DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development...

29
DETAILED PROGRESS REPORT ON SPECIAL SKILL DEVELOPMENT PROJECT UNDER SGSY BEING IMPLEMENTED BY HIMACHAL CONSULTANCY ORGANISATION (HIMCON) IN HIMACHAL PRADESH HIMACHAL CONSULTANCY ORGANISATION LTD. (HIMCON) New Bridge View Estate, The Mall, Shimla Phone: 0177-2654537, 2652488, Fax: 2655722 email: [email protected]

Transcript of DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development...

Page 1: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

DETAILED PROGRESS REPORT ON

SPECIAL SKILL DEVELOPMENT PROJECT

UNDER

SGSY BEING IMPLEMENTED BY

HIMACHAL CONSULTANCY ORGANISATION

(HIMCON)

IN HIMACHAL PRADESH

HIMACHAL CONSULTANCY ORGANISATION LTD. (HIMCON)

New Bridge View Estate, The Mall, Shimla

Phone: 0177-2654537, 2652488, Fax: 2655722 email: [email protected]

Page 2: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 2 of 29

Contents

CHAPTER- I ................................................................................................................................................. 3

CONCEPT NOTE ON SGSY TRAINING ......................................................................................................... 3

CHAPTER -II ................................................................................................................................................ 5

Financial Assistance for the Project:- ........................................................................................................ 5

CHAPTER -III ............................................................................................................................................... 6

Execution of the Project: ........................................................................................................................... 6

CHAPTER -III ............................................................................................................................................... 8

Inauguration of the SGSY - Special Project:- ............................................................................................. 8

CHAPTER –IV .............................................................................................................................................. 9

PROGRESS REPORT .................................................................................................................................... 9

Quarterly Progress Report of SGSY Special Project:- .......................................................................... 11

JULY 2010 – SEPTEMBER 2010 ................................................................................................................ 12

Annexure No. 1 ........................................................................................................................................ 12

OCTOBER 2010 – DECEMBER 2010 ......................................................................................................... 14

Annexure No. 2 ........................................................................................................................................ 14

JANUARY 2011 – MARCH 2011 ............................................................................................................... 16

Annexure No. 3 ........................................................................................................................................ 16

APRIL 2011 – JUNE 2011.......................................................................................................................... 18

Annexure No. 4 ........................................................................................................................................ 18

JULY 2011 – SEPTEMBER 2011 ................................................................................................................ 20

Annexure No. 5 ........................................................................................................................................ 20

OCTOBER 2011 – DECEMBER 2011 ......................................................................................................... 22

Annexure No. 6 ........................................................................................................................................ 22

JANUARY 2012 – MARCH 2012 ............................................................................................................... 23

Annexure No. 7 ........................................................................................................................................ 24

APRIL 2012 – JUNE 2012.......................................................................................................................... 26

Annexure No. 8 ........................................................................................................................................ 26

July 2012 .................................................................................................................................................. 28

Annexure No. 9 ........................................................................................................................................ 28

Page 3: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 3 of 29

CHAPTER- I

CONCEPT NOTE ON SGSY TRAINING

Government of India, Ministry of Rural Development has sanctioned a

“Special Project” for Skill Development under “SGSY” for Himachal Pradesh.

This Project envisage to impart three months skill training to 1700 youth

belonging to BPL families in Himachal Pradesh within a period of two years

as per the need and requirement of the existing industries in the state of

Himachal Pradesh. After the training the trained youth will be offered

employment opportunities in the industries.

This project will be implemented by Himachal Consultancy Organisation Ltd.

(HIMCON) under the guidance of Department of Rural Development and

Panchayat Raj, Himachal Pradesh.

Department of Rural Development and Panchayat Raj, Himachal Pradesh

and HIMCON have identified a few sectors of industries like Pharmaceutical,

Textile, Computer and Other Allied Industries etc. having concentration in

Himachal Pradesh for training and employment opportunities for the youth

of the target group.

As most of the BPL youth aspiring to be covered under the Project are

qualified up-to Matriculation, they have to be placed as unskilled workers at

minimum wages after the two and half month training. Subsequently looking

to their aptitude, ability to learn and attain certain level of technical skills

and experience they can be promoted as semi-skilled workers.

