DELIVERING CLEAN ENERGY TO ASIA For personal use only · 10/27/2011 · Mr. Stewart Elliott and...
Transcript of DELIVERING CLEAN ENERGY TO ASIA For personal use only · 10/27/2011 · Mr. Stewart Elliott and...
ENERGY WORLD CORPORATION
EWC
Presentation to
Shareholders
Annual General Meeting
27 October 2011
ENERGY WORLD
CORPORATION
DELIVERING CLEAN ENERGY TO ASIA
PRESERVING THE ENVIRONMENT
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Disclaimer • These materials have been prepared by Energy World Corporation Limited (the "Company") solely for information use
during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or
indirectly, to any other person (whether within or outside your organization/firm) or published, in whole or in part, for any
purpose
• The information contained in these materials has not been independently verified. These materials have been prepared
without taking into account the recipient’s investment objectives, financial situation or particular needs. No
representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness,
accuracy, completeness or correctness of the information or opinions contained herein. It is not the intention to provide,
and you may not rely on these materials as providing, a complete or comprehensive analysis of the Company's financial
or trading position or prospects. The information and opinions in these materials are provided as at the date of this
presentation and are subject to change without notice and will not be updated to reflect material developments which
may occur after the date of this presentation. None of the Company, nor any of their respective affiliates, nor any of their
respective directors, officers, agents, employees, advisers or representatives shall have any liability whatsoever (in
negligence or otherwise) for any loss howsoever arising from any use of these materials or their contents or otherwise
arising in connection with these materials.
• These materials contain statements that reflect the Company's current beliefs and expectations about the future as of
the respective dates indicated herein. These forward-looking statements are based on a number of assumptions about
the Company's operations and factors beyond the Company's control and are subject to significant risks and
uncertainties, and, accordingly, actual results may differ materially from these forward-looking statements. In furnishing
these materials, the Company undertakes no obligation to provide the recipient with access to any additional information.
The Company reserves the right, without giving reasons, at any time to revise, supplement or withdraw these materials
provided to the recipient and to terminate discussions with any or all of the recipients.
• These materials do not constitute and should not be construed as an offer to sell or issue or an invitation or solicitation
of an offer to purchase or subscribe for any securities of the Company in any jurisdiction or an inducement to enter into
investment activity. No part of these materials, nor the fact of their distribution, shall form the basis of or be relied upon
in connection with any contract, commitment or investment decision whatsoever.
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Introduction - Asia’s Appetite for Energy
Chart
showing
kilowatt hour
consumption
per capita.
Source data:
NationMaster
Energy Statistics
Energy World Corporation has always positioned itself to take advantage of Asia’s appetite for energy. There is a strong link between the consumption of electricity (kWh per capita) and the development level and quality of life of a country.
Energy World Corporation is working to provide energy to Asian countries by developing standard modular LNG production trains and by investing in LNG receiving terminals and Gas fired power generation.
104
140
344
425
446
457
478
501
597
827
1585
1865
3166
4797
5642
5699
6206
7029
7391
8072
8170
8937
11193
13351
0 2000 4000 6000 8000 10000 12000 14000 16000
Myanmar:
Bangldesh:
Sri Lanka:
Pakistan:
Papua New Guinea:
India:
Indonesia:
Vietnam:
Philippines:
North Korea:
China:
Thailand:
Malaysia:
Malta:
Russia:
Hong Kong:
United Kingdom:
Germany:
South Korea:
Japan:
Singapore:
New Zealand:
Australia:
United States:
kWh
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
HARDWARE
• Processing Engineering
• Equipment Design
• Civil Engineering
• Land Acquisition
• E.P.C. Contractor
SOFTWARE
• Permits
• Environmental
• Cultural Heritage
• Local Community Welfare
• Contribution to Local
Community
FINANCING
• Equity
• Debt
• Project Finance
• Capital Markets
Project Development Requirement
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia - Operations & Projects Update
ENERGY WORLD GROUP
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – 195 MW Plant
• 195 MW Plant is fully operational
• 91.1% Plant availability: exceeding PPA targets
• Plant Output of 1,458 GWh in FY2011
Indonesia Power Operations - Update
Switch Yard
135 MW Combined Cycle Plant
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – 60 MW Gas Turbine (part of 195 MW plant)
• Fully operational
• 60 MW Gas Turbine and original 135 MW plant
operated without any unplanned interruptions in
FY2011.
