Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011
description
Transcript of Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011
![Page 1: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/1.jpg)
CALIFORNIA I COLORADO I FLORIDA I GEORGIA I HAWAII I ILLINOIS I MARYLAND I NEW YORKNORTH CAROLINA I PENNSYLVANIA I TEXAS I VIRGINIA I WASHINGTON DC I WASHINGTON I WISCONSIN
Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011
![Page 2: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/2.jpg)
Whitlock Control Room Team
• Craig Orris Taylor: Whitlock Texas, Senior Account Executive, Control Room Specialist
• David Rizzo: Whitlock Texas, System Designer, Control Room Specialist
![Page 3: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/3.jpg)
How is Whitlock Different?
• Established 1956• Built Organically, no Debt or Private Equity• 40% Growth in 2011!• Unsurpassed Technical Certifications• Multiple National Awards• Design/Build/Manage Model• Manufacturer Agnostic, Over 450 Product Lines:
Barco, Mitsubishi, Jupiter, Evans, Christie, hundreds more
![Page 4: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/4.jpg)
What Does Whitlock’s Control Room Team Do For ITS?
• Traffic Management Center, Four Walls In Design/Build/Manage Process
• Situational Awareness with Large Display Systems Displaying Streaming Video
• Ergonomic Operator Consoles and Furniture• War Rooms, Conference Rooms, Training
Centers• Managed Services: Training, Maintenance,
Repair
![Page 5: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/5.jpg)
Whitlock Traffic Management Center Experience
• New Mexico DOT Statewide TMC, Albuquerque
• TxDOT Combined Traffic and Emergency Command Center (CTECC), Austin TX
• FDOT/Palm Beach County TMC, Florida• TDOT Memphis Smartway TMC, Tennessee• Many others
![Page 6: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/6.jpg)
NMDOT Statewide TMC
![Page 7: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/7.jpg)
NMDOT Statewide TMC
![Page 8: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/8.jpg)
FDOT/Palm Beach County TMC
![Page 9: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/9.jpg)
Whitlock Procurement Vehicles in Place
• NMDOT, multiple contracts• GSA, multiple contracts• Texas State DIR, allows other states to
piggyback• US Communities
![Page 10: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/10.jpg)
Whitlock is more than a traditional AV Systems Integrator. We have evolved into a full service Solutions Provider, offering support for every phase of the audiovisual technology lifecycle.
• Technology Selection/Procurement• Project Management• Standardization• Design/Engineering• Integration• Programming• Quality Assurance/Testing• Training• Managed Support
Whitlock Process Overview
![Page 11: Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011](https://reader036.fdocuments.in/reader036/viewer/2022062801/5681431e550346895daf7f31/html5/thumbnails/11.jpg)
11
THANK YOU!Craig Orris Taylor, Senior Account Executive
[email protected], 972-815-1126
www.whitlock.com