Page 4: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 4 of 29

The Three Months training has been split into Two Phases:-

PHASE-I

During the first phase of training basic orientation, motivation and aptitude

development for success in private sector jobs will be provided. This phase

will have training of two weeks. The venue of this phase of training will be

within five kilometers of the house of the trainers.

PHASE-II

Looking at the education, aptitude and mobility of the youth on the job skill

training will be given in the identified sectors of industries in Himachal

Pradesh for two and a half months. During this period the youth will be

exposed to the machines, processes, raw material and jobs in that sector of

industry and also their skills will be developed during on the job training.

Page 5: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 5 of 29

CHAPTER -II

Financial Assistance for the Project:-

The Special Project under SGSY for Skill Development of Rural Youth in all

the Districts of Himachal Pradesh was placed before the Project Approval

Committee (PAC) on dated September 14, 2009. The Project Approval

Committee (PAC) for Special Projects under SGSY considered the proposal in

its meeting held on September 14, 2009 and approved the project subjected

to certain conditions. (Copy of letter enclosed for ready reference).

The project will be implemented by Himachal Consultancy Organisation Ltd.

(HIMCON) and coordinated by DRDA, Hamirpur, Himachal Pradesh. The

Total cost of project was Rs. 117.00 lakh to be funded as follows:-

Source of Funds Rs. in Lakhs

a. Central Share 87.75

b. State Share 29.25

TOTAL 117.00

The 1700 rural BPL beneficiaries will be covered under the project for

training and to placement/wage employment.

The split up of the sanction is as under:

Training (residential programme) : 900 persons Rs.81.00 Lakhs

Training (Non residential) : 800 persons Rs.36.00 Lakhs

Page 6: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 6 of 29

CHAPTER -III

Execution of the Project:

Co-ordination with Industries:-

The successful implementation of the SGSY-Special Project, tie-up was done

with the industries. Baddi Barotiwala and Nalagarh Industries Association

(Regd.) and other industries their consent to provide training and to absorb

the beneficiaries after completion of training, under the SGSY Special Project

in various industries in Himachal Pradesh. (Copy of consent letter enclosed

for your ready reference)

HIMCON has tied up with various established groups for job training. Some

of the companies are as under:-

1. Wipro Ltd.

2. Timex Watches Ltd.

3. SGS Computers

4. Valco Industries Ltd.

5. Vardhman Textiles

6. Kanha Pharma

7. Cipla

Stay Arrangements:-

After receiving the consent letter from the industries HIMCON has arranged

staying accommodation for all the beneficiaries. Mountview Group Housing

Co. were initially selected for the accommodations to the beneficiaries stay

at Baddi.

Page 7: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 7 of 29

Food Arrangements:-

Food facility had also been arranged for the beneficiaries during the training

period of three months.

Publicity of the Project:-

HIMCON with its vigorous efforts tried to contact and motivate unemployed

youth of the state and to join on the job skill development training under

this prestigious project and wide publicity was given to this project by

HIMCON and also through BDO’s, Pradhans of Panchayats and other local

functionaries.

Page 8: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 8 of 29

CHAPTER -III

Inauguration of the SGSY - Special Project:-

After doing the basic spade work, tie-up with the industries the project was

launched by Shri Jai Ram Thakur, Honorable Minister for Rural Development

& Panchayati Raj of Himachal Pradesh on dated May 05, 2010.

Orientation camps of 15 days duration were held for 120 beneficiaries but

with initial constraints first batch of 15 beneficiaries were placed for on the

job training on July 2010 and subsequently batches of 15 - 20 beneficiaries

were enrolled and placed. Till September 2010 a total of 147 beneficiaries

were enrolled and placed for on the job training in different industries in

Baddi, District Solan in Himachal Pradesh.

With the efforts put in by HIMCON team the results are encouraging and the

pace of joining by BPL youth under the project was having upward trend

since beginning of September 2010.

