Delridge W a y S W Sylvan Way S W SW O r c h a r d S t 16th Ave SW Home Depot SW Myrtle St SW Myrtle St 2 4 t h A v e SW CSO 2 FLOW MONITORING UPGRADES N S W E SEWER SYSTEM IMPROVEMENTS DELRIDGE BASIN Project overview Seattle Public Utilities (SPU) is currently constructing a sewer improvement project in your neighborhood. CSO 2, located at the intersection of Delridge Way SW and SW Orchard Street, is one of two Combined Sewer Overflow (CSO) facilities in the Delridge neighborhood undergoing retrofits to reduce overflows of untreated stormwater and sewage into Longfellow Creek. CSO 2 holds excess untreated stormwater and sewage during heavy rainstorms, releasing it once there is capacity in the downstream system to carry it away. The current tank design is inefficient and prone to clogging that can result in more frequent overflows of untreated stormwater and sewage into Longfellow Creek. What does the project include? Improvements to CSO 2 includes: Installation of an actively-controlled system, including gates, pumps and sensors to better monitor and control the amount of flow that is allowed to enter the downstream sewer system. Installation of a new ventilation fan over the large storage tank to improve air quality and safety for SPU maintenance crews. In addition to improvements to the CSO 2 facility, SPU is installing 450 feet of new pipe, an underground diversion structure, pedestrian and landscaping improvements on the north side of SW Orchard Street, three new curb ramps at SW Orchard Street and Dumar Way SW, and a new roadside flow monitoring box at the intersection of 24th Avenue SW and SW Myrtle Street. CSO 2 Project area CSO 2 Today The project includes pedestrian and landscaping improvements on the north side of SW Orchard Street Spring 2015

Transcript of Delridge Basin Sew er System Impr ovemen ts …spu/@drainsew/documents/web...Delridge Basin Sew er...

Delridge Basin Sewer System ImprovementsDelridge Basin Sewer System Improvements

Delridge W

ay SW

Delrid

ge

Way SW

SW Barton St

SW Henderson St

SW Thistle St

SW Holden St

Sylvan W

ay SW

SW Orchard St

16th Ave S

W

SW Trenton St

SW Barton St

SW Cloverdale St

Chief SealthHigh School

Westwood Village Shopping Center

Home Depot

SW Myrtle StSW Myrtle St

24th

Ave

SW

CSO 2

FLOW MONITORING UPGRADES

N

S

W E

SEWER SYSTEM IMPROVEMENTSDELRIDGE BASIN

Project overview

Seattle Public Utilities (SPU) is currently constructing a sewer improvement project in your neighborhood. CSO 2, located at the intersection of Delridge Way SW and SW Orchard Street, is one of two Combined Sewer Overflow (CSO) facilities in the Delridge neighborhood undergoing retrofits to reduce overflows of untreated stormwater and sewage into Longfellow Creek.

CSO 2 holds excess untreated stormwater and sewage during heavy rainstorms, releasing it once there is capacity in the downstream system to carry it away. The current tank design is inefficient and prone to clogging that can result in more frequent overflows of untreated stormwater and sewage into Longfellow Creek.

What does the project include?

Improvements to CSO 2 includes:

• Installation of an actively-controlled system, including gates, pumps and sensors to better monitor and control the amount of flow that is allowed to enter the downstream sewer system.

• Installation of a new ventilation fan over the large storage tank to improve air quality and safety for SPU maintenance crews.

In addition to improvements to the CSO 2 facility, SPU is installing 450 feet of new pipe, an underground diversion structure, pedestrian and landscaping improvements on the north side of SW Orchard Street, three new curb ramps at SW Orchard Street and Dumar Way SW, and a new roadside flow monitoring box at the intersection of 24th Avenue SW and SW Myrtle Street.

CSO 2 Project area

CSO 2 Today

The project includes pedestrian and landscaping improvements on the north side of SW Orchard Street

Spring 2015

Delridge Basin Sewer System ImprovementsDelridge Basin Sewer System Improvements

• Construction began in early 2015. Crews are on-schedule for substantial completion in fall 2015.

• Most construction activity is occurring on SPU property, but upgrades to the flow monitoring system, including a new above-ground equipment cabinet, will take place in the right-of-way at 24th Avenue SW and SW Myrtle Street. Crews are also installing a new diversion structure on SW Orchard Street near Dumar Way SW, which will include construction of a new curb and gutter. This work will result in a narrower street after construction is complete.

• Work hours are Monday through Friday, 7 a.m. - 5 p.m., and Saturdays, 9 a.m. - 5 p.m. Crews may occasionally need to work extended hours. We will notify neighbors ahead of any needed schedule changes.

• During construction, traffic will be periodically reduced to one lane on SW Orchard Street near Delridge Way SW. Parking on SW Orchard Street will be eliminated, but will return in a reduced capacity after construction is completed.

Want to learn more?Contact Tara Wong Esteban (SPU Project Manager)

Phone: 206-684-5903 Email: [email protected]

www.seattle.gov/cso/delridge

For interpretation services please call 206-684-5903.Para servicios de interpretación por favor llame al 206-684-5903. Para sa serbisyo ng tagapagpaliwanag, tumawag sa 206-684-5903. Về dịch vụ phiên dịch xin gọi 206-684-5903.

CONCEPTUAL LANDSCAPE DESIGN ILLUSTRATIVE PLAN: CSO 2 - NPDES 168

DELRIDGE CSO RETROFITS, SEATTLE PUBLIC UTILITIES

NOVEMBER 2014

0’ 30’

Scale: 1”= 30’Low growing plants with thorns

Exis ng vegeta on

Exis ng trees limbed up to 8’, typical

Yucca

Street tree, typical

Low maintenance groundcover

Delri

dge

Way

SW

CSO 2NPDES 168

SW Orchard St

Narrow evergreen tree, typical

Low growing plants with thorns

Decora ve concrete path

Visually striking low-growing evergreen plants, typical

Fence

Low maintenance groundcover

Exis ng retaining wall

CSO 2 Conceptual landscape design

What will you see and hear during construction?

Spring 2015

Improvements to CSO 2 will prevent polluted runoff from harming the fish and other wildlife that call Longfellow Creek home