Detailed Design of Hullar Bridge
28
ISLAMIC REPUBLIC OF PAKISTAN EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY AZAD J AMMU AND KASHMIR URBAN DEVELOPMENT PROGRAM BAGH CITY DEVELOPMENT PROJECT (BCDP) CONSTRUCTION DRAWINGS HULLAR BRIDGE, BAGH October, 2010 CONTRACTOR: China Xinjiang Beixin Construction & Engineering (Group) Co., Ltd. China Xinjiang Beixin Camp, Rawani (near airport), Muzaffarabad, Azad Jammu & Kashmir Tel & Fax: +92 5 822-433596 E-mail: [email protected] DESIGNER FOR CXB: Document No: J-0446-CDHBD-003 R0 Date: 13-10-2010 Consulting Engineers & Project Managers 52-D1 Gulberg III Lahore, Pakistan Voice : +92 42 587 5181, 587 6457 Fax : +92 42 587 6889 Email : [email protected] http://www.ndapak.com
-
Upload
muhammed-nouman-mohsin-ramzi -
Category
Documents
-
view
225 -
download
1
description
Bridge Design
Transcript of Detailed Design of Hullar Bridge
ISLAMIC REPUBLIC OF PAKISTAN EARTHQUAKE RECONSTRUCTION AND
REHABILITATION AUTHORITY
AZAD JAMMU AND KASHMIR URBAN DEVELOPMENT PROGRAM
BAGH CITY DEVELOPMENT PROJECT (BCDP) CONSTRUCTION DRAWINGS HULLAR BRIDGE, BAGH
October, 2010
CONTRACTOR: China Xinjiang Beixin Construction & Engineering (Group) Co., Ltd.
China Xinjiang Beixin Camp, Rawani (near airport),
Muzaffarabad, Azad Jammu & Kashmir Tel & Fax: +92 5 822-433596 E-mail: [email protected]
DESIGNER FOR CXB:
Document No: J-0446-CDHBD-003 R0 Date: 13-10-2010
Consulting Engineers & Project Managers
52-D1 Gulberg III Lahore, Pakistan
Voice : +92 42 587 5181, 587 6457 Fax : +92 42 587 6889 Email : [email protected] http://www.ndapak.com