DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent...

10
If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million. In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas. DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 1 of 10 Folder: PP034603 Revision 0 DET NORSKE VERITAS SURVEY REPORT Customer : Air Logistics Corporation Client Purchase Order Number : 1025371 Location of testing : Azusa, California U.S.A. Monrovia, California U.S.A. Riverside, California U.S.A. Veritas Project No. : PP034603 Job Description : Piping Repair Methodology Verification Equipment Tested : Aqua Wrap (AW) G-03 & G-05 : Power Sleeve (PS) “Field Wetted Epoxy System” : Load Transfer Material from Thin Films (P/N 911) Test Procedure : Powersleeve® Installation Manual for Repairing Damaged Piping and Pipelines Installation Procedure for Piping (W-11 fabric with standard resin) : Aquawrap® – G-03 Fabric – G-05 Fabric Referenced Standard : Repair of Pressure Equipment and Piping ASME PCC-2 (2011) Scope of Work The following activities were performed during the inspections carried out at Air Logistics Corporation (ALC), located in Azusa, California (unless stated otherwise for offsite testing). The preparation of the samples was carried out between April 17th, 2012 and June 30th, 2012. 1. Verify calibration of testing equipment. 2. Verify dimensions and identification of the pipe samples. 3. Witness tests of the pipes specimens as per the proposed configuration and procedure. 4. Data review during start-up and completion of the tests. 5. Stamp and sign Air Logistics Corporation reports.

Transcript of DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent...

Page 1: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or

damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million. In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas.

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 1 of 10

Folder: PP034603 Revision 0

DET NORSKE VERITAS

SURVEY REPORT

Customer : Air Logistics Corporation Client Purchase Order Number : 1025371 Location of testing : Azusa, California U.S.A. Monrovia, California U.S.A. Riverside, California U.S.A.

Veritas Project No. : PP034603

Job Description : Piping Repair Methodology Verification Equipment Tested : Aqua Wrap (AW) G-03 & G-05

: Power Sleeve (PS) “Field Wetted Epoxy System”

: Load Transfer Material from Thin Films (P/N 911)

Test Procedure : Powersleeve® Installation Manual for

Repairing Damaged Piping and Pipelines Installation Procedure for Piping (W-11 fabric with standard resin)

: Aquawrap® – G-03 Fabric – G-05 Fabric Referenced Standard : Repair of Pressure Equipment and Piping

ASME PCC-2 (2011)

Scope of Work

The following activities were performed during the inspections carried out at Air

Logistics Corporation (ALC), located in Azusa, California (unless stated otherwise for offsite testing). The preparation of the samples was carried out between April 17th, 2012 and June 30th, 2012.

1. Verify calibration of testing equipment.

2. Verify dimensions and identification of the pipe samples.

3. Witness tests of the pipes specimens as per the proposed configuration and procedure.

4. Data review during start-up and completion of the tests.

5. Stamp and sign Air Logistics Corporation reports.

Page 2: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 2 of 10

Survey Preparations: 1. Reviewed certificates of calibration for all applicable measurement instruments used during the

preparation of the samples and for monitoring the tests.

2. Verified that all samples were identified and meet the proposed dimensional requirements.

3. Verified the assembly configuration for each proposed test:

a) Enery Release Rate (Gamma Testing)

b) Short Term Spool Test

c) 1000 Hour Lap-Shear (300 degrees farenheit)

d) Impact Test

e) Heat Distortion Temperature (HDT)

Survey Results:

a) Energy Release Rate (Gamma Testing)

• Verified setup configuration of samples as described in the PCC-2, Appendix IV. • Verified Mill Inspection Certificates for test pipes. Test pipe specimens minimum

diameter 100 mm ( 4 inches) and a minimum thickness of 3 mm (0.12 inch). • Verified test stand pressure gauge calibration certificates and monitored steady

pressurization rate.

• Pipe sample numbers used during testing (resulting burst pressure): Sample #1- 20 mm hole (780 psi burst pressure) Sample #2- 20 mm hole (850 psi burst pressure) – Impact Tested Sample #3- 20 mm hole (820 psi burst pressure) Sample #4- 20 mm hole (1150 psi burst pressure) Sample #5- 20 mm hole (750 psi burst pressure) Sample #6- 1 ½ inch hole (350 psi burst pressure) Sample #7- 1 ½ inch hole (475 psi burst pressure) Sample #8- 1 ½ inch hole (360 psi burst pressure) Sample #9- 1 ½ inch hole (425 psi burst pressure) Sample #10- 1 ¼ inch hole (460 psi burst pressure) Sample #11- 1 ½ inch hole (450 psi burst pressure) Sample #12- 1 ¼ inch hole (500 psi burst pressure) Sample #13- 1 ¼ inch hole (650 psi burst pressure) Sample #14- 1 ¼ inch hole (500 psi burst pressure) Sample #15- 1 ¼ inch hole (450 psi burst pressure) Sample #16- 20 mm hole (800 psi burst pressure) Sample #17- 1 ½ inch hole (540 psi burst pressure) Sample #18- 1 ½ inch hole (350 psi burst pressure)

Page 3: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 3 of 10

b) Short Term Spool Test

• Verified the setup configuration of Short Term Spool test samples as described in PCC-2 Standard, Appendix III.

