Sanitation Plans. Provision also mentions clustering of smaller cities for
attracting Private investment. The DPRs should be prepared in lines with Govt. of
India’s goals outlined in the NUSP 2008, SWM rules, advisories, CPHEEO manuals
(including cost recovery mechanisms), O & M practices and Service-level Benchmark
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
5
advisories released by MoUD and Manual on Municipal Solid Waste Management,
2000.
States will contribute a minimum of 25% funds for SWM projects to match 75%
Central Share (10% in the case of North East States and special category states). 80%
of the urban population to be covered by SWM services (allowing for a 2% increase
year on year) covering all statutory towns. 1 Central government Grant / VGF may
also be used to promote projects of waste to energy.
(vi) Fourteen Finance Commission Recommendations
Constituted by the President of India, under Article 280 of the constitution, the
Finance Commission is to recommend on distribution of central tax revenues
between the Union and the States. Supporting Local bodies through grant,
subsequent to the passage of the 73rd and 74th constitutional amendments was first
time announced in the 10th Finance Commission for providing basic services at the
grassroots level and strengthening decentralization.
The 13th Finance Commission has recommended two categories of Grants to Local
Bodies namely (1) General Basic Grant and (2) General Performance Grant. The
Basic Grants will be released on furnishing the Utilization Certificates for the last
releases and the General Performance Grant will be released on fulfillment of nine
conditions by the State Government, as stipulated in para 10.16.1 of the report of the
13th Finance Commission by March of a particular financial year.
Further, in 2009, MoUD initiated Service Level Benchmarking (SLB) with respect to
basic municipal services including solid waste management. SLB has been
introduced in 30 states and across 1700 ULBs.
Performance-related funds under the 13th Finance Commission have been linked to
improvements in SLBs including SWM. The 13th Finance Commission also
recommends that of all grants to be given to the ULBs, 50% should be for SWM
(2010- 2015). Moreover, the Ministry of New and Renewable Energy has funded five
Waste-to-Energy plants for utilization of MSW.
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
6
The 14th Finance Commission has recommend distribution of grants to the States
using 2011 population data. The grant to each state will be divided into two, a grant
to duly constituted gram panchayats and a grant to duly constituted municipalities,
on the basis of urban and rural population of that state using the data of census 2011.
The ratio of basic to performance grant is 90:10 with respect to panchayats and
80:20 in the case of municipalities. The total grants recommended by the
commission are Rs 2,87,436crore for a five-year period from April 1, 2015 to March
31, 2020. Of this, Rs 2,00,292.20crore will be given to panchayats and Rs 87,143.80
crore to municipalities. The transfers for financial year 2015-16 will be Rs 29,988
crore.
(vii) National Green Tribunal Recommendations
CPCB has framed and notified the “Action Plan for Management of Municipal Solid
Waste (MSW)” in compliance with the National Green Tribunal order dated 5th Feb-
2015 in the matter of OA No. 199 of 2014. The Action Plan emphasizes on
strengthening the planning exercise at national, state as well as city level by
improvising through the waste management value chain. In addition to that, The
Plan suggested the concept of regional cluster approach as well as technology options
on the basis of quantum of MSW generation.
1. 4 Need for the Project As per the 74th Constitutional Amendment, provision of solid waste services - waste
collection, transfer, recycling, resource recovery and disposal, is recognized as a key
service to be managed and delivered by Urban Local Bodies (ULBs). Also the
Municipal Solid Waste (Management and Handling) Rules, 2000 (MSW Rules)
imposes an obligation on all municipalities in India to adopt suitable processes for
scientific collection, management, processing and disposal of MSW.
Solid waste management is a major task of the local governments, typically
accounting for a sizeable portion of the municipal budget - about 20% to 50%. Most
ULBs spend nearly 60%-70% of their total overall budgetary allocation on collection,
another 20%-30% on transportation, and often less than 10% on the treatment and
final disposal of MSW. Despite this huge expenditure, ULBs are still grappling with
the challenge of preventing environmental degradation due to the unsystematic and
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
7
unscientific method of solid waste management.
