Towards Water Security and Climate Resilience in Burundi and Rwanda
Bugesera Trans boundary Project in Kagera River Basin for
Rwanda and Burundi”
GWP Water and Climate Programme
Work Package 5 – Demonstration Projects
![Page 2: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/2.jpg)
Kagera Basin-
LVBC/EAC
Bugesera
catchment
demonstration –
focus on Lake
Cyohoha
Implementation of WACDEP in Bugesera
![Page 3: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/3.jpg)
Proposed area for the project – Lake Cyohoha Sub-Catchment
![Page 4: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/4.jpg)
Entry points for local interventions in Bugesera
The interventions are expected to:
• have positive social and economic impacts
on the communities in both countries,
• enhance their adaptive capacity and
contribute to building resilience to climate
change impacts
• enable communities to jointly collaborate
while managing the shared transboundary
water and other natural resources
![Page 5: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/5.jpg)
Entry points for local interventions in Bugesera
• The Lake Cyohoha Catchment has been
identified by both countries as a hotspots in
various development plans and processes
(including NAPAs and National Climate
Communication Reports)
• Identified as hotspot in the Kagera Basin
Investment Strategy
• Need to respond to unsustainable projects on-
going in the sub-catchment supporting Busoni,
Bugabira (in Burundi) and Bugesera District
(Rwanda’s)
![Page 6: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/6.jpg)
”Innovation” in the Bugesera Demonstration Project
• Putting a climate and gender lens in identification
of interventions in Lake Cyohoha sub-catchment
• Working with communities from Burundi and
Rwanda on a shared basin to build adaptive
capacity and reduce vulnerabilities
• Contribute to harmonisation and sharing of
experiences in natural resource management
across borders
Transboundary Water Management at a local
level
![Page 7: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/7.jpg)
Progress in implementation of WACDEP in Bugesera
Consultations with local level stakeholders in
Bugesera (project launching July 2012)
Understanding Bugesera
Catchment problems through
community participatory
approach
![Page 8: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/8.jpg)
Progress in implementation of WACDEP in Bugesera
Situational analysis (considering climatic and non-climatic
drivers) in Lake Cyohoha Catchment carried out by a joint
team of experts from Burundi & Rwanda (Nov-Dec 2012)
Encroaching wetlands for agriculture and
grazing.
Water supply issues
![Page 9: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/9.jpg)
Progress in implementation of WACDEP in Bugesera
Stakeholders from Bu & Rw reviewed and
endorsed the findings of the situational
analysis (Dec 2012.)
![Page 10: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/10.jpg)
Progress in implementation of WACDEP in Bugesera
• Areas for quick actions assessed during Planning Meeting
for Activities around the Lake Cyohoha in Kirundo (July
2013)
• Participatory prioritization of interventions – that
contribute to building adaptive capacity and reducing
vulnerabilities
![Page 11: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/11.jpg)
Prioritised interventions selected in Bugesera
• Rainwater harvesting and
water storage facilities;
• Protection of buffer zones
along the shorelines of
Lake Cyohoha;.
• Building of terraces – to
manage soil erosion (thus
siltation of water
resources)
![Page 12: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/12.jpg)
Prioritised interventions selected in Bugesera
• Promoting adoption of
biogas, solar energy and
improved cook stoves;
• Building capacities of the
beneficiaries on water
security and climate
resilience.
• Women groups
involvement and Youth
training and involvement
![Page 13: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/13.jpg)
Results so far from the implemented activites
• Ownership of the program by local leaders
and stakeholders expressed
• Major problems/ challenges/issues, possible
adaptation actions and sites for action
identified for Lake Cyohoha sub-catchment
• Detailed 2013-2014 action plan that include a
list of activities, specific locations within the
catchment area, timeframe, responsible lead
institutions and collaborators and
mechanisms for implementation.
![Page 14: Demonstration projects WP5 GWP EA case study_andrew takawira for kidanemariam jembere_28 aug](https://reader034.fdocuments.in/reader034/viewer/2022042816/559855761a28abb51d8b45b7/html5/thumbnails/14.jpg)
Indicators for Work Package 5 in Bugasera
• Number of beneficiaries supported in
demonstration projects on water security
and climate resilience undertaken
• Number of documents produced outlining
the lessons from GWP demonstration
projects and a plan for replicating solutions