Transcript of Design Methods
-
EESC/USP
GeotecniaProjeto e
Construode Tneis
Design Methods 1
DESIGN METHODS
Empirical (Geomechanical
Classification)
Semi-Empirical
Observational
Rigorous
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 2
POINTS FOR DESIGN
Support Integrity
Internal Pressure
Ground Mass Load
Hydraulic Jacking
Face and Excavation Stability
Acceptable Settlements
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 3
Support Design
Physical integrity
Functionality
Cost (> 30%)
Durability
Speed of water
Cavitation
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 4
Schwartz & Einstein (1980)
Semi-empirical method
1 - T, M from mass-support interaction
(2D Solution)
2 - ld correction due to support delay Ld
3 - ly correction due to ground mass yielding
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 5
2*2*0 cos2112
111
2
1akak
pR
T
2cos2112
1 *22ak
pR
M
2cos16511
2
1
1
*2
*0
akak
pR
uE
p
kp
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 6
1
1****
***
0FCFC
FCa
65612
16*
**
2
F
Fa
2
2*
1
1
ss
s
AE
ERC
2
23*
1
1
ss
s
IE
ERF
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 7
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 8
Ground Properties Support Properties Case
Radius R E Eg g h
C* F*
1 10 ft. 15000 psi 0.30 1.94 x 106 pol 0.30 6.0 in. 0.134 484.0
2A 10 5000 0.40 1.94 x 106 0.30 6.0 0.0528 191.0
2B 10 5000 0.30 1.94 x 106 0.30 6.0 0.0447 161.0
3 10 1.5 x 105
0.15 3.0 x 106
0.15 6.0 1.0 4800
4 10 1.5 x 106 0.15 3.0 x 10
6 0.15 6.0 10.0 48000
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 9
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 10
R
L
T
T d
RSS
FEd 57,098,0l
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 11
f
fd
u
uu 0l
E
RPu If
1
R
Ldd 57,098,0l
R
L
E
RPu dI 57,002,0
10
ss
ss
AE
PRu
22 1 us
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 12
Clculo de ly
'
**
s
s
dy
P
P
T
T
ll
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 13
R
b
N
NP
Eu
uI2
1
1
'
'1
1
1
1
1
1
2
N
u
uI
NP
NP
NRb
sin
sinN
1
1
sin
cu
1
cos2
21'
EE
1'
(no volume change)
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 14
suporte
TT
TT
TT
P
P
yd
s
sy
54,0
33,1.41,0
33,1'
*
*
*
*
ll
l
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 15
Fictitious Pressure MethodPanet (1976)
pr =
p0
pr = a.p0 pr = zero
Initial stress acting on
excavation perimeter
Fictitious pressure on
excavation perimeter
Support installation
and elimination of
fictitious pressure
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 16
Load Reduction MethodPttler (1990)
p0 Cf = (1-a).p0
Final excavation and
support
Initial stress Support installation,
fictitious load, no initial
stresses
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 17
Core Stiffness Reduction MethodSwoboda (1978)
En = Em En =
b.Em
En = zero
Ec reduction
Ec E of excavation zone (core)
Em E of ground mass
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 18
Axissymmetric Element
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Design Methods 19
Axissymmetric Element
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Mtodos de Projeto 20
3-D Analysis at excavation face
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Mtodos de Projeto 21
SCHWARTZ & EINSTEIN (1980) support delay Ld
0.0
0.2
0.4
0.6
0.8
1.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4
Ld/R
ld=
(Tn
um
ri
co
)/(T
an
alti
co)
982.0571.0
R
Lddl
Ld=0.75m Ld=2.25mLd=3.25m
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Mtodos de Projeto 22
Luf = 2.5m
Lance de escavao
Ld = 3.0m
R = 3m
Eixo do tnel
Ls = 1.0m
1 CASO
Lui = 1.5m
Ld = 3.0m
Lui = 0.75m
Luf = 2.25mLs = 1.5m
R = 3m
2 CASO Eixo do tnel
Lance de escavao
Ld = 3.0m
Lui = 0
Luf = 2.0mLs = 2.0m
R = 3m
3 CASO Eixo do tnel
Lance de escavao
PROBLEM WITH SCHWARTZ & EINSTEIN (1980)
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Mtodos de Projeto 23
Ld/R = 1.0
0.0
0.2
0.4
0.6
0.8
1.0
0 1 2 3 4
Z/R
T* Lui/R=0.50
Lui/R=0.25
Lui/R=0.00
~100%
PROBLRM WITH SCHWARTZ & EINSTEIN (1980)
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
Mtodos de Projeto 24
Influence of shotcrete age on tunnel support
(Gomes, 1999)
Ld
Lui
LufLs = Le
R
Eixo do tnel
Lance de escavao
Segmento de concreto projetado curado (t > 28dias)
Segmento de concreto projetado novo (t = 1 / Velocidade)
Segmento de concreto projetado fresco (t = 0)
sL
sL
sL
sL
tN
tN
tN
tN
E
ZE
.9.0100
.3
.2.125
.25)1(
5.22
1)(
28
aa
Vt s
1
s
ui
LL
LZN
sL tNt .
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
25
Displacement x Advance Rate
-1.1
-0.9
-0.7
-0.5
-0.3
-0.1
-10 -8 -6 -4 -2 0 2 4 6 8 10
Z/R
U*
1 m/dia2 m/dia3 m/dia4 m/dia5 m/dia6 m/dia7 m/dia8 m/dias/ sup. - FLACs/ sup. - PANETEc=const.
-
EESC/USP
GeotecniaProjeto e
ConstruoDe Tneis
26
Normal Force x Advance Rate
0.0
0.2
0.4
0.6
0.8
1.0
0 2 4 6 8 10
Z/R
T* 1 m/dia
2 m/dia
3 m/dia
4 m/dia
5 m/dia
6 m/dia
7 m/dia
8 m/dia
Ec=const.