Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

download Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

of 8

Transcript of Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    1/8

    DescriptionPrepared Checked Approved

    ORIGINATOR

    Document Title

    INSPECTION AND TEST PLAN FOR SHOPPREFABRICATION OF

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    2/8

    INSPECTION AND TEST PLAN FOR SHOP

    PREFABRICATION OF

    STORAGE TANK

    Issue date: 25.10.2008 Doc No: Rev:D Page: 2 of 21

    LIST OF CONTENTS

    1-INSPECTION AND TEST PLAN

    2-ATTACHMENTS ( FORMS )

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    3/8

    INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF

    FUEL STORAGE TANK

    Issue date: 25.10.2008 Doc No: Rev:D Page:3 of 21

    StageNo.

    Descriptionof Activity

    Controlling documentAcceptance Criteria

    QualityRecord

    Inspection,Test and Witnessing Pla

    QC NOE T Oth. N

    1BeforeManufacturing

    Inspection and Test Plan This Plan H C

    Design Plan Drawing D C

    Design Approval Drawing C R

    Material Order ERMF-001 I C

    2BeforeWelding

    Welding Procedure

    Specifications API 650 sec.7 WPS H C

    Procedure QualificationRecords

    API 650 sec.7PQR H C

    Welder and WeldingOperator Certificates

    API 650 sec.7WPQR H C

    3Mill TestReports Certificates

    API 650 sec.2&specs Certificate H C

    4Base MaterialReceiving

    Dimensional InspectionAPI 650 sec.2&specs ERMR-001 I

    Thickness CheckAPI 650 sec.2&specs ERMR-001 I

    Visual ExaminationAPI 650 sec.2&specs ERMR-001 I

    Material IdentificationAPI 650 sec.2&specs

    ERMR-001&ERTR-004 I

    LEGENDQC : Quality control of SRD 3K GROUP I : Inspection

    NOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    4/8

    INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF

    FUEL STORAGE TANK

    Issue date: 25.10.2008 Doc No: Rev:D Page:4 of 21

    StageNo.

    Descriptionof Activity

    Controlling documentAcceptance Criteria

    QualityRecord

    Inspection,Test and Witnessing Pl

    5WeldingMaterialReceiving

    CertificatesAPI 650 sec.2&specs Certificate H C

    Dimensional InspectionAPI 650 sec.2&specs ERMR-001 I

    Thickness CheckAPI 650 sec.2&specs ERMR-001 I

    Visual ExaminationAPI 650 sec.2&specs ERMR-001 I

    Material IdentificationAPI 650 sec.2&specs ERMR-001 I

    6 Before cutting

    Dimensional Inspection Drawing I

    Material Identification API 650 Sec.2 I

    Marking Transfer ERTR-005 O&C

    7After CuttingShell Plates

    Dimensional Inspection

    Drawing & API 650sec.4 ERTR-006 I

    Bevel InspectionDrawing

    ERTR-006 I IxR

    LEGENDQC : Quality control of SRD 3K GROUP I : Inspection

    NOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    5/8

    INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF

    FUEL STORAGE TANK

    Issue date: 25.10.2008 Doc No: Rev:D Page:5 of 21

    StageNo.

    Descriptionof Activity

    Controlling documentAcceptance Criteria

    Inspection,Test and Witnessing Pla

    QC NOE T Oth. N

    8After RollingShell Plates Checking Shape

    Drawing & API 650sec.4 ERTR-006 I

    9After Formingothers

    Dimensional Inspection

    Drawing&API 650sec.4 ERTR-002 I C

    Checking Shape

    Drawing&API 650sec.4 ERTR-002 I C

    10

    After Markingand CuttingAnnularPlates

    Dimensional InspectionDrawing

    ERTR-002 I COrientation Check Drawing ERTR-002 I C

    Groove InspectionDrawing&API 650sec.4 ERTR-002 I

    Checking ShapeDrawing&API 650sec.4 ERTR-002 I

    Tack Weld InspectionDrawing&API 650sec.4 ERTR-002 I

    11

    After Marking,CuttingForming andFit-up of Drawoff Sump

    Dimensional Inspection Drawing ERTR-002 I C

    Orientation Check Drawing ERTR-002 I C

    Groove InspectionDrawing&API 650sec.4 ERTR-002 I

    Checking ShapeDrawing&API 650sec.4 ERTR-002 I

    Tack Weld InspectionDrawing&API 650sec.4 ERTR-002 I

    LEGENDQC : Quality control of SRD 3K GROUP I : InspectionNOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    6/8

    .INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF

    FUEL STORAGE TANK

    Issue date: 25.10.2008 Doc No: Rev:D Page:6 of 21

    StageNo.

