Design-Build Process from All Sides

5
DESIGN-BUILD Process Risk Assessment Benefits One Stop Shop for Owner Increased Collaboration Increased Efficiency Decreased Change Orders Increased Sustainability Elimination of Finger Pointing Between Design and Construction Team Disadvantages Architect and Contractor on Same Team, Owner is Not. Aspirational Rather than Value Based

description

Design-Build Process from All Sides Team Composition Skills Technical Expertise Problem Solving/Decision Skills Interpersonal Skills Diversity Experience & Knowledge Creative Tension Size (5-9) Small = efficient = 4 or 5 Large = creative

Transcript of Design-Build Process from All Sides

Page 1: Design-Build Process from All Sides

DESIGN-BUILD Process Risk Assessment

Benefits• One Stop Shop for Owner• Increased Collaboration• Increased Efficiency• Decreased Change Orders• Increased Sustainability• Elimination of Finger Pointing

Between Design and Construction Team

Disadvantages• Architect and Contractor on

Same Team, Owner is Not.• Aspirational Rather than Value

Based

Page 2: Design-Build Process from All Sides

DESIGN-BUILD Process Team Composition

• Skills• Technical Expertise• Problem Solving/Decision Skills• Interpersonal Skills

• Diversity• Experience & Knowledge• Creative Tension

• Size (5-9)• Small = efficient = 4 or 5• Large = creative <=12• Smallest team necessary

• Personality• Collaboration (1/3 not collaborative)• Command and Control• Firm Culture

Page 3: Design-Build Process from All Sides

DESIGN-BUILD Process Team Organization

• Cross-Functional Teams• Interdisciplinary• Systems or Areas

• Discrete Whole• Cost, Scope and Responsibility

• Design, Construction, Cost, Schedule, Commissioning

• Duration• Dependent on function• Package work to teams, not teams to work

• Teams within Teams• External or Internal Coordination

Page 4: Design-Build Process from All Sides

DESIGN-BUILD Process Team Agreement

• Mission Statement• Value Statement

• What is most important to team• Behaviors

• Process & Strategy• Measurable Goals

• Value • Goals• Target• Metric

• Communications• Teams

• Leadership• Cross-functional

Page 5: Design-Build Process from All Sides

DESIGN-BUILD Process Resolving Conflict

• Business Negotiations• Project Management• Senior Executive

• Mediation/DRB• Neutral• Non-binding

• Arbitration• Decision binding• Appeal only for procedural error

• Litigation• Cost• Length of time• Appealable