    Changing the way you succeed.

    Company Update

    Deepwater Pipelay

    Capabilities 1

  • 7/31/2019 Deepwater Capabilities

    2/21

    Changing the way you succeed.

    Health, Safety and Environment

    2

    An Occupational Health and Safety Policy Statement is merely a

    declaration of hopeunlessthere is an action plan for improvement.Top 10 Incident Prevention Actions

    Active Management Engagement

    Behavioral Safety Process

    Communications

    Hazard Hunt

    Risk Assessment

    Management of Change

    Permit to Work

    Safety Gram

    Last Minute Risk Assessment

    Stop Work Authority

    24,139 BSP Cards Submitted in 2008

  • 7/31/2019 Deepwater Capabilities

    3/21

    Changing the way you succeed.

    2009 Companywide TRIR Totals

    3

    Description Canyon ERT HSC RDS CorporateCapital

    ProjectsWell Ops PROFAC TOTAL

    Hours 1,001,969 641,972 1,390,771 94,500 322,080 257,297 1,302,195 22,979 5,033,763

    Medical 2 0 1 0 0 2 1 0 6

    Restricted Duty

    Cases0 0 0 0 0 0 4 0 4

    Lost Work Day

    Cases

    2 2 5 0 0 0 5 0 14

    Fatalities 0 0 0 0 0 0 0 0 0

    First Aid Cases 38 8 10 1 2 11 42 0 112

    Near Miss 59 2 36 1 0 7 58 0 163

    Equipment Damage 43 0 17 0 0 0 18 0 778

    Fire 0 0 2 0 0 0 2 0 4

    Pollution 18 1 3 0 0 2 4 0 28

    OSHA 300 Total

    Recordable Cases4 2 6 0 0 2 10 0 24

    OSHA 300 TRIR 0.80 0.62 0.86 0.00 0.00 1.55 1.54 0.00 0.95

  • 7/31/2019 Deepwater Capabilities

    4/21

    Changing the way you succeed.

    Services For Each Stage of the Field Life Cycle

    4

  • 7/31/2019 Deepwater Capabilities

    5/21

    Changing the way you succeed.

    Deepwater Pipelay Vessels- Intrepid

    5

    LENGTH 116 m (381 ft)

    TRANSIT SPEED 6 knts

    TENSION 138 mT (304 kips)

    A&R WINCH 250 mT (551 kips)

    PIPE DIAMETERS 3.5 to 10

    MAIN CRANE 400 mT (882 kips)

    FRICTION CLAMP 200 mT (441 kips)

    REEL CAPACITY 1550 mT (3417 kips)

    ACCOMODATIONS 74 Persons

    Intrepid has the flexibility to be deployedas a pipelay, installation or saturationdiving vessel.

    Thunder Hawk jumper fabrication and loadout onto Intrepid

  • 7/31/2019 Deepwater Capabilities

    6/21

    Changing the way you succeed.

    Deepwater Pipelay Vessels- Express

    6

    LENGTH 160 m (520 ft)

    TRANSIT SPEED 12.5 knts

    TENSION 160 mT (353 kips)

    A&R WINCH 250 mT (551 kips)

    PIPE DIAMETERS 2 to 14

    MAIN CRANE 400 mT (882 kips)

    AUX CRANE 150 mT (882 kips)

    REEL CAPACITY 2950 mT

    FRICTION CLAMP 250 mT (551 kips)

    DEP. ANGLE 30 to 90 degrees

    ACCOMODATIONS 132 Persons

    Express has established an extensive

    track record of field installation projectsaround the world.

    Multipurpose VLS system Danny 8x12 PIP, installed Q1 2010

  • 7/31/2019 Deepwater Capabilities

    7/21

    Changing the way you succeed.

    Deepwater Pipelay Vessels- Caesar

    7

    LENGTH 146 m (479 ft)

    TRANSIT SPEED 10 knts

    TENSION 405 mT (891 kips)

    A&R WINCH 450 mT (990 kips)

    PIPE DIAMETERS 6 to 36

    STINGER LENGTH 90 m (295 ft)

    MAIN CRANE 300 mT (660 kips)

    A-FRAME 450 mT (990 kips)

    ACCOMODATIONS 220 Persons

    Caesars onboard pipe welding and

    testing capability allows the vessel to S-lay virtually unlimited lengths of pipe up to36 in diameter.

