Design and Monitoring of borehole heat exchangers using distributed temperature measurements KTH Royal Institute of Technology José Acuña

Transcript of Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft...

Page 1: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Design and Monitoring of borehole heat exchangers using distributed

temperature measurements

KTH Royal Institute of TechnologyJosé Acuña

Page 2: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

www.svepinfo.sewww.pemtec.se

Fiber inne i borrhålen

TnTn‐1

T1 T2        T3 T4 ……….

Distributed Temperature Sensing

DTS Instrument

DTS Instrument

Page 3: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Measurement example: U-pipe BHEs

0

20

40

60

80

100

120

140

160

180

200

220

9 11 13 15 17 19 21 23 25

Djup

 [m]

Temperatur [C]

0,5 l/s0,4 l/s0,2 l/s0,14 l/s

Page 4: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Dep

th[m

]

time[°C] 0

260

Measurement example: DTRT

Page 5: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Example of results from DTRT

10

30

50

70

90

110

130

150

170

190

210

230

250

2.5 3 3.5Djup

 [m]

λberg [W/mK]

‐250

‐200

‐150

‐100

‐50

03 3,2 3,4 3,6 3,8 4

Djup [m]

Värmelednings förmåga [ W/mK] 

0

50

100

150

200

250

300

9.0 11.0 13.0 15.0 17.0 19.0

Dju

p [

m]

Temperatur [°C]

Page 6: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Stockholms University

130 boreholes230 m deep

Winter: 1400 kW2,5 / 6,0 ºC

Summer: 2500 kW31 / 25 ºC

Hesselmannskastiftelsen

Page 7: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

How to include DTS in design and monitoring of large bore fields ?

Page 8: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Installationsite

Page 9: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Optical fiber cables outside the BHE pipes

Page 10: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:
Page 11: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:
Page 12: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Some g-functions in zone 12

0

10

20

30

40

50

60

70

80

90

‐11 ‐9 ‐7 ‐5 ‐3 ‐1 1 3 5

g‐functio

n

ln (9FoH)

Single borehole

Two boreholes

Manifold 12

Whole Installation

Page 13: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Theory and practice

0

20

40

60

80

100

120

140

160

180

200

220

9 11 13 15 17 19 21 23 25

Djup

 [m]

Temperatur [C]

0,5 l/s0,4 l/s0,2 l/s0,14 l/s

0

50

100

150

200

250

300

9.0 11.0 13.0 15.0 17.0 19.0

Dju

p [

m]

Temperatur [°C]

Measured data vs.models byPatricia Monzóand Alberto Lazzarotto

Page 14: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

First DTRT: Frescati

Preliminary results

Page 15: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

KTH team: FRESCATI PROJECT

KTH energiteknikKTH byggnadsteknik

KTHs team:Patricia Monzó, doktorandDavide Rolando, researcherAlberto Lazarotto, doktorand (PhD tomorrow !!)José Acuña, researcherProf. Björn PalmProf. Folke Björk

Page 16: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

An example from USA

Borehole Thermal Energy Storage (BTES)

• Albany, GA• BTES• 306 boreholes• About 64 m deep

Page 17: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

DTS at the BTES

DTS

X

X

Page 18: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:
Page 19: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

Monitoring borehole, splice box

Page 20: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

First DTS measurement (raw data)

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

0

200

400

600

800

1000

1200

1400

1600

1800

2000

0 500 1000 1500 2000 2500

Tempe

rature [ºC]

Signal strength

Measured length [m]

Stokes

anti‐Stokes

temperature (°C)

Page 21: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

DTRT0

10

20

30

40

50

60

70

80

90

100

110

19 24 29 34 39 44

Depth [m

]

Temperature [ºC]

A DTRT has been recentlycarried out in order to get a better insight about the geology

Page 22: Design and Monitoring of borehole heat exchangers using …/Jose Acuna - … · Microsoft PowerPoint - Jose Acuna - DTS and BTES in Sweden and USA2.pptx Author: josea Created Date:

TACK!

Contact:

José Acuña, PhDKTH Royal Institute of Technology, Sweden

Mob: 076 232 00 08Email: [email protected]

www.energy.kth.se/energibrunnar