Demand flow poster slides rick (1)

20
Confidential Demand Flow Clinical Area DF Stage Demand Flow is: A two bin supplies delivery system that uses visual triggers to deliver the right supplies, to the right place, at the right cost Demand Flow’s objective: To remove the end-user from the supplies management business, while optimizing supply availability, eliminating supplies lead time, and reducing cost

Transcript of Demand flow poster slides rick (1)

Page 1: Demand flow poster slides rick (1)

Confidential

Demand Flow

Clinical Area

DF Stage

Demand Flow is:A two bin supplies delivery system that uses visual triggers to deliver the right supplies, to the right place, at the right cost

Demand Flow’s objective:To remove the end-user from the supplies management business, while optimizing supply availability, eliminating supplies lead time, and reducing cost

Page 2: Demand flow poster slides rick (1)

Confidential

Demand Flow

Kanbans sized exactly to LUM requirement

End-user removed from supplies management

Elimination of excess and obsolete supplies

Order placement is error-proofed

Cost per order line significantly decreased

Product standards set and maintained

Page 3: Demand flow poster slides rick (1)

Confidential

SCM Dashboard

Page 4: Demand flow poster slides rick (1)

Confidential

SCM Dashboard

Page 5: Demand flow poster slides rick (1)

Confidential

SCM Dashboard

Page 6: Demand flow poster slides rick (1)

Confidential

SCM Dashboard

Page 7: Demand flow poster slides rick (1)

Confidential

Page 8: Demand flow poster slides rick (1)

Confidential

Objectives

• Save Critical Resources: Time and Money!

• Remove silos and develop a unified data driven supply chain operation

• Introduce and sustain standard work and lean processes that drives continuous improvement

Page 9: Demand flow poster slides rick (1)

Confidential

Pre-Demand Flow

Excess supplies overran clinical work areas

Unreliable methods to ensure FIFO posed a

risk to patients

Inventory levels were “eyeballed”, reorder quantity was “best

guess”

Unreliable system was driving millions in

waste

Clutter led to chaos and cost

Too much clinical time was spent searching for

supplies; delaying patient care

Page 10: Demand flow poster slides rick (1)

Confidential

Post Demand Flow

Page 11: Demand flow poster slides rick (1)

Confidential

Operating Room

Page 12: Demand flow poster slides rick (1)

Confidential

Operating Room

Page 13: Demand flow poster slides rick (1)

Confidential

GI Lab

Page 14: Demand flow poster slides rick (1)

Confidential

The Journey

Compartmentalized Supply Chain Operations

Inventory Management Push Distribution Redundancies & Rework Basic Tools &

Infrastructure Fill-rate = 82% (inpatient

only)

Unified Supply Chain Focus on Total Cost of

Ownership Variance Control Visibility to all Spend Data Driven Operation Kanban Distribution Disciplined Processes

o Standard Work Continuous Improvement

28K clinical hours saved 30% less storage space 97% overall fill-rate 37K less stat/rush orders $900K saved in medical

supply expense (ops ex) CS warehouse reduced

$300Ko 8K to 4K sqft

33% supply chain staff efficiency

o 12 to 8FTE, who now also service surgical services

OperationsJuly 2011

Current Operation

RealizedGoals

(annual numbers)

Page 15: Demand flow poster slides rick (1)

Confidential

1. Average SKU’s available = 164

2. Average time to service = 25 mins

3. Weekly time required to service floors 1-11 = 252 hours

1. Average SKU’s available = 278

2. Average time to service = 5 mins

3. Weekly time to service 1-11 under LUM = 60 hoursa. 4.0FTE efficiency improvementb. Redeployed to service OR, Lab, etc

DFGeneral Inpatient

Pre-DFGeneral Inpatient

The Journey

Page 16: Demand flow poster slides rick (1)

Confidential

Annual Savings

~$1,000,000 saved on medical supply expense!!

~28,000 clinical hours saved!!

Page 17: Demand flow poster slides rick (1)

Confidential

Program Impact

Page 18: Demand flow poster slides rick (1)

Confidential

Program Impact

Jan-11

Feb-11

Mar-11

Apr-11

May-11

Jun-11Jul-1

1

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12Jul-1

20

500

1000

1500

2000

2500

3000

3500

4000

0

100

200

300

400

500

600

700

800

900

1000

Direct Issues

Waiting Time (HRS)

Dir

ect I

ssue

s

Hou

rs W

aitin

g

Direct Issues/Call Downs

Page 19: Demand flow poster slides rick (1)

Confidential

Lean Impact (Efficiency)

Room Size: 7ft x 12ft (84sqft)Supply Value: $8,943SKU Variety: 41

Room Size: 4ft x 7ft (28sqft)Supply Value: $1,810SKU Variety: 57

Outpatient Lab Then

Outpatient Lab Now

Page 20: Demand flow poster slides rick (1)

Confidential

Lean Impact (Rapid 5S)