Indonesia Power Operations - Update
60 MW Gas Turbine 135 MW Combined Cycle Plant
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – 120 MW Expansion
• Amendment to PPA signed on 12 Nov 2010.
• Formal approval from the Minister of Energy received on
31 Dec 2010 for the tariff contained in the PPA.
• Fully financed with a Project Finance debt package agreed
in June 2011 with funding provided by Standard Chartered
Bank, Mizuho Bank, Natixis, Sumitomo Mitsui, OCBC.
Indonesia Power Operations - Update
Site for 120MW Expansion 60 MW Gas Turbine
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Mr. Stewart Elliott and Mr. Brian Allen signing the
Project Finance package with Standard Chartered Bank Mr. Stewart Elliott and Mr. Brian Allen with Mizuho Bank
Indonesia - 120 MW Expansion, US$200M Project Finance Package
Gas Field Development, US$88M Finance Package
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – Sengkang Gas Operations
• Gas plant fully operational.
• Sengkang Further Plan of Development to provide gas for
120 MW expansion from Kampung Baru gasfield was agreed
on 16 Nov 2010.
• EEES nominated as supplier by BPMIGAS to PLN.
• POD to develop Walanga, Sampi Sampi and Bonge
(WASAMBO) gas fields approved by BPMigas 14 June 2011
Indonesia Gas Operations - Update
Kampung Baru Gas Plant
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – LNG Project Update
• Main Equipment currently being shipped, expected
production in 2013
• Site preparation works underway
Indonesia LNG Project - Update
Zeus Conference Members viewing EWC’s cold boxes
at Chart’s workshop in Sept 2011 Zeus Conference Members at Chart’s workshop in
Sept 2011
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – LNG Project Update
Four of EWC’s 0.5 MTPA cold boxes ready to be shipped
Mr. Stewart Elliott with transporters to be used for transporting
EWC cold boxes at Chart’s workshop in Sept 2011
Siemens’ Compressors
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – LNG Project Update
Slipform Equipment
Slipform equipment manufactured and ready for use
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Indonesia – Sengkang LNG Project
Mr. Brian Allen and Mr. Stewart Elliott meeting with Vice
President Jusuf Kalla to discuss the project
Mr. Brian Allen overseeing the payment for the land
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Mr. Brian Allen with South Sulawesi Governor Syahrul Yasin Limpo at the
ground-breaking ceremony for the Sengkang LNG Project in October 2011
Indonesia – Sengkang LNG Project
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
MOU signed for East Java LNG Receiving Terminal
• In October 2011, EWC signed a Memorandum of
Understanding with the Provincial Government of
East Java to develop and construct an LNG Import
Receiving Terminal
• East Java currently lacks a gas supply of around 3
MTPA to satisfy 332 local companies
• Phase 1 is expected to process 3 MTPA
• Phase 2 will include a gas fired power station and
further expansion of the LNG Import Terminal facilities F
or p
erso
nal u
se o
nly
ENERGY WORLD CORPORATION
EWC
Mr. Stewart Elliott meeting with East Java
Governor Soekarwo
East Java LNG Receiving Terminal
Mr. Stewart Elliott signing the MOU with East
Java Governor Soekarwo For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
East Java LNG Receiving Terminal
Mr. Stewart Elliott with East Java Governor
Soekarwo
Mr. Stewart Elliott exchanging the signed MOU with
East Java Governor Soekarwo
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
East Java LNG Receiving Terminal
The proposed site for the East Java LNG receiving
terminal
Mr. Brian Allen and Mr. Stewart Elliott meeting with the
local Bupati to discuss the land for the project For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Australia – Power Operations and LNG Projects Update
A U S T R A L I A
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Australia – Power operations update
• Plant fully operational
• Availability factor for Alice Springs Power Plant
was 79% for FY2011
• 44.69 GWh sold in the year
• Discussions commenced with NT PWC to extend
PPA beyond 2016 and install extra capacity
Australia Power Operations - Update
Alice Springs Power Plant
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Gilmore LNG Project
• 56,000 TPA Project Equipment shipped ETA
4 November 2011.
• Further development of gas fields planned.
