Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time...

27
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 27 March 2, 2011 Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems Weatherford Int’l / Production Optimization Systems

Transcript of Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time...

Page 1: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Gas Well Deliquification Workshop

Sheraton Hotel, Denver, Colorado

February 27 – March 2, 2011

Deliquification Solutions Using Real Time Automation

Steve Cannon

Product Line Manager, Deliquification Systems

Weatherford Int’l / Production Optimization Systems

Page 2: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

2

This Presentation

Today’s Oilfield is “data-rich”. We will take a look at

ways we can utilize this information for…

– Increased Production

– Reductions in Operating Costs and Well Failures

– Individual Well Management

– Efficiency in Field Operations

– Efficiency in Computer Operations and Automation

Page 3: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

3

Introduction

• Automation has become widely accepted in the oilfield,

but often falls short of taking full advantage of this

“data-rich” environment.

Page 4: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

4

Introduction

• Automation has become widely accepted in the oilfield,

but often falls short of taking full advantage of this

“data-rich” environment.

Page 5: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

• Wide variety of application solutions for all forms of

artificial lift.

– Plunger-Lift

– Gas-Lift

– Rod-Pump

– Electronic Submersible Pump

– Progressive Cavity Pump

– Capillary / Foam

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

5

Introduction

Page 6: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

6

Introduction

• Improvement in problem recognition from daily by

manual inspection to instantaneously with real time

data acquisition.

• Integrated tool sets replace individual automation silos

– Production

– Process

– Reservoir

– Geo-Science

Page 7: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

7

Understand Changing Well BehaviorIncreased Production

Page 8: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

8

Understand Changing Well Behavior

• The Challenge is Early Detection

of Production Problems

– Less Downtime More Production

• Automation as a Tool, not just

identifying the problem, but should offer insite to

the solution.

• A Continuous Cycle

– Surveillance

– Analysis

– Planning

– Execution

– Metrics (Key Performance Indicators)

Increased Production

Page 9: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

9

Automation: A Continuous CycleIncreased Production

Surveillance

•Automation

•Alarms

•Call outs

Best Practices – Operations, Eng., Work Over, Drilling

Analysis

•Engineering

Tools

Planning

•Scheduling

•Economics

Execution

•Cost

•Workflow

•Approvals

Enterprise Integration

KPIs

•ROI

•Exceptions

Corporate Standards and Workflows

Page 10: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

• Selecting the right form of artificial lift.

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

10

Deploy the Right Form of Artificial-LiftReduced Operating Costs & Well Failures

Page 11: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

• Selecting the right form of artificial lift.

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

11

Deploy the Right Form of Artificial-Lift

Interactive planning tool to help

provide you with a logical and

unbiased recommendation of an

artificial-lift solution.

http://www.clientdemos.net/weatherford_tus/

1. Liquid Rate

2. Wellhead Pressure

3. Water Cut

4. GLR

Reduced Operating Costs & Well Failures

Page 12: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

12

Production Optimization

• Decreased Liquid Loading

Increased Production

– Deploy the right form of artificial-lift

– Optimization Controls at the wellhead

• Goal: Identify problems before

they becomes a failure

– Continuous monitoring

– Automated limit checking

– Automatic Shut-In

– Predictive Modeling

Reduced Operating Costs & Well Failures

Page 13: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

13

Identify the ProblemReduced Operating Costs & Well Failures

1.5 day

Page 14: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

15

Manage Individual Wells by Exception

• Real-Time / Current Operating Values:

– Tubing pressure, pressure differential, static pressure and gas flow

rates are captured.

– Alarms based on variance from 7-, 28-days averages are generated.

• Off-Line / Nightly Analysis:

– Operating point analysis and Critical velocity analysis are performed

based on the latest well test, current pressure and gas flow readings

using applicable well model.

– Intelligent alarms are generated based on variance between

• calculated and measured operating gas flow rates

• production gas velocity and critical gas velocity at four

points in the well bore.

Individual Well Management

Page 15: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

16

Optimize Production

• Early Detection of Performance

Degradation by establishing a base-line of

performance.

• Lift Analysis helps determine operating

parameters, setting alarms and detecting

changes

• Automate Comparison of actual (well

test) to theoretical volumes and target values.