    Vessel awarded 46-mile 20 pipeline install in Gulf of Mexico

  • 7/31/2019 Deepwater Capabilities

    8/21

    Changing the way you succeed.

    Onshore Welding Capabilities

    Ingleside, Texas shore base facility

    Pipe stalk length 5,230 feet Onsite subsea component fabrication

    300 x 700slip can accommodate two

    Helix Subsea Construction vessels sideby side

    Constructed Helixs Danny 36-mile

    8 x 12-inch pipe-in-pipe, includingjumpers and manifolds

    Danny pip-in-pipe staging on racksHelix Danny pipe-in-pipe welding

    8

  • 7/31/2019 Deepwater Capabilities

    9/21

    Changing the way you succeed.

    Shore Base Fabrication Capabilities

    9

    20,500 sq. ft. fabrication building area

    120 acre site, with expansion capacity 40 acres storage capacity

    Deepwater slip allows cargo delivery viabarge

    Fabrication capabilities include:

    PLETs, PLEMs and manifolds

    2D and 3D jumpers

    Risers and skids

    On-site SIT capability

  • 7/31/2019 Deepwater Capabilities

    10/21

    Changing the way you succeed.

    Offshore Welding Capabilities

    10

    Caesar welding capabilities

    Fully automated pipe handling systems 7 welding stations, 1 testing station and

    1 coating station

    3x 135 mt SAS track tensioners opento 2.5 m clearance for passage of inlinecomponents

    Pipe feeds from barges or fromonboard 6,500 mT storage hold

  • 7/31/2019 Deepwater Capabilities

    11/21

    Changing the way you succeed.

    Caesar Welding Systems Layout

    11

    135 mT track tensioner Pipe elevator First welding station

  • 7/31/2019 Deepwater Capabilities

    12/21

    Changing the way you succeed.

    In-House Project Execution Services

    12

    Integrated project management, design,

    engineering, fabrication and constructionsupport services

    Innovative engineering solutions and projectmanagement

    Procurement support and execution

    Risk management (i.e. technical capacityassurance, cost control and contract

    management)Knowledge Management and Dissemination

    Document control

    Subcontract and interface management

  • 7/31/2019 Deepwater Capabilities

    13/21

    Changing the way you succeed.

    Helix Subsea Construction Differentiators

    13

    Helix has extensive experience in (ultra) deepwater construction(pipelines, PIP and insulated flowlines, umbilicals, manifolds, trees,

    jumpers, flying leads up to 9,000 fsw) and in installation and operation ofowner furnished equipment from all different manufacturers (Coflexip,Wellstream, NKT, Cameron, Aker, Oil States, FMC)

    Helix, as no other contractor, understands the full costquality developmentof deepwater infrastructure and the importance of reliability as Helix is alsoperforming development of Helixs own oil & gas properties from cradle tograve

    The Gulf of Mexico is Helixs home field with dedicated vessels and a spoolbase. We can accommodate ever moving installation windows

    Potential for one stop servicewith deepwater construction, diving, trenchingand fabrication of jumpers and PLEMs.

  • 7/31/2019 Deepwater Capabilities

    14/21

    Changing the way you succeed.

    Recent Experience- Reliance India

    14

    One of the largest offshore subsea gas field developments ever executedon a fast track basis in a remote area

  • 7/31/2019 Deepwater Capabilities

    15/21

    Changing the way you succeed.

    Helix Scope of Work- Reliance India

    15

    Installation of 11 structure suction piles

    Installation of 6 manifolds structuresInstallation of UDH structure

    Installation of 3 SDAs structure

    Installation of 28 umbilicals

    Installation and fabrication of 58 rigid jumpers (2D

    and 3D)Installation of ~200 flying leads

    Installation of 12 X-Trees

    Pull-in of 4 umbilicals at platform

    Partial trenching of 24-inch deepwater pipeline

    All metrologyAs-built survey

    Express, REM Forza, Olympic Canyon and Island Pioneerhave been deployed on this massive project in 2007/2008/2009

  • 7/31/2019 Deepwater Capabilities

    16/21

    Changing the way you succeed.