• Verified sample pressure maintained for the period of testing specified in PCC-2 Standard, Appendix III.

• Verified calibration on test stand pressure gauges at Authorized Testing Facility in Riverside , California on June 7, 2012.

• Pipe samples used during the Short Term Spool Testing:

- Sample ID: G03 – PASS (5,550 psig held for 100 seconds) - Sample ID: G05 – PASS (5,650 psig held for 120 seconds)

c) 1000 Hour Lap-Shear (300 degrees farenheit)

• Verified the setup configuration of the samples as described in the PCC-2 Standard, Appendix II-3.

• Reviewed temperature log during 1000 Hour period.

• Tensile testing conducted at Air Logistics Corporation facility in Monrovia,

California on July 10, 2012.

• 5 Samples tested from each lot (2 baseline tests and 2 processed tests)

d) Impact Test

• Verified the setup configuration of impact test on 4 inch sample (Sample #2 from Gamma Test - 20 mm hole) and hole preparation as described in PCC-2 Standard, Article 4.1 (Appendix VI).

• Verified test fixture adequacy to conduct a low velocity impact test with a 0.5 kg (1.1 lb) weight with a 12 mm (0.5 in.) hemispherical indentor.

• Verified Impact Test pipe coupon placement at base of low velocity impact test fixture. The test specimen was supported so that the hole is in the 12 o’clock orientation and the weight strike to the repair at the position of the hole in the test specimen.

• Verified preparations for the low velocity shuttle dropped from a height of dropped from a height of 1 m (39 inches).

• Verified that post impact pressure testing was conducted as described in PCC-2 Standard, Article 4.1 (Appendix VI)

Page 4: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 4 of 10

e) Heat Distortion Temperature (HDT)

• Verified the setup configuration of the samples as per described in the PCC-2 Standard.

• HDT coupons with G-03 fabric (Aquawrap) and W-11 fabric (standard resin).

• Verified HDT test coupon placement in testing fixture which produces a precalculated induced flexural stress on the coupon.

• Verified sample temperature at the moment of the test and the temperature log file.

4. Verified collected data during the start-up as per required start-up conditions.

5. Reviewed, signed and stamped Air Logistics Corporation data record sheets.

Azusa, California USA 30 June 2012 (for) DET NORSKE VERITAS Classification (Americas), Inc

Attachments:

1. Photographs

2. Endorsed Air Logistics Corporation Interim Test Results

Annex:

1. Powersleeve® Installation Manual for Repairing Damaged Piping and Pipelines

2. Installation Procedure for Piping – Aquawrap® – G-03 Fabric – G-05 Fabric

Page 5: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 5 of 10

Attachment 1: Photographs

Photograph 01 & 02: Preparation of Gamma test specimens.

Photograph 03 & 04: Representative Gamma test samples on test stand during testing,

Photograph 05 & 06: Test stand with closeup of pressure guage.

Page 6: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 6 of 10

Photograph 07 & 08: Aquawrap packaging prior to application to sample pipes.

Photograph 09 & 10: Preparation of Short Term Burst Test specimen.

Photograph 11 & 12: Short Term Burst specimen with pre-machined defect and wrapping.

Photograph 13 & 14: Short Term Spool Test at Authorized Testing Facility.

Page 7: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 7 of 10

Photograph 15 & 16: 1000 Hour Lap-Shear coupon preparation

Photograph 17 & 18: 1000 Hour Lap-Shear coupon pre and post testing

Photograph 19 & 20: 1000 Hour Lap-Shear coupon testing stand with test fixture.

Page 8: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 8 of 10

Photograph 21: Impact Test being conducted

Photograph 22 & 23: Confirmation of Impact Test tool

Photograph 24 & 25: Impact Test being conducted and closeup of impact area.

Photograph 26 & 27: Impact Test specimens being leak tested

Page 9: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 9 of 10

Photograph 28 & 29: Heat Distortion Temperature (HDT) specimen preparation

Photograph 30 & 31: Heat Distortion Temperature (HDT) specimen preparation

Photograph 32 & 33: HDT testing oven with representative specimens in oven.

Photograph 34 & 35: Post HDT test specimen closeups of representative specimen.

Page 10: DET NORSKE VERITAS SURVEY REPORT - PowerWrap Norske Veritas.pdf · ... been caused by any negligent act or omission of Det Norske Veritas, ... Piping Repair Methodology ... of Pressure

DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Høvik, Norway, Telephone: +47 67 57 99 00, Telefax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA Form No.: 40.91a Issue: January 2008 Page 10 of 10