EWC’s Gilmore LNG Cold-Box being transported
for shipment EWC’s Gilmore LNG Cold-Box being loaded onto a
cargo ship in the US bound for Australia
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Australia – Cultural Heritage
Mr. Elliott meeting with local community in
Queensland
Brewing the “billy”
The software part of our projects
is more important than solving all
the hardware and technical issues.
If there is no site, and no good
will, there is no project.
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Abbot Point LNG Project
• Queensland Government issued report in May 2011
re-confirming Abbot Point as a preferred location for
an LNG plant
• Contracts being finalised with the Queensland
Government regarding land for the LNG plant
• Land area suitable for LNG Liquifaction Facility and Export Terminal with capacity up to 10 MTPA
Australia
Gilmore
Eromanga
Abbot
Point
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Proposed
Power
Station
Proposed
LNG Plant
Proposed
LNG Jetty Water
Depth 13 M+
Australia – Abbot Point – LNG Plant & Power Station
Abbot Point
LNG Facility
QUEENSLAND
Gilmore
Galilee
Basin
Proposed
Queensland
Gas
Highway
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
His Excellency Benigno S. Aquino III, President of the Republic
of the Philippines Meeting with Stewart Elliott and Brian Allen
of Energy World Group
Brian Allen
Executive Director
Energy World Group
Stewart W. G. Elliott
Chairman, M.D. & C.E.O.
Energy World Group
His Excellency Benigno S. Aquino III
President of the Republic of the Philippines His Excellency Benigno S. Aquino III witnessing Mr. Elliott signing the
Board of Investments Agreement for the LNG Hub Terminal and Power
Station to be built at Pagbilao in the Philippines His Excellency Benigno S. Aquino III meeting Mr. Stewart Elliott and
Mr. Brian Allen on 31 August 2011 in Beijing to offer his full support for the
development of the LNG Hub Terminal and Power Station
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Philippines – LNG hub terminal update
• The Philippines’ first permit for the development,
construction and operation of an LNG Hub
Terminal and Re-gasification Facility awarded by
the Department of Energy to EWC in Jan 2011
• Site works commenced on land
Mr. Stewart Elliott with local staff on site Site works in progress
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
2 x 150 MW Combined Cycle Power Station General Arrangement
(The Power Station will use natural gas as fuel source)
The Philippines - LNG Hub Terminal and Power Station
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
Papua New Guinea – LNG project update
• Shareholders Agreement and Project Funding &
Construction Agreement signed in Feb 2011 for
3MTPA (2+1)
• Currently working towards Final Investment
decision by 31 Dec 2011
EWC’s CEO Stewart Elliott and Henry Aldorf of InterOil Stewart Elliott meeting with the local community in PNG
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
New Substantial Shareholders
• In July 2011, Orchid Fund Pte Limited, a Richard
Chandler Corporation company became a 14.9%
shareholder in EWC
• In October 2011, Capital Group Companies Inc.
passed the 5% threshold to become a substantial
shareholder in EWC
For
per
sona
l use
onl
y
ENERGY WORLD CORPORATION
EWC
SEHK Listing and De-listing from NZX
• Currently working towards a listing on the Main
Board of the Hong Kong Stock Exchange.
• HSBC is working with our other sponsors (CLSA,
Standard Chartered, etc) to achieve a successful
listing.
• In Oct 2011, we de-listed from the New Zealand
Stock Exchange.
SEHK Listing F
or p
erso
nal u
se o
nly