    Helix Fabrication Yards in India

    16

  • 7/31/2019 Deepwater Capabilities

    17/21

    Changing the way you succeed.

    Recent Experience- ERT Noonan

    17

    3,000 ft. water depth

    EPIC Installation scope

    36 mile umbilical

    36 mile 8-inchline

    PLETs Jumpers

    Flying leads

    Diving

    Hydrotest

    Pre-commissioning

  • 7/31/2019 Deepwater Capabilities

    18/21

    Changing the way you succeed.

    Recent Experience- ENI Longhorn

    18

    Install 2x 20 mile 8 / 2x 1 mile 6 flowlines

    Install 210 Te. manifold

    Install 2x 8 PLETs and flexible jumpers to themanifold

    Install 2x first end 6 PLETs, 2x second end 6PLETs

    Install 3x 6 well jumpers and 2x 6 infield pipelineto manifold jumpers.

    Install 19 miles main umbilical from Crystal

    platform to manifoldInstall 2x infield umbilicals and accompanying

    flying leads

    Install 5 mile 12 export pipeline from Crystalplatform to hot tap

    Install 12, 2x 8 risers and clamps and 16 I-tubeand clamps on the Crystal platform

    Install hot tap and subsea assembly and tie in the12 and 8 pipelines

    ENI Manifold (210 Te.) on deck of MSV Q4000 to beinstalled in 2,440 fsw

    Pre-commissioning of complete system

    Project Management and installationengineering.

  • 7/31/2019 Deepwater Capabilities

    19/21

    Changing the way you succeed.

    Other Major Subsea Projects

    19

    Anadarko Independence Hub 2007

    Installation of flowlines, umbilicals, PLETs in water depths up to 9,000 ft. Set a water depth world record for jumper installation

    EOG Trinidad 2007

    Installation of 14 heavy wall pipeline and 6 in-field including diving construction

    ATP Wenlock North Sea 2006

    Installation of 8 pipe with 3 piggy back and 20 miles of umbilical including diving construction

    Shell Pastel Pink - 2006 Welded and installed 4 x 8 pipe-in-pipe for Shell Pastel Pink in water depth of 4,300 ft.

    Dominion Rigel / 17 Hand 2004/5 Pipelay and jumper installation in 6,000 ft.

    Kerr McGee Gunnison - 2003 Installation of dual 6-inch flowline, umbilical, PLET, flexible riser, jumpers, and flying leads in

    3,500 ft.

    Kerr McGee Nansen / Boomvang 2002 Installation of dual 6-inch flowlines, umbilicals and PLETs, manifold and UTAs in 3,700 ft.

  • 7/31/2019 Deepwater Capabilities

    20/21

    Changing the way you succeed.

    Recent Technical Achievements

    20

    Canyon Offshore achieved the world record depth for flow line burial onthe Coulomb project for Shell Oil. The 28 mile long Coulomb flow linewas buried in water depths up to 7,576 ft. The burial performed for flow

    assurance improvement was a complete success with minimaldowntime and high profitability.

    The Q4000 removed a hydrate plug in a Mariner deepwaterflowline in the Gulf of Mexico using five miles of drill pipe.

    Helix Well Ops successfully abandoned 5 subsea wellheads wells forTotal in Vietnam resulting in a worlds first with single pass severance of

    conductor and casing strings in under 24 hours each.

    Helix Well Ops set world depth record for subsea wirelineintervention from a monohull vessel offshore Australia for Woodsideby retrieving tubing hanger plugs from two subsea wells located in392 m (1,286 ft) of water.

    The MSV Express successfully installed a jumper for theIndependence Hub development in the deepest recorded water depth

    of 9,083 feet.

  • 7/31/2019 Deepwater Capabilities

    21/21

    Changing the way you succeed.

    Thank You