Page 9: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 9 of 29

CHAPTER –IV

PROGRESS REPORT

The consolidated progress report since inception of the

Project is as under:

SGSY PROGRESS REPORT

JULY 2010 - JULY 2012

(SUMMARY REPORT)

MALE FEMALE TOTAL

TOTAL BENEFICIARIES ENROLLED

FOR TRAINING 516 107 623

MALE FEMALE TOTAL

TOTAL BENEFICIARIESCOMPLETED

TRAINING 420 100 520

MALE FEMALE TOTAL

TOTAL BENEFICIARIES EMPLOYED 420 100 520

BREAK-UP OF BENEFICIARIES COMPLETED TRAINING AND

ENPLOYED

CATEGORY MALE FEMALE TOTAL

GENERAL 193 54 247

SC 129 30 159

ST 26 4 30

OBC 68 12 80

MINORITY 4 0 4

TOTAL 520

Page 10: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 10 of 29

EXPENSES INCURRED ON TRAINING OF BENEFICIARIES

MALE FEMALE TOTAL

NO. OF BENEFICIARIES

COMPLETED TRAINING AND

EMPLOYED

420 100 520

TOTAL 520

EXPENSES @ Rs. 3000/- PER

BENEFICIARY PER MONTH

(THREE MONTHS TRAINING) (504 @ 9000/-) 46,80,000

TOTAL 46,80,000

Verification of all the 520 persons has also been completed.

Few photographs of the inaugural function in which Hon.ble

Minister for Rural Development, Govt. of Himachal Pradesh

was chief Guest and Verification Process in the presence of

Representatives of Rural Development Department are

annexed to this Report.

Copy of the Video at the time of convention of trainees

organised by HIMCON in which 102 participants were verified

and certificates distributed is also enclosed along with this

report.

The list of successful 520 trainees along-with their addresses

is annexed to this report after the quarterly progress report.

Page 11: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 11 of 29

Quarterly Progress Report of SGSY Special Project:-

Quarterly Progress Reports of SGSY-Special Projects from July 2010 – July

2012 are as under:-

The list of beneficiaries completed training from July 2010-September

2010 under the SGSY - Special Project is as under:

Page 12: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 12 of 29

JULY 2010 – SEPTEMBER 2010

Annexure No. 1

The following table shows the progress report of the SGSY-Special Project. In

this quarter 123 beneficiaries were enrolled for training out of which 103

male and 20 female beneficiaries. The following table shows the completed

information.

SGSY PROGRESS REPORT

JULY 2010 - SEPT 2010

JULY 2010 - SEPT 2010 MALE FEMALE TOTAL

CANDIDATES 103 20 123

MALE FEMALE TOTAL

COMPLETED 95 20 115

DROPPED OUTS 8 0 8

TOTAL 123

CATEGORY MALE FEMALE TOTAL

GENERAL 41 7 48

SC 40 11 51

ST 0 0 0

OBC 22 2 24

MINORITY 0 0 0

TOTAL 123

RELIGIOUS MALE FEMALE TOTAL

HINDU 103 20 123

MUSLIUM 0 0 0

TOTAL 123

Page 13: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 13 of 29

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

CANDIDATES COMPLETED THE

TRAINING 95 20 115

TOTAL 115

EXPENSES INCURED RUPEES. 3000/- PER

MONTH ON EACH CANDIDATE

RS. 9000/- PER CANDIDATE FOR

THREE MONTHS

(115 CANDIDATES @

RUPEES 9000/-) 10,35,000.00

TOTAL 10,35,000.00

During the quarter 115 beneficiaries has completed the training and rest of

eight beneficiaries dropped out. Therefore an amount of Rs. 10,35,000/- was

incurred on the Skill Training Programme of 115 beneficiaries during the

quarter.

Page 14: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 14 of 29

OCTOBER 2010 – DECEMBER 2010

Annexure No. 2

The list of beneficiaries completed training from October 2010-

December 2010 under SGSY-Special Project is as under:-

During the Quarter 163 beneficiaries enrolled for the training out of which

161 beneficiaries has completed the training and placed in their respective

companies. The following table shows the progress of the quarter.