Most of the ULBs in the state are collecting waste and disposing the waste at
dumping sites without any processing. Moreover, proper waste management in the
cities are hampered by the following problems:
• Increasing quantity and volume of solid waste
• Inadequate infrastructure for proper collection and transportation of waste
• Lack of adequate and appropriate facilities for MSW processing and disposal
• Limited access to land
• Increasing cost of solid waste collection and disposal.
Most cities and towns lack systematization of procedures relating to waste collection,
segregation, storage and transportation, and absence of scientific processing and
disposal of waste. As a consequence, ULBs are unable to achieve the desired level of
service level performance in terms of efficiency and satisfaction and thereby comply
with the MSW Rules.
As a part of the Swachha Bharat Mission, District Urban Development Cell, Udupi
intends to enhance the existing Solid waste management system and thus improve
the health and living standards of its residents in Kapu. The purpose of this project is
to identify the existing MSWM practices in Kapu in Udupi district, recognize
deficiencies/gaps in the present system and propose a comprehensive plan for
MSWM including segregation, collection, transportation and processing & scientific
disposal of waste in compliance with the MSW Rules 2000.
1. 5 Methodology adopted for the Study This DPR proposes a comprehensive SWM management and implementation plan
for the town. In order to address each of the problems associated with the current
SWM system, a series of steps shall be adopted, which are summarized in Exhibit 1.
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
8
Exhibit 1 : Approach and Methodology
Step 1: Problem Identification
Identification of problems in the town would involve meeting the various
stakeholders in the ULB, and gaining an understanding of the town from
administrators of the area. Tentative facts that emerge from such discussion are
• Waste management awareness level in the towns
• Transportation situation
• Status of sewerage and drainage system
• Source of wastes – slaughter houses, residential areas, bio medical waste
• Existing waste management system
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
9
• Estimates of household and bulk generators in the ULBs
• Major markets, bus stops and depots, transit centres
• Estimates of floating population
These would give the consultants basic idea about the functioning 0f the towns in
terms of solid waste, public toilets and other related infrastructure.
Step 2: Primary and secondary data collection
The main objective of the baseline study is to understand the existing solid waste
system as accurately as possible, analyze system deficiencies in the context of MSW
Rules, 2000 and utilize that information for further planning, implementation and
monitoring processes. Local conditions shall be considered while assessing the
inadequacy of existing service and planning for the future with due consideration of
local demography, physical location, growth objectives of the ULB as well as social
and environmental conditions. From previous experiences, we know that to
understand the problems of the ULB as well as the public, both primary and
secondary data collection is required. The major source of secondary data for this
project would be the ULB and other government and non-government organizations.
Detailed information for assessing the adequacy of municipal solid waste
management services may not be readily available with the ULB. Therefore, efforts
were made to collect secondary data from previous surveys and studies undertaken
for other purposes. Some essential information shall be collected from field level
supervisors. Primary data shall be collected only when authentic secondary data is
unavailable. Primary data shall be collected through conducting surveys and
measurements at the point of generation, using data collection formats.
Data collection
Secondary data would be collected after discussions with ULB officials to understand
the present practice of waste management and disposal system in the ULBs. Detailed
questionnaires would be prepared to collect information in a streamlined and
organized fashion at macro level. In this regard, the following preliminary
information would be collected to help in framing the methodology for primary data
collection.
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
10
• Map of the town with municipal limits and ward wise map
• Census Details – Year 2011, 2001, 1991, 1981, 1971, 1961, 1951
• Total number of households in ULB
• List of markets, hospitals, nursing homes, hotels, industries,
Abattoirs, slaughter houses in ULB
• Existing assets and manpower with ULB
Based on the evaluation of available secondary data and the outcome of discussions
with the ULB our strategy and approach to complete each and every stage of the
project shall be framed.
Quantification and Composition of MSW
The quantity and composition of MSW generated in the ULB is essential for
determining collection, processing and disposal options that could be adopted. They
are dependent on the population, demographic details, principal activities in the
city/ town, income levels and lifestyle of the community. It has been well established
that waste generation of an area is proportional to average income of the people of
that area. It is also observed that generation of organic, plastic and paper waste is
high in high income areas.
The Characterization studies carried out by NEERI in the year 1996 indicate that
MSW contains large organic fraction (30-40%), ash and fine earth (30-40%), paper
(3-6%) along with plastic glass and metal (each less than 1%), calorific value of refuse
ranges between 800-1000 kcal/kg and C/N ratio ranges between 20 and 30.Study
revealed that quantum of waste generation varies between 0.2-0.4 kg/capita/day in
the urban centers and it goes up to 0.5 kg/capita/day in metropolitan cities.
Estimation of Per capita waste generation details
For the purpose of estimating the per capita waste generated in the ULBs,
representative samples from each ULB shall be collected from households of low,
mid and higher income and commercial establishments.
The waste generators shall be advised to deposit all the waste generated in the bags
distributed to them and hand over the bag to the waste collector on the subsequent
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
11
day. The waste shall be weighed after collection and the weights recorded. The
average amount of waste disposed by a specific class of generators shall be estimated
by averaging data from several samples collected at multiple representative locations
within the ULB jurisdiction. These quantities shall then be extrapolated to the entire
ULB to assess the per capita waste generation.
Sampling for Waste Quantification
The waste quantification and characterization studies would be conducted for
samples collected from the open dumpsites of the city from where waste is dumped
by different sections of the society. This would be followed by waste quantification
and waste characterization (physical) by quartering method. The sample shall be
analyzed in the laboratory for its chemical characteristics.
Determining Waste Composition
The quartering and coining method is one of the best techniques for determining the
physical composition and characteristic of municipal waste. The sample is reduced to
a more manageable size as the actual classification is carried out by hand. The
Quartering and Coining sampling procedure is described below:
• Manageable quantity of MSW mixed from outside and inside of the waste pile,
sourced from random entities in an identified sampling location is collected
and mixed thoroughly.
• The sample is placed as a uniform heap and the heap is divided into four
portions using straight lines perpendicular to each other.
• Waste from opposing corners of the divided heap is removed to leave half of
the original sample. The remaining portions are again thoroughly mixed and
the quartering process is repeated until a desired size is obtained (10 kg of
waste can be handled/ segregated efficiently).
• The last remaining opposing fractions of waste shall be mixed and analyzed
for identifying physical and chemical properties of the waste.
• Chemical analysis of the sample shall be performed in a laboratory accredited
by the Ministry of Environment & Forests (MoEF).
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
12
Step 3 Data Collation and Analysis
The waste quantity and characterization details gathered during primary survey
would be compiled and analyzed. Estimating future waste generation quantities and
composition is critical for developing a MSW management Plan. Planning horizons
for solid waste processing/treatment/disposal projects typically extend to 20-30
years, depending on the nature of the facility.
The MSW management plan shall be designed for the following design periods(time-
frame):
(i) Short-term plan : 1 years
(ii) Mid-term plan : 2-5 years
(iii) Long-term plan : 6-10 years
Population Growth Projections
The census 2011 population figures would be used to calculate population projection
for each ward. The Projections would be done using the methods recommended in
CPHEEO Manual.
Arithmetical Increase Method: This method is generally applicable to large and old
cities. In this method the average increase of population per decade is calculated
from the past records and added to the present population to find out population in
the next decade. This method gives a low value and is suitable for well settled and
established communities.
Incremental Increase Method: In this method the increment in arithmetical increase
is determined from the past decades and the average of that increment is added to
the average increase. This method increases the figures obtained by the arithmetical
increase method.
Geometrical Increase Method: In this method percentage increase is assumed to be
the rate of growth and the average of the percentage increase is used to find out
future increment in population. This method gives much higher value and is mostly
applicable for growing towns and cities having vast scope for expansion.
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
13
Waste Generation Projections
Waste generation figures would be also calculated on the basis of these projected
figures and the per capita waste generation figures.
An assessment states that the per capita waste generation is increasing by about
1.3%per year. With an urban growth rate of 3-3.5% per annum, the annual increase
in waste quantities may be considered at 5 % per annum. Impacts of increasing ULB
jurisdiction should also be considered while assessing future waste generation rates.
Step 4: Gap analysis
The assessment of the information on the current status of waste management in the
ULB vis- a- vis the requirements of existing regulation, policies and guidelines and
identified SLBs will result in an identification of key shortfalls in achieving the
desired level of services and shall form the basis for preparing a plan to improve the
MSWM system. Gaps in the existing waste management system would be identified
with reference to the MSW Rules 2000, the information provided by the ULB
officials and the existing scenario as per the results of the primary survey.
Step 5: Evaluation & Proposal, Detailed engineering, BOQ
and Cost estimates
Based on the outcomes of the primary and secondary data collection and the
corresponding analysis of gap and requirement analysis results, discussions with the
stakeholders, ULB, and the best judgments made by the consultant experts,
alternatives would be considered and evaluated and a most suitable MSW
management model would be developed for implementation. Further, detailed
engineering, BOQ, cost and estimates for this plan would be developed and
considered for producing a finance model. Guidelines laid out by the Swachh Bharat
Mission would be used for the same.
1. 6 Structure of Report This Detailed Project Report (DPR) is for setting up a modern municipal solid waste
management project for the Town of Kapu in Udupi District. The DPR is organized
in thirteen chapters and the details are briefed below:
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
14
Chapter 1: Introduction
This chapter elaborates the background of waste management in India, the need for
the Project and the methodology adopted for the study.
Chapter 2: Project Area Profile
This chapter provides an understanding of the district and town profile.
Chapter 3: Present Scenario of SWM
This chapter provides details of current scenario in the town including quantification
& characterization of the waste, existing collection and transportation system and the
present processing and disposal methods adopted by the ULB.
Chapter 4: Review of Technologies
This chapter details out the technical details of the various technologies available for
processing the waste.
Chapter 5: Design Criteria
This chapter provides the design basis for the project including population growth
and waste generation projections, the strategy to be adopted and the proposed plan
for collection, transportation, processing and disposal of waste.
Chapter 6: Proposed Collection & Transportation Plan
This chapter elaborates the proposed collection and transportation plan for the town
and also provides details of the assets and manpower requirement.
Chapter 7: Proposed Processing & Disposal Plan
This chapter details out the various technologies proposed for processing the waste
and the details for the sanitary landfill facility. The plant & machinery and civil
infrastructure, manpower and area requirement for the processing and disposal
facility is provided in this chapter.
Chapter 8: Project Financials
This chapter provides the details of the capital cost and the operation and
maintenance cost for implementing the project including the funding pattern for the
project.
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
15
Chapter 9: Operating Framework
This chapter describes the framework for implementing the project.
Chapter 10: Legal Aspects
This chapter lists out legal provisions to be implemented by the ULBs to ensure
robust waste management system.
Chapter 11: Health Aspects
This chapter addresses the health and other related issues arising from waste
management activities.
Chapter 12: Role of Stakeholders
This chapter elaborates the roles and responsibilities of the various stakeholders of
the project.
Chapter 13: Information, Education & Communication (IEC)
This chapter provides strategies to be adopted for creating public awareness in terms
of MSW segregation at source level and 3R concept. Also provides Information
education, communication and awareness programmes.
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
16
2. Project Area Profile
2. 1 District Profile - Udupi
Background
Udupi district in the Karnataka state of India was carved out as a separate district
from the erstwhile Dakshina Kannada district on 25 August 1997. The three
northern taluks, Udupi, Kundapur and Karkala, were bifurcated from Dakshina
Kannada District to form Udupi district.
History
It is widely believed that the name of Udupi was derived from its Tulu name Odipu.
