The Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
DPWH STRATEGIC INFRASTRUCTURE
POLICIES AND PROGRAMS
1
05 August 2014
Secretary ROGELIO L. SINGSON
GOP Infrastructure Investment:OBJECTIVE: 5% of GDP by 2016
2
200
In B
illio
n P
eso
s
400
600
800
1,000
% o
f GD
P
2%
4%
6%
8%
P200.3 B
($4.6B) 2.1%
2011 2012 2013 2014 2015 2016
P215.7 B
($4.9B) 2.0%
P294.7 B
($6.7B)
2.5%
P404.3 B
($9.2B)
3.1%
P587.0 B
($13.3B)
4.1%
P824.0 B
($18.7B)
5.1%
US $ 1 - P 44
2014 Budget Allocation by Sector:
3
Road Transport – P 151.9 B ($ 3,452.3 M)
Air Transport – P 9.1 B ($ 206.8 M)
Marine Transport – P 3.2 B ($ 72.7 M)
Rail Transport – P 13.0 B ($ 295.5 M)
Tourism Infrastructure– P 24.8 B ($ 563.6 M)
Agriculture/Irrigation– P 62.2 B ($ 1,413.6 M)
Note: Excludes civil works cost of PPP projects, except for ROW of PPP projects.US $ 1 - P 44
Condition of Philippine Road Network:
Based on 2013 Road Condition Data
Legend
Road Classification
National Arterial
National Secondary
300,000 sq. km Total Land Area
215,717 kms Total Overall Road Network
32,227 kms Total National Road Length (includes newly converted roads)
0.72 km/sq. km Road Density
0.20 km/sq. km Paved Road Density
0.27 Overall Paved Road Ratio
0.83 Paved Road Ratio for Nat’l. Roads
4
DPWH Strategic Policies and Programs
5
Good Governance Reform and Anti-Corruption Program
Better Quality and Safer National Roads and Bridges Program
Effective Flood Control Program
Public Private Partnership Program
Resiliency Program
Strategic Convergence Program
The Global Competitiveness Report: Quality of Roads
by World Economic Forum
6
Ranking of the Philippines significantly improved from no. 114 (2010-2011) to no. 87 (2013-2014)
Legend: 1 = extremely underdeveloped; 7 = extensive and efficient by international standards (Based on 148 Countries)
5.7 5.7
5.4 5.4
5.1 5 5 4.9
3.5 3.53.4
3.7
2.72.6
2.7
3.12.8
3.1
3.43.6
7
Paving of National Roads
To pave national arterial roads from 88% in 2010 to 100% in 2015 and improve the quality
and safety of our national arterial & secondary roads.
Legend
Road Classification
National Arterial
National Secondary
2011 2012 2013 2014 2015 2016
Target Actual Target Actual Target Actual
Percentage of National Road Network paved (Target Total Length - 31,242 km)
83%25,916
km
82.8%25,879
km
85.7%26,778
km
84.2%26,306
km
88.4%27,627
km
88.2%27,568
km
91.2%28,483
km
97.0%30,316
km
100%31,242
km
Implement ten (10) Long Term Performance Based Maintenance contracts for national roads
with a total length of 1,325 km. to ensure that the road is safe and maintained in good to
excellent condition.
15 Manuals on Bridge Repair & Inspection, Road Construction & Maintenance
Management, Road Management & Supervision, etc. under the JICA Technical
Cooperation Project, Phase II, will all be issued in September 2014.
8
Bridges along National Roads made permanent
To make all existing temporary bridges permanent by 2015 to ensure that bridges, which
are the vital link in a road network, are functional even during and after calamities.
Legend
Road Classification
National Arterial
National Secondary
2011 2012 2013 2014 2015
Target Actual Target Actual Target Actual
Percentage of bridge along national roads made permanent (Target Total Length –345,978 lm)
96.8%335,043
lm
96.4%333,597
lm
97.5%337,329
lm
96.9%335,391
lm
98.4%340,510
lm
97.4%336,865
lm
98.9%342,172
lm
100%345,978
lm
15 Manuals on Bridge Repair & Inspection, Road Construction &
Maintenance Management, Road Management & Supervision, etc.
under the JICA Technical Cooperation Project, Phase II, will all be
issued in September 2014.
Boundary of Study Area and the River Basins
Based on river basins:Pasig-Marikina River Basin and Laguna Lake Basin.
Total area: 4,354 km2
Total Population: 17.1 M635 km2
72 km2
69 km2169 km2
3280 km2
95 km2
15 km2
19 km2
Master Plan for Flood Management in Metro Manila and Surrounding Areas
2
3
Three Major Flooding Occurrence:
(1) Huge volume of water coming from Sierra Madre
(2) Drainage capacity constraints in core area of Metro Manila
(3) Low lying communities around Manila Bay & Laguna Lake
1
11
DPWH Convergence Programs:
TOURISM CONVERGENCE PROGRAM:
• P 54.1 Billion Infrastructure support to designated strategic
Tourism Destinations.