Individual Well Management

Page 16: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

17

Reporting & AnalysisIndividual Well Management

Page 17: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

18

Integrated SolutionsIndividual Well Management

Production

Process

GeoSciences

Reservoir

Integrated Solutions

Page 18: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

19

Integrated Real-Time ModelingIndividual Well Management

Production

Process

GeoSciences

Reservoir

Integrated Real-TimeModeling

Page 19: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

20

Efficiency in Field Operations

• Less Windshield Time only travel to

the wellsite when it requires immediate

attention

• Alarm Notification and

Management 24/7/365 monitoring of

production

• Daily Production Reporting automated generation and email delivery

• Proactive Maintenance review of trend

reports and operational data to identify problems

before they occur.

• New & Lower Cost Wellsite

Controls & Equipment faster processing,

more local storage, more I/O, …

Efficiency in Field Operations

Page 20: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

21

Computer Operations & AutomationEfficiency in Computer Operations and Automation

Page 21: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

22

Computer Operations & AutomationEfficiency in Computer Operations and Automation

• Reduced Installation & Maintenance Costs

• PC-Based Platforms

• Integrated Tools

• Reduced Data Management Costs

• $/Mb of data little factor, store years of data.

• Common SQL Databases

• Move from older proprietary control systems to

open systems architectures & interfaces

• Data moves easily thru the enterprise

Page 22: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

2011 Gas Well Deliquification Workshop

Denver, Colorado

Feb. 27 - Mar. 2, 2011 23

In Closing, Automation Assists in…

Engineering & Analysis

– WellFlo

– Lift Optimization

– PanSystem

– ReO

GLV Calculations

Transfer Pressure Margins

Design Options

Flow Parameters

Report Options

Gas Lift Valve Calculations

Gas Passage

Set Pressures

Temperature Bias

GLV Chokes

0.675Discharge Coefficients

Use Catalog Discharge Coefficients

Use Temperature Bias

Use GLV Chokes

85Static Wellhead Temperature °F

Use Flowing Temp. Gradient When:

Ptstatic > Ptflowing MD > 4500 ft

24Choke Size: 1/64

Temperature Correction Calculation Method: Rigorous

Set Pressure Round-off 5 psi

Calculate Gas Passage Based on:

Orifice Calculations True Valve Performance

Correlation: VPC

Selection, Design, Setup & Configuration

– All Artificial Lift Types

– Controllers, RTU

– Flow Measurement

– Communication

– Fiber-Optic Sensors

Surveillance, Alarming & Reporting

– Automation & Control

– R-T Data Store

– Scorecard

– Decision Support

Page 23: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

24

…with Benefits including

• Increased Production with less

downtime and optimized lift controls.

• Reduced Operating Costs &

Well Failures. Attention directed to

problem areas.

• Individual Well Mgmt. Lift

analysis to select the right form of artificial

lift.

• Efficiency in Operations. Alarming & Production Reporting

• Efficiency in Computer

Operations & Automation. A

flexible framework to support multiple

forms of artificial lift within a single system

Page 24: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

25

…with Benefits including

• A flexible framework to

support varying forms of artificial lift

in a single system

• Improves Efficiency with

production optimization & controls

• Reduce Operating Costs focus efforts where there are problems.

• Reduce System Downtime with immediate problem notification.

• Predict Future Events with

“expert systems” analysis.

Page 25: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

26

Your Questions…

Page 26: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

27

Copyright

Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Gas Well Deliquification Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to:

– Display the presentation at the Workshop.

– Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee.

– Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee.

Other use of this presentation is prohibited without the expressed written permission of the author(s). The owner company(ies) and/or author(s) may publish this material in other journals or magazines if they refer to the Gas Well Deliquification Workshop where it was first presented.

Page 27: Deliquification Solutions Using Real Time Automation · Deliquification Solutions Using Real Time Automation Steve Cannon Product Line Manager, Deliquification Systems ... –Analysis

Feb. 27 - Mar. 2, 2011 2011 Gas Well Deliquification Workshop

Denver, Colorado

28

Disclaimer

The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas Well Deliquification Web Site.

The Artificial Lift Research and Development Council and its officers and trustees, and the Gas Well Deliquification Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas Well Deliquification Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained.

The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials.

The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose.