DESIGN DEVELOPMENT AND DESIGN DEVELOPMENT AND PRODUCTION CENTRE FOR PRODUCTION CENTRE FOR
KHADIKHADI
R.B.CHAVANR.B.CHAVAN
MGIRIMGIRI
WORDHAWORDHA
ACHIEVEMENTS OF KHADI GROUP
2001-2006
TECHNOLOGIES DEVELOPED
1. FINISHING OF KHADI GARMETS AND FABRICS
2. MERCERIZATION OF KHADI YARN
3. DYEING OF COTTON, WOOL, SILK KHADI WITH NATURAL DYES
4. QUALITY ASSURANCE MANUAL
TECHNOLOGIES TRANSFERRED IN IN KHADI SECTOR
TECHNOLOGYTECHNOLOGY KHADI INSTITUTIONKHADI INSTITUTION
1. FINISHING OF 1. FINISHING OF KHADI GARMENTSKHADI GARMENTS
BARABANKIBARABANKI
2. NATURAL DYES2. NATURAL DYES DIMAPUR &DIMAPUR &
SUNDERBANSUNDERBAN
3. QUALITY 3. QUALITY ASSURANCEASSURANCE
20 QA LABORATORIES 20 QA LABORATORIES BY KVIC BY KVIC
TECHNOLOGY READY FOR TRANSFER
MERCERIZATION OF KHADI YARN
LABORATORY EQUIPMENTS DEVELOPED
1. MERCERIZATION MACHINE FOR KHADI YARN
2. DYEING MACHINE FOR KHADI YARN
PUBLICATIONS
1. QUALITY ASSURANCE MANUAL (HINDI & ENGLISH)
2. QUALITY ASSURANCE MANUAL AT A GLANCE (HINDI & ENGLISH)
3. FINSHING OF KHADI GARMENTS
NUMBER OF TECHNOLGY DEMONSTRATION
WORKSHOP CONDUCTED
21
LABORATORIES SET UP AT
MGIRI
1. QUALITY ASSURANCE LABORATORY
2. TEXTILE CHEMICAL PROCESSING
ACHIEVEMENTS OF KHADI GROUP
OCTOBER 2006 – MAY 2007
6 MONTHS
TRANSFER OF OLD MACHINES FROM NASHIK TRAINING CENTRE
MINI SLIVER PLANT
1. COTTON OPENING MACHINE
2. PATTA MAKING MACHINE
3. CARDING MACHINE
4. SLIVER MAKING MACHINE
CHARKHA
6 SPINDLE CHARKHA 20
ROVING MAKING MACHINE 04
LOOMS
FRAME LOOMS 5
NEW MACHINES PURCHASED
1. WARPING SET01
2. LOOM 01
3. CARDING MACHINE01
4. 2 SPINDLE CHARKHA02
5. 6 SPINDLE CHARKHA01
6. WOOL SLIVER MAKING 01
7. SAMPLE LOOM 01
MACHINES TO BE PURCHASED IMMEDIATELY
GINNING MACHINE
COST Rs. 33,000/-
LABORATORY SET UP
1. PRE - SPINNING LABORATORY
2. SPINNING LABORATORY
3. WEAVING LABORATORY
BEST LABORATORY SET- UP FOR RESEARCH AND PRODUCT DEVELOPMENT
OF
KHADI
MACHINES DEVELOPED
1. 2 SPINDLE CHARKHA FOR WOOL
2. MODIFICATION OF ROVING MAKING MACHINE
MACHINE DEVELOPMENT IN PROGRESS
1. 6 HANK TO BOBBIN WINDING MACHINE
2. SIZING MACHINE
3. PADDING MANGLE
4. 3 SPINDLE WOOLEN CHARKHA
MACHIINE DEVELOPMENT IN PLANNING
1. CHARKHA FOR COARSE COTTON YARN
2. CHARKHA FOR WOOL CARPET YARN
3. DESIGN AND FABRICATION OF MINI SLIVER PLANT CONSISTING OF 5 MACHINES
FUTURE PLAN OF WORK
LABORATORY SET UP IN PLANNING
1. PRINTING LABORATORY
2. GARMENT LABORATORY
DESIGN DEVELOPMENT AND PRODUCTION CENTRE FOR KHADI
FACILITIES
1. PRE – SPINNING (COTTON, WOOL, SILK, OTHER FIBRES)
2. SPINNING
2. WEAVING
3. BLEACHING, DYEING, PRINTING, FINISHING
4. GARMENT MAKING
5. PACKING
PRODUCTION MACHINES NEED TO BE PURCHASED
1. JIGGER DYEING MACHINE
2. PADDING MANGLE
3. BOILER
4. CALENDER FOR KHADI FINISHING
5. GARMENT STICHING MACHINES
6. GARMENT PRESSING UNIT
KHADI SALE THROUGH WARDHA HUT AND KVIC EXHIBITIONS
HOW DESING DEVELOPMENT AND PRODUCTION CENTRE WILL SERVE THE
INTEREST OF KHADI SECTOR
1. STRONGLY BELIEVE THAT PRESENT STATE OF KHADI SECTOR IS DUE TO LACK OF TECHNICAL AND R&D INPUTS.
2. WILL PROVIDE TECHNOLOGY INPUTS AND READY SAMPLES ACCORDING TO MARKET DEMAND
3. PRODUCTION OF KHADI BY KHADI INSTITUTIONS ACCORDING TO MARKET DEMAND
4. QUALITY ASSURANCE AND REPRODUCIBILITY OF RESULTS
5. SUBSTANTIAL IMPROVEMENT IN KHADI SALE IN DOMESTIC MARKET
6. KHADI BEING CONSIDERED AS ECO-FRIENDLY FABRIC HAS GOOD EXPORT POTENTIALS. MAIN HURDLE QUALITY , REPRODUCIBILITY , PRODUCTIVITY
7. REVITALIZE THE KHADI SECTOR
CLUSTER ACTIVITY
RAW MATERIAL TO FINISHED PRODUCT
1. COTTON GROWING FARMERS AND SHEEP BREEDERS CAN CONVERT RAW COTTON AND WOOL TO FINISHED PRODUCTS IN THE FORM OF YARN, FABRIC OR FINISHED GARMENTS
2. VALUE ADDITION
3. LOCAL EMPLOYMENT GENERATION
4. ENHANCED EARNING
INTREST SHOWN
ORGANIC FARMS: MR. DEEPAK SHINDE,
900 FARMERS ASSOCIATION
ORGANIC FARMING
CLUSTER ACTIVITY
DAL MILL
OIL GHANI
BIO DIESEL
KHADI SPINNING
INTERESTED TO SET UP MINI SLIVER PLANT
WILLING TO GIVE ADVANCE FOR THE EQUIPMENTS
WOMEN WEAVE MRS. SALLY HOLKAR
CLUSTER ACTIVITY OF HANDLOOM WEAVING
INTERESTED TO START KHADI SPINNING AND WEAVING IN THE FORM OF CLUSTER ACTIVITY
INTEREST SHOWN IN THE PURCHASE OF MINI SLIVER PLANT
SIMILAR INTEREST SHOWN BY MANY WORKSHOP PARTICIPANTS FOR THE PURCHASE OF MERCERIZATION MACHINE, HANK DYEING MACHINE AND OTHER MACHINES DEVELOPED
NEED FOR SCALING UP PROTOTYPES
1. NO KHADI INSTITUTION HAS ADEQUATE INFRASTRUCTURE FOR DESIGN AND DEVELOPMENT OF TO SCALE UP PROTOTYPE MACHINES DEVELOPED AT MGIRI
2. KVIC SARANJAM KARYALAYAS HAVING WORKSHOP FACILITIES ARE NOT INTERESTED IN PRODUCTION OF NEW MACHINES DUE TO TECHNICAL MANPOWER SHORTAGE