The Tulu name in turn is associated with a temple at Malpe, devoted to
Vadabhandeshwara. Another story is that the name Udupi came from the
combination of the Sanskrit words Udu and Pa, which mean "stars" and "lord."
According to legend, the moon's light was once reduced due to a curse by King
Daksha, whose 27 daughters (the 27 stars, according to Hindu astrology) were
married to the moon. The moon prayed to Lord Shiva to get back its original shine.
Lord Shiva was pleased with the moon's prayer and restored its shine. Legend says
that the moon and his wives made their prayer at the Chandramouleeshwara temple
at Udupi, creating a linga that can be seen even today. According to this story,
therefore, Udupi means the land of the "lord of the stars," the moon.
Geography
Udupi district is surrounded by Uttara Kannada district in north, Dakshina Kannada
district in southern direction. Shivamogga district borders on north east side
and Chikkamagaluru district on east. Arabian Sea is on west of Udupi district. Land
nearer to sea is plain with small hills and paddy fields, coconut gardens etc. Land
bordering the Western Ghats in the east is covered with forests and hilly terrain; the
forests are very thick in some parts and Someshwara Wildlife Sanctuary is located
near Hebri and Someshwara and Mukambika Wild Life sanctuary is established
near Kollur. Kudremukh national park begins 16 km away from Karkala near Mala.
The area surrounding Kollur is also thickly forested and villages are located in
between forest area. Some parts of Kundapur taluk and Karkala taluk are looking
https://en.wikipedia.org/wiki/Karnataka�https://en.wikipedia.org/wiki/India�https://en.wikipedia.org/wiki/Taluk�https://en.wikipedia.org/wiki/Udupi�https://en.wikipedia.org/wiki/Kundapur�https://en.wikipedia.org/wiki/Karkala�https://en.wikipedia.org/wiki/Dakshina_Kannada�https://en.wikipedia.org/wiki/Dakshina_Kannada�https://en.wikipedia.org/wiki/Dakshina_Kannada�https://en.wikipedia.org/wiki/Uttara_Kannada�https://en.wikipedia.org/wiki/Shivamogga_district�https://en.wikipedia.org/wiki/Chikkamagaluru_district�https://en.wikipedia.org/wiki/Arabian_sea�https://en.wikipedia.org/wiki/Someshwara_Wildlife_Sanctuary�https://en.wikipedia.org/w/index.php?title=Mukambika_Wild_Life_sanctuary&action=edit&redlink=1�https://en.wikipedia.org/wiki/Kollur,_Udupi_district�https://en.wikipedia.org/wiki/Kudremukh_national_park�https://en.wikipedia.org/wiki/Kollur,_Udupi_district�
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
17
like Malenadu both in appearance covered with forests and greenery as well as in
culture also. The district is harbouring rare species of flora and fauna. Tiger, King
Cobra, deer, bison are some of the wild life seen in the district. Flora includes rose
wood, teak wood, some of rare plants and fungus.
Demographics
According to the 2011 census Udupi district has a population of 1,177,908, roughly
equal to the US state of Rhode Island. This gives it a ranking of 403rd in India (out of
a total of 640). The district has a population density of 304 inhabitants per square
kilometre (790/sq mi). Its population growth rate over the decade 2001-2011 was
5.9%. Udupi has a sex ratio of 1093 females for every 1000 males. The average
literacy rate was 83%, higher than the national average of 59.5%.
Climate
The climate of the district shares the wider climatic pattern of the other West Coast
districts of India. It is characterized by excessive humidity(78%) during the greater
part of the year. There are four seasons viz.,
• Four wet months of June, July, August and September, when the district
encounters strong winds, high humidity, heavy showers and a slight fall in
temperature.
• Two warm and damp months of October and November when south west
monsoon is retreating.
