weeks 56 Critical Section 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18”x40” SS tube truss system W12x24 SS frame mechanical supply (2) 30 mil glass door w/ Mecco shading 8”x18” alum frame channel custom alum roll-up track system 4”x10” SS C-channel deck support steel deck w/ conc. floor w/ raised floor 4”x4” SS tube acoustic support frame acoustic suspended paneling suspended SS lighting grid Theater: Structural Diagram Axon View Level 1: RCP w/ FlexSpace below Level 3: Theater with RCP Longitudinal Section Transverse Section 1 1 1 2 2 2 3 3 4 4 9 10 11 12 14 13 5 5 6 6 6 7 7 8 8 15 16

description

Degree Project Section

Transcript of Degree Project Section

Page 1: Degree Project Section

weeks 56Critical Section123456789

10111213141516

18”x40” SS tube truss systemW12x24 SS framemechanical supply(2) 30 mil glass door w/ Mecco shading8”x18” alum frame channelcustom alum roll-up track system4”x10” SS C-channel deck supportsteel deck w/ conc. floor w/ raised floor4”x4” SS tube acoustic support frameacoustic suspended panelingsuspended SS lighting gridTheater: Structural Diagram Axon ViewLevel 1: RCP w/ FlexSpace belowLevel 3: Theater with RCPLongitudinal SectionTransverse Section

1

1 1

22 23

3

4

4

9

10

11

12

14

13

5

5

6

6

6

7 7

88

15 16