Design Review Revision Parcel Q1
Presented by: DW NP Property, LLC and DW NP Q, R, V Property, LLC c/o DivcoWest Real Estate Investments 200 State Street, 12th Floor Boston, MA 02109
Prepared by: Beals and Thomas, Inc. Reservoir Corporate Center 144 Turnpike Road Southborough, MA 01772
In collaboration with: Prellwitz Chilinski Associates, Inc.Galluccio & Watson, LLP Goulston & Storrs PC Michael Van Valkenburgh Associates, Inc.
Submitted in Compliance with the City of Cambridge Zoning Ordinance and M.G.L. c.40A
September 17, 2019
September 17, 2019 Ms. Catherine Preston Connolly, Chair Cambridge Planning Board 344 Broadway Cambridge, MA 02139 Via: Hand Delivery Reference: Cambridge Crossing Block Q1 Design Review Revision PB #179 Cambridge, Massachusetts Dear Chair Connolly and Members of the Board: DivcoWest Real Estate Investments and its affiliates, DW NP Property, LLC and DW Q, R, V, LLC (collectively “DivcoWest”), respectfully submit this Revised Design Review Application for Block Q1 (Q1 Building), which is part of the larger Cambridge Crossing development. The Planning Board previously approved the design of the Q1 Building, pursuant to a Design Review submission filed with the Planning Board on June 26, 2017 and revised by subsequent filings with the Planning Board on July 5, 2017 and December 5, 2017. The Planning Board reviewed and approved the improvements as set forth in the above submissions at its meeting on January 2, 2018. The Special Permit requires that we construct a Bicycle Center, consisting of Blue Bike station, repair facilities and long‐term bicycle storage, on Blocks Q1, Q2, R and/or V. It further requires that the Bicycle Center be operational by the time that the relocated MBTA Lechmere GLX Station (the “New Lechmere Station”) is operational, currently projected by the MBTA to be April 2021. We have decided to locate the Bicycle Center in immediate vicinity of the New Lechmere Station and bus terminal, in the Q1 Building, with the required Blue Bike sharing station on the adjacent Block R between the two station headhouses. The Q1 Building will be the only one among Q1, Q2, R, and V that will be constructed by the time that the New Lechmere Station is operational. We are submitting a separate package to the City of Cambridge PTDM Officer for review of the Bicycle Center itself, pursuant to the Parking and Transportation Demand Management (PTDM) requirements of the City of Cambridge. However, accommodating the Bicycle Center within the Q1 Building will require some modifications to the approved Design Review Approval granted previously by the Planning Board, as follows:
‐ Adding 7 covered long‐term bicycle parking lockers situated along the westerly face of the Q1 Building, in addition to 228 bicycle parking spaces provided by the MBTA on Blocks R and Q
‐ Adding an outdoor water bottle filling station situated at the southwest corner of the Q1 Building,
‐ Adding an outdoor battery charging station (for power assisted bicycles) situated at the southwest corner of the Q1 Building,
‐ Adding a window and awning on the south façade of the Q1 Building, and ‐ Adding exterior lighting on the Q1 building façade to illuminate the plaza to the south.
Accommodating these amenities within the Q1 Building does not impact the approved GFA of 18,835 square feet and as a result the change in the programming for the southwesterly and westerly portions of the Q1 Building do not require any revisions to Appendix I to the Special Permit. We look forward to the opportunity to meet with the Planning Board to discuss this application and to bringing this exciting amenity to Cambridge Crossing. Thank you for your consideration.
Sincerely, DIVCOWEST REAL ESTATE INVESTMENTS
Exhibits: Parcel Q1 Retail Building/Bike Center, September 17, 2019:
‐ Bicycle Center Site Plan showing the components of the Bicycle Center and the overall compliance with the PTDM Plan requirements, dated September 17, 2019;
‐ Location Plan; ‐ Site Plan showing the relationship of Parcel Q1 to adjacent parcels; ‐ Approved Ground Floor Plan (approved by the Planning Board in March 2019); ‐ Proposed Ground Floor Plan that includes the modifications required to
accommodate the Bicycle Center; ‐ South Elevation as Approved and as Proposed including the modifications
required to accommodate the Bicycle Center; ‐ West Elevation as Approved and as Proposed including the modifications required
to accommodate the Bicycle Center; ‐ Approved Perspective of the South façade; ‐ Proposed Perspective of the South façade including the modifications required to
accommodate the Bicycle Center; ‐ Enlarged Plan depicting the proposed layout of the Bicycle Center; ‐ Interior Perspective rendering showing the proposed Bicycle Center; ‐ Site Furnishings precedent images showing the Amazon and Bike lockers; and ‐ Chart showing compliance with PTDM Requirements.