• Three cool months of December, January and February when generally dry
conditions prevail and
• Three hot months of March, April and May which is the period of rising
temperature. Climate in the district is generally equable. However, it is
colder in the interior than in the coast
Agriculture
Agriculture is the main stay of the district. Out of the total geographical area of 3.56
lakh hectare (ha), the area under forest is one lakh ha. (28 percent), area under
cultivation, 0.99 lakh ha. (27 percent) and fallow land, 0.13 ha (4 percent).
https://en.wikipedia.org/wiki/Malenadu�https://en.wikipedia.org/wiki/2011_census_of_India�https://en.wikipedia.org/wiki/Demographics_of_India�https://en.wikipedia.org/wiki/Rhode_Island�https://en.wikipedia.org/wiki/Districts_of_India�https://en.wikipedia.org/wiki/Family_planning_in_India�https://en.wikipedia.org/wiki/Sex_ratio�https://en.wikipedia.org/wiki/Women_in_India�
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
18
The remaining 45 percent of the land is either not available for cultivation or
uncultivable. The district is not having any major and medium irrigation projects.
Main crops grown are paddy, pulses and oilseeds. Paddy accounts for nearly 80
percent of the cropped area, followed by pulses (14 percent). Sugarcane, which was
grown once in about 2000 ha, is now abandoned with the break-down of Brahmavar
sugar factory. The district has substantial acreage under plantation crops such as
coconut, cashew-nut, arecanut and rubber. Other horticultural crops grown in the
district include mango, sapota, banana, pineapple and vegetables. The Most of
farmers in the district are small and marginal farmers with land holding less than
2ha. The average size of land holding works out to 0.83ha.
Industry
Udupi district has large and medium scale industrial units. They include cashew-nut
processing units, rice mills, coconut powder units, fish canning and processing units,
fish meal and fish oil units, fish net manufacturing units, printing units, granite
units, readymade garment units, auto parts and units of block manufacturing etc.
The district has three industrial estates and about 7500 registered small scale units
employing persons, mainly in automobiles, chemicals, electrical and electronics,
ferrous and non-ferrous, food and intoxicants, leather, mechanical engineering,
paper and printing, textiles, wood and others. The traditional industries like tiles and
beedi are losing importance. The minerals and ores that are available in the district
include silica, calcium, ordinary sand, laterite and granites.
The district has 98 kms long coastal belt, which provides good scope for fisheries in
Udupi and Kundapura taluks. Since the district has heavy rain fall, number of
tributaries and backwaters provide good scope for inland fishery.
Tourism
Udupi district is known for its temples, beaches and Udupi restaurants. It is also
considered the cultural and spiritual capital of Karnataka. The pilgrim places include
famous Krishna temple of Udupi set up by Madhwacharya in 13th century with eight
Muths and Kollur Mukambika temple located at the foothills of Kodachadri set up in
eighth century by Adi Shankaracharya. Bound by lush green mountains on the east
and palm fringed beaches on the west, the district has numerous tourist spots of
great scenic beauty in its entire expanse. Malpe, Kaup and Thrasi Maravanthe
-
Detailed Project Report for MSW Management for Kapu Town Municipal Council -----------------------------------------------------------------------------------------------------------------------
M/s MaRS Planning & Engineering Services Pvt. Ltd
19
beaches are well known. St. Mary’s Island close to Malpe has unique basalt rock
formations and natural beauty. The Western Ghat Mountains offer places of tourist
attraction. Historical places include Barkur, Udyavar and Karkala. The district is also
famous for its various fairs and festivals and folk dances like Yakshagana - a fabulous
costumed musical dance drama, Boothakolas and Kambla, a buffalo race.
Transportation
The Udupi district has two national highways passing through, one is NH-17 (now
renamed as NH 66) and another is NH-13. The NH-17 (now renamed as NH-66)
which moves in north and south direction connects Udupi with cities like Mangaluru,
Karwar, Murudeshwara, Kochi, Madgaon, Goa, Ratnagiri and Mumbai. The NH-13
connects district with Shimoga, Bijapura, Solapur, Chitradurga and Hospet. The
district has network of bituminised roads connecting dist