3. PROTOTYPE DESIGN CENTRE AT DAHANU HAS WORKSHOP FACILITITES BUT NO TECHNICAL MANPOWER WITH THE KNOWLEDGE OF KHADI MACHINES
OBVIOUS CHOICE
MGIRI WARDHA
FOR EARLY TECHNOLOGY TRANSFER
MANPOWER REQUIRED
DEDICATED MANPOWER ONLY FOR KHADI SECTION
WORKSHOP
DESIGN ENGINEER 01
FOREMAN 01
LATHE OPERATOR 01
WELDER 01
FITTER 01
GENERAL HELP 01
Total 06
KHADI SECTION
TECHNICAL • SECTION HEAD 01
• TEXTILE TECHNOLOGIST01
• CHEMICAL PROCESSING TECHNOLOGIST01
• GARMENT/TEXTILE DESIGNER 01
• KHADI TECHNOLOGIST (KHALLARKAR) 01
• EXPERT SPINNER AND WEAVER (KVIC)
TOTAL 05
NON TECHNICAL (FOR PRODUCTION,ATTENDANT CATEGORY)
• SPINNERS FOR PRODUCTION 05
• WEAVERS FOR PRODUCTION02
• CHEMICAL PROCESSOR 02
• GENERAL ASSISTANCE 01
TOTAL10
KHADI 10
WORKSHOP 06
PRODUCTION 10
TOTAL 26
PRSENT STAFF POSITION
WORKSHOP
1. MRS. SARITA
2. LAKHEKAR
3. AMAN
4. PRAVIN
5. SACHIN
6. PRAKASH
KHADI SECTION
1. PROF. R.B.CHAVAN
2. MR. PANDHARPURE
3. MR. NIMJE (KVIC)
4. MR. SHAHID (KVIC)
OTHERS
1. MR. KHALARKAR
2. MR. DHYANESHWAR
3. MR. ROUT
4. MR.PRAMOD
5. MR. PAWAN
TOTAL 09
KHADI 09
WORKSHOP06
TOTAL 15
SALARY COMMITMENT FOR THE PRESENT STAFF
WORKSHOP
DESIGNATION SALARY Rs./MONTH
LAKHEKAR 5000
AMAN 4000
PRAVEEN 3000
SACHIN 2500
PRAKASH KVIC
TOTAL 14,500
STAFF MEMBER SALARY Rs./MONTH
LAKHEKAR 5000
AMAN 4000
PRAVEEN 3000
SACHIN 2500
PRAKASH KVIC
TOTAL 14,500
SALARY COMMITMEN FOR THE PRESENT STAFF STRUCTURE
KHADI SECTION
STAFF MEMBER SALARY Rs./MONTH
PROF.R.B.CHAVAN 26,400
PANDHARPURE 8000
NIMJE KVIC
SHAHID KVIC
KHALLARKAR 3000
TOTAL 37,400
SALARY COMMITMEN FOR THE PRESENT STAFF STRUCTURE
SALARY COMMITMEN FOR THE PRESENT STAFF STRUCTURE
KHADI SECTION
STAFF MEMBER SALARY Rs./MONTH
PAWAN 2000
PRAMOD 1800
ROUT 1800
DYANESHWAR 2000
TOTAL 7,600
GRAND TOTAL 59,500 PER MONTH
PRODUCTION STAFF EXTRA
TOTAL FUND REQUIREMENT
SALARY 60,000 PER MONTH
RAW MATERIAL PURCHASES 20,000 PER MONTH
TOTAL 80,000 PER MONTH
ANNUAL FUND REQUIREMENT 9,60,000 PER YEAR
SUBSTANTIAL PART OF EXPENSES WILL BE RECOVERD ONCE PRODUCTION AND SALE
ACTIVITIES ARE STARTED.
THE CENTRE CAN BE NOT ONLY SELF SUPPORTIN BUT PROFIT MAKING IN 3 YEARS
TIME
PURCHASE OF PRODUCTION EQUIPMENTS 10 LAKH
SALARY OF PRODUCTION STAFF EXTRA
EARLY TECHNOLOGY TRANSFER
ESTABLISH THE REPUTATION OF MGIRI AS TRUE TECHNOLOGY PROVIDER
REVITALIZATION OF KHADI SECTOR