Electronic Systems Support Demonstrator Racks Rack coordination meeting 25 November 2004

description

Demonstrator Racks. Rack coordination meeting 25 November 2004. Aims. To construct complete racks to represent the two types of installation ATLAS/CMS ALICE/LHCb Including A representative set of subracks Electrical distribution Cooling Control To allow studies to be made on: - PowerPoint PPT Presentation

Transcript of Demonstrator Racks

Page 1: Demonstrator Racks

Electronic Systems Support

Demonstrator Racks

Rack coordination meeting25 November 2004

Page 2: Demonstrator Racks

25

Novem

ber

20

04

- c

pR

ack

Coord

inati

on

2

Aims To construct complete racks to represent the two

types of installation ATLAS/CMS ALICE/LHCb

Including A representative set of subracks Electrical distribution Cooling Control

To allow studies to be made on: Rack control Subrack installation Cable management Cooling

Page 3: Demonstrator Racks

25

Novem

ber

20

04

- c

pR

ack

Coord

inati

on

3

Status Three racks are in place in 4-S-060

One ATLAS/CMS rack One ALICE rack One LHCb rack

Cooling water connections Next week

Electrical connection ATLAS/CMS done – Canalis + distribution chassis ALICE/LHCb next week

Control See other report

Rack equipment Rack attachments – waiting on delivery of parts Heat exchangers – delivered, problem with water connections Turbine chassis – waiting on prototypes VME subracks

9U water cooled – available 9U air cooled – available 6U water cooled – available 6U air cooled – available

Installation complete for the end of the year Available to experiments for installation tests, etc. – January

Page 4: Demonstrator Racks

25

Novem

ber

20

04

- c

pR

ack

Coord

inati

on

4

Racks – ATLAS/CMS, LHCb & ALICE

Page 5: Demonstrator Racks

25

Novem

ber

20

04

- c

pR

ack

Coord

inati

on

5

Power distribution chassis

Rear of turbine chassis

To Twido4 outlets