Detailed Plans on Production Service Operations in Spain

Andreu Pacheco (IFAE/PIC)GDB Meeting

13-1-2004

Page 2: Detailed Plans on Production Service Operations in Spain Andreu Pacheco (IFAE/PIC) GDB Meeting 13-1-2004.

LCG2 Migration Current Status

• We are ready to enter LCG2

• At PIC, Gonzalo Merino and Marc Rodriguez are in charge of this migration.

• Gonzalo was also in charge last September of Spanish LCG1 integration, including the coordination of all spanish sites.

Page 3: Detailed Plans on Production Service Operations in Spain Andreu Pacheco (IFAE/PIC) GDB Meeting 13-1-2004.

LCG2 Plans in Spain

1. PIC will migrate 50% of their computing resources to LCG2.

2. The 6000-slot PIC robotic storage facility will be added to LCG2.

3. The rest of the sites will move to LCG2 100% of their current LCG1 resources.

4. PIC will migrate 100% to LCG2.

Page 4: Detailed Plans on Production Service Operations in Spain Andreu Pacheco (IFAE/PIC) GDB Meeting 13-1-2004.

Spanish sites in LCG1

• CIEMAT, Madrid

• IFCA, Santander

• IFIC, Valencia

• PIC (IFAE), Barcelona

• UAM, Madrid

• UB, Barcelona

• USC, Santiago de Compostela

Page 5: Detailed Plans on Production Service Operations in Spain Andreu Pacheco (IFAE/PIC) GDB Meeting 13-1-2004.

Remarks

• It is very important for us that experiments will use only grid computing by June 2004.

• This will move most LHC computing resources located in spanish sites to LCG2.