Deployment in ExxonMobil

4
Deployment in ExxonMobil Operating plants and research sites Purchase in small quantities Can accept some risk by maintaining existing sample system as backup Able to test ideas, components Major projects Large quantities purchased Risk averse / use proven designs only Can take most advantage of standard designs Engineering cost savings first duplicate design saves more than 50% of the engineering cost Manufacturing cost savings first duplicate construction saves 10-20% of labor due to repetitive tasks

description

Deployment in ExxonMobil. Operating plants and research sites Purchase in small quantities Can accept some risk by maintaining existing sample system as backup Able to test ideas, components Major projects Large quantities purchased Risk averse / use proven designs only - PowerPoint PPT Presentation

Transcript of Deployment in ExxonMobil

Page 1: Deployment in ExxonMobil

Deployment in ExxonMobil

Operating plants and research sites

• Purchase in small quantities

• Can accept some risk by maintaining existing sample system as backup

• Able to test ideas, components

Major projects

• Large quantities purchased

• Risk averse / use proven designs only

• Can take most advantage of standard designs

– Engineering cost savings• first duplicate design saves more than 50% of the engineering cost

– Manufacturing cost savings • first duplicate construction saves 10-20% of labor due to repetitive tasks

Page 2: Deployment in ExxonMobil

Deployment in ExxonMobil

Multiple sites using modular components today• Gas and liquid streams, up to diesel• Superior performance to traditional designs: easier maintenance, fewer leaks• Smaller surface area, less absorption effects• Faster reconfiguration to new processes

A major project in Asia Pacific will have Gen I and proven Gen II technology• Will use modular technology on all streams where it has been shown to work at our plant

sites (>95% of applications; >200 systems)• Will use Gen. II components and connectivity, assuming testing is successful

Testing of Siemens Gen II systems is underway• Tests to be run on process streams, important applications• SAAI supplying these systems in support of project work

Testing of the modular sample system concept is complete at ExxonMobil: NeSSITM is a success

Current work is focused on migration to NeSSITM Generation II systems

Page 3: Deployment in ExxonMobil

Example: SeTS: NeSSITM-Enabled Gas Sampling

OxygenSensor (GE)

MoistureAnalyzer (GE)

Static GasMixer (1/4” SS)

H.P.N2 Line ( 150 psi )

To mix with BTX fordilution and flushingsystem

• 4 Rails ( NeSSITM Stick )

• Mass Flow Controllers

• Temperature Probes

Contain components to analyze gas mixtures

Control gas flows (0-1liter/min), (0-100sccm), ( 0-10sccm), (0-2sccm)

•Sensor Ports

( measures dew/ frost points over a range of -110 to +60 C) (-166 to +140 F )

Slide courtesy of Cornelius Brons (ExxonMobil Research and Engineering Company)

Page 4: Deployment in ExxonMobil

Example: SeTS unit with hollow wave guide mid-IR

Mid Hollow WaveGuide IR

NeSSITM Platform

SeTS UnitGas (B,T,X)Manifold

Sample Gas LinesTo G.C. From Valco

Slide courtesy of Cornelius Brons (ExxonMobil Research and Engineering Company)