Detailed Design Phase Review: P14415 Patrick Morabito John Wilson Michael Coffey Nathan Conklin...

download Detailed Design Phase Review: P14415 Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky.

If you can't read please download the document

Transcript of Detailed Design Phase Review: P14415 Patrick Morabito John Wilson Michael Coffey Nathan Conklin...

  • Slide 1
  • Detailed Design Phase Review: P14415 Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky
  • Slide 2
  • Agenda Requirements Review Prior Design 1 Design 1 Design 2 Test Plan Risks Moving Forward
  • Slide 3
  • Customer Requirements
  • Slide 4
  • Engineering Requirements
  • Slide 5
  • Functional Decomposition Upper Level
  • Slide 6
  • Functional Decomposition Mid Level
  • Slide 7
  • Functional Decomposition Mid Level
  • Slide 8
  • Functional Decomposition Mid Level
  • Slide 9
  • Functional Decomposition Mid Level
  • Slide 10
  • Functional Decomposition Sub System level
  • Slide 11
  • Design 1 - Prior Design Iteration Overly Conservative Analysis Model Failed Worst Case Loading (6180psi): +150% of Ultimate Strength (4100psi) Value too high to justify moving forward (Arrows denote failure location)
  • Slide 12
  • Design 1 - Manufacturing Process Full production and prototype tooling costs for large dimension (32in x 32in) base too expensive to proceed. Prototype costs range in the $8,000 + range Full production run costs for lots of 100 = $50.00 o still relatively large for simplicity of part Have contacted Faro Industries for additional vacuum forming support. Possibility to re- quote prototype using wooden mold. *Discussed in more detail later in powerpoint Wooden mold for large dimension part could cost ~ $3,000
  • Slide 13
  • Design 1 - Vacuum forming at R.I.T
  • Slide 14
  • Design 1 - Plastic Material Selection Material Selected: HDPE Acrylic: Brittle Polycarbonate: Expensive relative to HDPE (2x the cost for most sheets) ABS: Poor UV resistance
  • Slide 15
  • Design 1 - Selected Design
  • Slide 16
  • Design 1 -Assembly Drawing
  • Slide 17
  • Design 1 -Lid Assembly Drawing
  • Slide 18
  • Design 1 - Mold
  • Slide 19
  • Design 1 -Mold Drawing
  • Slide 20
  • Design 1 -Mold Assembly Drawing
  • Slide 21
  • Design 1 - Rebar Design
  • Slide 22
  • Slide 23
  • Design 1 - Rebar Length Optimization
  • Slide 24
  • Slide 25
  • Design 1 - Proof of CR/ER Overview
  • Slide 26
  • Design 1 - Proof of CR/ER: Strength (Insert link to detailed calculations here?) 29600 Cycles => ~3.86 years (Family of 7, 3 times per day, 365 days a year)
  • Slide 27
  • Design 1 - Analysis Assumptions Rebar supported by edge of hole Load applied across 4in diameter circle Modified Goodman Failure Theory Rebar is hot-rolled
  • Slide 28
  • Design 1 - Ansys Analysis - Stress 270lbs
  • Slide 29
  • Design 1 - Ansys Analysis - Displacement 270lbs
  • Slide 30
  • Design 1 - Ansys Analysis - Stress 120lbs
  • Slide 31
  • Design 1 - Ansys Analysis - Displacement 120lbs
  • Slide 32
  • Design 1 - Ansys Analysis - Stress 270lbs
  • Slide 33
  • Design 1 - Ansys Analysis - Displacement 270lbs
  • Slide 34
  • Design 1 - Analysis Summary Average Loading (120lbs): Infinite Life & No Yield High Loading (270lbs): Finite Life (29600 cycles) & No Yield; 3.86 years Largest Unsupported Plastic Section Wont Fail Actual Design Stronger: Loading Distributed by Plastic & Ribbing
  • Slide 35
  • Design 1 - Proof of CR/ER: Dimensional
  • Slide 36
  • (.61m)
  • Slide 37
  • Design 1 - Proof of CR/ER: Dimensional (.23m) (.15m)
  • Slide 38
  • Design 1 - Proof of CR/ER: Costs
  • Slide 39
  • Design 1 - Cost Breakdown: Shipping Assumptions: -One day storage before loading and after unloading (2 days total) -Weight does not affect shipping cost -Arborloo will be assembled in Haiti (i.e. only raw material is shipped) Cost to ship: 20 Shipping Container Dimensions:
  • Slide 40
  • Design 1 - Cost Breakdown Cont. Material Cost: Shipping Cost: Labor Cost:
  • Slide 41
  • Design 1 - Proof of CR/ER: Weight
  • Slide 42
