Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
Transcript of Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
1/8
DescriptionPrepared Checked Approved
ORIGINATOR
Document Title
INSPECTION AND TEST PLAN FOR SHOPPREFABRICATION OF
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
2/8
INSPECTION AND TEST PLAN FOR SHOP
PREFABRICATION OF
STORAGE TANK
Issue date: 25.10.2008 Doc No: Rev:D Page: 2 of 21
LIST OF CONTENTS
1-INSPECTION AND TEST PLAN
2-ATTACHMENTS ( FORMS )
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
3/8
INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF
FUEL STORAGE TANK
Issue date: 25.10.2008 Doc No: Rev:D Page:3 of 21
StageNo.
Descriptionof Activity
Controlling documentAcceptance Criteria
QualityRecord
Inspection,Test and Witnessing Pla
QC NOE T Oth. N
1BeforeManufacturing
Inspection and Test Plan This Plan H C
Design Plan Drawing D C
Design Approval Drawing C R
Material Order ERMF-001 I C
2BeforeWelding
Welding Procedure
Specifications API 650 sec.7 WPS H C
Procedure QualificationRecords
API 650 sec.7PQR H C
Welder and WeldingOperator Certificates
API 650 sec.7WPQR H C
3Mill TestReports Certificates
API 650 sec.2&specs Certificate H C
4Base MaterialReceiving
Dimensional InspectionAPI 650 sec.2&specs ERMR-001 I
Thickness CheckAPI 650 sec.2&specs ERMR-001 I
Visual ExaminationAPI 650 sec.2&specs ERMR-001 I
Material IdentificationAPI 650 sec.2&specs
ERMR-001&ERTR-004 I
LEGENDQC : Quality control of SRD 3K GROUP I : Inspection
NOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
4/8
INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF
FUEL STORAGE TANK
Issue date: 25.10.2008 Doc No: Rev:D Page:4 of 21
StageNo.
Descriptionof Activity
Controlling documentAcceptance Criteria
QualityRecord
Inspection,Test and Witnessing Pl
5WeldingMaterialReceiving
CertificatesAPI 650 sec.2&specs Certificate H C
Dimensional InspectionAPI 650 sec.2&specs ERMR-001 I
Thickness CheckAPI 650 sec.2&specs ERMR-001 I
Visual ExaminationAPI 650 sec.2&specs ERMR-001 I
Material IdentificationAPI 650 sec.2&specs ERMR-001 I
6 Before cutting
Dimensional Inspection Drawing I
Material Identification API 650 Sec.2 I
Marking Transfer ERTR-005 O&C
7After CuttingShell Plates
Dimensional Inspection
Drawing & API 650sec.4 ERTR-006 I
Bevel InspectionDrawing
ERTR-006 I IxR
LEGENDQC : Quality control of SRD 3K GROUP I : Inspection
NOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
5/8
INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF
FUEL STORAGE TANK
Issue date: 25.10.2008 Doc No: Rev:D Page:5 of 21
StageNo.
Descriptionof Activity
Controlling documentAcceptance Criteria
Inspection,Test and Witnessing Pla
QC NOE T Oth. N
8After RollingShell Plates Checking Shape
Drawing & API 650sec.4 ERTR-006 I
9After Formingothers
Dimensional Inspection
Drawing&API 650sec.4 ERTR-002 I C
Checking Shape
Drawing&API 650sec.4 ERTR-002 I C
10
After Markingand CuttingAnnularPlates
Dimensional InspectionDrawing
ERTR-002 I COrientation Check Drawing ERTR-002 I C
Groove InspectionDrawing&API 650sec.4 ERTR-002 I
Checking ShapeDrawing&API 650sec.4 ERTR-002 I
Tack Weld InspectionDrawing&API 650sec.4 ERTR-002 I
11
After Marking,CuttingForming andFit-up of Drawoff Sump
Dimensional Inspection Drawing ERTR-002 I C
Orientation Check Drawing ERTR-002 I C
Groove InspectionDrawing&API 650sec.4 ERTR-002 I
Checking ShapeDrawing&API 650sec.4 ERTR-002 I
Tack Weld InspectionDrawing&API 650sec.4 ERTR-002 I
LEGENDQC : Quality control of SRD 3K GROUP I : InspectionNOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
6/8
.INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF
FUEL STORAGE TANK
Issue date: 25.10.2008 Doc No: Rev:D Page:6 of 21
StageNo.
