    CHIYODA MALAYSIA SDN. BHD.

    DATE : 17

    NOVEMEBR 05CIVIL & STRUCTURAL

    ENGINEERING SECTION DESIGN

    PLAN

    M3205-CS-DP-001

    REV. : 1PAGE : 1 OF 5

    PROJECT : EPCC OF PACKAGE 3 BULK DEPOT FACILITIES AND

    PACKAGE 4 LPG BOTTLING FACILITIES FOR

    INDEPENENT OIL TERMINAL PROJECT

    OWNER : : ASSAR CHEMICAL SDN. BHD.

    LOCATION : KUCHING, SARAWAK

    JOB NO. : M3205

    1 Issue for Execution 17 Nov 05 KS Gan

    0 Issue for Approval 17 Mar 05 KS Gan KS Gan Rama

    Rev. Description Date Originated Reviewed Approved

  • 7/31/2019 Design Plan 1 - CS

    2/5

    CHIYODA MALAYSIA SDN. BHD.

    DATE : 17

    NOVEMEBR 05CIVIL & STRUCTURAL

    ENGINEERING SECTION DESIGN

    PLAN

    M3205-CS-DP-001

    REV. : 1PAGE : 2 OF 5

    SCOPE OF WORK

    BRIEF DESCRIPTION OF SCOPE OF WORK

    Civil & Structural Engineering Section of JV, between Chiyoda Malaysia Sdn

    Bhd & PPES Works ( Sarawak ) Sdn Bhd shall be responsible for the following

    activities that required for this project with regard to civil and structural work:

    Package 3

    1. Preparation of Drawings for Buildings

    - Administration Building

    - Bulk Depot Guard House

    - Jetty Guard House

    - Additive Tank Shed

    - Fire Water Pump Shed

    - Product Pump Shed

    - Tank Truck Loading Gantry

    -Bulk Drivers Rest Area / Toilet / Surau

    - E&I Distribution Shed

    - Switchgear Room & Sesco

    - Bulk Storage & Workshop

    - Building HVAC & Plumbing / Sanitary

    - Additive Drum Shed

    2. Preparation of Drawings for General Civil Works and Foundations

    - Standard Drawing

    - Underground Composite Drawing

    -

    Composite Piling Plan- Pipe Support / Pipe Sleeper Details

    - Road, Paving and Drainage Works

    - Fencing

    - Storage Tanks Foundations

    - Road Culverts

    - Foundation for Oily Water Separator & Associated Supports

    - Misc. Supports and Foundations

    - Pavement and Surfacing Drawings

    3. Preparation of Drawings for Structures Works

    - Operating Platform

  • 7/31/2019 Design Plan 1 - CS

    3/5

    CHIYODA MALAYSIA SDN. BHD.

    DATE : 17

    NOVEMEBR 05CIVIL & STRUCTURAL

    ENGINEERING SECTION DESIGN

    PLAN

    M3205-CS-DP-001

    REV. : 1PAGE : 3 OF 5

    - Pipe Rack / Pipe Bridges

    4. Preparation of Design Calculation

    5. Preparation of Construction Specifications

    6. Carry out circulate, review and comment on IDC Document

    Package 4

    1. Preparation of Drawings for Buildings- Administration Building

    - Guard House

    - Filling Hall

    - Air Compressor Shed

    - Pump / Compressor Shed

    - Truck Loading Bay

    - LPG Workers Canteen / Toilet / Surau

    - Switchgear and Generator Room

    - Building HVAC & Plumbing / Sanitary

    2. Preparation of Drawings for General Civil Works and Foundation

    - Underground Composite Drawing

    - Composite Piling Plan

    - Pipe Support / Pipe Sleeper Details

    - Road, Paving and Drainage Works

    - Fencing

    - Spherical Tanks Foundations

    - Road Culverts

    - Misc. Supports and Foundations

    -Pavement and Surfacing Drawings

    3. Preparation of Drawings for Structures Works

    - Operating Platform

    - Pipe Rack / Pipe Bridges

    4. Preparation of Design Calculation

    5. Preparation of Construction Specifications

    6. Carry out circulate, review and comment on IDC Document

  • 7/31/2019 Design Plan 1 - CS

    4/5

    CHIYODA MALAYSIA SDN. BHD.

    DATE : 17

    NOVEMEBR 05CIVIL & STRUCTURAL

    ENGINEERING SECTION DESIGN

    PLAN

    M3205-CS-DP-001

    REV. : 1PAGE : 4 OF 5

    ENGINEER IN CHARGE

    1 The JVs C&S Consultant is Jurutera Jasa ( Sarawak ) Sdn Bhd. They

    shall be responsible for the overall C&S design work including coordination

    work with Aki-Media ( architectural work ) and Project Konsultant Malaysia

    ( plumbing, sanitary and HVAC work ).

    Jurutera Jasa ( Sarawak ) Sdn Bhd

    Tai Lee Yoon - Civil / Structure Engineer

    Hu Hiong Ho and others - Discipline Engineer

    Mr. Tai & Hu shall be responsible for all the work scope as mentioned

    above.

    A. Chiyoda Malaysia Sdn Bhd

    2 1. Gan Kem Sing Lead Civil / Structure Engineer

    2. Lim Chin Chiat Discipline Engineer

    3. Saifuddin Bin Adnan Discipline Engineer

    Mr. Lim & Mr. Saifuddin shall be responsible for coordinating with

    Jurutera Jasa on works as mentioned above.

    RESPONSIBILITIES

    1. Discipline Engineer shall be responsible for:

    a. design verification and sign in all his outputs at CHECKED

    column as an indication that design verification has been performed.

    b. update his design input and output control sheet.

    c. ensuring the design changes requested by EM is incorporated in the

    output.

  • 7/31/2019 Design Plan 1 - CS

    5/5

    CHIYODA MALAYSIA SDN. BHD.

    DATE : 17

    NOVEMEBR 05CIVIL & STRUCTURAL

    ENGINEERING SECTION DESIGN

    PLAN

    M3205-CS-DP-001

    REV. : 1PAGE : 5 OF 5

    2. Lead of Civil / Structure shall be responsible for :

    a. to review all his discipline engineers output and sign on the column

    Engr

    b. assign any of his discipline engineers for a selected task which maynot be described in this Section Design Plan.

    3. Civil / Structure Discipline Engineer at Chiyoda Malaysia Sdn Bhd shall

    be responsible for :

    a. Coordination work between Chiyoda Malaysia Sdn Bhd & C&S

    Consultant regarding loading data transfer and drawings review.

    VERIFICATION, REVIEW AND APPROVAL STAGES

    The verification and review processes will be performed by discipline engineer

    and lead engineer during the following design stages when the outputs are

    ready for:

    1. IFA Issue For Approval

    2. IFC Issue For Construction

    DESIGN INPUT AND OUTPUT

    The following are attached

    1. Design Input Control Sheet

    2. Design Output Control Sheet