  • Design 1 - Proof of CR/ER: Assembly Finished Purchased Product: Does not require on-site assembly On-site installation requires the removal of surrounding surface to allow the product to sit in the ground No complex tools required at use location
  • Slide 43
  • Design 1 - Estimated Process Time Approximately 66 minutes
  • Slide 44
  • Design 1 - Proof of CR/ER: Static coefficient of friction
  • Slide 45
  • Design 1 - Proof of CR/ER: Misc Ease of Cleaning: Detachable lid, non porous material, lightweight dumpable design, smooth surface Aesthetically Pleasing: Pending focus group review
  • Slide 46
  • Design 1 - Additional Customer Requirement: Possible Shelter Attachment
  • Slide 47
  • Design 1 - Summary Cost in lots of 1000: $23.86 Weight per base: 22.2lbs Infinite life for rebar at average load (120lbs) 3.86 years for rebar at high load (270lbs)
  • Slide 48
  • Design 2: Deck-Loo - Overview Design Advantages Robust material Designed for use outdoor Designed as walking surface Simple Construction Pre cut pieces can be assembled with screws alone Lightweight Design 22.9 lbs
  • Slide 49
  • Design 2 - Material Selection 100% Recycled High Density Polyethylene High Ultimate Strength Excellent environmental stress crack resistance High Ductility
  • Slide 50
  • Design 2 - Manufacturing Process Delivery of Kitted plastic lumber to village craftsman Assembled by screwing lumber together Purchased in village and carried to use sight fully assembled
  • Slide 51
  • Design 2 - Prototype
  • Slide 52
  • Design 2 - Proof of CR/ER Overview
  • Slide 53
  • Main Concern is deflection Deflection between supports Deflection of supports What is comfortable?
  • Slide 54
  • Design 2 - Proof of CR/ER Overview Deflection between supports Deflection of Supports
  • Slide 55
  • Design 2 - Proof of CR/ER Overview This analysis is conservative because of point load assumption, so deflection should be less Based on current Haitian sanitation solutions, the team agrees this deflection is sufficient. However, we have ordered more supports than needed, so we can adjust if necessary
  • Slide 56
  • Design 2 - Proof of CR/ER Overview
  • Slide 57
  • Slide 58
  • Slide 59
  • Slide 60
  • Design 2 - Cost Breakdown: Shipping Assumptions: -One day storage before loading and after unloading (2 days total) -Weight does not affect shipping cost -Arborloo will be assembled in Haiti (i.e. only raw material is shipped) Cost to ship: 20 Shipping Container Dimensions:
  • Slide 61
  • Design 2 - Cost Breakdown Cont. Material Cost: Shipping Cost: Labor Cost:
  • Slide 62
  • Design 2 - Summary Cost in lots of 1000: $40.86 Weight per base: 22.9lbs Worst case deflection:.44in Simple Construction
  • Slide 63
  • Test Plan
  • Slide 64
  • Slide 65
  • Highlighted Risks Risks 1.Not adoptable: high cost 1.Prototype fails tests 1.Unable to manufacture in Haiti 1.Unacceptable deflection Mitigation Strategy 1.Optimize cost through iteration 2.Modify design accordingly 1.Manufacture in the US 1.Increase the number/material of ribs
  • Slide 66
  • Limitations On campus manufacturability: machine may be unable to form 1/4in sheets Advanced deadlines in MSDII Mold making capabilities Shipping capabilities
  • Slide 67
  • Future Project Recommendations Reiterate with only vacuum formed plastic, without any added supports o Work with Faro Industries Reiterate with a focus on recycled materials
  • Slide 68
  • Future MSD Recommendations Less lecture content early on and more work time 15 minutes for Subject Matter Expert meetings is much too short
  • Slide 69
  • Learning Experience Importance of project planning and documentation Iterative design process
  • Slide 70
  • MSDII Critical Path and Milestones
  • Slide 71
  • Moving Forward Tasks Determine mold making capabilities Order raw materials Manufacture mold Assemble Prototypes
  • Slide 72
  • Acknowledgements A big thank you to Sarah, Pedro, Kevin, Johnny, Dr. Thorn, Dr. Lam, Dr. Debartolo, and Dr. Boedo, Dr. Humphrey, and all other parties that have assisted us
  • Slide 73
  • Questions?