DETAIL "1"
7
CAP
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
SCHEMA Konsult Inc. Joint Venture with
PERTCONSULT International
DCCD Engineering Corporation
Philipp's Technical Consultants Corp.
Project Manager Project Manager, DOTC-PMO
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
SCHEMA Konsult Inc.Joint Venture with
PERTCONSULT International
DCCD Engineering Corporation
Philipp's Technical Consultants Corp.
Project Manager Project Manager, DOTC-PMO
CIVIL ENGINEER
EDUARDO V. SANTILLAN
300mm 300 300 300 300 300 300 300 300 300
300
mm
300
300
300
300
300
30
030
030
0300
300mm 300 300 300 300 300 300 300 300 300
5 c
m
TOP SOIL
SUB-GRADE LEVEL
SODDING (CARABAO GRASS
SODDING(Carabao Grass)
EMBANKMENT / EXCAVATION SIDE SLOPE
NGL
300
mm
300
300
300
300
300
300
300
300
300
TOP SOIL( t = 5 cm)
13
CAP
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
SCHEMA Konsult Inc.Joint Venture with
PERTCONSULT International
DCCD Engineering Corporation
Philipp's Technical Consultants Corp.
Project Manager Project Manager, DOTC-PMO
CIVIL ENGINEER
EDUARDO V. SANTILLAN
PCCPASPHALT
SHOULDERASPHALT
SHOULDER
DETAIL "A"
START OF SODDING
DRAINAGE END OF SODDING
NGL
TOP SOIL ( t = 5cm)
SODDING( CARABAO GRASS)
EDGE OF ASPHALTSHOULDER
EMBANKMENT MATERIALS
5 c
m
14
CAP
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
SCHEMA Konsult Inc.Joint Venture with
PERTCONSULT International
DCCD Engineering Corporation
Philipp's Technical Consultants Corp.
Project Manager Project Manager, DOTC-PMO
0+000
0+100
0+200
0+300
0+400
0+500
0+600
0+700
0+800
0+900
1+000
1+100
1+200
1+300
1+400
1+500
1+700
1+800
1+900
2+000
2+100
2+200
0-100
2+300
2+400
2+500
2+600
TCSB STA.2+160
PCSB STA.2+225
PCSB STA.2+518TCSB STA.2+525
0+000
0+100
0+200
0+300
0+400
0+500
0+600
0+700
0+800
0+900
1+000
1+100
1+200
1+300
1+400
1+500
1+700
1+800
1+900
2+000
2+100
2+200
0-100
2+300
2+400
2+500
2+600
1
CAA
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
SCHEMA Konsult Inc.Joint Venture with
PERTCONSULT International
DCCD Engineering Corporation
Philipp's Technical Consultants Corp.
Project Manager Project Manager, DOTC-PMO
2+100
2+200
2+300
2+400
2+500
2+600
TCSB STA.2+160
PCSB STA.2+225
PCSB STA.2+518TCSB STA.2+525
0+000
0+100
0+200
0+300
0+400
0+500
0+600
0+700
0+800
0+900
1+000
1+100
1+200
1+300
1+400
1+500
1+700
1+800
1+900
2+000
2+100
2+200
0-100
2+300
2+400
2+500
2+600
0.35
10.
380
0.42
0
6 - 12mmØSPACED @0.265m O.C.
0.150 1.200 0.150
1.500
0.15
01.
000
0.30
0
1.45
0
150mm THK CHB w/4 - 12mmØ VERT. and HOR.BARS SPACED @0.200m O.C.
150mm THK CONC. w/2 - 12mmØ HOR. BARS [email protected] O.C.
1.375m LONG 16mm Ø R.S.B. SPACED@ 0.300m O.C. BOTHWAYS
1.30m LONG 16mm Ø BAR HANDLE
Ø0.170
Concrete Encasement
2
CAA
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
SCHEMA Konsult Inc.Joint Venture with
PERTCONSULT International
DCCD Engineering Corporation
Philipp's Technical Consultants Corp.
Project Manager Project Manager, DOTC-PMO
0.075
0.110
0.050 0.075
0.110
0.050 0.320 0.050
0.420
0.07
5
0.26
0
0.11
00.
075
TAMPED EARTH BACKFILL
150 mm WIDE WARNING TAPE
F G E (EMBANKMENT)
10mmØ TIES
CONCRETE ENCASED(MANHOLE TO MANHOLE)
CONCRETE ENCASEMENT (TYPICAL)
0.54
00.
300
TWO PIPES
2 sq.mm HOT-DIPGALVANIZED STEEL WIRE
12mmØ REBAR
0.075
0.110
0.050 0.050
0.110
0.580
0.05
0
0.42
0
0.32
00.
050
0.075
0.110
0.050 0.240 0.0500.240
0.38
00.
300
TAMPED EARTH BACKFILL
150 mm WIDE WARNING TAPE
CONCRETE ENCASEMENT (TYPICAL)
F G E (EMBANKMENT)
10mmØ TIES
SIX PIPES
2 sq.mm HOT-DIPGALVANIZED STEEL WIRE
12mmØ REBAR
CONCRETE ENCASED(MANHOLE TO MANHOLE)
0.075
0.110
0.050 0.050
0.110
0.740
0.050
0.110
0.050 0.219 0.0500.203
0.075
0.110
0.219
2 sq.mm HOT-DIPGALVANIZED STEEL WIRE10mmØ TIES
0.05
0
0.42
0
0.32
00.
050
0.38
00.
300
TAMPED EARTH BACKFILL
150 mm WIDE WARNING TAPE
CONCRETE ENCASEMENT (TYPICAL)
F G E (EMBANKMENT)
EIGHT PIPES
12mmØ REBAR
CONCRETE ENCASED(MANHOLE TO MANHOLE)
3
CAA
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
SCHEMA Konsult Inc.Joint Venture with
PERTCONSULT International
DCCD Engineering Corporation
Philipp's Technical Consultants Corp.
Project Manager Project Manager, DOTC-PMO
1
ETF
O