Design Plan 1 - CS
Transcript of Design Plan 1 - CS
-
7/31/2019 Design Plan 1 - CS
1/5
CHIYODA MALAYSIA SDN. BHD.
DATE : 17
NOVEMEBR 05CIVIL & STRUCTURAL
ENGINEERING SECTION DESIGN
PLAN
M3205-CS-DP-001
REV. : 1PAGE : 1 OF 5
PROJECT : EPCC OF PACKAGE 3 BULK DEPOT FACILITIES AND
PACKAGE 4 LPG BOTTLING FACILITIES FOR
INDEPENENT OIL TERMINAL PROJECT
OWNER : : ASSAR CHEMICAL SDN. BHD.
LOCATION : KUCHING, SARAWAK
JOB NO. : M3205
1 Issue for Execution 17 Nov 05 KS Gan
0 Issue for Approval 17 Mar 05 KS Gan KS Gan Rama
Rev. Description Date Originated Reviewed Approved
-
7/31/2019 Design Plan 1 - CS
2/5
CHIYODA MALAYSIA SDN. BHD.
DATE : 17
NOVEMEBR 05CIVIL & STRUCTURAL
ENGINEERING SECTION DESIGN
PLAN
M3205-CS-DP-001
REV. : 1PAGE : 2 OF 5
SCOPE OF WORK
BRIEF DESCRIPTION OF SCOPE OF WORK
Civil & Structural Engineering Section of JV, between Chiyoda Malaysia Sdn
Bhd & PPES Works ( Sarawak ) Sdn Bhd shall be responsible for the following
activities that required for this project with regard to civil and structural work:
Package 3
1. Preparation of Drawings for Buildings
- Administration Building
- Bulk Depot Guard House
- Jetty Guard House
- Additive Tank Shed
- Fire Water Pump Shed
- Product Pump Shed
- Tank Truck Loading Gantry
-Bulk Drivers Rest Area / Toilet / Surau
- E&I Distribution Shed
- Switchgear Room & Sesco
- Bulk Storage & Workshop
- Building HVAC & Plumbing / Sanitary
- Additive Drum Shed
2. Preparation of Drawings for General Civil Works and Foundations
- Standard Drawing
- Underground Composite Drawing
-
Composite Piling Plan- Pipe Support / Pipe Sleeper Details
- Road, Paving and Drainage Works
- Fencing
- Storage Tanks Foundations
- Road Culverts
- Foundation for Oily Water Separator & Associated Supports
- Misc. Supports and Foundations
- Pavement and Surfacing Drawings
3. Preparation of Drawings for Structures Works
- Operating Platform
-
7/31/2019 Design Plan 1 - CS
3/5
CHIYODA MALAYSIA SDN. BHD.
DATE : 17
NOVEMEBR 05CIVIL & STRUCTURAL
ENGINEERING SECTION DESIGN
PLAN
M3205-CS-DP-001
REV. : 1PAGE : 3 OF 5
- Pipe Rack / Pipe Bridges
4. Preparation of Design Calculation
5. Preparation of Construction Specifications
6. Carry out circulate, review and comment on IDC Document
Package 4
1. Preparation of Drawings for Buildings- Administration Building
- Guard House
- Filling Hall
- Air Compressor Shed
- Pump / Compressor Shed
- Truck Loading Bay
- LPG Workers Canteen / Toilet / Surau
- Switchgear and Generator Room
- Building HVAC & Plumbing / Sanitary
2. Preparation of Drawings for General Civil Works and Foundation
- Underground Composite Drawing
- Composite Piling Plan
- Pipe Support / Pipe Sleeper Details
- Road, Paving and Drainage Works
- Fencing
- Spherical Tanks Foundations
- Road Culverts
- Misc. Supports and Foundations
-Pavement and Surfacing Drawings
3. Preparation of Drawings for Structures Works
- Operating Platform
- Pipe Rack / Pipe Bridges
4. Preparation of Design Calculation
5. Preparation of Construction Specifications
6. Carry out circulate, review and comment on IDC Document
-
7/31/2019 Design Plan 1 - CS
4/5
CHIYODA MALAYSIA SDN. BHD.
DATE : 17
NOVEMEBR 05CIVIL & STRUCTURAL
ENGINEERING SECTION DESIGN
PLAN
M3205-CS-DP-001
REV. : 1PAGE : 4 OF 5
ENGINEER IN CHARGE
1 The JVs C&S Consultant is Jurutera Jasa ( Sarawak ) Sdn Bhd. They
shall be responsible for the overall C&S design work including coordination
work with Aki-Media ( architectural work ) and Project Konsultant Malaysia
( plumbing, sanitary and HVAC work ).
Jurutera Jasa ( Sarawak ) Sdn Bhd
Tai Lee Yoon - Civil / Structure Engineer
Hu Hiong Ho and others - Discipline Engineer
Mr. Tai & Hu shall be responsible for all the work scope as mentioned
above.
A. Chiyoda Malaysia Sdn Bhd
2 1. Gan Kem Sing Lead Civil / Structure Engineer
2. Lim Chin Chiat Discipline Engineer
3. Saifuddin Bin Adnan Discipline Engineer
Mr. Lim & Mr. Saifuddin shall be responsible for coordinating with
Jurutera Jasa on works as mentioned above.
RESPONSIBILITIES
1. Discipline Engineer shall be responsible for:
a. design verification and sign in all his outputs at CHECKED
column as an indication that design verification has been performed.
b. update his design input and output control sheet.
c. ensuring the design changes requested by EM is incorporated in the
output.
-
7/31/2019 Design Plan 1 - CS
5/5
CHIYODA MALAYSIA SDN. BHD.
DATE : 17
NOVEMEBR 05CIVIL & STRUCTURAL
ENGINEERING SECTION DESIGN
PLAN
M3205-CS-DP-001
REV. : 1PAGE : 5 OF 5
2. Lead of Civil / Structure shall be responsible for :
a. to review all his discipline engineers output and sign on the column
Engr
b. assign any of his discipline engineers for a selected task which maynot be described in this Section Design Plan.
3. Civil / Structure Discipline Engineer at Chiyoda Malaysia Sdn Bhd shall
be responsible for :
a. Coordination work between Chiyoda Malaysia Sdn Bhd & C&S
Consultant regarding loading data transfer and drawings review.
VERIFICATION, REVIEW AND APPROVAL STAGES
The verification and review processes will be performed by discipline engineer
and lead engineer during the following design stages when the outputs are
ready for:
1. IFA Issue For Approval
2. IFC Issue For Construction
DESIGN INPUT AND OUTPUT
The following are attached
1. Design Input Control Sheet
2. Design Output Control Sheet