Defect List Pentronic 1
2
DEFECT LIST – PLOT 7 LOCATION: PODIUM RELATED PARTY: PENTRONIC No. Location Description Before After Target To Complete Status 1. Level 3 - (Staircase 14) Poor Workmanship – No Exmet – Patching (Fire Intercom) 30.6.2015 2. Level 3 – (Shop Lot 2) Poor Workmanship – No Exmet – Patching (Fire Intercom) 30.6.2015
-
Upload
muhammad-zufar-bin-marwah -
Category
Documents
-
view
231 -
download
4
description
MSP
Transcript of Defect List Pentronic 1
DEFECT LIST PLOT 7LOCATION: PODIUM
RELATED PARTY: PENTRONIC
No.LocationDescriptionBeforeAfterTarget To CompleteStatus
1.Level 3 -(Staircase 14)Poor Workmanship No Exmet Patching (Fire Intercom)
30.6.2015
2.Level 3
(Shop Lot 2)Poor Workmanship No Exmet Patching (Fire Intercom)
30.6.2015
3.Level 2- ( Shop Lot 2)Poor Workmanship No Exmet Patching (Fire Intercom)
30.6.2015