Descriptionof Activity
Controlling documentAcceptance Criteria
QualityRecord
Inspection,Test and Witnessing Pla
QC NOE T Oth. N
12
After Markingand CuttingForming and Fit-up of WindGirders
Dimensional Inspection Drawing ERTR-002 I C
Orientation Check Drawing ERTR-002 I C
Groove InspectionDrawing&API 650sec.4 ERTR-002 I
Checking ShapeDrawing&API 650sec.4 ERTR-002 I
Tack Weld InspectionDrawing&API 650
sec.4 ERTR-002 I
13
After Marking,Cutting, Forming
and Fit-up ofRoof Parts
Dimensional InspectionDrawing
ERTR-002 I C
Orientation Check Drawing ERTR-002 I C
Groove InspectionDrawing&API 650sec.4 ERTR-002 I
Checking ShapeDrawing&API 650sec.4 ERTR-002 I
Tack Weld InspectionDrawing&API 650sec.4 ERTR-002
14
After Marking,Cutting Forming
and Fit-up ofLadders and
Platforms
Dimensional InspectionDrawing
ERTR-002 I C
Orientation CheckDrawing
ERTR-002 I C
Groove InspectionDrawing&API 650sec.4 ERTR-002 I
Checking Shape
Drawing&API 650sec.4 ERTR-002 I
Tack Weld InspectionDrawing&API 650sec.4 ERTR-002 I
LEGENDQC : Quality control of SRD 3K GROUP I : InspectionNOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
7/8
INSPECTION AND TEST PLAN FOR SHOP PREFABRICATION OF
FUEL STORAGE TANK
Issue date: 25.10.2008 Doc No: Rev:D Page:7 of 21
StageNo.
Descriptionof Activity
Controlling documentAcceptance Criteria
QualityRecord
Inspection,Test and Witnessing Pla
QC NOE T Oth. N
15After Fit-up ofPipe to Flange
Dimensional& VisualInspection
Drawing&API 650sec.4 ERTR-002 I C
Groove & Tack WeldInspection
Drawing&API 650sec.4 ERTR-002 I
Checking Material Id. ERTR-004 ERTR-002 I
16During
Welding
Check of WPSRelated WPS
IxR C
Check of Preheat&Interpass Temp.
Related WPSIxR C
Checking WeldingMaterial
Related WPSIxR C
Check of Welders&Welding Operators
WPQR of welders&welding operators IxR C
17 After Welding
General Visual &Dimensional Inspection
Drawing&API650sec.4&6.5 ERTR-001 OxC C
RadiographicExamination
API 650 sec.6.1ERTR-007ERTR-008ERTR-009 OxC C
18BeforeShipment
Final InspectionOxC C
NOTES:
1-Radiographic examination3.1-To be applied 100% on longitudinal butt welds of nozzles pipes and manhole pipes.3.2-To be applied 100% on welds(if any)of WN flange to pipe on nozzle and manhole
LEGENDQC : Quality control of SRD 3K GROUP I : InspectionNOE : Employer I x R : Inspection RandomT : Third Party W : WitnessOth : Other SW : Spot WitnessPWHT : Postweld Heat Treatment C : Check ReviewWPS : Welding Procedure Record H : Hold PointPQR : Procedure Quality Record O : ExecutionWPQR : Welder& Welding Operator Performance Qualification Record D : Drawing By
-
7/29/2019 Derescom Att.No-12 -QUALITY PLAN FOR TANK PREFABRICATION.pdf
8/8
INSPECTION AND TEST PLAN FOR SHOP
PREFABRICATION OF
STORAGE TANK
Issue date: 25.10.2008 Doc No: Rev:D Page:8 of 21
ATTACHMENTFORM LIST
DOCUMENT NO. DOCUMENT TITLE
ERMR-001 Material Receipt And acceptance Report
ERTR-001 Visual and Dimensional Inspection Report
ERTR-002 Inspection Report
ERTR-003 Surface Preparation And Painting Inspection Report
ERTR-004 Material Incoming Record Form
ERTR-005 Stamping And Marking Transfer Report
ERTR-006 Inspection Report for Cutting And Forming Storage Tank Plates
ERTR-007 Radiographic Examination Report ( Cover Page )
ERTR-008 Radiographic Examination Report
ERTR-009 Radiographic Examination Plan
ERTR-010 Liquid Penetrant Examination Report
ERTR-011 Magnetic Particle Examination Report
ERMF-001 Material Order Form