    Descriptionof Activity

    Controlling documentAcceptance Criteria

    QualityRecord

    Inspection,Test and Witnessing Pla

    QC NOE T Oth. N

    12

    After Markingand CuttingForming and Fit-up of WindGirders

    Dimensional Inspection Drawing ERTR-002 I C

    Orientation Check Drawing ERTR-002 I C

    Groove InspectionDrawing&API 650sec.4 ERTR-002 I

    Checking ShapeDrawing&API 650sec.4 ERTR-002 I

    Tack Weld InspectionDrawing&API 650

    sec.4 ERTR-002 I

    13

    After Marking,Cutting, Forming

    and Fit-up ofRoof Parts

    Dimensional InspectionDrawing

    ERTR-002 I C

    Orientation Check Drawing ERTR-002 I C

    Groove InspectionDrawing&API 650sec.4 ERTR-002 I

    Checking ShapeDrawing&API 650sec.4 ERTR-002 I

    Tack Weld InspectionDrawing&API 650sec.4 ERTR-002

    14

    After Marking,Cutting Forming

    and Fit-up ofLadders and

    Platforms

    Dimensional InspectionDrawing

    ERTR-002 I C

    Orientation CheckDrawing

    ERTR-002 I C

    Groove InspectionDrawing&API 650sec.4 ERTR-002 I

    Checking Shape

    Drawing&API 650sec.4 ERTR-002 I

    Tack Weld InspectionDrawing&API 650sec.4 ERTR-002 I

    LEGENDQC : Quality control of SRD 3K GROUP I : InspectionNOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    7/8

    INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF

    FUEL STORAGE TANK

    Issue date: 25.10.2008 Doc No: Rev:D Page:7 of 21

    StageNo.

    Descriptionof Activity

    Controlling documentAcceptance Criteria

    QualityRecord

    Inspection,Test and Witnessing Pla

    QC NOE T Oth. N

    15After Fit-up ofPipe to Flange

    Dimensional& VisualInspection

    Drawing&API 650sec.4 ERTR-002 I C

    Groove & Tack WeldInspection

    Drawing&API 650sec.4 ERTR-002 I

    Checking Material Id. ERTR-004 ERTR-002 I

    16During

    Welding

    Check of WPSRelated WPS

    IxR C

    Check of Preheat&Interpass Temp.

    Related WPSIxR C

    Checking WeldingMaterial

    Related WPSIxR C

    Check of Welders&Welding Operators

    WPQR of welders&welding operators IxR C

    17 After Welding

    General Visual &Dimensional Inspection

    Drawing&API650sec.4&6.5 ERTR-001 OxC C

    RadiographicExamination

    API 650 sec.6.1ERTR-007ERTR-008ERTR-009 OxC C

    18BeforeShipment

    Final InspectionOxC C

    NOTES:

    1-Radiographic examination3.1-To be applied 100% on longitudinal butt welds of nozzles pipes and manhole pipes.3.2-To be applied 100% on welds(if any)of WN flange to pipe on nozzle and manhole

    LEGENDQC : Quality control of SRD 3K GROUP I : InspectionNOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By

  • 7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf

    8/8

    INSPECTION AND TEST PLAN FOR SHOP

    PREFABRICATION OF

    STORAGE TANK

    Issue date: 25.10.2008 Doc No: Rev:D Page:8 of 21

    ATTACHMENTFORM LIST

    DOCUMENT NO. DOCUMENT TITLE

    ERMR-001 Material Receipt And acceptance Report

    ERTR-001 Visual and Dimensional Inspection Report

    ERTR-002 Inspection Report

    ERTR-003 Surface Preparation And Painting Inspection Report

    ERTR-004 Material Incoming Record Form

    ERTR-005 Stamping And Marking Transfer Report

    ERTR-006 Inspection Report for Cutting And Forming Storage Tank Plates

    ERTR-007 Radiographic Examination Report ( Cover Page )

    ERTR-008 Radiographic Examination Report

    ERTR-009 Radiographic Examination Plan

    ERTR-010 Liquid Penetrant Examination Report

    ERTR-011 Magnetic Particle Examination Report

    ERMF-001 Material Order Form