Design Methods

26
EESC/USP Geotecnia Projeto e Construção de Túneis Design Methods 1 DESIGN METHODS Empirical (Geomechanical Classification) Semi-Empirical Observational Rigorous

description

Métodos de Diseño Túneles

Transcript of Design Methods

  • EESC/USP

    GeotecniaProjeto e

    Construode Tneis

    Design Methods 1

    DESIGN METHODS

    Empirical (Geomechanical

    Classification)

    Semi-Empirical

    Observational

    Rigorous

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 2

    POINTS FOR DESIGN

    Support Integrity

    Internal Pressure

    Ground Mass Load

    Hydraulic Jacking

    Face and Excavation Stability

    Acceptable Settlements

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 3

    Support Design

    Physical integrity

    Functionality

    Cost (> 30%)

    Durability

    Speed of water

    Cavitation

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 4

    Schwartz & Einstein (1980)

    Semi-empirical method

    1 - T, M from mass-support interaction

    (2D Solution)

    2 - ld correction due to support delay Ld

    3 - ly correction due to ground mass yielding

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 5

    2*2*0 cos2112

    111

    2

    1akak

    pR

    T

    2cos2112

    1 *22ak

    pR

    M

    2cos16511

    2

    1

    1

    *2

    *0

    akak

    pR

    uE

    p

    kp

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 6

    1

    1****

    ***

    0FCFC

    FCa

    65612

    16*

    **

    2

    F

    Fa

    2

    2*

    1

    1

    ss

    s

    AE

    ERC

    2

    23*

    1

    1

    ss

    s

    IE

    ERF

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 7

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 8

    Ground Properties Support Properties Case

    Radius R E Eg g h

    C* F*

    1 10 ft. 15000 psi 0.30 1.94 x 106 pol 0.30 6.0 in. 0.134 484.0

    2A 10 5000 0.40 1.94 x 106 0.30 6.0 0.0528 191.0

    2B 10 5000 0.30 1.94 x 106 0.30 6.0 0.0447 161.0

    3 10 1.5 x 105

    0.15 3.0 x 106

    0.15 6.0 1.0 4800

    4 10 1.5 x 106 0.15 3.0 x 10

    6 0.15 6.0 10.0 48000

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 9

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 10

    R

    L

    T

    T d

    RSS

    FEd 57,098,0l

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 11

    f

    fd

    u

    uu 0l

    E

    RPu If

    1

    R

    Ldd 57,098,0l

    R

    L

    E

    RPu dI 57,002,0

    10

    ss

    ss

    AE

    PRu

    22 1 us

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 12

    Clculo de ly

    '

    **

    s

    s

    dy

    P

    P

    T

    T

    ll

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 13

    R

    b

    N

    NP

    Eu

    uI2

    1

    1

    '

    '1

    1

    1

    1

    1

    1

    2

    N

    u

    uI

    NP

    NP

    NRb

    sin

    sinN

    1

    1

    sin

    cu

    1

    cos2

    21'

    EE

    1'

    (no volume change)

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 14

    suporte

    TT

    TT

    TT

    P

    P

    yd

    s

    sy

    54,0

    33,1.41,0

    33,1'

    *

    *

    *

    *

    ll

    l

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 15

    Fictitious Pressure MethodPanet (1976)

    pr =

    p0

    pr = a.p0 pr = zero

    Initial stress acting on

    excavation perimeter

    Fictitious pressure on

    excavation perimeter

    Support installation

    and elimination of

    fictitious pressure

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 16

    Load Reduction MethodPttler (1990)

    p0 Cf = (1-a).p0

    Final excavation and

    support

    Initial stress Support installation,

    fictitious load, no initial

    stresses

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 17

    Core Stiffness Reduction MethodSwoboda (1978)

    En = Em En =

    b.Em

    En = zero

    Ec reduction

    Ec E of excavation zone (core)

    Em E of ground mass

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 18

    Axissymmetric Element

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Design Methods 19

    Axissymmetric Element

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Mtodos de Projeto 20

    3-D Analysis at excavation face

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Mtodos de Projeto 21

    SCHWARTZ & EINSTEIN (1980) support delay Ld

    0.0

    0.2

    0.4

    0.6

    0.8

    1.0

    0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4

    Ld/R

    ld=

    (Tn

    um

    ri

    co

    )/(T

    an

    alti

    co)

    982.0571.0

    R

    Lddl

    Ld=0.75m Ld=2.25mLd=3.25m

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Mtodos de Projeto 22

    Luf = 2.5m

    Lance de escavao

    Ld = 3.0m

    R = 3m

    Eixo do tnel

    Ls = 1.0m

    1 CASO

    Lui = 1.5m

    Ld = 3.0m

    Lui = 0.75m

    Luf = 2.25mLs = 1.5m

    R = 3m

    2 CASO Eixo do tnel

    Lance de escavao

    Ld = 3.0m

    Lui = 0

    Luf = 2.0mLs = 2.0m

    R = 3m

    3 CASO Eixo do tnel

    Lance de escavao

    PROBLEM WITH SCHWARTZ & EINSTEIN (1980)

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Mtodos de Projeto 23

    Ld/R = 1.0

    0.0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 1 2 3 4

    Z/R

    T* Lui/R=0.50

    Lui/R=0.25

    Lui/R=0.00

    ~100%

    PROBLRM WITH SCHWARTZ & EINSTEIN (1980)

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    Mtodos de Projeto 24

    Influence of shotcrete age on tunnel support

    (Gomes, 1999)

    Ld

    Lui

    LufLs = Le

    R

    Eixo do tnel

    Lance de escavao

    Segmento de concreto projetado curado (t > 28dias)

    Segmento de concreto projetado novo (t = 1 / Velocidade)

    Segmento de concreto projetado fresco (t = 0)

    sL

    sL

    sL

    sL

    tN

    tN

    tN

    tN

    E

    ZE

    .9.0100

    .3

    .2.125

    .25)1(

    5.22

    1)(

    28

    aa

    Vt s

    1

    s

    ui

    LL

    LZN

    sL tNt .

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    25

    Displacement x Advance Rate

    -1.1

    -0.9

    -0.7

    -0.5

    -0.3

    -0.1

    -10 -8 -6 -4 -2 0 2 4 6 8 10

    Z/R

    U*

    1 m/dia2 m/dia3 m/dia4 m/dia5 m/dia6 m/dia7 m/dia8 m/dias/ sup. - FLACs/ sup. - PANETEc=const.

  • EESC/USP

    GeotecniaProjeto e

    ConstruoDe Tneis

    26

    Normal Force x Advance Rate

    0.0

    0.2

    0.4

    0.6

    0.8

    1.0

    0 2 4 6 8 10

    Z/R

    T* 1 m/dia

    2 m/dia

    3 m/dia

    4 m/dia

    5 m/dia

    6 m/dia

    7 m/dia

    8 m/dia

    Ec=const.