SGSY PROGRESS REPORT

OCT 2010 - DEC 2010

OCTOBER, 2010 TO

DECEMBER, 2010 MALE FEMALE TOTAL

CANDIDATES 132 31 163

MALE FEMALE TOTAL

COMPLETED 130 31 161

DROPPED OUTS 2 0 2

TOTAL 163

CATEGORY MALE FEMALE TOTAL

GENERAL 64 18 82

SC 47 10 57

ST 4 1 5

OBC 17 2 19

MINORITY 0 0 0

TOTAL 163

Page 15: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 15 of 29

RELIGIOUS MALE FEMALE TOTAL

HINDU 132 31 163

MUSLIUM 0 0 0

TOTAL 163

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

CANDIDATES COMPLETED THE

TRAINING 130 31 161

TOTAL 161

EXPENSES INCURED @ RUPEES. 3000/-

PER MONTH ON EACH CANDIDATE FOR

THREE MONTHS

RS. 9000/- PER CANDIDATE

FOR THREE MONTHS

(161 Candidates @ Rs.

9000/- per candidate) 14,49,000.00

TOTAL 14,49,000.00

During the quarter 161 (Male = 130 and Female = 31) beneficiaries has

completed the training. An amount of Rs. 14,49,000/- was incurred on the

Skill Training Programme of 161 beneficiaries during the quarter.

Page 16: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 16 of 29

JANUARY 2011 – MARCH 2011

Annexure No. 3

During the Quarter 67 beneficiaries enrolled for the training out of which 48

beneficiaries has completed the training and placed in their respective

companies. The following table shows the progress of the quarter.

JANUARY 2011 - MARCH 2011 MALE FEMALE TOTAL

CANDIDATES 62 5 67

MALE FEMALE TOTAL

COMPLETED 44 4 48

DROPPED OUTS 18 1 19

TOTAL 67

CATEGORY MALE FEMALE TOTAL

GENERAL 34 3 37

SC 5 1 6

ST 18 1 19

OBC 5 0 5

MINORITY 0 0 0

TOTAL 67

RELIGIOUS MALE FEMALE TOTAL

HINDU 62 5 67

MUSLIUM 0 0 0

TOTAL 67

Page 17: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 17 of 29

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

CANDIDATES TRAINING

COMPLETED 44 4 48

TOTAL 48

EXPENSES INCURED @ RS. 3000/- PER MONTH

ON EACH CANDIDATE

FOR 3 MONTHS RUPEES. 9000/- PER

CANDIDATE FOR THREE MONTHS (48 @ 9000/-) 4,32,000.00

TOTAL 432,000.00

During the quarter 48 (Male 44 and Female 4) beneficiaries has completed

the training. An amount of Rs. 4,32,000/- was incurred on the Skill Training

Programme of 48 beneficiaries during the quarter.

Page 18: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 18 of 29

APRIL 2011 – JUNE 2011

Annexure No. 4

During the Quarter 177 beneficiaries enrolled for the training out of which

112 beneficiaries has completed the training and placed in their respective

companies. The following table shows the progress of the quarter.

SGSY PROGRESS REPORT

APRIL 2011 - JUNE 2011

APRIL 2011 - JUNE 2011 MALE FEMALE TOTAL

CANDIDATES 154 23 177

MALE FEMALE TOTAL

COMPLETED 91 21 112

DROPPED OUTS 63 2 65

TOTAL 177

CATEGORY MALE FEMALE TOTAL

GENERAL 50 12 62

SC 31 6 37

ST 36 3 39

OBC 35 2 37

MINORITY 2 0 2

TOTAL 177

RELIGIOUS MALE FEMALE TOTAL

HINDU 152 23 175

MUSLIUM 2 0 2

TOTAL 177

Page 19: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 19 of 29

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

COMPLETED CANDIDATES TRAINING

COMPLETED 91 21 112

TOTAL 112

EXPENSES INCURED RS. 3000/- PER

MONTH ON EACH CANDIDATE FOR

THREE MONTHS

RUPEES. 9000/- PER CANDIDATE

FOR THREE MONTHS

(112 CANDIDATES @

RUPEES 9000/-) 10,08,000

TOTAL 1,008,000

During the quarter 112 (Male 91 and Female 21) beneficiaries has

completed the training. An amount of Rs. 10,08,000/- was incurred on the

Skill Training Programme of 112 beneficiaries during the quarter.

Page 20: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 20 of 29

JULY 2011 – SEPTEMBER 2011

Annexure No. 5

The list of beneficiaries completed training from July 2011- September

2011 under SGSY-Special Project is enclosed as under:

During the Quarter 42 beneficiaries enrolled for the training out of which 41

beneficiaries has completed the training and placed in their respective

companies. The following table shows the progress of the quarter.

SGSY PROGRESS REPORT

JULY 2011 - SEPT 2011

JULY 2011 - SEPT 2011 MALE FEMALE TOTAL

CANDIDATES 41 1 42

MALE FEMALE TOTAL

COMPLETED 35 6 41

DROPPED OUTS 0 1 1

TOTAL 42

CATEGORY MALE FEMALE TOTAL

GENERAL 23 4 27

SC 5 3 8

ST 4 0 4

OBC 3 0 3

MINORITY 0 0 0

TOTAL 42

Page 21: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 21 of 29

During the quarter 41 (Male 35 and Female 6) beneficiaries has completed

the training. An amount of Rs. 3,69,000/- was incurred on the Skill Training

Programme of 41 beneficiaries during the quarter.

RELIGIOUS MALE FEMALE TOTAL

HINDU 35 7 42

MUSLIUM 0 0 0

TOTAL 42

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

CANDIDATES TRAININGS

COMPLETED 35 6 41

TOTAL 41

EXPENSES INCURED RS. 3000/- PER MONTH ON

EACH CANDIDATE FOR 3 MONTHS

RS. 9000/- PER

CANDIDATE FOR THREE

MONTHS

(41 CANDIDATES @

RUPEES 9000/- PER

CANDIDATE)

3,69,000

TOTAL 3,69,000

Page 22: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 22 of 29

OCTOBER 2011 – DECEMBER 2011

Annexure No. 6

The list of beneficiaries completed training from October 2011 to

December 2011 under SGSY-Special Project is as under:

During the Quarter 22 beneficiaries enrolled for the training out of which 18

beneficiaries has completed the training and placed in their respective

companies. The following table shows the progress of the quarter.

SGSY PROGRESS REPORT

OCTOBER 2011 - DECEMBER 2011

OCT 2011 - DEC 2011 MALE FEMALE TOTAL

CANDIDATES 16 6 22

MALE FEMALE TOTAL

COMPLETED 12 6 18

DROPPED OUTS 4 0 4

TOTAL 22

CATEGORY MALE FEMALE TOTAL

GENERAL 7 3 10

SC 7 1 8

ST 0 0 0

OBC 2 0 2

MINORITY 2 0 2

TOTAL 22

Page 23: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 23 of 29

RELIGIOUS MALE FEMALE TOTAL

HINDU 14 6 20

MUSLIUM 2 0 2

TOTAL 22

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

CANDIDATES TRAININGS

COMPLETED CANDIDATES 12 6 18

TOTAL 18

EXPENSES INCURED RS. 3000/-

PER MONTH ON EACH CANDIDATE

FOR THREE MONTHS

RUPEES 9000/- PER CANDIDATE

FOR THREE MONTHS

(18 CANDIDATES @

RUPEES 9000/- PER

CANDIDATE)

162,000

TOTAL 162,000

During the quarter 18 (Male 12 and Female 6) beneficiaries has completed

the training. An amount of Rs. 1,62,000/- was incurred on the Skill Training

Programme of 18 beneficiaries during the quarter.

JANUARY 2012 – MARCH 2012

Page 24: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 24 of 29

Annexure No. 7

The list of beneficiaries completed training from January 2012- March

2012 under SGSY-Special Project is enclosed as under:

During the Quarter 9 beneficiaries enrolled for the training out of which 9

beneficiaries has completed the training and placed in their respective

companies. The following table shows the progress of the quarter.

SGSY PROGRESS REPORT

JANUARY 2012 - MARCH 2012

JAN 2012 - MAR 2012 MALE FEMALE TOTAL

CANDIDATES 8 1 9

MALE FEMALE TOTAL

COMPLETED 8 1 9

DROPPED OUTS 0 0 0

TOTAL 9

CATEGORY MALE FEMALE TOTAL

GENERAL 4 1 5

SC 2 0 2

ST 0 0 0

OBC 2 0 2

MINORITY 0 0 0

TOTAL 9

Page 25: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 25 of 29

During the quarter 9 (Male 8 and Female 1) beneficiaries has completed the

training. An amount of Rs. 81,000/- was incurred on the Skill Training

Programme of 9 beneficiaries during the quarter.

