DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of...
Transcript of DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of...
![Page 1: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/1.jpg)
Clarendon Circle ImprovementsWilson and Washington Blvd
Washington Blvd ImprovementsKirkwood Road to Wilson Blvd
DES Division Of Transportation
Clarendon Circle Area – Arterial Street Improvement Projects
April, 2018Department of Environmental Services Division Of Transportation
Tom Hutchings [email protected] 703 228 3809
Projects will be constructed in sequence and phased to keep traffic and pedestrian impact low.
Project #1
Project #2
![Page 2: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/2.jpg)
Clarendon Circle Improvements Wilson Blvd and Washington Blvd
Project Goals
• Reduce intersection size and tighten intersection geometry
• Shorten pedestrian crossing distances and widen crosswalk areas
• Better align Washington Boulevard and Wilson Boulevards
• Upgrade traffic signals
• Improve traffic flow.
• Install New Carlyle streetlights
• Provide wider center medians at all crossings
• Close N. Irving Street next to Silver Diner, add a green streets element
• Adds curb extensions at Liberty Tavern and old Sam’s Deli corner
• Adds bike lanes to improve bike lane connections
• New Street trees
![Page 3: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/3.jpg)
Clarendon Circle Improvements Wilson Blvd and Washington Blvd
Existing Conditions
![Page 4: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/4.jpg)
Clarendon Circle Improvements Wilson Blvd and Washington Blvd
Approved Conceptual Design
Conceptual Design based on the preferred Concept developed in the 2012
Clarendon Circle Transportation Study
![Page 5: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/5.jpg)
Clarendon Circle Improvements Wilson Blvd and Washington Blvd
100% Engineering Design
![Page 6: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/6.jpg)
View looking south on Washington Boulevard
O’ Sullivan's Corner North Side Social Corner
Silver Diner Corner
Illustrations of Proposed Improvements
Illustrations are conceptual. The 90% plans show more accurate detail of sidewalk locations,
utility strips and additional street tree plantings.
![Page 7: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/7.jpg)
View looking south on Washington Boulevard from NE Corner (old Petco site)
North Side Social Corner
Silver Diner Corner
Illustrations of Proposed Improvements
Illustrations are conceptual. The 90% plan view show more accurate detail of sidewalk
locations, utility strips and additional street tree plantings.
![Page 8: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/8.jpg)
Illustrations of Proposed ImprovementsView looking West on Wilson Blvd
Liberty Tavern Corner
Wells Fargo bank Corner Olmstead Building
Corner
Illustrations are conceptual. The 90% plan view show more accurate detail of sidewalk
locations, utility strips and additional street tree plantings
![Page 9: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/9.jpg)
Clarendon Circle Improvements Wilson Blvd and Washington Blvd
New sidewalks and bike routing addresses the need for better pedestrian and bike access
![Page 10: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/10.jpg)
Clarendon Circle Improvements Clarendon Sector Plan
Both Projects deliver on the goals of the Sector Plan and lay the groundwork for
potential future related projects
![Page 11: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/11.jpg)
Clarendon Circle Improvements Wilson Blvd and Washington Blvd
Sector Plan Concept
Exact build out of the Sector Plan concept would create a much larger intersection than
the current design. More recent studies suggest that a smaller intersection, as designed is
a more desirable and pedestrian friendly
![Page 12: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/12.jpg)
Thank you!
Contact Information:
Tom Hutchings,
Capital Project Manager
Arlington County
Washington and Wilson Blvd Intersection Project Schedule
(Clarendon Circle)
Spring 2018: Project Advertised for Construction
Summer 2018: Bid Opening / Notice to Proceed
Fall 18/Winter 19: Phased construction to start
Winter 2020: Anticipated project completion
Project Webpage: https://projects.arlingtonva.us/projects/clarendon-
circle/ or Google: “Clarendon Circle Improvements Arlington”
![Page 13: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/13.jpg)
Washington Boulevard and 13th Street N. Improvements Wilson Blvd to N. Kirkwood Drive
Images reflects new street alignments as per approved
Clarendon West / Red Top Site Plan
![Page 14: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/14.jpg)
Washington Boulevard and 13th Street N. ImprovementsWashington Blvd from Wilson Blvd to Kirkwood Drive
Project Goals
• Provide 4 lanes and eliminate traffic controlled reverse lane.
• Reconfigure Washington Blvd and 13th Street to be a “T” intersection
• Provide public open space for future 13th and Washington Blvd Park
• Underground Utilities
• Upgrade traffic signals
• Install New Carlyle streetlights
• New street trees
Project #2
![Page 15: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/15.jpg)
Washington Boulevard and 13th Street N. ImprovementsWashington Blvd from Wilson Blvd to Kirkwood Drive
Project Area in red
![Page 16: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/16.jpg)
Washington Boulevard and 13th Street N. ImprovementsWilson Blvd to Kirkwood Drive
Project Schedule
To be coordinated with approval and
developmentExisting Conditions
![Page 17: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/17.jpg)
Washington Boulevard and 13th Street N. ImprovementsWilson Blvd to Kirkwood Drive
Planned new streets shown over
existing streets
![Page 18: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/18.jpg)
Washington Boulevard and 13th Street N. ImprovementsWilson Blvd to N. Kirkwood Drive
Planned Improvements
![Page 19: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/19.jpg)
Washington Boulevard and 13th Street N. ImprovementsWilson Blvd to N. Kirkwood Drive
Proposed Open Space / Future Park at 13th Street and Washington Blvd
![Page 20: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/20.jpg)
Washington Boulevard and 13th Street N. ImprovementsWilson Blvd to N. Kirkwood Drive
Future Park at 13th Street and Washington Blvd Detail
![Page 21: DES Division Of Transportation Clarendon Circle Area Arterial … · 2019-01-28 · DES Division Of Transportation Clarendon Circle Area –Arterial Street Improvement Projects Department](https://reader033.fdocuments.in/reader033/viewer/2022053001/5f0577eb7e708231d4131cf5/html5/thumbnails/21.jpg)
Thank you!
Contact Information:
Tom Hutchings,
Capital Project Manager
Arlington County
Washington Blvd and 13th Street N. Project Schedule
Winter 2018: Plans 100% complete
Spring 2018: Finalize land transfers from adjacent future
Development (Clarendon West)
Summer 2018: Advertise construction
Fall 2018 – Bid Opening: Issue Notice to Proceed with construction
Winter 2019: Phased construction to start
Winter 2020: Anticipated project completion
Project Webpage: https://projects.arlingtonva.us/projects/clarendon-
circle/ or Google “Washington Blvd and 13th street Arlington”