Parcel V1
Parcel V2W
ater
St
Nor
th F
irst S
t
MBTA Bus Loop
MBTA CommuterRail Facility
Gore St
Cambridge St
Second St
First St
Parcel C
Parcel D
Building J/K
Parcel L/M
The Common
BaldwinOpen Space
Morgan Avenue
Parcel Q2
Parcel Q1 Parcel R
Jacobs StWater St
Earhart St
Monsignor O’Brien Hwy
Glassworks Ave
Sierra Building
Earhart Park
Morgan Avenue
East
St
Bikes
Open Space
Parcel I Residential
Parcel WRetailParcel I Retail
Water St Park
N
0 60 120 240 ft
Bicycle Center MVVA17 September 2019
LEGENDCommunity PathMonsignor O’Brien Highway Bike LanesCambridge Crossing Bicycle Lanes
Blue Bike Stations
Bicycle Center
MBTA Station
MBTA Bicycle Storage
Bike Parking
– Lockers – Shower – Changing Rooms – Toilet Rooms – Bike Repair Station – Tire and tube recycling – Water Fountain, Bottle Fill Station – Air Pump – Bicycle Battery Charging Station – Commuter Information
– 42 Blue Bikes
– 48 MBTA Bike Parking Spaces
– 180 MBTA Bike Parking Spaces
– 7 Long-Term Bike Parking Spaces
2LOCATION PLAN
CAMBRIDGE CROSSING - Parce l Q1Approved Masterp lan per Amendment #7 (Minor )
Parcel Q1
3SITE PLAN
PARCEL W
PARCEL I-1
RESIDENTIAL
PARCEL R-1
PARCEL R-2
STATION PLAZA
SUBJECT TO FUTURE
DESIGN REVIEW
PARCEL I-2 RETAIL
PARCEL JK
THE COMMON
PARCEL I-3 OPEN SPACE
PARCEL Q1PARCEL Q2
FUTURE GREEN LINE (ABOVE)
PARCEL Q3
4GROUND FLOOR PLAN - APPROVED MARCH 2019
���
���
20’0’ 40’
Scale: 1”=20’
AREA CALCULATIONS
GROUND FLOOR GFA: 9,020 SFSECOND FLOOR GFA: 9,815 SF
TOTAL GFA: 18,835 SF
FUTURE HUBWAY STATION
Q-1Q-2
I-2 W
R
Long term bike storage. Capacity: 4 bikes
Elev.Office Lobby
Trash / Loading
Water
Elec.
5GROUND FLOOR PLAN - PROPOSED
���
���
bike stor.
Elev.Office Lobby
Trash / Loading
20’0’ 40’
Scale: 1”=20’
AREA CALCULATIONS
GROUND FLOOR GFA: 9,020 SFSECOND FLOOR GFA: 9,815 SF
TOTAL GFA: 18,835 SF
Water
Elec.
Add Bike Lockers
Extent of Temporary Hardscape for Interim Condition After
Construction of Q1 and Before Completion of Q2
Add Amazon LockersLong term bike parking: 7 bike lockers added
Add Bike Lockers
Add Bike Center
Q-1Q-2
I-2 W
RAdd Charging Station
& Bottle Fill Station
6SOUTH ELEVATION - 3/2019 APPROVED AND 8/2019 PROPOSED
19’-6” second floor
19’-6” second floor
34’-2” top of parapet
34’-2” top of parapet
41’-6” top of parapet
41’-6” top of parapet
0’ ground floor slab
0’ ground floor slab
SOUTH ELEVATION - APPROVED MARCH 2019
SOUTH ELEVATION - PROPOSEDELEVATION KEY
16’0’ 32’
Scale: 1”=20’
awning at bike center entry
wall mounted light fixtures
additional storefront and spandrel glass
commuter and wayfinding graphics
7WEST ELEVATION -3/2019 APPROVED AND 8/2019 PROPOSED
16’0’ 32’
Scale: 1”=20’
19’-6” second floor
19’-6” second floor
41’-6” top of parapet
41’-6” top of parapet
34’-2” top of parapet
34’-2” top of parapet
0’ ground floor slab
0’ ground floor slab
WEST ELEVATION - APPROVED MARCH 2019
WEST ELEVATION - PROPOSEDELEVATION KEY
Amazon lockers
Bike lockers
vines to be trimmed around gas meter area and air intake louvers
8
Rendered image is intended for building design review. Landscaping and entourage in this view are for illustrative purposes only.
SOUTH PERSPECTIVE - APPROVED MARCH 2019
9
Rendered image is intended for building design review. Landscaping and entourage in this view are for illustrative purposes only.
SOUTH PERSPECTIVE - PROPOSED
10
WC
WC
SHOWER / CHANGING
LOCKERS
CHANGINGROOM
CHANGINGROOM
CHANGINGROOM
BIKE REPAIR W/ AIR PUMPS
WORK COUNTER W/ SINK & STORAGE
BIKE REPAIR W/ AIR PUMPS
SEATING
SEATING
RETAILACCESS DOOR
BIKE CENTER ENTRY
VENDING
TIRE RECYCLING
BIKE CENTER - ENLARGED PLAN
11BIKE CENTER - INTERIOR PERSPECTIVE
12
Amazon Locker Long Term Bike Parking
SITE FURNISHINGS - LOCKERS
13COMPLIANCE WITH PTDM REQUIREMENTS
������������ �� ������ �� �����
�������� � � ��������������� ������������� ���������� ��
�������������� ����������������������������
���������������� �� ����������������������������������������������
��������� �������������������
���� � ����� �������� � ��������������
�!����� ��������� �����������������������������
�"����� #$#�������%���� � ������������
����������������� &��������������������������������'�������(���
����������������� ������������� ������������ �
�)�������� ���� � �������
����������� � �������
