Design Development Packet
-
Upload
baylee-holder -
Category
Documents
-
view
218 -
download
2
description
Transcript of Design Development Packet
4TH YEAR SYSTEMS STUDIOUTSA DEPT. OF ARCHITECTUREFALL 2011
PREVENTATIVE HEALTHCARE CENTERSan Antonio, TX
BAYLEE HOLDER
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
My main focus is to create a healthy region through
a heathly building. The proposed facility looks to create a healthier society.
EXPERIENCE
PLACE
MATERIALS
The materials used in the building are going to be
natural that do not produce off gassing, in order to keep the idea of a healthy building. The materi-als can also be thought of as an analogy to whole, healthy, natural foods and healthy building.
The most important experience for the user is a
healthy experience. I intend to carry out this idea by allowing the user to become healthier while interacting with the building.
MY A
GEN
DA
N. F
lores
St.
Martin St.
Main
St.
Art Pace Gallery (Existing)
SITE
I-35
esirnus
noon
sunset
sezeerb gnilooc
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 1/350" = 1'-0"
A-1SITE PLAN 1
PREVENTATIVEHEALTHCARE CENTER
SITE PLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-2BASEMENT FLOOR PLAN 1
PREVENTATIVEHEALTHCARE CENTER
BASEMENTFLOOR PLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-3GROUND FLOOR PLAN 1
PREVENTATIVEHEALTHCARE CENTER
GROUND FLOOPLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-4SECOND FLOOR PLAN 1
PREVENTATIVEHEALTHCARE CENTER
SECOND FLOORPLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-5THIRD FLOOR PLAN 1
PREVENTATIVEHEALTHCARE CENTER
THIRD FLOORPLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-6ROOF PLAN 1
PREVENTATIVEHEALTHCARE CENTER
ROOF PLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-7LONGITUDINAL SECTION 1
PREVENTATIVEHEALTHCARE CENTER
LONGITUDINALSECTION
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-8CROSS SECTION 1
PREVENTATIVEHEALTHCARE CENTER
CROSS SECTION
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-9CROSS SECTION 1
PREVENTATIVEHEALTHCARE CENTER
CROSS SECTION
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-10NORTH ELEVATION 1
PREVENTATIVEHEALTHCARE CENTER
NORTHELEVATION
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-11WEST ELEVATION 1
PREVENTATIVEHEALTHCARE CENTER
WEST ELEVATION
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-12EAST ELEVATION 1
PREVENTATIVEHEALTHCARE CENTER
EAST ELEVATION
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 1/4" = 1'-0"
A-13WALL SECTIONS 1
PREVENTATIVEHEALTHCARE CENTER
WALL SECTIONS
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
WALL SECTIONS 2
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 1/8" = 1'-0"
A-14WALL SECTIONS 1
PREVENTATIVEHEALTHCARE CENTER
WALL SECTIONS
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-15BASEMENT REFLECTED CEILING PLAN 1
PREVENTATIVEHEALTHCARE CENTER
REFLECTEDCEILING PLANS
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
2FIRST FLOOR REFLECTED CEILING PLAN
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-16SECOND REFLECTED CEILING PLAN 1
PREVENTATIVEHEALTHCARE CENTER
REFLECTEDCEILING PLANS
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
A-17THIRD FLOOR REFLECTED CEILING PLAN 1
PREVENTATIVEHEALTHCARE CENTER
REFLECTEDCEILING PLANS
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 3/32" = 1'-0"
S-1FOUNDATION PLAN 1
PREVENTATIVEHEALTHCARE CENTER
FOUNDATIONPLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
2
BASEMENT STRUCTURE
FIRST FLOOR STRUCTURE
SECOND FLOOR
THIRD FLOOR
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 1/16" = 1'-0"
EM-1BASEMENT FLOOR MECHANICAL 1
PREVENTATIVEHEALTHCARE CENTER
MECHANICALPLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
GROUND FLOOR MECHANICAL 2
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 1/16" = 1'-0"
EM-2SECOND FLOOR MECHANICAL 1
PREVENTATIVEHEALTHCARE CENTER
MECHANICALPLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4TH YEAR SYSTEMSSTUDIOUTSA DEPT. OFARCHITECTUREFALL 2011
SCALE: 1/16" = 1'-0"
EM-3THIRD FLOOR MECHANICAL 1
PREVENTATIVEHEALTHCARE CENTER
MECHANICALPLAN
PHASE
Design Development 9/21/11
DATE
San Antonio, TX
BAYLEE HOLDER
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
All of the plants grown will included vitamin c, vitamin e, and omega-3 fatty acids.The irrigation sytem wil be a sprinkler system.See landscape drawings and specifications.No overspray from irrigation systems occurs at exterior walks.
and will be precast concrete
concrete slabs that are set as specified in floor plans. The finish shall be have a little texture to it but overall smooth surface.
5.6 The exterior shading device shall be made of preforated metal that will be cut into different sized pentagons.
The roof will be a green roof from Live Roof with 15 year guarantee.
Kawneer manufactured
manufactured by Kawneerwooden doors
“flush overlay” type, with a smooth finish
“Ives”smooth
“Ives” (medium quality)stainless steel
concrete with a shiny smooth finish manufactured by Armstrong and will be “Genoble type”
“Dunn-Edwards”
wool non-toxic light tan
Shall be manufactured by Bobrick the type will be Sierra Series Solid Color Reinforced Composite
Manufactured by Bobrick Shall be manufactured by Bobrick and will be stainless steel Shall be manufactured by Bobrick and will be stainless steel Manufactured by Bobrick and will be a stainless steel lavatory mounted dispenser Manufactured by Bobrick and will be make of non-toxic plastic
brushed chrome finishManufactured by Bobrick
will be black and 6” tall.The font will be arial
stainless steel finishstainless steel finish
shall be roll up type and will be white
Otis and will be a hydraulic elevator and the interior finish will be wood
Rheem
Kohler
Kohler
Kohler
Kohler with seat, white finish
Switch plates and outlet covers shall be white finish at 4’ above the floor
LightolierLightolier
LightolierLightolier
Lightolier
LightolierLightolier
Lightolier