Deep retrofitting via EPC
Transcript of Deep retrofitting via EPC
![Page 1: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/1.jpg)
Deep retrofitting via EPC
Factor4, Johan Coolen Brussels, 6th November 2014
![Page 2: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/2.jpg)
Contents
• General – Factor4
– European EPC projects
– EPC in an nutshell
• New Belgian EPC-contract
– General concept
– Optimisation of maintenance
– Optimisation of comfort
• Conclusion
Disclaimer: The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.
![Page 3: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/3.jpg)
Guaranteed profit
Plus+® projects
Guaranteed profit with energy efficiency
Higher productivity
Comfortmeter© surveys
Comfort measurement campaigns
Comfort measures
Independent advice
Development of smartEPC®
(first EPC-contract in Belgium)
EPC facilitator
Measurement & verification
of energy savings
![Page 4: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/4.jpg)
Guaranteed profit
Plus+® projects
Guaranteed profit with energy efficiency
Higher productivity
Comfortmeter© surveys
Comfort measurement campaigns
Comfort measures
Independent advice
Development of smartEPC®
(first EPC-contract in Belgium)
EPC facilitator
Measurement & verification
of energy savings
![Page 5: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/5.jpg)
Guaranteed profit
Plus+® projects
Guaranteed profit with energy efficiency
Higher productivity
Comfortmeter© surveys
Comfort measurement campaigns
Comfort measures
Independent advice
Development of smartEPC®
(first EPC-contract in Belgium)
EPC facilitator
Measurement & verification
of energy savings
![Page 6: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/6.jpg)
General
Project Objective Pilot EPC projects
Transparense www.transparense.eu/be
Increasing professionalism and transparency of ESCo industry, including EPC Code of Conduct
city of Ghent
EESI 2020 www.eesi2020.eu/be
Promotion of EPC and EPC-facilitation in Europe
city of Antwerp
![Page 7: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/7.jpg)
General concept Belgian EPC-contract
No limitations
of existing EPC-contracts,
procedures,…
International know-how
transfer via IEA and European projects, analysis of
foreign EPC-contracts
Out-of the box thinking
Completely new EPC-contract
![Page 8: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/8.jpg)
General concept Belgian EPC-contract
EPC-project
Year 1…n
Bonus/Penalty Energy cost savings
Energy cost savings ( >= value offer)
Comfort performance (>= value before contract)
Increased elements value ( >= value offer)
Basic project requirements ( >= values tender documents)
Year n (End)
Bonus/Penalty Comfort performance
Bonus/Penalty Increased elements value
Fixed price
Payments (€) Performances
![Page 9: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/9.jpg)
Net-cost saving during project
Co
st (
€/y
ear
)
<- EPC-project -> <- After EPC-project
Energy cost
Remuneration ESCO
Before EPC-project -> Year
General concept Belgian EPC-contract
Selection criterion ESCO Maximal net-cost saving = actualised value of:
+ Annual guaranteed energy cost savings
- Annual remuneration ESCO (investment, maintenance,…)
+ Increased elements value at end of project
(€)
![Page 10: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/10.jpg)
General concept Belgian EPC-contract
During project
Payment ESCO = Fixed price + Bonus/Penalties where Bonus/Penalties
• comfortscore,
• energy saving
• increased elements value at end project
ESCO: maximal decision autonomy as long as basic project requirements are fulfilled : functionality, safety, legal standards, etc.
![Page 11: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/11.jpg)
Optimal maintenance
EPC-project
Year 1…n
Bonus/Penalty Energy cost savings
Energy cost savings ( >= value offer)
Comfort performance (>= value before contract)
Increased elements value ( >= value offer)
Basic project requirements ( >= values tender documents)
Year n (End)
Bonus/Penalty Comfort performance
Bonus/Penalty Increased elements value
Fixed price
Payments (€) Performances
![Page 12: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/12.jpg)
ESCO 100% technical responsible for whole building – Installation: HVAC, lighting, elevators, alarm systems, sanitary
equipment, tubes, cables,….