CONVERGENCE FOR AGRI INFRASTRUCTURE:
• Undertake Farm to Market Road Network to access food
production and processing sites;
• Water impounding projects to optimize water resources for
irrigation and flood management;
FLOOD MANAGEMENT PROGRAM:
• Implement P28.7 Billion (FY 2011–FY 2014) flood mitigation
/intervention projects consistent with the Flood Management
Master Plan for Metro Manila and Surrounding areas;
• Clear waterways of Metro Manila and address drainage
capacity constraints;
• A total of 3,309.98 km covering 363 rivers & 2,323 sections
of drainage canals & waterways cleaned/cleared and
desilted.
INTEGRATED TRANSPORT SYSTEM:
• Support for access to major airports, seaports and RORO
ports;
• Implement an initial P2.8 Billion Infrastructure support in
preparation for APEC 2015 by improving access to designated airports, convention sites, tourism destinations;
• Mindanao Logistics Infrastructure Network Program –
Implement an initial P16.2 Billion (FY 2011-FY 2014) for the
410 kms - 16 road network (Local and National Roads) .
P106 Billion is still needed for the 2,405 kms -24 priority
road network;
Project Name Length (km)
Proj. Cost (Php Bn)
Completion
Tarlac-Pangasinan-La Union Expressway 88.85 17.52 2018
Daang Hari-SLEx Link 4.00 2.01 2014
STAR, Lipa – Batangas , Phase II 19.74 2.32 2015
NAIA Expressway 7.15 12.32 2015
Metro Manila Skyway Stage 3 14.82 26.66 2017
Manila North Expressway and NLEx-SLExConnector Road
26.27 32.02 2017
ON-GOING : 160.83 km
Project Name Length (km)
Proj. Cost (Php Bn)
Completion
CALA Expressway (Cavite and Laguna Side) 47.00 35.43 2019
Central Luzon Link Expressway (CLLEx), Phase I (Tarlac-Cabanatuan, Nueva Ecija)
30.70 14.94 2017
Laguna Lakeshore Expressway Dike 47.00 122.81* 2021
NEDA BOARD APPROVED: 124.70 km
Project Name Length (km)
Proj. Cost (Php Bn)
Completion
Metro Manila Expressway, C-6 58.09 TBD TBD
CLLEx, Phase II (Cabanatuan-San Jose) 35.70 14.20 TBD
PROPOSED (PRIORITY): 93.79 km
Proposed HSH* Network in Metro Manila and its
200km Sphere:
* HSH-High Standard Highway12
* Includes P57.897 B reclamation cost.
13
FY 2014 Fund Utilization vs. Previous Years
In Billion Pesos
DPWH Performance Report:Improved project execution and disbursements
Note: NCA-Notice of Cash Allocation; TRA-Tax Remittance Advice; FC-Forex Cash; FNC-Forex Non-Cash
In B
illio
n P
eso
s
As of July 22, 2014
14
2011-2015 DPWH Infrastructure Program:Capital Outlays - Projects
Am
ou
nt (I
n B
illio
n P
eso
s)
10%
45%
32%
41%
Distribution of Proposed FY 2015 Budget by Region:(Capital Outlays, Projects)
15
CAR – P 10.18 B
Region I – P 11.30 B
Region II – P 8.24 B
Region III – P 20.00 B
NORTHERN LUZON-P49.73 B (23.3%)
Region XIII – P 10.65 B
Region X – P 18.04 B
Region IX – P 11.81 B
Region XI – P 13.73 B
Region XII – P 8.89 B
MINDANAO – P63.12 B (29.5%)
NCR – P 19.29 B (9.0%)
Region IV-A – P 17.16 B
Region IV-B – P 12.48 B
Region V – P 14.20 B
SOUTHERN LUZON-P43.84 B (20.5%)
Region VI – P 13.96 B
Region VII – P 13.04 B
VISAYAS – P37.85 B (17.7%) **
Region VIII – P 10.85 B
TOTAL : P213.85 B
* Excluding Inter-Regional/Nationwide-P55.87 B
** Does not include Yolanda Rehabilitation/Reconstruction Budget:
Infrastructure Cluster – P22.7 B
Resettlement Cluster - P37.2 B
16
Proposed DPWH FY 2015 Budget:
FY 2015 Budget (Capital Outlays-Projects)
(In Billion Pesos)
(P 44.84 B)
(P 128.22 B) *(P 5.08 B)
(P 12.16 B)
(P 10.85 B)
(P 3.34 B)
(P 173.51 B)
TOTAL : P269.71 B
(P 18.37 B) (P 1.56 B)
Moving Forward:Continuing investments in infrastructure for more jobs and sustained
growth.
17
Institutionalize Good Governance and Anti-Corruption Reforms
Infrastructure Investment for GOP to grow from 2.5% of GDP in 2013 to
5.0% of GDP in 2016.
DPWH will pursue investments in:
1. Upgrading Quality and Safety of Roads and Bridges
• Long Term Road Maintenance Contracts
• Design and Build Bridge Program
2. Better access to Tourism Destinations, Airports, Seaports, RORO
Ports and Food Production Areas
3. Flood Risk Reduction Program and Structural Resilience
• Flood Control Projects
4. Mindanao Logistics Network Projects
5. ARMM Support Infrastructure Program
6. Resiliency and Disaster Risk Management Projects