RELIGIOUS MALE FEMALE TOTAL

HINDU 8 1 9

MUSLIUM 0 0 0

TOTAL 9

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

COMPLETED CANDIDATES 8 1 9

TOTAL 9

EXPENSES INCURED @ RUPEES 3000/- PER

CANDIDATE PER MONTH FOR 03 MONTHS ON

NINE CANDIDATED

RS. 9000/- PER CANDIDATE FOR

THREE MONTHS

(9 CANDIDATES @

RUPEES 9000/- PER

CANDIDATE)

81,000

TOTAL 81,000

Page 26: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 26 of 29

APRIL 2012 – JUNE 2012

Annexure No. 8

The list of beneficiaries completed training from April 2012- June 2012

under SGSY-Special Project is enclosed as under:

During the Quarter 12 beneficiaries enrolled for the training out of which 12

beneficiaries has completed the training and placed in their respective

companies. The following table shows the progress of the quarter.

SGSY PROGRESS REPORT

April 2012 - June 2012

April 2012 - June 2012 MALE FEMALE TOTAL

CANDIDATES COMPLETED

TRAINING 6 6 12

CATEGORY MALE FEMALE TOTAL

GENERAL 4 5 9

SC 2 1 3

ST 0 0 0

OBC 0 0 0

MINORITY 0 0 0

TOTAL 12

RELIGIOUS MALE FEMALE TOTAL

HINDU 6 6 12

MUSLIUM 0 0 0

TOTAL 12

Page 27: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 27 of 29

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

COMPLETED CANDIDATES 6 6 12

TOTAL 12

EXPENSES INCURED RS. 3000/- PER MONTH ON

EACH CANDIDATE FOR 3 MONTHS

RUPEES 9000/- PER CANDIDATE

FOR THREE MONTHS

(9 CANDIDATED @

RUPEES 9000/-) 108,000

TOTAL 108,000

During the quarter 12 (Male 6 and Female 6) beneficiaries has completed

the training. An amount of Rs. 1,08,000/- was incurred on the Skill Training

Programme of 12 beneficiaries during the quarter.

Page 28: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 28 of 29

July 2012

Annexure No. 9

The list of beneficiaries completed training in the month of July 2012

under SGSY-Special Project is enclosed as under:

Few candidates has gone through Orientation programme before 31 March

2012 but enrolled for training from 10.04.2012 these beneficiaries has

completed the training in the month of July 2012. During this month 4

beneficiaries enrolled for the training out of which 4 beneficiaries has

completed the training and placed in their respective companies. The

following table shows the progress of the quarter.

SGSY PROGRESS REPORT

SGSY CANDIDATES COMPLETED TRAINING IN JULY 2012

MALE FEMALE TOTAL

CANDIDATES COMPLETED TRAINING 0 4 4

CATEGORY MALE FEMALE TOTAL

GENERAL 0 4 4

SC 0 0 0

ST 0 0 0

OBC 0 0 0

MINORITY 0 0 0

TOTAL 4

Page 29: DETAILED PROGRESS REPORT - · PDF filedetailed progress report on special skill development project under sgsy being implemented by himachal consultancy organisation (himcon) in himachal

Page 29 of 29

EXPENSES INCURRED ON SGSY PROJECT

MALE FEMALE TOTAL

COMPLETED CANDIDATES 0 4 4

TOTAL 4

EXPENSES INCURED @ RUPEES 3000/- PER

MONTH ON EACH CANDIDATE

FOR 3 MONTHS RUPEES 9000/- PER

CANDIDATE FOR THREE MONTHS

(9 CANDIDATES @

RUPEES 9000/-) 36,000

TOTAL 36,000

During this month 4 beneficiaries has completed the training. An amount of

Rs. 36,000/- was incurred on the Skill Training Programme of 4

beneficiaries during the quarter.

HIMCON has slowed down the activities in this project as the second

installment has not been received and over Rs. 17.50 lakhs have

already been spent from HIMCON’s own resources.