– Building envelope: windows, solar protection, roof, gutters,...
ESCO 100% financially responsible – During project: fixed price for maintenance&replacement costs
– End of project: increased elements value
elements value (EUR)
Maintenance condition of elements (evaluation via Dutch norm NEN 2767)
Price of the new element
Optimal maintenance
![Page 13: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/13.jpg)
Optimal maintenance
Advantages ESCO will minimise long term building cost, e.g.
More focus on preventive maintenance and measures with long technical lifetime (high quality equipment,…), as…
– Cost future replacement investments in project
– Increased elements value at end
ESCO 100% responsible, less follow-up cost by building owner, e.g.
No input control required of maintenance
No ‘discussions’ about necessity replacement investments
![Page 14: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/14.jpg)
Optimal comfort
EPC-project
Year 1…n
Bonus/Penalty Energy cost savings
Energy cost savings ( >= value offer)
Comfort performance (>= value before contract)
Increased elements value ( >= value offer)
Basic project requirements ( >= values tender documents)
Year n (End)
Bonus/Penalty Comfort performance
Bonus/Penalty Increased elements value
Fixed price
Payments (€) Performances
![Page 15: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/15.jpg)
Optimal comfort
Conventional EPC-contract For each building/space: – Space temperature in summer: <26°C – Relative humidity >40% – Illuminance level >500 lux – …
Disadvantages Low reliability – Methodological problems
e.g. Measured summer comfort outside temperature measurement period
– Critical comfort aspects not valued e.g. Customer-friendliness of ESCO, user control HVAC,…
– Non-critical comfort aspects overvalued e.g. comfort 300 lux = comfort 500 lux
![Page 16: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/16.jpg)
Optimal comfort
Disadvantages (continued)
No incentive to perform better
Low cost efficiency because….
- Expensive measurement/logging campaigns
- 5-10k incl. reporting (<-> 1,5k via Comfortmeter incl. reporting)
- Inflexible/hard targets e.g. with same cost much higher overall comfort possible by
– Underperforming comfort target x
– Over performing comfort target y
![Page 17: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/17.jpg)
Optimal comfort
Via online comfort survey tool: www.comfortmeter.eu
Time: ± 40 respondents every 3 years,
55 questions, 11 themes, 10’/respondent
± 55% respons
![Page 18: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/18.jpg)
Optimal comfort
Comfortscore +1% -> 0,2% productivity increase
e.g. Potential improvement comfort score by ESCO in ATHF = +3,2%
employee productivity increase = + 90.000 €/year
>>> energy saving potential in ATHF = + 9.000 €/year !
0%
5%
10%
15%
20%
25%
BRMR ATHF BRBE BIFI BRTR MRCF LACF EUCF SACA BLCF SECF MACF Pool
Comfort score (maintenance) per building (%)
Worst practice
Best practice
![Page 19: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/19.jpg)
Optimal comfort
Advantages new EPC-contract • ESCO more focused on higher comfort and employee satisfaction
When surveyed comfortscore
Bonus ESCO
Reputation ESCO
(and vice versa…)
• Performance based deep retrofitting of buildings with major comfort problems (e.g. Sick Building Syndrome)
• Minimal comfort guaranteed via conventional comfort requirements (=backup)
• Lower cost
– Cost comfort as ESCO will financially optimise
– Cost comfortmeter surveys < comfort logging temperature etc.
![Page 20: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/20.jpg)
Conclusion
The best of both worlds….
Specialised expertise ESCO
+
The same motivation as building user/owner
Building cost (a)
Comfort and employee satisfaction
(a) = energy + maintenance + investment
![Page 21: Deep retrofitting via EPC](https://reader034.fdocuments.in/reader034/viewer/2022042604/6262d8c689682d2e31620806/html5/thumbnails/21.jpg)
Contact
Factor4, Johan Coolen
Email: [email protected]
Mobile: 00-32-494-729795
Website: www.factor4.be